Wichman et al., 1990 - Google Patents
Development of USNRC standard review plan 3.6. 3 for leak-before-break applications to nuclear power plantsWichman et al., 1990
- Document ID
- 7751428865820859986
- Author
- Wichman K
- Lee S
- Publication year
- Publication venue
- International Journal of Pressure Vessels and Piping
External Links
Snippet
Abstract In the United States, it is now permissible to eliminate the dynamic effects of postulated high energy pipe ruptures from the design basis of nuclear power plants using 'Leak-Before-Break'(LBB) technology. To provide review guidance for the implementation of …
- 230000018109 developmental process 0 title abstract description 10
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GASES [GHG] EMISSION, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
- Y02E30/40—Other aspects relating to nuclear fission
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C3/00—Reactor fuel elements and their assemblies; Selection of substances for use as reactor fuel elements
- G21C3/02—Fuel elements
- G21C3/04—Constructional details
- G21C3/06—Casings; Jackets
- G21C3/07—Casings; Jackets characterised by their material, e.g. alloys
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C13/00—Pressure vessels; Containment vessels; Containment in general
- G21C13/02—Details
- G21C13/032—Joints between tubes and vessel walls, e.g. taking into account thermal stresses
- G21C13/036—Joints between tubes and vessel walls, e.g. taking into account thermal stresses the tube passing through the vessel wall, i.e. continuing on both sides of the wall
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C15/00—Cooling arrangements within the pressure vessel containing the core; Selection of specific coolants
- G21C15/24—Promoting flow of the coolant
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/02—Devices or arrangements for monitoring coolant or moderator
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C15/00—Cooling arrangements within the pressure vessel containing the core; Selection of specific coolants
- G21C15/18—Emergency cooling arrangements; Removing shut-down heat
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21Y—INDEXING SCHEME RELATING TO NUCLEAR REACTORS, POWER PLANTS AND EXPLOSIVES, TO PROTECTION AGAINST RADIATION, TO THE TREATMENT OF RADIOACTIVELY CONTAMINATED MATERIAL, TO APPLICATIONS OF RADIOACTIVE SOURCES AND TO THE UTILISATION OF COSMIC RADIATION
- G21Y2004/00—SOLUTION
- G21Y2004/304—Redundancy, adding material or parts
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21Y—INDEXING SCHEME RELATING TO NUCLEAR REACTORS, POWER PLANTS AND EXPLOSIVES, TO PROTECTION AGAINST RADIATION, TO THE TREATMENT OF RADIOACTIVELY CONTAMINATED MATERIAL, TO APPLICATIONS OF RADIOACTIVE SOURCES AND TO THE UTILISATION OF COSMIC RADIATION
- G21Y2002/00—PROBLEM
- G21Y2002/303—Risk of damage
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21Y—INDEXING SCHEME RELATING TO NUCLEAR REACTORS, POWER PLANTS AND EXPLOSIVES, TO PROTECTION AGAINST RADIATION, TO THE TREATMENT OF RADIOACTIVELY CONTAMINATED MATERIAL, TO APPLICATIONS OF RADIOACTIVE SOURCES AND TO THE UTILISATION OF COSMIC RADIATION
- G21Y2002/00—PROBLEM
- G21Y2002/201—Inadequate efficiency
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21Y—INDEXING SCHEME RELATING TO NUCLEAR REACTORS, POWER PLANTS AND EXPLOSIVES, TO PROTECTION AGAINST RADIATION, TO THE TREATMENT OF RADIOACTIVELY CONTAMINATED MATERIAL, TO APPLICATIONS OF RADIOACTIVE SOURCES AND TO THE UTILISATION OF COSMIC RADIATION
- G21Y2002/00—PROBLEM
- G21Y2002/104—Inadequate performance, deformation, cracks, rupture
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C19/00—Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21Y—INDEXING SCHEME RELATING TO NUCLEAR REACTORS, POWER PLANTS AND EXPLOSIVES, TO PROTECTION AGAINST RADIATION, TO THE TREATMENT OF RADIOACTIVELY CONTAMINATED MATERIAL, TO APPLICATIONS OF RADIOACTIVE SOURCES AND TO THE UTILISATION OF COSMIC RADIATION
- G21Y2004/00—SOLUTION
- G21Y2004/10—Compositions
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21Y—INDEXING SCHEME RELATING TO NUCLEAR REACTORS, POWER PLANTS AND EXPLOSIVES, TO PROTECTION AGAINST RADIATION, TO THE TREATMENT OF RADIOACTIVELY CONTAMINATED MATERIAL, TO APPLICATIONS OF RADIOACTIVE SOURCES AND TO THE UTILISATION OF COSMIC RADIATION
- G21Y2002/00—PROBLEM
- G21Y2002/402—Complicated assembling, disassembling, replacing, dismantling
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D1/00—Details of nuclear power plant
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Wichman et al. | Development of USNRC standard review plan 3.6. 3 for leak-before-break applications to nuclear power plants | |
| Shah et al. | Assessment of field experience related to pressurized water reactor primary system leaks | |
| McDowell et al. | High Temperature Gas Reactors: Assessment of Applicable Codes and Standards | |
| Aggarwal et al. | A leak-before-break strategy for CANDU primary piping systems | |
| Lee et al. | Application of LBB to high energy pipings of a pressurized water reactor in Korea | |
| Roos et al. | Integrity assessment for safety relevant nuclear piping | |
| Laxman et al. | Regulatory Perspective for the Definition of Probabilistic Acceptance Criteria for CANDU Pressure Tubes | |
| Wlchman et al. | Background and Status of Leak-Before-Break Applications in U. $. Nuclear Power Plants | |
| Taboada¹ et al. | Intergranular Corrosion in Nuclear Systems | |
| Ali | Evolution of the leak-before-break concept in nuclear plants: issues and resolutions in the process of regulatory actions | |
| Kozluk et al. | Demonstrating leak-before-break for CANDU heat transport piping | |
| Schulz | Limitations of the inspection and testing concepts for pressurised components from the viewpoint of operating experience | |
| Bush et al. | An overview of stress corrosion in nuclear reactors from the late 1950s to the 1990s | |
| Bush | An Overview of Pipe Breaks from the Perspective of Operating Experience | |
| Grüter et al. | Leak-before-break considerations for LMFBR structures | |
| Ware et al. | Aging degradation of BWR feedwater and main steam lines | |
| Taboada et al. | Piping issues in nuclear systems in the USA | |
| Subudhi et al. | Aging Management of Reactor Coolant System Mechanical Components in Pressurized Water Reactors for License Renewal | |
| Ware et al. | Assessment of Field Experience Related to Pressurized Water Reactor Primary System Leaks | |
| Faidy | Aging Management Program of Large Diameter Safety Class Piping | |
| Johnson et al. | Understanding and managing corrosion in nuclear power plants | |
| Scarth et al. | Technical basis for revisions to ASME section XI acceptance standards for surface flaws in piping in stress corrosion cracking susceptible materials | |
| Drahos et al. | X Residual Life Assessment of Major Light Water Reactor | |
| Choi et al. | Some applications of piping failure database to nuclear safety issues in Korea | |
| Bougaenko et al. | Strength aspects of safety and life extension of RBMK reactors |