Al Ramadan, 2020 - Google Patents
Experimental, analytical, and numerical investigations of gas leakage through annular cementAl Ramadan, 2020
View PDF- Document ID
- 8405338657700870961
- Author
- Al Ramadan M
- Publication year
External Links
Snippet
All praise and gratitude go to the almighty Allah for bringing me this far. This dissertation is dedicated to my parents, who have been a source of motivation, inspiration, and encouragement. Also, I would like to dedicate it to my wife (Sarah), my daughter (Yara), my …
- 239000004568 cement 0 title abstract description 16
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/1208—Packers; Plugs characterised by the construction of the sealing or packing means
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/04—Casing heads; Suspending casings or tubings in well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
- E21B33/143—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/10—Valve arrangements for boreholes or wells in wells operated by control fluid supplied from above ground
- E21B34/101—Valve arrangements for boreholes or wells in wells operated by control fluid supplied from above ground with means for equalizing fluid pressure above and below the valve
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Al Ramadan et al. | Experimental investigation of well integrity: Annular gas migration in cement column | |
| Nygaard et al. | Effect of dynamic loading on wellbore leakage for the wabamun area CO2-sequestration project | |
| Therond et al. | Large scale testing & modelling for cement zonal isolation of water injection wells | |
| Bai et al. | Well completion and integrity evaluation for CO2 injection wells | |
| Shadravan et al. | HPHT cement sheath integrity evaluation method for unconventional wells | |
| Ahmed et al. | Failure mechanisms of the wellbore mechanical barrier systems: Implications for well integrity | |
| Khalifeh et al. | Techniques and materials for North Sea plug and abandonment operations | |
| Al Ramadan et al. | Numerical modeling of gas migration through cement sheath and microannulus | |
| Moghadam et al. | Large-scale laboratory investigation of the microannulus behavior in the casing-cement interface | |
| Ahmed et al. | Numerical and experimental evaluation of liner dual barrier system in geothermal wells | |
| Wu et al. | Sealant technologies for remediating cement-related oil and gas well leakage | |
| Wojtanowicz | Environmental control of well integrity | |
| Syed et al. | Well integrity technical and regulatory considerations for CO2 injection wells | |
| Fu | Leak-off test (LOT) models | |
| Pedersen et al. | Cementing of an offshore disposal well using a novel sealant that withstands pressure and temperature cycles | |
| Ahmed | Evaluation of liner hanger seal assembly and cement sheath as a dual barrier system: implications for industry and regulators | |
| Al Ramadan | Experimental, analytical, and numerical investigations of gas leakage through annular cement | |
| Wise et al. | Top of cement selection results in leakage pathways of cased wellbores during production | |
| Shadravan | A Method for Cement Integrity Evaluation in Unconventional Wells | |
| Zeng et al. | Research on the effect of casing deformation on sustained casing pressure | |
| Kwatia et al. | Literature report of elastomer sealing materials and cement systems | |
| Wise | Numerical simulations of wellbore cement sheath microannuli leakage in Gulf of Mexico wells | |
| Wu | Investigation of Hydraulic and Mechanical Cement Integrity: An Advanced Computational Study | |
| Amiri | Development of a Hydro-Mechanically Coupled Approach to Estimate Potential Leakage in Carbon Storage Wells | |
| Laaouar et al. | Well Integrity Management: Annulus Pressure, Causes and Solutions |