Malakooti, 1989 - Google Patents
A gradient-based approach for solving hierarchical multi-criteria production planning problemsMalakooti, 1989
- Document ID
- 10066103793070958805
- Author
- Malakooti B
- Publication year
- Publication venue
- Computers & industrial engineering
External Links
Snippet
In this paper, a framework for applying multiple objective programming to production/ manufacturing problems is presented. We discuss six classes of production planning problems, which are related to each other by a set of objectives. The problems are structured …
- 238000004519 manufacturing process 0 title abstract description 47
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/0265—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion
- G05B13/027—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion using neural networks only
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/02—Knowledge representation
- G06N5/022—Knowledge engineering, knowledge acquisition
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computer systems based on biological models
- G06N3/02—Computer systems based on biological models using neural network models
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Park | Knowledge capturing methodology in process planning | |
| Nof et al. | Control and decision support in automatic manufacturing systems | |
| Suresh et al. | Dynamic scheduling—a survey of research | |
| Szelke et al. | Knowledge-based reactive scheduling | |
| Deb et al. | Fuzzy decision support system for manufacturing facilities layout planning | |
| Abdi | Layout configuration selection for reconfigurable manufacturing systems using the fuzzy AHP | |
| Chan et al. | Design and evaluation of automated cellular manufacturing systems with simulation modelling and AHP approach: a case study | |
| Shukla et al. | Bidding-based multi-agent system for integrated process planning and scheduling: a data-mining and hybrid tabu-SA algorithm-oriented approach | |
| Mishra et al. | A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach | |
| Taylan et al. | Fuzzy control charts for process quality improvement and product assessment in tip shear carpet industry | |
| Malakooti | A gradient-based approach for solving hierarchical multi-criteria production planning problems | |
| Kasie et al. | Integrating fuzzy case-based reasoning and discrete-event simulation to develop a decision support system for part-fixture assignment and fixture flow control | |
| Mamalis et al. | On-line integration of a process planning module with production scheduling | |
| Jayakumar et al. | A simulated annealing algorithm for machine cell formation under uncertain production requirements | |
| Chan et al. | The applications of flexible manufacturing technologies in business process reengineering | |
| Rezazadeh et al. | Linear programming embedded particle swarm optimization for solving an extended model of dynamic virtual cellular manufacturing systems | |
| Carvalho et al. | Fuzzy set theory to establish resilient production systems | |
| Li | Assembly line balancing under uncertain task time and demand volatility | |
| Vosniakos et al. | Neural network simulation metamodels and genetic algorithms in analysis and design of manufacturing cells | |
| Ibadov et al. | Selection of technological and organizational solutions for construction works with the use of a fuzzy relation of preferences | |
| Libosvar | Hierarchies in production management and control: A survey | |
| Balamurugan et al. | INVESTIGATION OF NON-VALUE-ADDED ACTIVITIES TO REDUCE LEAD TIME IN THE MASS-CUSTOMIZED GLASS PROCESS INDUSTRY. | |
| Mahmoodirad et al. | An effective hybrid fuzzy programming approach for an entropy-based multi-objective assembly line balancing problem | |
| Dolinska et al. | Dynamic control of flexible manufacturing systems | |
| Balamurugan et al. | Investigation of Non-Value-Added Activities to Mitigate Impacting Parameter on Lead Time in The Mass-Customized Glass Process Industry |