Pallapothu et al., 2014 - Google Patents
A statistical evaluation of cement placement techniques by use of cement bond indexPallapothu et al., 2014
- Document ID
- 15275252327816767485
- Author
- Pallapothu S
- Bogaerts M
- DeBruijn G
- Peyle S
- Rashid F
- Publication year
- Publication venue
- SPE Annual Technical Conference and Exhibition?
External Links
Snippet
Cement placement plays an important role in the primary cementing process. There are several best practices in place which are believed to have significant impact on the quality of the overall cement job. Previous investigations suggest that a combination of multiple …
- 239000004568 cement 0 title abstract description 112
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
- E21B33/143—Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/42—Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
- C09K8/46—Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Bottiglieri et al. | Successful Single-Stage Cementing in a Weak Formation: A Case History in Spain | |
| Yetunde et al. | Challenges and remedy for cementing of HPHT wells in Nigerian operation | |
| Ariyanto et al. | Achieving cementing improvement in horizontal tight gas field development | |
| Stiles et al. | Implementation of advanced cementing techniques to improve long term zonal isolation in steam assisted gravity drainage wells | |
| Wray et al. | The application of high-density elastic cements to solve HPHT challenges in South Texas: The success story | |
| DeBruijn et al. | Flexible cement improves wellbore integrity in SAGD wells | |
| Isgenderov et al. | ECD management solves lost circulation issues in cementing narrow pressure window: a case study | |
| Pedersen et al. | Cementing of an offshore disposal well using a novel sealant that withstands pressure and temperature cycles | |
| Osayande et al. | Beating the odds with channeling in erd well cementing: solution to persistent channeling problems | |
| Pallapothu et al. | A statistical evaluation of cement placement techniques by use of cement bond index | |
| Dooply et al. | Understanding cementing dynamics in deepwater dual gradient drilling operations | |
| Isgenderov et al. | Modified approach leads to successful off-bottom cementing plugs in highly deviated wells in the caspian sea | |
| Holand et al. | Lubricants Enabled Completion of ERD Well | |
| McPherson | Cementation of horizontal wellbores | |
| Moroni et al. | Achieving Long-Term Isolation for Thin Gas Zones in the Adriatic Sea Region | |
| Davies et al. | Reverse circulation of primary cementing jobs—Evaluation and case history | |
| Song et al. | Investigating the benefits of rotating liner cementing and impact factors | |
| Shaughnessy et al. | Optimizing HTHP cementing operations | |
| Pine et al. | Selection of Foamed Cement for HPHT Gas Well Proves Effective for Zonal Isolation—Case History | |
| Akhmetov et al. | Environmentally Compliant Flexible Cement System Achieves Customer Zonal Isolation Objectives: A Case History from the Norwegian Continental Shelf | |
| Mohammad et al. | Coalbed methane cementing best practices-Indian case history | |
| Green et al. | Foam cementing on the eldfisk field: a case study | |
| Heu et al. | Structured approach in qualifying cement isolation through the use of cementing scorecard and post-job execution data | |
| Pavlock et al. | Unconventional reservoirs: proper planning and new theories meet the challenges of horizontal cementing | |
| Verbakel et al. | Optimized cement systems and placement techniques for tight clearance liners |