Chang et al., 2004 - Google Patents
Design, testing and construction of rock socket for tower foundations of the New Carquinez BridgeChang et al., 2004
- Document ID
- 15291689678427760293
- Author
- Chang C
- Legaspi, Jr D
- Ma Y
- Chin C
- Orsolini G
- Publication year
- Publication venue
- Geotechnical engineering for transportation projects
External Links
Snippet
The new Carquinez Bridge is a suspension bridge with spans of 147 m, 728 m, and 181 m. It consists of the south anchorage, a transition pier, two towers (South and North towers), and the north anchorage. This paper describes the rock conditions and available rock strength …
- 239000011435 rock 0 title abstract description 106
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/02—Investigation of foundation soil in situ before construction work
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Xanthakos | Ground anchors and anchored structures | |
| Mitchell et al. | Performance of improved ground during the Loma Prieta earthquake | |
| Armour et al. | Micropile design and construction guidelines: Implementation manual | |
| Cheng et al. | Analysis, design and construction of foundations | |
| Prashant et al. | Soil nailing for stabilization of steep slopes near railway tracks | |
| Ergun | Deep excavations | |
| Martin et al. | Large diameter double underreamed drilled shafts | |
| Sabatini et al. | Micropile design and construction (reference manual for NHI Course 132078) | |
| Ma et al. | Deep foundations | |
| Chang et al. | Design, testing and construction of rock socket for tower foundations of the New Carquinez Bridge | |
| Malik | Geotechnical statistical evaluation of Lahore site data and deep excavation design | |
| Soliman et al. | Driven steel piles in clay shale on Northeast Anthony Henday Drive in Edmonton | |
| Ferrucci et al. | Performance of an Osterberg Cell (O-Cell) Load Test on a High-Capacity Production Drilled Shaft at the Kosciuszko Bridge | |
| Momenzadeh et al. | Seismic retrofit of 92/280 I/C foundations by micropile groups in San Francisco Bay area, California | |
| Ivanetich et al. | Compaction grout: a case history of seismic retrofit | |
| Brown | Recent advances in the selection and use of drilled foundations | |
| Shu et al. | Sequential measurement and analysis of large underground retaining structures by diaphragm wall anchor for the spring area | |
| Nicholson et al. | Permanent ground anchors: Nicholson design criteria | |
| Ware et al. | Tieback wall construction—Results and controls | |
| Lew et al. | Mitigation of soil liquefaction by deep soil mixing for hospitals | |
| Littlejohn | 10 Soil anchorages | |
| Hsiung | Field performance of an excavation using sleeve grouting | |
| Mitchell et al. | Soil conditions and earthquake hazard mitigation in the Marina district of San Francisco | |
| Myers et al. | Aerial Siphon in Winter Park | |
| John | Graphical Methods for Slope Stability Analysis |