Powers et al., 2006 - Google Patents
A Critical Review of Chirag Field Completions Performance—Offshore Azerbaijan BPowers et al., 2006
- Document ID
- 15703756591052447499
- Author
- Powers B
- Edment B
- Elliott F
- Gilchrist J
- Twynam A
- Parlar M
- Publication year
- Publication venue
- SPE International Conference and Exhibition on Formation Damage Control
External Links
Snippet
Chirag field was the first of three fields put into production in the Azeri–Chirag–Guneshli (ACG) megastructure, located in the Azeri sector of the Caspian Sea and operated by BP on behalf of Azerbaijan International Operating Company (AIOC). Production commenced in …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/025—Consolidation of loose sand or the like round the wells without excessively decreasing the permeability thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/56—Compositions for consolidating loose sand or the like around wells without excessively decreasing the permeability thereof
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/02—Well-drilling compositions
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/50—Compositions for plastering borehole walls, i.e. compositions for temporary consolidation of borehole walls
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2666180C (en) | Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell | |
| Powers et al. | A Critical Review of Chirag Field Completions Performance—Offshore Azerbaijan B | |
| Hecker et al. | Reducing Well Cost by Gravel Packing in Nonaqueous Fluid | |
| McLeod Jr et al. | Gravel packing for high rate completions | |
| Alexander et al. | Evolution of open-hole gravel pack methodology in a low frac-window environment: Case histories and lessons learned from the Kraken field development | |
| Farrow et al. | Screening methodology for downhole sand control selection | |
| Parlar et al. | Emerging Techniques in Gravel Packing Open-Hole Horizontal Completions in High-Performance Wells | |
| Parlar et al. | Gravel Packing Wells Drilled With Oil-Based Fluids: A Critical Review of Current Practices and Recommendations for Future Applications | |
| Ali et al. | High-Productivity Horizontal Gravel Packs | |
| Whaley et al. | Greater plutonio open hole gravel pack completions: Fluid design and field application | |
| Burton et al. | Drilling and Completion of Horizontal Wells Requiring Sand Control | |
| Colwart et al. | Lessons learned on sand-control failure and subsequent workover at Magnolia deepwater development | |
| Tolan et al. | Gravel Packing Long Openhole Intervals with Viscous Fluids Utilizing High Gravel Concentrations: Toe-to-Heel Packing without the Need for Alternate Flow Paths | |
| Gupta et al. | Analysing critical elements in openhole gravel pack treatment design cycle: Case study in Indian ultra-deepwater | |
| Zhou et al. | Completion Sand Control Evolution in the Peng Lai Field, Bohai Bay, Offshore China | |
| Edment et al. | Improvements in horizontal gravel packing | |
| Akong et al. | Completion of High-Rate Gas Wells, Horizontal Gravel Pack and Filter-Cake Cleanup: A Case History From the Mahogany Field, Trinidad | |
| Mathis et al. | Horizontal Open Hole Well Displacement Practices: Effect of Various Techniques on Well Productivity, Operational Complexity, and Overall Project Economics | |
| Burton et al. | Innovative Completion Design and Well Performance Evaluation for Effective Frac-Packing of Long Intervals: A Case Study from the West Natuna Sea, Indonesia | |
| Wang et al. | An alternative wellbore stabilisation and sand control technology–application of expandable sand control system in ulti-lateral wells | |
| Peña et al. | Angola Ultra-Deepwater Development: Pinnacle Completion Designs Deliver Prolific Production | |
| Wagner et al. | Open-hole horizontal drilling and gravel-packing with oil-based fluids-an industry milestone | |
| Cooper et al. | A Critical Review of Completion Techniques for High-Rate Gas Wells Offshore Trinidad | |
| Firmanto et al. | Alternate Path Horizontal Openhole Gravel-Pack Completion in Soft-Weak Carbonate Gas Reservoir: Offshore East Java | |
| Godwin et al. | Simultaneous gravel packing and filtercake cleanup with shunt tubes in open-hole completions: a case history from the Gulf of Mexico |