Braun et al., 2019 - Google Patents
Combining inverse photogrammetry and BIM for automated labeling of construction site images for machine learningBraun et al., 2019
View PDF- Document ID
- 1777671259585559849
- Author
- Braun A
- Borrmann A
- Publication year
- Publication venue
- Automation in Construction
External Links
Snippet
Image-based object detection provides a valuable basis for site information retrieval and construction progress monitoring. Machine learning approaches, such as neural networks, are able to provide reliable detection rates. However, labeling of training data is a tedious …
- 238000010276 construction 0 title abstract description 129
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2207/00—Indexing scheme for image analysis or image enhancement
- G06T2207/30—Subject of image; Context of image processing
- G06T2207/30108—Industrial image inspection
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2207/00—Indexing scheme for image analysis or image enhancement
- G06T2207/20—Special algorithmic details
- G06T2207/20112—Image segmentation details
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T7/00—Image analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2207/00—Indexing scheme for image analysis or image enhancement
- G06T2207/20—Special algorithmic details
- G06T2207/20092—Interactive image processing based on input by user
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06K—RECOGNITION OF DATA; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K9/00—Methods or arrangements for reading or recognising printed or written characters or for recognising patterns, e.g. fingerprints
- G06K9/00624—Recognising scenes, i.e. recognition of a whole field of perception; recognising scene-specific objects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T11/00—2D [Two Dimensional] image generation
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Braun et al. | Combining inverse photogrammetry and BIM for automated labeling of construction site images for machine learning | |
| Braun et al. | Improving progress monitoring by fusing point clouds, semantic data and computer vision | |
| US11443444B2 (en) | Interior photographic documentation of architectural and industrial environments using 360 panoramic videos | |
| Golparvar-Fard et al. | Automated progress monitoring using unordered daily construction photographs and IFC-based building information models | |
| Han et al. | Potential of big visual data and building information modeling for construction performance analytics: An exploratory study | |
| Han et al. | Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs | |
| Yang et al. | Construction performance monitoring via still images, time-lapse photos, and video streams: Now, tomorrow, and the future | |
| Golparvar-Fard et al. | D4AR–a 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication | |
| Golparvar-Fard et al. | Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs | |
| Fathi et al. | Automated as-built 3D reconstruction of civil infrastructure using computer vision: Achievements, opportunities, and challenges | |
| Lin et al. | Construction progress monitoring using cyber-physical systems | |
| Behnam et al. | Automated progress monitoring system for linear infrastructure projects using satellite remote sensing | |
| US9070216B2 (en) | Four-dimensional augmented reality models for interactive visualization and automated construction progress monitoring | |
| Brilakis et al. | Toward automated generation of parametric BIMs based on hybrid video and laser scanning data | |
| Kim et al. | Automated construction progress measurement using a 4D building information model and 3D data | |
| Yang et al. | Vision-based tower crane tracking for understanding construction activity | |
| Bosche et al. | Automated retrieval of 3D CAD model objects in construction range images | |
| Fard et al. | Application of visualization techniques for construction progress monitoring | |
| Chen et al. | Real-time 3D crane workspace update using a hybrid visualization approach | |
| Han et al. | A formalism for utilization of autonomous vision-based systems and integrated project models for construction progress monitoring | |
| Lei et al. | A CNN-based 3D patch registration approach for integrating sequential models in support of progress monitoring | |
| Zollmann et al. | Interactive 4D overview and detail visualization in augmented reality | |
| Braun et al. | Process-and computer vision-based detection of as-built components on construction sites | |
| Wei et al. | 3D imaging in construction and infrastructure management: Technological assessment and future research directions | |
| Braun et al. | Bim-based progress monitoring |