[go: up one dir, main page]

Massarelli et al., 2001 - Google Patents

Final Report–Fatigue Reliability of Steel Highway Bridge Details

Massarelli et al., 2001

View PDF
Document ID
2026939023934659262
Author
Massarelli P
Baber T
Publication year
Publication venue
Cooperation with the US Department of Transportation Federal Highway Administration. Charlottesville, Virginia Virginia Transportation Research Council

External Links

Snippet

The expected life of a steel highway bridge subjected to random, variable-amplitude traffic cycles is highly dependent on damage accumulation caused by various fatigue mechanisms. This study addressed some of the issues associated with developing …
Continue reading at vtrc.virginia.gov (PDF) (other versions)

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/0202Control of the test
    • G01N2203/0212Theories, calculations
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0058Kind of property studied
    • G01N2203/006Crack, flaws, fracture or rupture
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/32Investigating strength properties of solid materials by application of mechanical stress by applying repeated or pulsating forces
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/50Computer-aided design
    • G06F17/5009Computer-aided design using simulation
    • G06F17/5018Computer-aided design using simulation using finite difference methods or finite element methods

Similar Documents

Publication Publication Date Title
Lukić et al. Probabilistic assessment of welded joints versus fatigue and fracture
Frangopol et al. Probabilistic models for life‐cycle performance of deteriorating structures: review and future directions
Kwon et al. Bridge fatigue assessment and management using reliability-based crack growth and probability of detection models
Stewart Spatial and time-dependent reliability modelling of corrosion damage, safety and maintenance for reinforced concrete structures
Marques et al. Damage detection and fatigue life estimation under random loads: A new structural health monitoring methodology in the frequency domain
Mahmoud et al. Fatigue reliability of a single stiffened ship hull panel
Chung Fatigue reliability and optimal inspection strategies for steel bridges
Zárate et al. Deterministic and probabilistic fatigue prognosis of cracked specimens using acoustic emissions
El Aghoury Numerical tool for fatigue life prediction of corroded steel riveted connections using various damage models
Massarelli et al. Fatigue reliability of steel highway bridge details.
Baji et al. Probabilistic model for time to cover cracking due to corrosion
Gheitasi et al. A performance-based framework for bridge preservation based on damage-integrated system-level behavior
Massarelli et al. Final Report–Fatigue Reliability of Steel Highway Bridge Details
Li Time dependent reliability analysis of the serviceability of corrosion affected concrete structures
Milana et al. Fatigue life assessment methods: the case of ship unloaders
Tangri et al. A Review on Analysis of Damage Diagnosis and the Vibration Characteristics of Steel Bridge Structures
Zelmati et al. Remaining Life Estimation of the High Strength Low Alloy Steel Pipelines by Using Response Surface Methodology
Cherifi et al. Probabilistic analysis for estimation of the initiation time of corrosion
Noor et al. Prediction of Service Life Decline of Double Welded Wide Flanges due to Fatigue in Steel Arch Bridge under Excessive Loads.
Puklický Time-dependent reliability analysis of stainless steel members and bridges
Nikitin et al. A Comprehensive Study of Fatigue Crack Initiation and Growth under Very High Cycle Torsional Fatigue Loading
Peil et al. Fatigue prediction of steel structures by means of monitoring and testing
Walbridge et al. Probabilistic models to evaluate effectiveness of steel bridge weld fatigue retrofitting by peening
Shlyushenkov et al. Modeling the fatigue failure processes in evaluating the reliability of machines and their components
Massarelli Fatigue reliability of steel highway bridge details