Massarelli et al., 2001 - Google Patents
Final Report–Fatigue Reliability of Steel Highway Bridge DetailsMassarelli et al., 2001
View PDF- Document ID
- 2026939023934659262
- Author
- Massarelli P
- Baber T
- Publication year
- Publication venue
- Cooperation with the US Department of Transportation Federal Highway Administration. Charlottesville, Virginia Virginia Transportation Research Council
External Links
Snippet
The expected life of a steel highway bridge subjected to random, variable-amplitude traffic cycles is highly dependent on damage accumulation caused by various fatigue mechanisms. This study addressed some of the issues associated with developing …
- 229910000831 Steel 0 title abstract description 21
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/02—Details not specific for a particular testing method
- G01N2203/0202—Control of the test
- G01N2203/0212—Theories, calculations
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0058—Kind of property studied
- G01N2203/006—Crack, flaws, fracture or rupture
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/32—Investigating strength properties of solid materials by application of mechanical stress by applying repeated or pulsating forces
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
- G06F17/5018—Computer-aided design using simulation using finite difference methods or finite element methods
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Lukić et al. | Probabilistic assessment of welded joints versus fatigue and fracture | |
| Frangopol et al. | Probabilistic models for life‐cycle performance of deteriorating structures: review and future directions | |
| Kwon et al. | Bridge fatigue assessment and management using reliability-based crack growth and probability of detection models | |
| Stewart | Spatial and time-dependent reliability modelling of corrosion damage, safety and maintenance for reinforced concrete structures | |
| Marques et al. | Damage detection and fatigue life estimation under random loads: A new structural health monitoring methodology in the frequency domain | |
| Mahmoud et al. | Fatigue reliability of a single stiffened ship hull panel | |
| Chung | Fatigue reliability and optimal inspection strategies for steel bridges | |
| Zárate et al. | Deterministic and probabilistic fatigue prognosis of cracked specimens using acoustic emissions | |
| El Aghoury | Numerical tool for fatigue life prediction of corroded steel riveted connections using various damage models | |
| Massarelli et al. | Fatigue reliability of steel highway bridge details. | |
| Baji et al. | Probabilistic model for time to cover cracking due to corrosion | |
| Gheitasi et al. | A performance-based framework for bridge preservation based on damage-integrated system-level behavior | |
| Massarelli et al. | Final Report–Fatigue Reliability of Steel Highway Bridge Details | |
| Li | Time dependent reliability analysis of the serviceability of corrosion affected concrete structures | |
| Milana et al. | Fatigue life assessment methods: the case of ship unloaders | |
| Tangri et al. | A Review on Analysis of Damage Diagnosis and the Vibration Characteristics of Steel Bridge Structures | |
| Zelmati et al. | Remaining Life Estimation of the High Strength Low Alloy Steel Pipelines by Using Response Surface Methodology | |
| Cherifi et al. | Probabilistic analysis for estimation of the initiation time of corrosion | |
| Noor et al. | Prediction of Service Life Decline of Double Welded Wide Flanges due to Fatigue in Steel Arch Bridge under Excessive Loads. | |
| Puklický | Time-dependent reliability analysis of stainless steel members and bridges | |
| Nikitin et al. | A Comprehensive Study of Fatigue Crack Initiation and Growth under Very High Cycle Torsional Fatigue Loading | |
| Peil et al. | Fatigue prediction of steel structures by means of monitoring and testing | |
| Walbridge et al. | Probabilistic models to evaluate effectiveness of steel bridge weld fatigue retrofitting by peening | |
| Shlyushenkov et al. | Modeling the fatigue failure processes in evaluating the reliability of machines and their components | |
| Massarelli | Fatigue reliability of steel highway bridge details |