Subaie et al., 2012 - Google Patents
Dead Horizontal Well Revival Utilizing Fiber-Optic Enabled Coiled Tubing Combined with Underbalance Perforating Gun Deployment Technique (Case Study)Subaie et al., 2012
- Document ID
- 3258729579561781220
- Author
- Subaie F
- Otaibi N
- Sultan F
- Burov A
- Keong A
- Publication year
- Publication venue
- Abu Dhabi International Petroleum Exhibition and Conference
External Links
Snippet
In many oil fields water production often threatens the reservoir performance and economic viability of wells. Excess unwanted water production can cause an increase in production costs and a decrease in productivity. To mitigate this, it is crucial to utilize water …
- 238000000034 method 0 title abstract description 22
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing, or removing tools, packers or the like in the boreholes or wells
- E21B23/01—Apparatus for displacing, setting, locking, releasing, or removing tools, packers or the like in the boreholes or wells for anchoring the tools or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Vera et al. | Real-Time Fiber Optic Integrated System Provides Precision and Confidence in a Coiled-Tubing-Conveyed Perforating Operation: A Case Study from the Eastern Foothills in Colombia | |
| Subaie et al. | Dead Horizontal Well Revival Utilizing Fiber-Optic Enabled Coiled Tubing Combined with Underbalance Perforating Gun Deployment Technique (Case Study) | |
| Lowe et al. | A case history of comprehensive hydraulic fracturing monitoring in the Cana Woodford | |
| Franco et al. | Enhancing the Effectiveness of Workover Interventions With Coiled Tubing and Real-Time Downhole Measurements | |
| CN107109917B (en) | Method for remedying sand fallout during complete well | |
| Vera et al. | Real-Time Fiber-Optic Integrated System with Retrievable Packer Enables Single-Trip Dual-Zone Evaluation: Case Study, Eastern Foothills, Colombia | |
| Sedda et al. | Multistage Hydraulic Fracturing Campaign Learning Curve in a Tight Sandstone Reservoir, Offshore West Africa | |
| Hässig Fonseca et al. | Leveraging Coiled Tubing Conveyance in an Integrated and Rigless Abandonment and Perforation Workflow | |
| Heaney et al. | Digital Slickline: Case Studies highlighting impact of real-time slickline and efficiency improvements compared to traditional slickline & e-line interventions | |
| Burov et al. | Innovative coiled tubing water shutoff techniques in horizontal wells | |
| Robert et al. | Adopting North American, multi-stage fracturing and horizontal completion technologies starts to unlock the Amin tight gas formation in the Sultanate of Oman | |
| Keong et al. | Overcoming Challenges and Increasing Efficiency for Coiled Tubing Wellbore Cleanout and Perforation in a Subhydrostatic Gas Injector Well with Real-Time Downhole Measurement | |
| Al Jubran et al. | A Coiled Tubing Perforating Solution Incorporating a Gun Deployment System and Dynamic Underbalance Technique Improves Well Production in High Angle Deep Gas Wells in Saudi Arabia | |
| Hassig et al. | Leveraging Coiled Tubing Conveyance in an Integrated and Rigless Abandonment and Perforation Workflow | |
| Truby et al. | Data Gathering for a Comprehensive Hydraulic Fracturing Diagnostic Project: A Case Study | |
| Anopov et al. | Case Study: Application of On-Off Adaptive ICDs with Inner Sliding Sleeves in a Horizontal Well in Saudi Arabia using 2 3/8-in Coiled Tubing | |
| Panferov et al. | Maximize Efficiency of Coiled Tubing-Conveyed Perforation with Advanced Gun Deployment System and Real-Time Correlation in High-H2S/High-Pressure Wells | |
| Ojeh-Oziegbe et al. | Successful Installation of the First Deep Water Single Trip Stand-Alone-Screens Completion in the Industry Saves rig Time | |
| Tapia et al. | Innovating the Method to Perforate Using Completion Insertion and Removal Under Pressure System in High-Pressure Conditions | |
| Molero et al. | Coiled-Tubing-Conveyed Perforating for High-Pressure/High-Temperature Environment in Mexico Marine | |
| Fernandez C et al. | Coiled Tubing Adaptability in the Development of Shale Plays: 81 Days of Continuous Operation in the First UK Land Gas Shale Project | |
| Baumann et al. | Perforating Large High-Pressure Wells with Low-Shock and Low-Debris Gun Systems | |
| Tapia et al. | Redefining Perforation in Sub-Horizontal Gas Wells in Underbalanced Conditions with Slickline Deployment and Smart Coiled Tubing | |
| McClean et al. | Advance Live-Well Deployment System in Caspian Sea Wells | |
| P Mosar et al. | Innovative solution for IWAG Injection Monitoring Using Fiber Optic Cable Cemented Behind Casing in an Intelligent Well: A First in Malaysia |