CN104076279A - Test device for alternating current generator - Google Patents

Test device for alternating current generator Download PDF

Info

Publication number
CN104076279A
CN104076279A CN201310103610.XA CN201310103610A CN104076279A CN 104076279 A CN104076279 A CN 104076279A CN 201310103610 A CN201310103610 A CN 201310103610A CN 104076279 A CN104076279 A CN 104076279A
Authority
CN
China
Prior art keywords
alternator
control
dragging motor
interface
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310103610.XA
Other languages
Chinese (zh)
Other versions
CN104076279B (en
Inventor
田晓理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Avic Nanhang Shenzhen Test & Control Co
Original Assignee
SHENZHEN WONDROUS TECHNOLOGY SCIENCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN WONDROUS TECHNOLOGY SCIENCE Co Ltd filed Critical SHENZHEN WONDROUS TECHNOLOGY SCIENCE Co Ltd
Priority to CN201310103610.XA priority Critical patent/CN104076279B/en
Publication of CN104076279A publication Critical patent/CN104076279A/en
Application granted granted Critical
Publication of CN104076279B publication Critical patent/CN104076279B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)
  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

The invention discloses a test device for an alternating current generator. The test device comprises a frame, a measurement and control system, a dragging case, and a power converter, and also comprises an operation bench for cooling and heating; a workbench is disposed at the top surface of the frame; a cooling system and a heating system are disposed under the workbench in the frame; a dragging motor and a switching tool are installed on the workbench; the dragging motor and the switching tool are in a transmission connection; a test piece for test is the alternating current generator connected with the switching tool; the switching tool is used for simulating an accessory casing of the alternating current generator, and is provided with two sets of independently oil supply loops mutually separated and not influencing each other; the measurement and control system comprises a control computer and a measurement and control unit; the control computer controls the dragging motor to operate; and the measurement and control unit performs data acquisition and control, and monitors and controls the dragging motor. The test device can automatically measure relative parameters of the generator in different work states in real time, and provides a basis for product development, performance examination, and acceptance inspection.

Description

A kind of proving installation of alternator
Technical field
The present invention relates to the technical field of measurement and test of alternator, specifically the proving installation of alternator.
Background technology
Aeroengine Control Systems is FADEC, in full powers limit digital and electronic engine control, alternator is containing match power conversion) be the important composition parts of Aeroengine Control Systems, it is the main power supply of system, the safety and reliability of alternator, the directly safety and reliability of the whole Engine digital control system of impact, efficient, longevity and high reliability are the inevitable requirements of its development.For improving design efficiency, effectively avoid causing repeatedly because experience lacks in design, guarantee project process requirement, need in design, verify design proposal, and make fast, assessment reliably.
In the design process of aviation alternator, how to overcome the impact of electromagnetism, material, structure, the performance of environment on generator, and the wide voltage how aviation alternator being sent, broadband AC power is effectively converted to direct supply, building a set of alternator design simulating, verifying and test platform is a rational solution.Because the singularity of alternator product is as high rotating speed, stator, rotor isolating construction, in running, need lubricating oil cooling, output can short circuit etc., and development is carried out very difficultly, is one of gordian technique of aircraft, once be once the focus that the military and main frame unit pay close attention to, for this reason, special test equipment is badly in need of in relevant unit, for examination, functional test, failure proof, system integration test and the technical research of alternator and power converter.
Test, the examination platform of the alternator in existing Aeroengine Control Systems adopt traditional gear speed raising case mode, and moment of inertia is large, and response speed is slow, cannot true reappearance engine transient change procedure.Cannot meet high-power, the test of high tacho generator, examination demand.
Owing to lacking special test and testing equipment, product enter rear shortage detect research technique, also lack the degree of depth of verification experimental verification, affect making smooth advances of whole Engine digital control system development always.The concerned power generation machine Development Techniques particularly experimental test technology of generator key components and parts is external strict technology of blocking, and domestic do not have the similar equipment can be for reference yet.
Summary of the invention
The present invention is intended to overcome the existing above-mentioned defect of prior art, a kind of proving installation of alternator of the correlation parameter under can automatic real-time measurement generator different operating state is provided, for product development, Performance Assessment, inspection and acceptance provide foundation, realize alternator aeronautic measurement comprehensive standard.
The present invention carrys out specific implementation by the following technical programs.
A kind of proving installation of alternator, it is characterized in that: the proving installation of described alternator comprises frame, TT&C system, drag case and power converter, also comprise operator's console cooling and heating, end face in frame is provided with worktable, in frame and below worktable, be provided with cooling system and heating system, operator's console cooling and heating is located at by the side of frame, dragging motor and switching tooling are installed on worktable, dragging motor and switching tooling are in transmission connection, testpieces as test is alternator and is connected with switching tooling, switching tooling is for the accessory drive gearbox of analog AC engine and the independently two cover oil supply loops that are provided with mutual isolation and are independent of each other, one tunnel is that described alternator is for lubricating oil, another road is that the mechanical joints between switching tooling and alternator supplies lubricating oil, TT&C system comprises controls computing machine and measurement and control unit, control computing machine in TT&C system is according to the duty of the accessory drive gearbox of alternator, controlling dragging motor turns round, cooling system is that described dragging motor and switching tooling and alternator carry out cooling according to duty, heating system can be heated to alternator, measurement and control unit is for the checking of alternator performance test, check and accept and participate in test joint-trial, and to the temperature in alternator and power converter test, pressure, flow, voltage, electric current, frequency, the signal of reporting to the police carries out data acquisition and control, and monitoring and control described dragging motor, wherein switching tooling is described alternator the cold and hot of confession lubricating oil is mainly the state that simulation flows into alternator lubricating oil, can be to entering the temperature of alternator lubricating oil, flow is controlled, analog AC generator is at different oil temperatures, pressure, operating characteristic during for oil condition.
Described control computing machine is provided with modular man-machine interface, modular man-machine interface comprises main interface, high-speed electric expreess locomotive interface, oil system interface, parametric calibration interface, fault diagnosis interface, data readback interface and section setting, described measurement and control unit comprises collecting computer, data acquisition computer gathers moment of torsion and the rotating speed of dragging motor, the case temperature of alternator and power converter, environment temperature and electronic program load signal, gather alternator line voltage by the first processing unit, phase current and control signal thereof, gather the voltage of power converter by the second processing unit, electric current, frequency.
Described dragging motor and control thereof comprise supply voltage: three-phase AC380V; The range of speeds: 250~25000r/min, stepless adjustable to maximum speed by starting point, maximum speed can free amplitude limit; Power bracket: the full range of speeds is not less than 10kW, and load torque is not less than 4N.M; Control function: drag platform and be provided with manual/auto two kinds of regulative modes, auto state adopts PC control, and manual mode adopts knob control, drag on platform and with interface and can supply his machine control; Index For Steady-state: the sampling period is not more than under 100ms, be not more than ± 0.1% dynamic indicator of rotating speed stable state processed: 5% step response time of the unloaded rated speed of high-speed electric expreess locomotive is not more than 200ms; Turn to: from motor output end backward, for counterclockwise, also can inverted running; Cooling: to carry liquid coolant and force liquid cooling; Liquid coolant is aerooil 4050.Enter alternator adapter cold oil temperature lower than 55 DEG C, enter the controlled intensification of oil temperature and the cooling of tested alternator, temperature range is 20~150 DEG C, and flow can change with rotating speed automatically according to testing requirements, and can meet long-time running; Output shaft jerk value: after output shaft tape relay seat, the be not more than ± 0.03mm of output shaft radial beat eccentricity of adapter; Duty: energy continuous working at least 15 hours; Defencive function: dragging motor overload, overcurrent, excess temperature are processed and protected; Electromagnetic compatibility: meet the relevant EMC Requirements of GB, do not affect miscellaneous equipment, instrument is normally worked;
Described dragging motor adopts 25000RPM High-speed DC drive motor.
The lubricating oil isolation of described alternator and switching tooling connecting end surface adopts rotary seal mode to seal.
The present invention compared with prior art tool has the following advantages: the present invention has abandoned the mode of traditional slowspeed machine band raising speed case, adopts directly to drive at a high speed kinematic train and provide power for alternator.Directly drive at a high speed the requirement that kinematic train is moving, steady-state behaviour meets accessory drive gearbox real work state, duty that can real simulation alternator, for performance test and the checking of alternator provide reliable foundation.
The proving installation of alternator of the present invention can be used for performance test, simulated engine accessory drive gearbox operating mode l-G simulation test, short-circuit fault simulation test, open circuit fault simulation test, hot operation test, low-temperature working test, the long-life certification test of alternator; Can be used for performance test, simulation FADEC load condition l-G simulation test, environmental test, EMC test, the environmental stress screening test of power converter; Can be used for performance test, resultant fault test, combined reliability test, participation system integration semi-physical simulation after alternator and power converter coupling, and can be used for the performances acceptance of alternator and power converter.
The proving installation of alternator of the present invention adopts modular design on the whole, facilitate integrated and safeguard, simultaneously by experiment process standardization, process of the test robotization, test findings standardization, the consistance and the reliability that have greatly improved test efficiency and test findings, overall performance meets design requirement.
Brief description of the drawings
Fig. 1 is the structural representation () of the proving installation of alternator of the present invention;
Fig. 2 is the structural representation (two) of the proving installation of alternator of the present invention.
Specific embodiment
Below in conjunction with accompanying drawing, the proving installation of alternator of the present invention is described in detail.
As Fig. 1, Fig. 2, the proving installation of alternator of the present invention, comprise TT&C system 1, drag case 2, frame 4 and power converter, also comprise operator's console 3 cooling and heating, be provided with worktable 5 at the end face of frame 4, in frame 4 and below worktable 5, be provided with cooling system 6 and heating system 7, operator's console 3 cooling and heating is located at by the side of frame 4, dragging motor 8 and switching tooling 9 are installed on worktable 5, dragging motor and switching tooling are in transmission connection, testpieces as test is alternator 10 and is connected with switching tooling 9, switching tooling 9 is for the accessory drive gearbox of analog AC engine 10 and the independently two cover oil supply loops that are provided with mutual isolation and are independent of each other, one tunnel is described alternator fuel feeding, another road is the mechanical joints fuel feeding between switching tooling and alternator, TT&C system 1 comprises controls computing machine and measurement and control unit, control computing machine in TT&C system is according to the duty of engine accessory power rating casing, controlling dragging motor 8 turns round, cooling system 6 is that dragging motor 8 and switching tooling 9 and alternator 10 carry out cooling according to duty, be that cooling system 6 is provided with pipeline by dragging motor 8 and switching tooling 9 and alternator 10, heating system 7 is provided with pipeline and passes through alternator, thereby can heat to alternator.Measurement and control unit is for the checking of alternator performance test, examination and participate in test joint-trial, and the signal of the temperature in alternator and power converter test, pressure, flow, voltage, electric current, frequency, warning is carried out data acquisition and controlled, realize monitoring and control described dragging motor.Wherein switching tooling 9 is alternator 10 the cold and hot of confession lubricating oil is mainly the state that simulation flows into alternator lubricating oil, can control to the temperature, the flow that enter alternator lubricating oil the operating characteristic of analog AC generator in the time of different oil temperatures, pressure, confession oil condition.
Control computing machine and be provided with modular man-machine interface, modular man-machine interface comprises main interface, high-speed electric expreess locomotive interface, oil system interface, parametric calibration interface, fault diagnosis interface, data readback interface and section setting, measurement and control unit comprises collecting computer, data acquisition computer gathers moment of torsion and the rotating speed of dragging motor, the case temperature of alternator and power converter, environment temperature and electronic program load signal, gather alternator line voltage by the first processing unit, phase current and control signal thereof, gather the voltage of power converter by the second processing unit, electric current, frequency.Dragging motor comprises High-speed DC drive motor and kinematic train thereof, as adopt 250~25000RPM High-speed DC drive motor, the requirement of the real work state by its stable state sexual satisfaction alternator accessory drive gearbox, the duty of real simulation alternator, for performance test and the checking of alternator provide reliable foundation.
Wherein alternator 10 adopts rotary seal mode to seal with the lubricating oil isolation of the connecting end surface of switching tooling 9.
The proving installation of alternator of the present invention, is the duty of simulation Aeroengine Control Systems Special alternating-current generator and power converter, regulating load parameter automatically, and to being gathered by the various parameters of trial product, generating report forms.
Wherein the proving installation of alternator also comprises dragging motor switch board, parameter testing cabinet, electronic load, measurement and control unit comprises data acquisition computer, control computing machine by driver control dragging motor, data acquisition computer gathers the moment of torsion of dragging motor and the case temperature of rotating speed, alternator and power converter, environment temperature and electronic program load signal, gather alternator line voltage, phase current and control signal thereof by the first processing unit, gather voltage, electric current, the frequency of power converter by the second processing unit.
The proving installation of alternator of the present invention can be used for performance test, simulated engine accessory drive gearbox operating mode l-G simulation test, short-circuit fault simulation test, open circuit fault simulation test, hot operation test, low-temperature working test, the long-life certification test of alternator; Can be used for performance test, simulation FADEC load condition l-G simulation test, environmental test, EMC test, the environmental stress screening test of power converter; Can be used for performance test, resultant fault test, combined reliability test, participation system integration semi-physical simulation after alternator and power converter coupling, and can be used for the performances acceptance of alternator and power converter.
Control computing machine testing software is installed, testing software adopts Document/View System Based mechanical development, adopt Visual C Plus Plus and MFC class libraries, Measurement Studio virtual instrument control in conjunction with NI company carries out interface, adopt object-oriented programming technology, testing system software adopts modular design, comprises the interface and the module that are made up of main interface, high-speed electric expreess locomotive interface, oil system interface, parametric calibration interface, fault diagnosis interface, data readback interface, section setting, background data base.
Dragging motor of the present invention and control thereof:
Supply voltage: three-phase AC380V; The range of speeds: (250~25000) r/min, stepless adjustable to maximum speed by starting point, maximum speed can free amplitude limit; Power bracket: the full range of speeds is not less than 10kW (load torque is not less than 4N.M); Control function: drag platform and be provided with manual/auto two kinds of regulative modes, auto state adopts PC control, and manual mode adopts knob control, drag on platform and with interface and can supply his machine control; Index For Steady-state: the sampling period is not more than under 100ms, rotating speed stable state processed is not more than ± and 0.1%; (by the inner collection value examination of frequency converter) dynamic indicator: 5% step response time of the unloaded rated speed of high-speed electric expreess locomotive is not more than 200ms; (50%, 60%, 80%, 90% four some examination raising speed and reduction of speed dynamic.) turn to: from motor output end backward, be counterclockwise (can inverted running); Cooling: to carry liquid coolant and force liquid cooling; Liquid coolant is aerooil 4050.Enter alternator adapter cold oil temperature lower than 55 DEG C, enter the controlled intensification of oil temperature and the cooling of tested alternator, temperature range is (20~150) DEG C, and flow can change with rotating speed automatically according to testing requirements, and can meet long-time running; Output shaft jerk value: after output shaft tape relay seat, the be not more than ± 0.03mm of output shaft radial beat eccentricity of adapter; Duty: adapt to S1 (continuously), energy continuous working at least 15 hours; Defencive function: dragging motor overload, overcurrent, excess temperature are processed and protected; Electromagnetic compatibility: meet the relevant EMC Requirements of GB; Do not affect miscellaneous equipment, instrument is normally worked.
The gordian technique of the proving installation of alternator of the present invention is:
1,25000RPM directly drives at a high speed:
The present invention has abandoned the mode of traditional slowspeed machine band raising speed case, adopts 25000RPM directly to drive at a high speed kinematic train and provides power for alternator.Directly drive at a high speed the requirement that kinematic train is moving, steady-state behaviour meets accessory drive gearbox real work state, duty that can real simulation alternator, for performance test and the checking of alternator provide reliable foundation.
2, the emulation of alternator accessory drive gearbox environment: switching tooling is for simulating mechanical joints and the alternator oil supply loop of accessory drive gearbox and alternator.Switching tooling possesses two and overlaps independently oil supply loop, and a road is alternator fuel feeding, and another road is switching tooling high-speed bearing cooling and lubricating fuel feeding, and two cover oil circuits are isolated mutually, are independent of each other.The lubricating oil isolation of alternator and switching tooling connecting end surface adopts rotary seal mode, make alternator in the time of High Rotation Speed in alternator in lubricating oil and switching tooling lubricating oil can not interpenetrate, both ensure the normal lubrication of switching tooling, ensured again the normal fuel injection of alternator.
3, the cold and hot simulation of lubricating oil: the cold and hot simulation of lubricating oil is mainly the state that simulation flows into alternator lubricating oil, can be to entering the temperature of alternator lubricating oil, flows etc. are controlled, the operating characteristic of analog AC generator in the time of different oil temperatures, pressure, confession oil condition.
4, testing software: software adopts Document/View System Based mechanical development, adopt Visual C Plus Plus and MFC class libraries, Measurement Studio virtual instrument control in conjunction with NI company carries out interface, adopt object-oriented programming technology, software reliability is good, and there is certain Universal and scalability, can take into account follow-up developments.Testing system software adopts modular design; comprise interface and the modules such as main interface, high-speed electric expreess locomotive interface, oil system interface, parametric calibration interface, fault diagnosis interface, data readback interface, section setting, background data base, and possess perfect defencive function.

Claims (5)

1. the proving installation of an alternator, it is characterized in that: the proving installation of described alternator comprises frame, TT&C system, drag case and power converter, also comprise operator's console cooling and heating, end face in frame is provided with worktable, in frame and below worktable, be provided with cooling system and heating system, operator's console cooling and heating is located at by the side of frame, dragging motor and switching tooling are installed on worktable, dragging motor and switching tooling are in transmission connection, testpieces as test is alternator and is connected with switching tooling, switching tooling is for the accessory drive gearbox of analog AC engine and the independently two cover oil supply loops that are provided with mutual isolation and are independent of each other, one tunnel is that described alternator is for lubricating oil, another road is that the mechanical joints between switching tooling and alternator supplies lubricating oil,
TT&C system comprises controls computing machine and measurement and control unit, control computing machine in TT&C system is according to the duty of the accessory drive gearbox of alternator, controlling dragging motor turns round, cooling system is that described dragging motor and switching tooling and alternator carry out cooling according to duty, heating system can be heated to alternator, measurement and control unit is for the checking of alternator performance test, check and accept and participate in test joint-trial, and to the temperature in alternator and power converter test, pressure, flow, voltage, electric current, frequency, the signal of reporting to the police carries out data acquisition and control, and monitoring and control described dragging motor,
Wherein switching tooling is described alternator the cold and hot of confession lubricating oil is mainly the state that simulation flows into alternator lubricating oil, can control to the temperature, the flow that enter alternator lubricating oil the operating characteristic of analog AC generator in the time of different oil temperatures, pressure, confession oil condition.
2. the proving installation of alternator according to claim 1, it is characterized in that: described control computing machine is provided with modular man-machine interface, modular man-machine interface comprises main interface, high-speed electric expreess locomotive interface, oil system interface, parametric calibration interface, fault diagnosis interface, data readback interface and section setting
Described measurement and control unit comprises collecting computer, data acquisition computer gathers the moment of torsion of dragging motor and the case temperature of rotating speed, alternator and power converter, environment temperature and electronic program load signal, gather alternator line voltage, phase current and control signal thereof by the first processing unit, gather voltage, electric current, the frequency of power converter by the second processing unit.
3. the proving installation of alternator according to claim 1, is characterized in that described dragging motor and control thereof comprise:
Supply voltage: three-phase AC380V;
The range of speeds: 250~25000r/min, stepless adjustable to maximum speed by starting point, maximum speed can free amplitude limit;
Power bracket: the full range of speeds is not less than 10kW, and load torque is not less than 4N.M;
Control function: drag platform and be provided with manual/auto two kinds of regulative modes, auto state adopts PC control, and manual mode adopts knob control, drag on platform and with interface and can supply his machine control;
Index For Steady-state: the sampling period is not more than under 100ms, rotating speed stable state processed is not more than ± and 0.1%;
Dynamic indicator: 5% step response time of the unloaded rated speed of high-speed electric expreess locomotive is not more than 200ms;
Turn to: from motor output end backward, for counterclockwise, also can inverted running;
Cooling: to carry liquid coolant and force liquid cooling; Liquid coolant is aerooil 4050.Enter alternator adapter cold oil temperature lower than 55 DEG C, enter the controlled intensification of oil temperature and the cooling of tested alternator, temperature range is 20~150 DEG C, and flow can change with rotating speed automatically according to testing requirements, and can meet long-time running;
Output shaft jerk value: after output shaft tape relay seat, the be not more than ± 0.03mm of output shaft radial beat eccentricity of adapter;
Duty: energy continuous working at least 15 hours;
Defencive function: dragging motor overload, overcurrent, excess temperature are processed and protected;
Electromagnetic compatibility: meet the relevant EMC Requirements of GB, do not affect miscellaneous equipment, instrument is normally worked.
4. the proving installation of alternator according to claim 3, is characterized in that: described dragging motor adopts 25000RPM High-speed DC drive motor.
5. the proving installation of alternator according to claim 1, is characterized in that: the lubricating oil isolation of described alternator and switching tooling connecting end surface adopts rotary seal mode to seal.
CN201310103610.XA 2013-03-28 2013-03-28 Test device for alternating current generator Expired - Fee Related CN104076279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310103610.XA CN104076279B (en) 2013-03-28 2013-03-28 Test device for alternating current generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310103610.XA CN104076279B (en) 2013-03-28 2013-03-28 Test device for alternating current generator

Publications (2)

Publication Number Publication Date
CN104076279A true CN104076279A (en) 2014-10-01
CN104076279B CN104076279B (en) 2017-02-01

Family

ID=51597669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310103610.XA Expired - Fee Related CN104076279B (en) 2013-03-28 2013-03-28 Test device for alternating current generator

Country Status (1)

Country Link
CN (1) CN104076279B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105974235A (en) * 2016-06-03 2016-09-28 广州市诚臻电子科技有限公司 Generator driving system used for electromagnetic compatibility test
CN107015556A (en) * 2017-04-28 2017-08-04 莱诺斯科技(北京)股份有限公司 A kind of bus solid-state power controller test device
CN107167732A (en) * 2017-06-20 2017-09-15 北京奥博汽车电子电器有限公司 Automobile generator efficiency automatic testing equipment
CN107201982A (en) * 2017-07-31 2017-09-26 国电联合动力技术有限公司 A kind of stand power test device for marine tidal-current energy generator group
CN107346000A (en) * 2017-08-12 2017-11-14 芜湖双翼航空装备科技有限公司 One kind is used for aviation alternator test tool and its application method
CN107748339A (en) * 2017-11-29 2018-03-02 成都飞亚航空设备应用研究所有限公司 A kind of power of alterating and direct current multi-function test stand
CN107765193A (en) * 2016-08-23 2018-03-06 哈尔滨飞机工业集团有限责任公司 A kind of high power system general assembly test method
CN107797064A (en) * 2017-10-18 2018-03-13 重庆理工大学 A kind of minitype permanent magnetism intermediate frequency liquid cooling generator test system
CN110209081A (en) * 2019-05-28 2019-09-06 深圳市雷赛软件技术有限公司 Method and relevant apparatus for trial operation motor
CN110223579A (en) * 2019-06-26 2019-09-10 商飞信息科技(上海)有限公司 One kind to drag DC servo motor control simulated teaching platform
CN110850287A (en) * 2019-10-22 2020-02-28 北京动力机械研究所 12 ten thousand high-speed permanent-magnet machine test bench testing arrangement that change
CN111856280A (en) * 2020-08-14 2020-10-30 上海法雷奥汽车电器系统有限公司 Gear transmission inspired integrated motor durability test device and test method
CN112130066A (en) * 2020-08-12 2020-12-25 东风博泽汽车系统有限公司 Test tool for gearbox motor
CN113092970A (en) * 2021-04-21 2021-07-09 银川怡祥矿山机械制造有限公司 Large-scale motor comprehensive test platform
CN118732671A (en) * 2024-09-03 2024-10-01 南通市产品质量监督检验所 An intelligent test system for the response time of motor control of new energy vehicles

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1128348A (en) * 1995-07-03 1996-08-07 北京朝阳兰天航空综合设备厂 Aero-generator power supply comprehensive experiment table
DE10323145A1 (en) * 2003-05-22 2004-12-09 Robert Bosch Gmbh Testing method for electric machine, e.g. car generator, driven by car engine and coupled in car network to battery and control appliance, by which measured values of battery current during time period
KR100835680B1 (en) * 2006-12-22 2008-06-05 김종술 Performance tester of vehicle remanufacturing alternator
CN101685138A (en) * 2008-09-26 2010-03-31 浙江师范大学 Method for testing electrical property of AC generating set
CN201637829U (en) * 2010-03-30 2010-11-17 北京通航华苏美航材科技开发有限公司 Comprehensive test bed for double current generators
CN202013410U (en) * 2011-02-18 2011-10-19 捷荣航材(广州)有限公司 Property testing platform for alternate/direct current motor of airplane
CN202025072U (en) * 2011-01-19 2011-11-02 广州智维电子科技有限公司 System for testing automobile alternating current generator
US8226008B2 (en) * 2004-10-29 2012-07-24 Spx Corporation Alternator and starter tester with bar code functionality and method
CN102818994A (en) * 2012-08-21 2012-12-12 江苏云意电气股份有限公司 Performance test system for automobile alternating current power generator

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1128348A (en) * 1995-07-03 1996-08-07 北京朝阳兰天航空综合设备厂 Aero-generator power supply comprehensive experiment table
DE10323145A1 (en) * 2003-05-22 2004-12-09 Robert Bosch Gmbh Testing method for electric machine, e.g. car generator, driven by car engine and coupled in car network to battery and control appliance, by which measured values of battery current during time period
US8226008B2 (en) * 2004-10-29 2012-07-24 Spx Corporation Alternator and starter tester with bar code functionality and method
KR100835680B1 (en) * 2006-12-22 2008-06-05 김종술 Performance tester of vehicle remanufacturing alternator
CN101685138A (en) * 2008-09-26 2010-03-31 浙江师范大学 Method for testing electrical property of AC generating set
CN201637829U (en) * 2010-03-30 2010-11-17 北京通航华苏美航材科技开发有限公司 Comprehensive test bed for double current generators
CN202025072U (en) * 2011-01-19 2011-11-02 广州智维电子科技有限公司 System for testing automobile alternating current generator
CN202013410U (en) * 2011-02-18 2011-10-19 捷荣航材(广州)有限公司 Property testing platform for alternate/direct current motor of airplane
CN102818994A (en) * 2012-08-21 2012-12-12 江苏云意电气股份有限公司 Performance test system for automobile alternating current power generator

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨鲁峰 等: "某型航空发动机试车测控系统", 《测控技术》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105974235A (en) * 2016-06-03 2016-09-28 广州市诚臻电子科技有限公司 Generator driving system used for electromagnetic compatibility test
CN105974235B (en) * 2016-06-03 2019-02-26 广州市诚臻电子科技有限公司 A kind of generator drive system for electromagnetic compatibility test
CN107765193A (en) * 2016-08-23 2018-03-06 哈尔滨飞机工业集团有限责任公司 A kind of high power system general assembly test method
CN107015556A (en) * 2017-04-28 2017-08-04 莱诺斯科技(北京)股份有限公司 A kind of bus solid-state power controller test device
CN107167732A (en) * 2017-06-20 2017-09-15 北京奥博汽车电子电器有限公司 Automobile generator efficiency automatic testing equipment
CN107201982A (en) * 2017-07-31 2017-09-26 国电联合动力技术有限公司 A kind of stand power test device for marine tidal-current energy generator group
CN107201982B (en) * 2017-07-31 2023-12-26 国电联合动力技术有限公司 Bench power test device for tidal current energy generator set
CN107346000A (en) * 2017-08-12 2017-11-14 芜湖双翼航空装备科技有限公司 One kind is used for aviation alternator test tool and its application method
CN107346000B (en) * 2017-08-12 2023-12-05 芜湖双翼航空装备科技有限公司 Test tool for aviation alternating-current generator and application method thereof
CN107797064A (en) * 2017-10-18 2018-03-13 重庆理工大学 A kind of minitype permanent magnetism intermediate frequency liquid cooling generator test system
CN107748339A (en) * 2017-11-29 2018-03-02 成都飞亚航空设备应用研究所有限公司 A kind of power of alterating and direct current multi-function test stand
CN110209081A (en) * 2019-05-28 2019-09-06 深圳市雷赛软件技术有限公司 Method and relevant apparatus for trial operation motor
CN110209081B (en) * 2019-05-28 2022-06-03 深圳市雷赛软件技术有限公司 Method for commissioning an electric machine and associated device
CN110223579A (en) * 2019-06-26 2019-09-10 商飞信息科技(上海)有限公司 One kind to drag DC servo motor control simulated teaching platform
CN110850287B (en) * 2019-10-22 2021-09-28 北京动力机械研究所 12 ten thousand high-speed permanent-magnet machine test bench testing arrangement that change
CN110850287A (en) * 2019-10-22 2020-02-28 北京动力机械研究所 12 ten thousand high-speed permanent-magnet machine test bench testing arrangement that change
CN112130066A (en) * 2020-08-12 2020-12-25 东风博泽汽车系统有限公司 Test tool for gearbox motor
CN111856280A (en) * 2020-08-14 2020-10-30 上海法雷奥汽车电器系统有限公司 Gear transmission inspired integrated motor durability test device and test method
CN113092970A (en) * 2021-04-21 2021-07-09 银川怡祥矿山机械制造有限公司 Large-scale motor comprehensive test platform
CN118732671A (en) * 2024-09-03 2024-10-01 南通市产品质量监督检验所 An intelligent test system for the response time of motor control of new energy vehicles
CN118732671B (en) * 2024-09-03 2024-12-24 南通市产品质量监督检验所 An intelligent test system for the response time of motor control of new energy vehicles

Also Published As

Publication number Publication date
CN104076279B (en) 2017-02-01

Similar Documents

Publication Publication Date Title
CN104076279A (en) Test device for alternating current generator
CN104076280A (en) AC power generator testing system
CN104236919B (en) Electric automobile multifunctional performance test-bed
CN101587345B (en) Function test system for controller used in hybrid power or electric vehicle
CN102692326B (en) Simulation test device for simulating performance of hybrid electric vehicle
CN103869707A (en) Semi-physical simulation test system applied to commercial aero engine control system
CN102507209A (en) Test stand for reliability of series-connection extended-range pure electric automobile power assembly
CN103344442A (en) Hybrid power system test bed and operating method thereof
CN101629990A (en) Full power test method and test device for whole wind turbine
CN102096043A (en) Platform and method for testing life of motors
WO2025086505A1 (en) Operating condition design method for reliability verification of dual-motor system of p13-configuration electric drive transmission and reliability testing method for dual-motor system of p13-configuration electric drive transmission
CN103162958A (en) Vehicle hydraulic machinery stepless transmission test bench and test system
CN203217056U (en) Universal testing system for DC generator of aircraft
CN106932211B (en) Power assembly rack system of plug-in hybrid electric vehicle
CN203422453U (en) Test device for alternating current generator
CN115656659A (en) Hybrid unmanned electric and electric drive test system and test method under multiple working conditions
WO2024234529A1 (en) Powertrain durability and reliability testing method, rack, and service life prediction method
CN113551917A (en) Semi-physical simulation test bed and test method for multi-machine parallel operation device of gas turbine
CN204064663U (en) A kind of engine generator loading pilot system
CN103149038B (en) Vehicle mechanical and hydraulic dual-flow transmission steering device test bench and system
CN205038314U (en) A testing system for generator
CN106053054A (en) Gear box characteristic parameter real-time on-line detection device
CN203351100U (en) Movable mould test bench for energy conversion based on permanent magnet wind generator
CN102830353A (en) Full-power test device of direct drive type megawatt permanent magnet synchronous generator
CN202735833U (en) Test device for wind generator set variable-pitch control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: SHENZHEN WONDROUS TECHNOLOGY SCIENCE Co.,Ltd.

Document name: the First Notification of an Office Action

DD01 Delivery of document by public notice

Addressee: SHENZHEN WONDROUS TECHNOLOGY SCIENCE Co.,Ltd.

Document name: Notification of Passing Examination on Formalities

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161212

Address after: 518000 Guangdong Province, Nanshan District high tech North District, Long Hill Road, No. avionics engineering research and development building, building 11, building 7

Applicant after: AVIC NANHANG (SHENZHEN) TEST & CONTROL CO.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Taoyuan road southern commercial building 8 floor 819

Applicant before: SHENZHEN WONDROUS TECHNOLOGY SCIENCE Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201