CN104184215B - Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method - Google Patents
Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method Download PDFInfo
- Publication number
- CN104184215B CN104184215B CN201410464334.4A CN201410464334A CN104184215B CN 104184215 B CN104184215 B CN 104184215B CN 201410464334 A CN201410464334 A CN 201410464334A CN 104184215 B CN104184215 B CN 104184215B
- Authority
- CN
- China
- Prior art keywords
- dispatching
- information
- control device
- substation
- instruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Selective Calling Equipment (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本申请公开了一种变电站调度自动化联调方法,获取调度主站下发的指令信息后,判断所述指令信息的数据类型;当判断所述指令信息的数据类型为遥控执行指令时;依据获取的总控装置的数据库中的数据信息与所述指令信息进行匹配,依据匹配结果向调度主站回馈报文信息。可见,采用本申请公开的变电站调度自动化联调方法遥控执行类型的指令信息不必传送到所述总控装置,亦可进行变电站调度自动化联调,解决了现有技术中在进行变电站调度自动化联调时需要进行全站停电的问题。
The present application discloses an automatic joint debugging method for substation dispatching. After obtaining the instruction information issued by the dispatching master station, the data type of the instruction information is judged; when the data type of the instruction information is judged to be a remote execution instruction; according to the obtained The data information in the database of the master control device is matched with the instruction information, and the message information is fed back to the dispatching master station according to the matching result. It can be seen that by using the substation dispatching automation joint debugging method disclosed in this application, the remote execution type instruction information does not need to be transmitted to the general control device, and the substation dispatching automation joint debugging can also be performed, which solves the problem of substation scheduling automation joint debugging in the prior art. When it is necessary to carry out the problem of total power outage.
Description
技术领域technical field
本申请涉及变电站系统自动化信息联调技术领域,更具体地说,涉及一种变电站调度自动化联调方法和应用该方法的装置及系统。The present application relates to the technical field of substation system automation information joint debugging, and more specifically, relates to a substation scheduling automatic joint debugging method and a device and system applying the method.
背景技术Background technique
调度自动化系统是保障电网安全稳定运行的重要系统,其运行是否正常直接关系到调度员对整个电网的监控能力。正是由于调度自动化系统在电网安全运行中起着重要的作用,因此当一套新的调度自动化系统上线试运行时,接入该系统的众多变电站均需要进行自动化信息联调,以确保接入调度自动化系统的变电站信息正确无误,从而防止出现变电站自动化信息误报、漏报甚至是误控制设备,引起电网事故。The dispatching automation system is an important system to ensure the safe and stable operation of the power grid. Whether its operation is normal or not is directly related to the dispatcher's ability to monitor the entire power grid. It is precisely because the dispatching automation system plays an important role in the safe operation of the power grid, so when a new dispatching automation system goes online for trial operation, many substations connected to the system need to carry out automated information joint debugging to ensure access The information of the substation in the dispatching automation system is correct, so as to prevent the occurrence of misreporting, omission of substation automation information, or even miscontrolling equipment, which may cause power grid accidents.
现有技术中,在自动化信息联调过程中,变电站就通常通过全站停电的方式来完成信息联调,从而严重影响了供电可靠性,对用户的生活和工作产生影响。In the prior art, in the process of automated information joint debugging, substations usually complete the information joint debugging through a power outage of the whole station, which seriously affects the reliability of power supply and affects the life and work of users.
发明内容Contents of the invention
有鉴于此,本申请提供一种变电站调度自动化联调系统,用于当所述变电站中添加新的调度自动化系统后对接入该系统的变电站进行自动化信息联调,以解决现有技术中只能通过全站停电的方式进行信息联调的问题。In view of this, this application provides a substation scheduling automation joint debugging system, which is used to perform automatic information joint debugging on the substations connected to the system after a new scheduling automation system is added to the substation, so as to solve the problem of only The problem of information joint debugging can be carried out through the power outage of the whole station.
一种变电站调度自动化联调方法,包括:An automatic joint debugging method for substation dispatching, comprising:
获取变电站总控装置数据库中的数据信息,依据所述总控装置数据库中的数据信息进行运动参数设置,模拟所述总控装置运行;Obtain the data information in the database of the substation master control device, set motion parameters according to the data information in the database of the master control device, and simulate the operation of the master control device;
采集变电站总控装置的实时数据并转发给调度主站;Collect real-time data of the substation master control device and forward it to the dispatching master station;
获取调度主站下发的指令信息,并判断所述指令信息的数据类型;Obtaining instruction information issued by the dispatching master station, and judging the data type of the instruction information;
当判断所述指令信息的数据类型为遥控执行指令时;When it is judged that the data type of the instruction information is a remote execution instruction;
依据获取的总控装置的数据库中的数据信息与所述指令信息进行匹配,依据匹配结果向调度主站回馈报文信息。The command information is matched with the acquired data information in the database of the general control device, and the message information is fed back to the dispatching master station according to the matching result.
优选的,上述变电站调度自动化联调方法中,还可以包括:Preferably, in the above-mentioned substation scheduling automation joint debugging method, it may also include:
当判断所述指令信息的数据类型为遥信信号时;When it is judged that the data type of the instruction information is a remote signaling signal;
依据所述遥信信号模拟保护跳闸信息,并将模拟的保护跳闸信息发送给调度主站。The protection tripping information is simulated according to the remote signaling signal, and the simulated protection tripping information is sent to the master dispatching station.
优选的,上述变电站调度自动化联调方法中,还可以包括:Preferably, in the above-mentioned substation scheduling automation joint debugging method, it may also include:
当判断所述指令信息的数据类型为遥控选择指令时;When it is judged that the data type of the instruction information is a remote control selection instruction;
将所述遥控选择指令发送至总控装置,获取并发送所述总控装置依据所述遥控选择指令发送的返校报文至调度主站。The remote control selection instruction is sent to the master control device, and the return-to-school message sent by the master control device according to the remote control selection instruction is obtained and sent to the master dispatching station.
优选的,上述变电站调度自动化联调方法中,,获取到所述调度主站下发的指令信息后,判断所述指令信息的数据类型前还包括:Preferably, in the above substation dispatching automation joint debugging method, after obtaining the instruction information issued by the dispatching master station, before judging the data type of the instruction information, it also includes:
判断所述指令信息是否符合104规约格式,如果是,继续执行,否则丢弃该指令。Judging whether the instruction information conforms to the protocol format of 104, if yes, continue to execute, otherwise discard the instruction.
一种远动工作站,可以包括:A telecontrol workstation may include:
模拟单元,用于获取变电站总控装置数据库中的数据信息,依据所述总控装置数据库中的数据信息进行运动参数设置,模拟所述总控装置;The simulation unit is used to obtain the data information in the database of the substation master control device, set motion parameters according to the data information in the database of the master control device, and simulate the master control device;
数据采集单元,用于采集总控装置的实时数据并转发给调度主站;The data collection unit is used to collect the real-time data of the master control device and forward it to the dispatching master station;
指令采集单元,用于获取调度主站下发的指令信息;An instruction collection unit, used to obtain instruction information issued by the dispatching master station;
判断单元,用于判断所述指令信息的数据类型;a judging unit, configured to judge the data type of the instruction information;
第一处理单元,当判断所述指令信息的数据类型为遥控执行指令时;判断所述遥控执行指令判断所述遥控执行指令的正确性,并依据判断结果向所述发送相应的报文。The first processing unit, when judging that the data type of the instruction information is a remote execution instruction; judging the correctness of the remote execution instruction, and sending a corresponding message to the said remote execution instruction according to the judgment result.
优选的,上述远动工作站中,还可以包括:Preferably, the above-mentioned telecontrol workstation may also include:
第二处理单元,用于当判断所述指令信息的数据类型为遥信信号时,依据所述遥信信号模拟保护跳闸信息,并将模拟的保护跳闸信息发送给调度主站。The second processing unit is configured to simulate protection tripping information according to the remote signaling signal when judging that the data type of the instruction information is a remote signaling signal, and send the simulated protection tripping information to the master dispatching station.
优选的,上述远动工作站中,还可以包括:Preferably, the above-mentioned telecontrol workstation may also include:
第三处理单元,用于当判断所述指令信息的数据类型为遥控选择指令时,将所述遥控选择指令发送至总控装置,获取并发送所述总控装置依据所述遥控选择指令发送的返校报文至调度主站。The third processing unit is configured to send the remote control selection command to the master control device when judging that the data type of the command information is a remote control selection command, and obtain and send the data sent by the master control device according to the remote control selection command The return-to-school message is sent to the dispatching master station.
优选的,上述远动工作站中,还可以包括:Preferably, the above-mentioned telecontrol workstation may also include:
规约判断单元,用于判断所述指令信息是否符合104规约格式,如果是,继续执行,否则丢弃该指令。A protocol judging unit, configured to judge whether the instruction information conforms to the 104 protocol format, if yes, continue to execute, otherwise discard the instruction.
一种变电站调度自动化联调系统,可以包括:调度主站、变电站总控装置以及设置在所述调度主站和变电站总控装置之间的远动工作站,其中所述远动工作站为上述任意一项所述的远动工作站。An automatic joint debugging system for substation dispatching, which may include: a dispatching master station, a substation master control device, and a telecontrol workstation arranged between the dispatch master station and the substation master control device, wherein the telecontrol workstation is any one of the above-mentioned The telecontrol workstation described in this item.
优选的,上述变电站调度自动化联调系统中,所述远动工作站第一端通过数据总线与变电站总控装置相连,另一端依次通过变电站路由器、通信光端机、调度主站路由器与所述调度主站相连。Preferably, in the above substation dispatching automation joint debugging system, the first end of the remote control workstation is connected to the substation master control device through a data bus, and the other end is connected to the dispatching master station through a substation router, a communication optical transceiver, and a dispatching master station router in sequence. connected.
本申请实施例公开的变电站调度自动化联调方法,获取调度主站下发的指令信息后,判断所述指令信息的数据类型;当判断所述指令信息的数据类型为遥控执行指令时;依据获取的总控装置的数据库中的数据信息与所述指令信息进行匹配,依据匹配结果向调度主站回馈报文信息。可见,采用本申请公开的变电站调度自动化联调方法遥控执行类型的指令信息不必传送到所述总控装置,亦可进行变电站调度自动化联调,解决了现有技术中在进行变电站调度自动化联调时需要进行全站停电的问题。In the substation scheduling automation joint debugging method disclosed in the embodiment of the present application, after obtaining the command information issued by the dispatching master station, the data type of the command information is judged; when it is judged that the data type of the command information is a remote execution command; according to the obtained The data information in the database of the master control device is matched with the instruction information, and the message information is fed back to the dispatching master station according to the matching result. It can be seen that by using the substation dispatching automation joint debugging method disclosed in this application, the remote execution type instruction information does not need to be transmitted to the general control device, and the substation dispatching automation joint debugging can also be performed, which solves the problem of substation scheduling automation joint debugging in the prior art. When it is necessary to carry out the problem of total power outage.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only It is an embodiment of the present invention, and those skilled in the art can also obtain other drawings according to the provided drawings without creative work.
图1为本申请实施例公开的变电站调度自动化联调方法的流程图;Fig. 1 is the flow chart of the substation scheduling automation joint debugging method disclosed in the embodiment of the present application;
图2为本申请另一实施例公开的变电站调度自动化联调方法的流程图;Fig. 2 is a flow chart of a substation scheduling automation joint debugging method disclosed in another embodiment of the present application;
图3为本申请实施例公开的远动工作站的结构图;Fig. 3 is a structural diagram of the telecontrol workstation disclosed in the embodiment of the present application;
图4为本申请另一实施例公开的远动工作站的结构图;FIG. 4 is a structural diagram of a telecontrol workstation disclosed in another embodiment of the present application;
图5为本申请实施例公开的变电站调度自动化联调系统的结构图;Fig. 5 is a structural diagram of the substation dispatching automation joint debugging system disclosed in the embodiment of the present application;
图6为本申请另一实施例公开的变电站调度自动化联调系统的结构图。Fig. 6 is a structural diagram of a substation scheduling automation joint debugging system disclosed in another embodiment of the present application.
具体实施方式detailed description
针对于现有技术中,在变电站中添加新设备后,对新设备进行变电站调度自动化联调时,需要对变电站进行全站停电而对用户的生活和工作产生影响的问题,本申请提供了一种变电站调度自动化联调方法、一种远动工作站和应用所述远动工作站的系统。In view of the existing technology, after adding new equipment in the substation, when the substation dispatching automation joint commissioning is performed on the new equipment, it is necessary to conduct a power outage of the substation and affect the life and work of the user. This application provides a A substation scheduling automation joint debugging method, a telecontrol workstation and a system using the telecontrol workstation.
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
本申请实施例中的所述方法可以建立在现有技术中的远动工作站的基础上进行实施,所述远动工作站为:电网调度自动化联调系统中,安装在发电厂、变电站中的、一种具有、遥测、遥信、遥控、摇调四种远动功能的自动化设备。The method in the embodiment of the present application can be implemented on the basis of a telecontrol workstation in the prior art. The telecontrol workstation is: in the power grid dispatching automation joint debugging system, installed in a power plant or a substation, An automation device with four telecontrol functions: remote measurement, remote signaling, remote control, and shaking.
实施例一Embodiment one
图1为本申请实施例公开的变电站调度自动化联调方法的流程图。Fig. 1 is a flow chart of a substation scheduling automation joint debugging method disclosed in an embodiment of the present application.
参见图1,所述方法可以包括:Referring to Figure 1, the method may include:
步骤S101:获取变电站总控装置数据库中的数据信息,依据所述总控装置数据库中的数据信息进行运动参数设置,模拟所述总控装置运行;Step S101: Obtain the data information in the database of the substation master control device, set motion parameters according to the data information in the database of the master control device, and simulate the operation of the master control device;
可以理解的是,在该步骤中需要获取当前变电站总控装置数据库中的数据信息,依据所述数据库中的数据信息模拟总控装置的运行状态,在需要进行变电站调度自动化信息联调时,可以直接将调度主站与所述模拟出的总控装置的运行状态进行联调,从而在联调时不会对所述总控装置的运行产生影响。It can be understood that in this step, it is necessary to obtain the data information in the database of the current substation master control device, and simulate the operating state of the master control device according to the data information in the database. When joint debugging of substation scheduling automation information is required, the The dispatching master station and the simulated operating state of the general control device are directly carried out joint adjustment, so that the operation of the general control device will not be affected during the joint adjustment.
步骤S102:采集总控装置的实时数据并转发给调度主站;Step S102: collect the real-time data of the master control device and forward it to the dispatching master station;
其中,该步骤中所述采集总控装置的实时数据主要包括实时采集所述中控装置的实时潮流数据,所述实施潮流数据包括:总控装置中设置的各种电气量(线路上的电压、电流、功率等量值)和负荷潮流等,获取到所述实时潮流数据后,再将所述实时潮流数据转发至调度主站,已完成“四遥”中的“遥测”;Wherein, the real-time data of collecting the general control device in this step mainly includes collecting the real-time power flow data of the central control device in real time, and the implementation power flow data includes: various electrical quantities (voltage on the line) set in the general control device , current, power, etc.) and load power flow, etc., after obtaining the real-time power flow data, the real-time power flow data is forwarded to the dispatching master station, and the "telemetry" in the "four remotes" has been completed;
步骤S103:获取调度主站下发的指令信息,并判断所述指令信息的数据类型;当判断所述指令信息的数据类型为遥控执行指令时,执行步骤S104;Step S103: Obtain the instruction information issued by the dispatching master station, and judge the data type of the instruction information; when it is judged that the data type of the instruction information is a remote execution instruction, execute step S104;
其中,在执行该步骤中本申请公开的方法还对由调度主站下发的指令信息的数据类型进行判断,当检测到所述指令信息的指令类型为遥控执行指令时,即表明此时所述调度主站在对所述中控装置执行所述遥控执行指令,该遥控执行指令主要控制总控装置进行分合闸动作,并回馈执行结果,由于如果使用所述总控装置执行该指令并生成回馈结果会导致变电站出现全站断电现象,因此,本申请上述方法中在判断所述指令信息为遥控执行指令后,执行步骤S104;Wherein, in executing this step, the method disclosed in the present application also judges the data type of the command information issued by the dispatching master station, and when it is detected that the command type of the command information is a remote execution command, it indicates that the The dispatching master station executes the remote control execution instruction to the central control device, and the remote control execution instruction mainly controls the master control device to perform opening and closing actions, and feeds back the execution result, because if the master control device is used to execute the instruction and The generation of feedback results will lead to a power outage in the entire substation. Therefore, in the above method of the present application, after judging that the instruction information is a remote execution instruction, step S104 is executed;
步骤S104:依据获取的总控装置的数据库中的数据信息与所述指令信息进行匹配,依据匹配结果向调度主站回馈报文信息。Step S104: matching the instruction information with the acquired data information in the database of the master control device, and feeding back message information to the master dispatching station according to the matching result.
其中,该步骤可为:解析所述指令信息获取控制对象信息,判断所述获取的总控装置的数据库中的数据信息是否包含所述控制对象信息,如果是生成第一报文信息回馈至所述调度主站,否则生成第二报文信息回馈至所述调度主站。Wherein, this step may be: analyze the instruction information to obtain the control object information, judge whether the acquired data information in the database of the master control device contains the control object information, and if it generates the first message information and feed it back to the The dispatching master station, otherwise, generate the second message information and feed it back to the dispatching master station.
其中,所述获取的总控装置的数据库中的数据信息包括所述总控装置控制的控制对象的信息,所述控制对象即为所述遥控执行指令分合闸动作的执行对象,例如,该步骤中所述指令信息的控制对象为A,所述A的执行动作为开闸,则在所述获取的总控装置的数据库中的数据信息中判断是否存在控制对象A,所述A是否可进行开闸动作,如果所述获取的总控装置的数据库中的数据信息中存在控制对象A,且能够对所述A执行开闸动作,则向所述调度主站回馈表示指令信息正确的第一报文信息,否则,向所述调度主站回馈表示指令信息错误的第二报文信息,可以理解的是,当上述步骤执行完毕后,可丢弃该指令信息。Wherein, the acquired data information in the database of the general control device includes the information of the control object controlled by the general control device, and the control object is the execution object of the remote control execution instruction opening and closing action, for example, the In the step, the control object of the instruction information is A, and the execution action of A is to open the gate, then it is judged whether there is a control object A in the data information in the database of the master control device obtained, and whether the A can be Carry out the gate opening action, if there is a control object A in the data information in the database of the master control device obtained, and the gate opening action can be performed on the A, then feedback to the dispatching master station indicating that the instruction information is correct. One message information, otherwise, feed back the second message information indicating that the instruction information is wrong to the dispatching master station. It can be understood that after the above steps are executed, the instruction information can be discarded.
通过上述描述可见,采用本申请上述实施例公开的方法对变电站调度自动化联调时,首先获取变电站总控装置数据库中的数据信息,依据所述总控装置数据库中的数据信息进行运动参数设置,模拟所述总控装置,当所述调度主站发送的指令信息为遥控执行指令时,并不需要将所述指令信息发送至总控装置,而是直接对所述指令信息进行解析,获取该指令信息对应的控制对象信息,判断所述获取的控装置数据库中的数据信息是否包含有所述控制对象信息,如果是,如果是生成第一报文信息回馈至所述调度主站,否则生成第二报文信息回馈至所述调度主站。从而使得所述遥控执行类型的指令信息不必传送到所述总控装置,亦可进行变电站调度自动化联调,解决了现有技术中在进行变电站调度自动化联调时需要进行全站停电的问题。It can be seen from the above description that when adopting the method disclosed in the above embodiments of the present application for joint debugging of substation scheduling automation, first obtain the data information in the database of the substation master control device, and set the motion parameters according to the data information in the database of the master control device. By simulating the master control device, when the command information sent by the master dispatching station is a remote execution command, it is not necessary to send the command information to the master control device, but directly analyze the command information to obtain the The control object information corresponding to the instruction information, judge whether the data information in the obtained control device database contains the control object information, if yes, if it is to generate the first message information and feed it back to the dispatching master station, otherwise generate The second message information is fed back to the dispatching master station. Therefore, the command information of the remote control execution type does not need to be transmitted to the general control device, and the automatic joint debugging of substation dispatching can also be carried out, which solves the problem in the prior art that the whole station needs to be blacked out when performing automatic joint debugging of substation dispatching.
图2为本申请另一实施例公开的变电站调度自动化联调方法的流程图。Fig. 2 is a flow chart of a substation scheduling automation joint debugging method disclosed in another embodiment of the present application.
可以理解的是,参见图2,本申请上述方法还可以包括:It can be understood that, referring to FIG. 2, the above method of the present application may also include:
当所述指令信息的数据类型的判断结果为遥信信号时,执行步骤S105;When the judgment result of the data type of the instruction information is a remote signaling signal, execute step S105;
步骤S105:依据所述遥信信号模拟保护跳闸信息,并将模拟的保护跳闸信息发送给调度主站。Step S105: Simulate protection trip information according to the remote signaling signal, and send the simulated protection trip information to the master dispatching station.
其中,由于本申请上述实施例公开的方法中,所述步骤S101中,获取到所述变电站总控装置数据库中的数据信息后,模拟所述总控装置运行,因此当判断所述指令信息的类型为遥信信号时,依据所述指令信息模拟跳闸信号,并将所述跳闸信号以报文形式回馈给调度主站。Wherein, since in the method disclosed in the above-mentioned embodiments of the present application, in the step S101, after obtaining the data information in the database of the substation master control device, the operation of the master control device is simulated, so when judging the When the type is a remote signaling signal, a trip signal is simulated according to the instruction information, and the trip signal is fed back to the dispatching master station in the form of a message.
可以理解的是,参见图2,本申请上述方法还可以包括:It can be understood that, referring to FIG. 2, the above method of the present application may also include:
当判断所述指令信息的数据类型为遥控选择指令时,执行步骤S106;When it is judged that the data type of the instruction information is a remote control selection instruction, step S106 is executed;
步骤S106:将所述遥控选择指令发送至总控装置,获取并发送所述总控装置依据所述遥控选择指令发送的返校报文至调度主站,执行步骤S107;Step S106: Send the remote control selection command to the master control device, obtain and send the return-to-school message sent by the master control device according to the remote control selection command to the dispatching master station, and execute step S107;
步骤S107:判断所述返校报文中的遥控序号与所述调度主站数据库中的遥控序号是否匹配,并输出判断结果,以验证调度主站数据库中的遥控序号的正确性。。Step S107: Judging whether the remote control serial number in the return-to-school message matches the remote control serial number in the master dispatching station database, and outputting the judgment result to verify the correctness of the remote control serial number in the master dispatching station database. .
可以理解的是,本申请上述方法在数据传输过程中,可采用专用的协议或规约,例如104规约。当上述方法中数据传递形式是104规约的形式时,上述方法在获取到所述调度主站下发的指令信息后,判断所述指令信息的数据类型前还可以包括:判断所述指令信息是否符合104规约格式,如果是,继续执行,否则丢弃该指令。It can be understood that, in the above-mentioned method of the present application, a dedicated protocol or protocol, such as the 104 protocol, may be used during the data transmission process. When the data transmission form in the above method is the form of the 104 protocol, the above method may also include: after obtaining the instruction information issued by the dispatching master station, before judging the data type of the instruction information: If it conforms to the format of the 104 protocol, if yes, continue to execute, otherwise discard the instruction.
实施例二Embodiment two
图3为本申请实施例公开的远动工作站的结构图。FIG. 3 is a structural diagram of a telecontrol workstation disclosed in an embodiment of the present application.
对应于上述方法,本申请还公开了一种应用上述方法的远动工作站100,上述方法部分和本实施例公开的远动工作站中的技术特征可相互借鉴,所述远动工作站100可以包括:Corresponding to the above method, this application also discloses a remote control workstation 100 applying the above method. The technical features of the above method part and the remote control workstation disclosed in this embodiment can be used for reference. The remote control workstation 100 may include:
模拟单元101,用于获取变电站总控装置数据库中的数据信息,依据所述总控装置数据库中的数据信息进行运动参数设置,模拟所述总控装置运行;The simulation unit 101 is used to obtain the data information in the database of the substation master control device, set motion parameters according to the data information in the database of the master control device, and simulate the operation of the master control device;
数据采集单元102,用于采集总控装置的实时数据并转发给调度主站;The data collection unit 102 is used to collect the real-time data of the general control device and forward it to the dispatching master station;
指令采集单元103,用于获取调度主站下发的指令信息;An instruction acquisition unit 103, configured to acquire instruction information issued by the dispatching master station;
判断单元104,用于判断所述指令信息的数据类型;A judging unit 104, configured to judge the data type of the instruction information;
第一处理单元105,当判断所述指令信息的数据类型为遥控执行指令时;依据获取的总控装置的数据库中的数据信息与所述指令信息进行匹配,依据匹配结果向调度主站回馈报文信息。The first processing unit 105, when judging that the data type of the instruction information is a remote execution instruction; according to the acquired data information in the database of the master control device, matches the instruction information, and returns a report to the dispatching master station according to the matching result text information.
图4为本申请另一实施例公开的远动工作站的结构图。Fig. 4 is a structural diagram of a telecontrol workstation disclosed in another embodiment of the present application.
与所述方法相对应,本申请上述实施例中远动工作站,参见图4,还可以包括:Corresponding to the method, the telecontrol workstation in the above embodiments of the present application, see FIG. 4, may also include:
第二处理单元106,用于当判断所述指令信息的数据类型为遥信信号时,依据所述遥信信号模拟保护跳闸信息,并将模拟的保护跳闸信息发送给调度主站。The second processing unit 106 is configured to simulate protection tripping information according to the remote signaling signal when judging that the data type of the instruction information is a remote signaling signal, and send the simulated protection tripping information to the master dispatching station.
和或and / or
第三处理单管107,用于当判断所述指令信息的数据类型为遥控选择指令时,将所述遥控选择指令发送至总控装置,获取并发送所述总控装置依据所述遥控选择指令发送的返校报文至调度主站。The third processing unit 107 is used to send the remote control selection command to the master control device when it is judged that the data type of the command information is a remote control selection command, and acquire and send the remote control selection command according to the remote control device. Send the back-to-school message to the dispatching master station.
其中,本申请上述实施例中的远动工作站可内可设置有载有104规约软件的芯片,上述远动工作站的各个单元的数据传递符合104规约。此时,所述远动工作站还可以包括一规约判断单元,用于判断所述指令信息是否符合104规约格式,如果是,继续执行,否则丢弃该指令。Wherein, the remote control workstation in the above-mentioned embodiments of the present application may be provided with a chip carrying 104 protocol software, and the data transmission of each unit of the above-mentioned remote control workstation complies with the 104 protocol. At this time, the remote control workstation may further include a protocol judging unit for judging whether the instruction information conforms to the protocol format of 104, if yes, continue to execute, otherwise discard the instruction.
实施例三Embodiment three
图5为本申请实施例公开的变电站调度自动化联调系统的结构图。Fig. 5 is a structural diagram of the substation dispatching automation joint commissioning system disclosed in the embodiment of the present application.
参见图5,对应于所述远动工作站,本实施例开公开了一种变电站调度自动化联调系统,包括调度主站200、变电站总控装置300以及设置在所述调度主站200和变电站总控装置300之间的远动工作站100,其中所述远动工作站100可以为本申请上述任意一实施例公开的远动工作站100。Referring to Fig. 5 , corresponding to the telecontrol workstation, this embodiment discloses a substation scheduling automation joint debugging system, including a dispatching master station 200, a substation master control device 300, and a master dispatching station 200 and a substation master station. The remote control workstation 100 between the control devices 300, wherein the remote control workstation 100 may be the remote control workstation 100 disclosed in any one of the above-mentioned embodiments of the present application.
图6为本申请另一实施例公开的变电站调度自动化联调系统的结构图。Fig. 6 is a structural diagram of a substation scheduling automation joint debugging system disclosed in another embodiment of the present application.
参见图6,所述远动工作站100与所述总控装置300、调度主站200之间的连接关系可为:所述远动工作站100第一端通过数据总线与变电站总控装置300相连,另一端依次通过变电站路由器4、通信光端机5、调度主站路由器6与所述调度主站200相连。Referring to Fig. 6, the connection relationship between the telecontrol workstation 100, the master control device 300 and the dispatching master station 200 can be: the first end of the telecontrol workstation 100 is connected to the substation master control device 300 through a data bus, The other end is connected to the dispatching master station 200 through the substation router 4 , the communication optical transceiver 5 , and the dispatching master station router 6 in sequence.
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。Each embodiment in this specification is described in a progressive manner, each embodiment focuses on the difference from other embodiments, and the same and similar parts of each embodiment can be referred to each other.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410464334.4A CN104184215B (en) | 2014-09-12 | 2014-09-12 | Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410464334.4A CN104184215B (en) | 2014-09-12 | 2014-09-12 | Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104184215A CN104184215A (en) | 2014-12-03 |
| CN104184215B true CN104184215B (en) | 2016-08-24 |
Family
ID=51965048
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410464334.4A Active CN104184215B (en) | 2014-09-12 | 2014-09-12 | Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104184215B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105554454B (en) * | 2015-12-15 | 2018-07-13 | 成都交大光芒科技股份有限公司 | Disconnecting switch visualizes Remote monitor and control system and method |
| CN105978152B (en) * | 2016-06-21 | 2018-05-04 | 国网福建省电力有限公司 | A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging |
| CN109191082B (en) * | 2018-09-18 | 2022-08-19 | 广东电网有限责任公司 | Programming method and system of scheduling platform and computer readable storage medium |
| CN110021995A (en) * | 2019-01-30 | 2019-07-16 | 国网浙江宁波市鄞州区供电有限公司 | A kind of distribution network automated information joint debugging emulation test system |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6795789B2 (en) * | 2001-05-21 | 2004-09-21 | Omnicron Electronics Corp. Usa | System for testing of intelligent electronic devices with digital communications |
| CN103545917A (en) * | 2012-07-12 | 2014-01-29 | 吉林省电力有限公司四平供电公司 | A Dispatch Automation Substation Simulation System |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007179309A (en) * | 2005-12-28 | 2007-07-12 | Nec Corp | Debug system for grid environment, grid service management device, debug method and program |
-
2014
- 2014-09-12 CN CN201410464334.4A patent/CN104184215B/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6795789B2 (en) * | 2001-05-21 | 2004-09-21 | Omnicron Electronics Corp. Usa | System for testing of intelligent electronic devices with digital communications |
| CN103545917A (en) * | 2012-07-12 | 2014-01-29 | 吉林省电力有限公司四平供电公司 | A Dispatch Automation Substation Simulation System |
Non-Patent Citations (3)
| Title |
|---|
| 不停电进行变电站综自系统联调的方法;周耀辉;《电子设计工程》;20120131;第20卷(第2期);第78-80页 * |
| 监控系统不停电遥控联调方案探讨;唐晓玲等;《机电信息》;20121231(第33期);第17,19页 * |
| 调度自动化主站与变电站远动设备调试相关问题的研究;王洪哲等;《全国城市供用电自动化及电力通讯应用技术论文集》;20050127;第106-109页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104184215A (en) | 2014-12-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104460346B (en) | Feeder automation action logic test method based on power distribution terminal service verification | |
| CN108400908B (en) | Automatic Acceptance Method of Substation Monitoring Information | |
| CN103051065B (en) | The distributed FA interlock method of testing of a kind of power distribution automation and system | |
| CN104052633B (en) | Intelligent station 61850 and the stipulations integration test method of telemechanical 104 | |
| CN104155970B (en) | A kind of intelligent substation monitoring host computer closed loop test system and method for testing thereof | |
| CN104678258B (en) | A method for actively researching and judging distribution network faults based on public-specific transformer information | |
| CN102832707A (en) | Misoperation-preventive locking logic automatic test system for intelligent transformer substation | |
| CN104090194A (en) | Intelligent substation relay protection noninvasive test system and method | |
| CN110784020A (en) | Automatic checking and accepting equipment, system and method for monitoring information | |
| CN104184215B (en) | Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method | |
| CN105207366B (en) | IEC61850-based plug-and-play model configuration tool for power distribution terminals and its implementation method | |
| CN113485214B (en) | One-key sequential control operation order testing method and device for transformer substation | |
| CN107666179B (en) | A method and system for updating information of interactive point table of power distribution automation diagram | |
| CN103905275A (en) | Electric power telecontrol equipment testing method based on IEC61850 replacement services | |
| CN106451792A (en) | A smart substation telecontrol point-to-point system and method | |
| CN106909615B (en) | A method and device for verifying consistency of data information between a master station and a slave station | |
| CN103955563A (en) | IEC 61850-based communication simulation method for transformer grounding on-line monitoring equipment | |
| CN104459385A (en) | Relay protection automatic testing method | |
| CN102788915A (en) | Feeder automation online simulation method based on maintenance workstation | |
| WO2015149595A1 (en) | Iec61850-based communication simulation method for insulation on-line monitoring device | |
| CN103955564A (en) | IEC 61850-based leakage current on-line monitoring equipment communication simulation method | |
| CN103984795A (en) | IEC 61850-based partial discharge on-line monitoring equipment communication simulation method | |
| CN109217472A (en) | A kind of monitoring information verification automated closed-loop joint debugging method | |
| CN103902768A (en) | Communication simulation method for oil chromatography on-line monitoring equipment | |
| CN105680441B (en) | Simulation based on stimulated replacement technology is to a device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 315000 185 Huifeng East Road, Yinzhou District, Ningbo, Zhejiang Co-patentee after: State Grid Corporation of China Patentee after: Yinzhou District power supply Co., Ltd., Ningbo City, Zhejiang, China Co-patentee after: Ningbo Power Supply Company of State Grid Zhejiang Electric Power Company Address before: 315100 185 Huifeng East Road, Yinzhou District, Ningbo, Zhejiang Co-patentee before: State Grid Corporation of China Patentee before: State Grid Zhejiang Ningbo City Yinzhou District Power Supply Company Co-patentee before: Ningbo Power Supply Company of State Grid Zhejiang Electric Power Company |