[go: up one dir, main page]

CN104213562B - The blocking device in a kind of slip casting aperture and using method thereof - Google Patents

The blocking device in a kind of slip casting aperture and using method thereof Download PDF

Info

Publication number
CN104213562B
CN104213562B CN201410395178.0A CN201410395178A CN104213562B CN 104213562 B CN104213562 B CN 104213562B CN 201410395178 A CN201410395178 A CN 201410395178A CN 104213562 B CN104213562 B CN 104213562B
Authority
CN
China
Prior art keywords
grouting
pressure
slip casting
filler
mould bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410395178.0A
Other languages
Chinese (zh)
Other versions
CN104213562A (en
Inventor
程鹏达
吴梦喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Mechanics of CAS
Original Assignee
Institute of Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Mechanics of CAS filed Critical Institute of Mechanics of CAS
Priority to CN201410395178.0A priority Critical patent/CN104213562B/en
Publication of CN104213562A publication Critical patent/CN104213562A/en
Application granted granted Critical
Publication of CN104213562B publication Critical patent/CN104213562B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明公开了一种注浆孔口的阻塞装置,其能够解决注浆管道和注浆孔壁之间的空隙密封不严的问题,防止注浆液从注浆管道和注浆孔壁之间的空隙渗漏至地表而造成的注浆材料浪费,避免注浆压力陡降、待加固地层填充不足,保证工程质量和施工进度。这种注浆孔口的阻塞装置,注浆管道插入注浆孔壁内并且二者之间具有空隙,该装置包括胀阻器模袋、第一紧固元件、第二紧固元件,胀阻器模袋套在注浆管道上,并且胀阻器模袋的前、后端分别通过第一、第二紧固元件固定到注浆管道上,填充物注入胀阻器模袋,填充物充满胀阻器模袋后与注浆孔壁胶结而与岩体啮合形成结石体。还提供了该装置的使用方法。

The invention discloses a blocking device for a grouting hole, which can solve the problem that the gap between the grouting pipe and the wall of the grouting hole is not tightly sealed, and prevent the grouting liquid from passing between the grouting pipe and the wall of the grouting hole. The waste of grouting materials caused by the leakage of the gaps to the surface can avoid the sudden drop of grouting pressure and the insufficient filling of the stratum to be reinforced, so as to ensure the quality of the project and the progress of construction. The blocking device of the grouting hole, the grouting pipe is inserted into the wall of the grouting hole and there is a gap between the two, and the device includes the expansion resistor mold bag, the first fastening element, the second fastening element, the expansion resistance The device mold bag is set on the grouting pipeline, and the front and rear ends of the expansion resistor mold bag are respectively fixed to the grouting pipeline through the first and second fastening elements, and the filler is injected into the expansion resistor mold bag, and the filler is filled with After the mold bag of the expansion resistor is cemented with the wall of the grouting hole, it meshes with the rock mass to form a stone body. Methods of using the device are also provided.

Description

一种注浆孔口的阻塞装置及其使用方法Blocking device for grouting orifice and method of use thereof

技术领域technical field

本发明属于工程技术领域,具体地涉及一种注浆孔口的阻塞装置,以及该装置的使用方法,主要用于水利水电工程、地基处理、或隧道防渗堵漏的注浆技术中。The invention belongs to the technical field of engineering, and in particular relates to a blocking device for a grouting hole and a method for using the device, which are mainly used in grouting technologies for water conservancy and hydropower projects, foundation treatment, or tunnel anti-seepage and plugging.

背景技术Background technique

目前,堤坝、地下洞窟防渗帷幕注浆、地基加固、防渗堵漏注浆过程中,常见的橡胶塞、改进式橡胶圈孔口封闭法,在封闭注浆管道和注浆孔壁之间的环形空隙时密封不严。这些装置的工作原理是依靠橡胶材料塞入注浆孔口中,橡胶材料产生弹性变形,进而作用在注浆孔壁上的压力来产生摩擦力,用该摩擦力抵抗注浆压力。通过实验研究发现,注浆压力很高时,橡胶阻塞装置的摩擦力无法抵抗注浆压力,从而导致橡胶阻塞装置失效,进而造成注浆液从注浆管道和注浆孔壁之间的空隙渗漏至地表,注浆材料浪费,且注浆压力陡降、待加固地层填充不足,影响工程质量以及施工进度。At present, in the process of anti-seepage curtain grouting, foundation reinforcement, and anti-seepage plugging grouting in embankments and underground caves, common rubber plugs and improved rubber ring orifice sealing methods are used between the closed grouting pipe and the wall of the grouting hole. The annular gap is not tightly sealed. The working principle of these devices is to rely on the rubber material to be inserted into the grouting hole, the rubber material produces elastic deformation, and then the pressure acting on the wall of the grouting hole generates frictional force, and the frictional force is used to resist the grouting pressure. Through experimental research, it is found that when the grouting pressure is high, the friction force of the rubber blocking device cannot resist the grouting pressure, which leads to the failure of the rubber blocking device, and then causes the grouting fluid to seep from the gap between the grouting pipe and the wall of the grouting hole. Leakage to the surface, waste of grouting materials, sudden drop of grouting pressure, insufficient filling of the ground to be reinforced, affecting project quality and construction progress.

发明内容Contents of the invention

本发明的技术解决问题是:克服现有技术的不足,提供一种注浆孔口的阻塞装置,其能够解决注浆管道和注浆孔壁之间的空隙密封不严的问题,防止注浆液从注浆管道和注浆孔壁之间的空隙渗漏至地表而造成的注浆材料浪费,避免注浆压力陡降、待加固地层填充不足,保证工程质量和施工进度。The technical problem of the present invention is: to overcome the deficiencies of the prior art, to provide a blocking device for the grouting hole, which can solve the problem that the gap between the grouting pipe and the wall of the grouting hole is not tightly sealed, and prevent the grouting The waste of grouting material caused by the leakage of liquid from the gap between the grouting pipe and the wall of the grouting hole to the surface can avoid the sudden drop of grouting pressure and insufficient filling of the ground to be reinforced, and ensure the quality of the project and the progress of the construction.

本发明的技术解决方案是:这种注浆孔口的阻塞装置,注浆管道插入注浆孔壁内并且二者之间具有空隙,该装置包括胀阻器模袋、第一紧固元件、第二紧固元件,胀阻器模袋套在注浆管道上,并且胀阻器模袋的前、后端分别通过第一、第二紧固元件固定到注浆管道上,填充物注入胀阻器模袋,填充物充满胀阻器模袋后与注浆孔壁胶结而与岩体啮合形成结石体。The technical solution of the present invention is: the blocking device of the grouting hole, the grouting pipe is inserted into the wall of the grouting hole and there is a gap between the two, the device includes a dilatation device mold bag, a first fastening element, The second fastening element, the expansion resistor mold bag is set on the grouting pipeline, and the front and rear ends of the expansion resistor mold bag are respectively fixed on the grouting pipeline through the first and second fastening elements, and the filler is injected into the expansion Resistor mold bag, the filler fills the expansion resistor mold bag and cements with the wall of the grouting hole to mesh with the rock mass to form a stone body.

由于本发明采用了套在注浆管道上的胀阻器模袋,填充物充满胀阻器模袋后与注浆孔壁胶结而与岩体啮合形成结石体,所以本发明通过该结石体的抗剪强度抵抗注浆压力的作用,而一般来说结石体的抗剪强度较高,就使得这种注浆孔口的阻塞装置能够抵御很高的注浆压力,进而能够解决注浆管道和注浆孔壁之间的空隙密封不严的问题,防止注浆液从注浆管道和注浆孔壁之间的空隙渗漏至地表而造成的注浆材料浪费,避免注浆压力陡降、待加固地层填充不足,保证工程质量和施工进度。Because the present invention adopts the dilatator die bag that is sleeved on the grouting pipeline, the filler fills the dilatator die bag and cements with the wall of the grouting hole to mesh with the rock mass to form a stone body. The shear strength resists the effect of grouting pressure, and generally speaking, the stone body has a high shear strength, which makes this blocking device of the grouting orifice able to withstand high grouting pressure, thereby solving the problem of grouting pipes and The gap between the grouting hole walls is not tightly sealed, preventing the grouting fluid from leaking from the gap between the grouting pipe and the grouting hole wall to the surface and causing the waste of grouting materials, avoiding a sudden drop in grouting pressure, Insufficient filling of the ground to be reinforced ensures the quality of the project and the progress of the construction.

还提供了这种注浆孔口的阻塞装置的使用方法,包括以下步骤:Also provided is a method of using the blocking device for the grouting orifice, comprising the following steps:

(1)测量外水压力,获得预期注浆压力,并确定胀阻器模袋的长度;(1) Measure the external water pressure, obtain the expected grouting pressure, and determine the length of the mold bag of the expansion resistor;

(2)依据现场实际条件,选择本发明的注浆孔口的阻塞装置,组装后放入注浆孔壁中;(2) according to actual conditions on site, select the blocking device of the grouting orifice of the present invention, put into the grouting hole wall after assembling;

(3)开启填充物注入泵,通过注浆流量压力记录仪获得注入压力曲线和流量;当注入压力持续增加时,胀阻器模袋开始滤水,需控制压力增幅不宜过大;当注入压力持续增大后压力曲线接近水平直线时,胀阻器模袋滤水完毕,开始挤压孔壁,需保持注入压力一定时间后再增大压力,直至达到预期注浆压力;当注入压力达到预期注浆压力后,需维持该压力3-5分钟;最后,关闭填充物注入泵,完成胀阻器模袋的填充;(3) Turn on the filler injection pump, and obtain the injection pressure curve and flow rate through the grouting flow pressure recorder; when the injection pressure continues to increase, the dilatator mold bag starts to filter water, and the pressure increase should not be too large; when the injection pressure After continuous increase, when the pressure curve is close to the horizontal straight line, the water filter of the expansion resistor mold bag is completed, and the hole wall begins to be squeezed. It is necessary to maintain the injection pressure for a certain period of time before increasing the pressure until the expected grouting pressure is reached; when the injection pressure reaches the expected After the grouting pressure, it is necessary to maintain the pressure for 3-5 minutes; finally, close the filler injection pump to complete the filling of the dilatator mold bag;

(4)通过注浆管道进行注浆。(4) Grouting through the grouting pipeline.

附图说明Description of drawings

图1示出了根据本发明的注浆孔口的阻塞装置的受力示意图;Fig. 1 shows a schematic diagram of the force of the blocking device of the grouting orifice according to the present invention;

图2示出了根据本发明的注浆孔口的阻塞装置的第一实施例的结构示意图;Fig. 2 shows a schematic structural view of a first embodiment of a blocking device for a grouting orifice according to the present invention;

图3示出了填充物注入图2的注浆孔口的阻塞装置的示意图;Fig. 3 shows a schematic diagram of a plugging device for injecting filler into the grouting orifice of Fig. 2;

图4示出了填充物充满图2的注浆孔口的阻塞装置并挤压注浆孔壁的示意图;Fig. 4 has shown the schematic diagram that filler is filled with the blocking device of the grouting hole of Fig. 2 and squeezes the grouting hole wall;

图5示出了图2的注浆孔口的阻塞装置完成阻塞后注浆的示意图;Fig. 5 shows the schematic diagram of grouting after the blocking device of the grouting orifice of Fig. 2 is blocked;

图6示出了根据本发明的注浆孔口的阻塞装置的第二实施例的结构示意图;Fig. 6 shows a schematic structural view of a second embodiment of a blocking device for a grouting orifice according to the present invention;

图7示出了填充物注入图6的注浆孔口的阻塞装置的示意图;Fig. 7 shows a schematic diagram of the plugging device for injecting the filler into the grouting orifice of Fig. 6;

图8示出了填充物充满图6的注浆孔口的阻塞装置并挤压注浆孔壁的示意图;Fig. 8 shows the schematic diagram of the plugging device filling the grouting orifice of Fig. 6 and extruding the grouting hole wall;

图9示出了图6的注浆孔口的阻塞装置完成阻塞后注浆的示意图。Fig. 9 shows a schematic diagram of grouting after the blocking device of the grouting hole in Fig. 6 is blocked.

具体实施方式detailed description

如图2-9所示,这种注浆孔口的阻塞装置,注浆管道2插入注浆孔壁1内并且二者之间具有空隙,该装置包括胀阻器模袋3、第一紧固元件、第二紧固元件,胀阻器模袋3套在注浆管道2上,并且胀阻器模袋3的前、后端分别通过第一、第二紧固元件固定到注浆管道2上,填充物注入胀阻器模袋,填充物充满胀阻器模袋后与注浆孔壁胶结而与岩体啮合形成结石体。As shown in Figure 2-9, the blocking device of the grouting hole, the grouting pipe 2 is inserted into the grouting hole wall 1 and there is a gap between the two, the device includes the expansion resistor mold bag 3, the first tight fixed element, the second fastening element, the expansion resistor mold bag 3 is set on the grouting pipeline 2, and the front and rear ends of the expansion resistor mold bag 3 are respectively fixed to the grouting pipeline by the first and second fastening elements 2, the filler is injected into the mold bag of the expansion resistor, and after the filler is filled with the mold bag of the expansion resistor, it is cemented with the wall of the grouting hole and meshed with the rock mass to form a stone body.

由于本发明采用了套在注浆管道上的胀阻器模袋,填充物充满胀阻器模袋后与注浆孔壁胶结而与岩体啮合形成结石体,所以本发明通过该结石体的抗剪强度抵抗注浆压力的作用,而一般来说结石体的抗剪强度较高,就使得这种注浆孔口的阻塞装置能够抵御很高的注浆压力,进而能够解决注浆管道和注浆孔壁之间的空隙密封不严的问题,防止注浆液从注浆管道和注浆孔壁之间的空隙渗漏至地表而造成的注浆材料浪费,避免注浆压力陡降、待加固地层填充不足,保证工程质量和施工进度。Because the present invention adopts the dilatator die bag that is sleeved on the grouting pipeline, the filler fills the dilatator die bag and cements with the wall of the grouting hole to mesh with the rock mass to form a stone body. The shear strength resists the effect of grouting pressure, and generally speaking, the stone body has a high shear strength, which makes this blocking device of the grouting orifice able to withstand high grouting pressure, thereby solving the problem of grouting pipes and The gap between the grouting hole walls is not tightly sealed, preventing the grouting fluid from leaking from the gap between the grouting pipe and the grouting hole wall to the surface and causing the waste of grouting materials, avoiding a sudden drop in grouting pressure, Insufficient filling of the ground to be reinforced ensures the quality of the project and the progress of the construction.

另外,如图2-5所示,在第一、第二紧固元件之间的注浆管道的管壁上开有若干注浆管道表面出浆孔4,第一紧固元件是常规紧固件5,第二紧固元件是孔内定压封管装置6,填充物经过注浆管道后通过注浆管道表面出浆孔注入胀阻器模袋3。In addition, as shown in Figures 2-5, several grouting pipe surface grouting holes 4 are opened on the pipe wall of the grouting pipe between the first and second fastening elements, and the first fastening element is a conventional fastening element. Part 5, the second fastening element is the constant pressure pipe sealing device 6 in the hole, and the filler is injected into the expansion resistor mold bag 3 through the grouting hole on the surface of the grouting pipe after passing through the grouting pipe.

图3示出了填充物注入图2的注浆孔口的阻塞装置的示意图;图4示出了填充物充满图2的注浆孔口的阻塞装置并挤压注浆孔壁的示意图;图5示出了图2的注浆孔口的阻塞装置完成阻塞后注浆的示意图。图中的箭头表示填充物的流向。填充物进入注浆管道后,受到孔内定压封管装置6的阻隔,将从注浆管道表面出浆孔4流出进入胀阻器模袋3,随着注入量增大,胀阻器模袋3被持续填充,如图3所示。随着胀阻器模袋3持续填充,胀阻器模袋过滤并保留水泥浆液中的水泥颗粒(当填充物是含水泥浆液的浆液时)。当胀阻器模袋内被水泥颗粒填充完毕时,胀阻器模袋挤压注浆孔壁,注浆孔壁受压产生变形,随后胀阻器模袋与变形后的注浆孔壁啮合形成高强度结石体,如图4所示。当注入压力持续增大,超过孔内定压封管装置6的承压临界值后,孔内定压封管装置6失效,注浆液通过注浆管道进入深层地层,如图5所示。Fig. 3 shows the schematic diagram of the plugging device of filling material injected into the grouting orifice of Fig. 2; Fig. 4 shows the schematic diagram of filling material filling the blocking device of the grouting orifice of Fig. 2 and extruding the grouting hole wall; Fig. 5 shows a schematic diagram of grouting after the blocking device of the grouting orifice in FIG. 2 is blocked. The arrows in the figure indicate the flow direction of the filler. After the filler enters the grouting pipeline, it is blocked by the constant pressure sealing device 6 in the hole, and will flow out from the grouting hole 4 on the surface of the grouting pipeline into the expansion resistor mold bag 3. As the injection volume increases, the expansion resistor mold bag will 3 is continuously filled, as shown in Figure 3. As the dilatator mold bag 3 continues to fill, the dilatator mold bag filters and retains cement particles in the cement slurry (when the filler is a slurry containing cement slurry). When the mold bag of the expansion resistor is filled with cement particles, the mold bag of the expansion resistor squeezes the wall of the grouting hole, and the wall of the grouting hole is deformed under pressure, and then the mold bag of the expansion resistor meshes with the deformed wall of the grouting hole A high-strength stone body was formed, as shown in Figure 4. When the injection pressure continues to increase and exceeds the pressure critical value of the constant pressure sealing device 6 in the hole, the constant pressure sealing device 6 in the hole fails, and the grouting fluid enters the deep formation through the grouting pipeline, as shown in Figure 5.

另外,如图6-9所示,该装置还包括填充管7,填充管7穿过第一紧固元件而插入胀阻器模袋,第一、第二紧固元件均是常规紧固件5,填充物经过填充管注入胀阻器模袋3。In addition, as shown in Figures 6-9, the device also includes a filling tube 7, the filling tube 7 passes through the first fastening element and is inserted into the mold bag of the expansion resistor, and the first and second fastening elements are conventional fasteners 5. The filler is injected into the expander mold bag 3 through the filling pipe.

图7示出了填充物注入图6的注浆孔口的阻塞装置的示意图;图8示出了填充物充满图6的注浆孔口的阻塞装置并挤压注浆孔壁的示意图;图9示出了图6的注浆孔口的阻塞装置完成阻塞后注浆的示意图。图中的箭头表示填充物的流向。填充物进入填充管7后,直接进入胀阻器模袋3,随着注入量增大,胀阻器模袋3被持续填充,如图7所示。随着胀阻器模袋3持续填充,胀阻器模袋过滤并保留水泥浆液中的水泥颗粒(当填充物是含水泥浆液的浆液时)。当胀阻器模袋内被水泥颗粒填充完毕时,胀阻器模袋3挤压孔壁,孔壁受压产生变形,随后胀阻器模袋3与变形后的注浆孔壁啮合形成高强度结石体,如图8所示。当胀阻器模袋3注入压力达到预期注浆压力后,即可通过注浆管道对深层地层进行注浆,如图9所示。Fig. 7 shows the schematic diagram of the plugging device of filling material injected into the grouting orifice of Fig. 6; Fig. 8 shows the schematic diagram of filling material filling the blocking device of the grouting orifice of Fig. 6 and extruding the grouting hole wall; Fig. 9 shows a schematic diagram of grouting after the blocking device of the grouting hole in FIG. 6 is blocked. The arrows in the figure indicate the flow direction of the filler. After the filler enters the filling pipe 7, it directly enters the dilatator mold bag 3, and as the injection volume increases, the dilatator mold bag 3 is continuously filled, as shown in FIG. 7 . As the dilatator mold bag 3 continues to fill, the dilatator mold bag filters and retains cement particles in the cement slurry (when the filler is a slurry containing cement slurry). When the expansion resistor mold bag is filled with cement particles, the expansion resistor mold bag 3 squeezes the hole wall, and the hole wall is deformed under pressure, and then the expansion resistor mold bag 3 meshes with the deformed grouting hole wall to form a high Strength stone body, as shown in Figure 8. When the injection pressure of the expander mold bag 3 reaches the expected grouting pressure, the deep formation can be grouted through the grouting pipeline, as shown in FIG. 9 .

另外,第一紧固元件向后距离注浆孔口30-50cm。这样的距离对于阻塞效果比较好,而且施工比较方便。In addition, the first fastening element is 30-50 cm backwards from the grouting orifice. This distance is better for blocking effect, and the construction is more convenient.

另外,胀阻器模袋3是土工布。这种材料填充物的透过率比较高,而且成本低廉。In addition, the mold bag 3 of the expansion resistor is a geotextile. The transmittance of this material filler is relatively high, and the cost is low.

另外,所述填充物是含90%-100%水泥浆液的浆液。实验证明采用这种水泥浆液比例的填充物阻塞效果和施工成本都比较好。In addition, the filler is a slurry containing 90%-100% cement slurry. Experiments have proved that the blocking effect and construction cost of the filler with this cement slurry ratio are better.

还提供了这种注浆孔口的阻塞装置的使用方法,包括以下步骤:Also provided is a method of using the blocking device for the grouting orifice, comprising the following steps:

(1)测量外水压力,获得预期注浆压力,并确定胀阻器模袋的长度;(1) Measure the external water pressure, obtain the expected grouting pressure, and determine the length of the mold bag of the expansion resistor;

(2)依据现场实际条件,选择本发明一种优选方式(直接通过注浆管道注入填充物)或另一种优选方式(通过填充管注入填充物)的注浆孔口的阻塞装置,组装后放入注浆孔壁中;(2) According to the actual conditions on site, select a preferred mode of the present invention (directly inject filler through grouting pipe) or another preferred mode (inject filler through filling pipe) blocking device for grouting orifice, after assembling Put it into the wall of the grouting hole;

(3)开启填充物注入泵,通过注浆流量压力记录仪获得注入压力曲线和流量;当注入压力持续增加时,胀阻器模袋开始滤水,需控制压力增幅不宜过大;当注入压力持续增大后压力曲线接近水平直线时,胀阻器模袋滤水完毕,开始挤压孔壁,需保持注入压力一定时间后再增大压力,直至达到预期注浆压力;当注入压力达到预期注浆压力后,需维持该压力3-5分钟;最后,关闭填充物注入泵,完成胀阻器模袋的填充;(3) Turn on the filler injection pump, and obtain the injection pressure curve and flow rate through the grouting flow pressure recorder; when the injection pressure continues to increase, the dilatator mold bag starts to filter water, and the pressure increase should not be too large; when the injection pressure After continuous increase, when the pressure curve is close to the horizontal straight line, the water filter of the expansion resistor mold bag is completed, and the hole wall begins to be squeezed. It is necessary to maintain the injection pressure for a certain period of time before increasing the pressure until the expected grouting pressure is reached; when the injection pressure reaches the expected After the grouting pressure, it is necessary to maintain the pressure for 3-5 minutes; finally, close the filler injection pump to complete the filling of the dilatator mold bag;

(4)通过注浆管道进行注浆(可无需待凝即可进行地层注浆)。(4) Grouting is performed through the grouting pipeline (stratum grouting can be performed without waiting for solidification).

其中步骤(1)中通过公式(1)获得胀阻器模袋与注浆孔壁的啮合长度:Wherein step (1) obtains the meshing length of the mold bag of the dilatator and the wall of the grouting hole by the formula (1):

σσ ττ ×× LL ×× ππ DD. == PP 11 ×× ππ 44 (( DD. 22 -- dd 22 )) -- -- -- (( 11 ))

如图1所示,结石体抗剪强度为στ,P1为注浆压力,D为注浆孔壁直径,d为注浆管道直径,L为胀阻器模袋与注浆孔壁的啮合长度。As shown in Fig. 1, the shear strength of the stone body is σ τ , P1 is the grouting pressure, D is the diameter of the grouting hole wall, d is the diameter of the grouting pipe, and L is the engagement between the dilatator mold bag and the grouting hole wall length.

得到胀阻器模袋与注浆孔壁的啮合长度后,再加上一个适当值(例如L)就得到胀阻器模袋的长度。After obtaining the engagement length of the dilatator mold pocket and the wall of the grouting hole, add an appropriate value (for example L) to obtain the length of the dilatator mold pocket.

以上所述,仅是本发明的较佳实施例,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属本发明技术方案的保护范围。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention in any form. Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention are still within the scope of this invention. The protection scope of the technical solution of the invention.

Claims (5)

1. the blocking device in slip casting aperture, in grouting pipe (2) inserts slip casting hole wall (1) and Therebetween there is space, it is characterised in that: this device include swollen resistance device mould bag (3), first Tightening member, the second tightening member, swollen resistance device mould bag (3) is enclosed within grouting pipe (2),
And the front and back ends of swollen resistance device mould bag (3) is fixed to by first, second tightening member respectively On grouting pipe (2), filler injects swollen resistance device mould bag, after filler is full of swollen resistance device mould bag Cementing with slip casting hole wall and engage with rock mass formation Seed harvest;
Some grouting pipe tables are had on the tube wall of the grouting pipe between first, second tightening member Face slurry outlet (4), the first tightening member is conventional fasteners (5), and the second tightening member is Hole pressure decided at the higher level but not officially announced pipe sealing device (6), filler is gone out by grouting pipe surface after grouting pipe Swollen resistance device mould bag (3) is injected in slurry hole.
The blocking device in slip casting aperture the most according to claim 1, it is characterised in that:
First tightening member distance slip casting aperture 30-50cm backward.
The blocking device in slip casting aperture the most according to claim 1, it is characterised in that:
Swollen resistance device mould bag (3) is geotextiles.
The blocking device in slip casting aperture the most according to claim 1, it is characterised in that:
Described filler is the slurries containing 90%-100% cement grout.
5. a using method for the blocking device in slip casting aperture according to claim 1, its feature It is: comprise the following steps:
(1) measure external water pressure, it is thus achieved that expection grouting pressure, and determine the length of swollen resistance device mould bag;
(2) according to on-the-spot physical condition, the blocking device in the slip casting aperture of claim 2 or 3 is selected, Put into after assembling in slip casting hole wall;
(3) open filler injection pump, obtain injection pressure curve by flow rate of grouting manograph And flow;When injection pressure continues to increase, swollen resistance device mould bag starts drainage, need to control pressure and increase Width is unsuitable excessive;When after injection pressure persistently increases, pressure curve is close to horizontal linear, swollen resistance device Mould bag drainage is complete, starts to extrude hole wall, increases pressure after need to keeping injection pressure certain time again, Until reaching expection grouting pressure;After injection pressure reaches expection grouting pressure, this pressure need to be maintained Power 3-5 minute;Finally, close filler injection pump, complete the filling of swollen resistance device mould bag;
(4) slip casting is carried out by grouting pipe.
CN201410395178.0A 2014-08-12 2014-08-12 The blocking device in a kind of slip casting aperture and using method thereof Expired - Fee Related CN104213562B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410395178.0A CN104213562B (en) 2014-08-12 2014-08-12 The blocking device in a kind of slip casting aperture and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410395178.0A CN104213562B (en) 2014-08-12 2014-08-12 The blocking device in a kind of slip casting aperture and using method thereof

Publications (2)

Publication Number Publication Date
CN104213562A CN104213562A (en) 2014-12-17
CN104213562B true CN104213562B (en) 2016-08-24

Family

ID=52095445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410395178.0A Expired - Fee Related CN104213562B (en) 2014-08-12 2014-08-12 The blocking device in a kind of slip casting aperture and using method thereof

Country Status (1)

Country Link
CN (1) CN104213562B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812117A (en) * 2017-03-16 2017-06-09 中国水电建设集团十五工程局有限公司 Dam reverse drainage plugging device and method
CN109442130A (en) * 2018-12-24 2019-03-08 北京市市政工程研究院 Drainage pipeline pocket shape water blocking device and construction mounting structure and water blockoff tear blocking method open
CN110566209B (en) * 2019-08-08 2024-09-03 中铁第四勘察设计院集团有限公司 Non-return device and non-return method for grouting pipe
CN111188350A (en) * 2020-01-21 2020-05-22 上海勘察设计研究院(集团)有限公司 Confined water dewatering well structure and dewatering method
CN112647380B (en) * 2020-12-23 2022-04-26 江苏精享裕建工有限公司 Roadbed concrete repairing grouting reinforcement method and reinforcement sealing device thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1085981A (en) * 1993-10-26 1994-04-27 涂正武 Capsule sealing grouting and sealing device thereof
CN201627206U (en) * 2010-04-08 2010-11-10 中国葛洲坝集团股份有限公司 Grouting device for grouting anchor rod
CN102787602A (en) * 2012-08-31 2012-11-21 中国水利水电第七工程局成都水电建设工程有限公司 Curtain grouting technique
CN203007953U (en) * 2013-01-16 2013-06-19 中铁十七局集团第三工程有限公司 Inflatable grouting type slurry-stopping plug for hollow grouting anchor rod

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144737A (en) * 1998-11-16 2000-05-26 Ohbayashi Corp Compaction device of underwater charging material

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1085981A (en) * 1993-10-26 1994-04-27 涂正武 Capsule sealing grouting and sealing device thereof
CN201627206U (en) * 2010-04-08 2010-11-10 中国葛洲坝集团股份有限公司 Grouting device for grouting anchor rod
CN102787602A (en) * 2012-08-31 2012-11-21 中国水利水电第七工程局成都水电建设工程有限公司 Curtain grouting technique
CN203007953U (en) * 2013-01-16 2013-06-19 中铁十七局集团第三工程有限公司 Inflatable grouting type slurry-stopping plug for hollow grouting anchor rod

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
模袋法施工技术在海子水库南副坝截渗工程中的应用;陈焊华;《水利科技与经济》;20120331;第18卷(第3期);第96-97页 *

Also Published As

Publication number Publication date
CN104213562A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104213562B (en) The blocking device in a kind of slip casting aperture and using method thereof
CN109162722B (en) Advanced compaction grouting reinforcement method for loose and weak strata suitable for shallow buried tunnels
CN103075179B (en) Entitative coal seam gas drainage drilling hole double-pipe drainage method
CN103161478B (en) Impulse-type grouting method
CN102704984B (en) Borehole high-concentration gas extraction and drainage method and device thereof
CN110259383A (en) A kind of protrusive bores note integrated device and application method
CN108952760B (en) Intelligent circulating pressure increasing-discharging type dynamic grouting system and method
CN103410182A (en) Unilateral pile foundation unloading horizontal top-level pull deviation rectifying and broken pile reinforcement construction method
CN102852535A (en) Underground two-fluid grouting device
CN109680675A (en) A kind of Stabilizing Grout method that can dynamically control grouting amount and harden opportunity
CN204753611U (en) Deep basal pit pressure -bearing water precipitation gas well gas bag plugging device
CN102838325A (en) Hole sealing grout stop material and grouting hole sealing process
CN202644538U (en) A grouting device used for a water-rich quicksand stratum
CN105421475A (en) Air bag type curtain leakage blocking device and method
CN109629573A (en) A water-stop structure for a pocket grouting well wall
CN203362181U (en) Mud jacking film bag for water resistance and leaking stoppage in tunnel construction
CN115929252B (en) Bag sealer, close-fitting gas extraction drilling sealing method and device
CN100497845C (en) Mixed grouting device for blocking high-pressure groundwater and mixing method grouting process therefor
CN104343123B (en) Double-layer film bag device and method for sealing grouting pipes in gushing sandy soil layers
CN104328781B (en) A kind of unfavorable geologic body controlling oozes profit chemical grouting method
CN206290265U (en) A kind of new grouting small pilot pipe
CN112942307B (en) A kind of grouting reinforcement method of loose soil layer and grouting reinforcement method of coastal karst area
CN112360512A (en) Weak water-rich stratum tunnel structure repairing pretreatment device and method
CN203603155U (en) Novel double-size grouting end mixing device
CN204252139U (en) Be applied to the two-layer equation film bagging apparatus of Grouting Pipe sealing in water burst sandy soils

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

CF01 Termination of patent right due to non-payment of annual fee