CN104370217B - Portal crane for paving bridge decks - Google Patents
Portal crane for paving bridge decks Download PDFInfo
- Publication number
- CN104370217B CN104370217B CN201310346971.7A CN201310346971A CN104370217B CN 104370217 B CN104370217 B CN 104370217B CN 201310346971 A CN201310346971 A CN 201310346971A CN 104370217 B CN104370217 B CN 104370217B
- Authority
- CN
- China
- Prior art keywords
- crane
- gantry
- bridge
- spreader
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C17/00—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
- B66C17/06—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes
- B66C17/26—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes combined with auxiliary apparatus, e.g. log saws, pushers for unloading vehicles, means for shunting railway vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C17/00—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
- B66C17/04—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports with lifting beams, e.g. slewable beams, carrying load-engaging elements, e.g. magnets, hooks
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明提供了一种桥梁面板铺设门式起重机,包括支撑行走门架、桥式起重机、吊具,门架为钢结构总成,桥式起重机在其上行走,其主梁采用悬臂结构,使边桥面板的中心能超过门架横梁中心而铺设边桥板;桥式起重机在所述的门架作整机移动,能调整取板和铺板定位;门架的四条支腿上各设一台悬臂吊,悬臂吊前后对门吊行走轨道进行倒运和铺设,实行铺板门机节段式前行或后退;吊具包括吊架、吊具轴和绳具。本发明在起重机过跨时,由设置于龙门吊上的旋转吊完成龙门吊大车行走轨道梁的前后安拆,能方便快速过跨,缩短起重机辅助调整时间。
The invention provides a bridge deck laying gantry crane, which includes a supporting traveling gantry, a bridge crane, and a spreader. The gantry is a steel structure assembly, and the bridge crane walks on it. The center of the side bridge deck can exceed the center of the beam of the gantry to lay the side bridge slab; the bridge crane moves on the gantry as a whole machine, and can adjust the board picking and laying positioning; each of the four legs of the gantry is equipped with a Cantilever crane, the cantilever crane reverses and lays the walking track of the door crane before and after, and implements the segmental forward or backward of the paving door machine; the spreader includes hanger, spreader shaft and rope. When the crane crosses the span, the rotary crane installed on the gantry crane completes the front and rear installation and disassembly of the traveling track beam of the gantry crane cart, which can facilitate and quickly cross the span and shorten the auxiliary adjustment time of the crane.
Description
技术领域technical field
本发明发明涉及一种大型桥梁桥梁板面铺设施工用设备,属于起重机械设计制造领域。The invention relates to a large-scale bridge deck paving construction equipment, which belongs to the field of hoisting machinery design and manufacture.
背景技术Background technique
在大跨径桥梁建设过程中,钢拱桥、斜拉桥、悬索桥等钢梁式桥梁上铺有桥面板,桥面板重量一般在40t以下,外形尺寸一般在长X宽x高=12000mmx5000mmx250mm以下,已有的大型桥梁的桥面板铺设施工工艺一般采用架桥机架设或在水道中采用船式浮吊进行铺设,一台架桥机投入的设备投资磊,一天能铺板少。其工艺复杂,设备成本投资大,效率低,桥梁建设工期长,对于跨山谷无水道的桥梁更无法采用浮吊进行铺设,这是现有施工技术和设备所存在的主要问题。During the construction of long-span bridges, bridge decks are laid on steel girder bridges such as steel arch bridges, cable-stayed bridges, and suspension bridges. The bridge deck pavement construction process of some large bridges is generally erected by bridge erecting machines or laid by boat-type floating cranes in waterways. The investment in equipment for a bridge erecting machine is large, and less slabs can be laid in one day. The process is complicated, the equipment cost is large, the efficiency is low, the construction period of the bridge is long, and it is impossible to use the floating crane to lay the bridge across the valley without a waterway. This is the main problem existing in the existing construction technology and equipment.
发明内容Contents of the invention
本发明提供一种大型桥梁桥梁板面铺设施工用的变跨、能适应一定桥面宽度范围的门式起重机。The invention provides a gantry crane with a variable span for the construction of a large-scale bridge slab pavement, which can adapt to a certain bridge deck width range.
本发明是这样实现的:The present invention is achieved like this:
一种桥面板铺设门式起重机,包括支撑行走门架、桥式起重机、吊具,门架为钢结构总成,桥式起重机在其上行走,其主梁采用悬臂结构,使边桥面板的中心能超过门架横梁中心而铺设边桥板;桥式起重机在所述的门架作整机移动,能调整取板和铺板定位;门架的四条支腿上各设一台悬臂吊,悬臂吊前后对门吊行走轨道进行倒运和铺设,实行铺板门机节段式前行或后退;吊具包括吊架、吊具轴和绳具,吊具采用吊板吊架式,能360º全回转;绳具采用双耳绳和卸扣锁紧式,双耳绳挂在吊架上面的圆弧凹槽内。A bridge deck laying gantry crane, including a supporting traveling gantry, a bridge crane, and a spreader. The gantry is a steel structure assembly, and the bridge crane walks on it. The main girder adopts a cantilever structure, so that the side bridge deck The center can exceed the center of the gantry beam to lay the side bridge slab; the bridge crane moves on the gantry as a whole machine, and can adjust the board picking and laying positioning; a cantilever crane is installed on each of the four legs of the gantry. Reverse and lay the door crane walking track before and after the hoisting, implement the segmental forward or backward of the paving door machine; the spreader includes hanger, spreader shaft and rope. The rope adopts double-eared rope and shackle locking type, and the double-eared rope is hung in the arc groove on the hanger.
本发明在起重机过跨时,由设置于龙门吊上的旋转吊完成龙门吊大车行走轨道梁的前后安拆,能方便快速过跨,缩短起重机辅助调整时间。When the crane crosses the span, the rotary crane installed on the gantry crane completes the front and rear installation and disassembly of the traveling track beam of the gantry crane cart, which can facilitate and quickly cross the span and shorten the auxiliary adjustment time of the crane.
本发明桥面板铺设门式起重机实现变跨,能适应一定桥面宽度范围。The bridge deck laying gantry crane of the invention realizes variable span and can adapt to a certain bridge deck width range.
附图说明Description of drawings
图1为本发明的门式起重机总主视图;Fig. 1 is the general front view of gantry crane of the present invention;
图2为本发明的门式起重机侧视示意图;Fig. 2 is a schematic side view of the gantry crane of the present invention;
图3为本发明的门式起重机的吊具主视图Fig. 3 is the front view of the spreader of the gantry crane of the present invention
图4为本发明的吊具侧视图;Fig. 4 is a side view of the spreader of the present invention;
图5为本发明的双耳绳图;Fig. 5 is the double ear rope figure of the present invention;
图中标识为: 1桥式起重机 2门架 3门架运行机构 4夹轨器 5悬臂吊The marks in the figure are: 1 Overhead crane 2 Gantry 3 Gantry running mechanism 4 Rail clamp 5 Cantilever crane
6 环链葫芦 7 吊具 8吊具轴 9绳具 10卸扣 11 凹槽。6 chain hoist 7 spreader 8 spreader shaft 9 rope 10 shackle 11 groove.
具体实施方式detailed description
下面结合附图作进一步的说明:Further explanation is made below in conjunction with accompanying drawing:
本发明桥面板铺设门式起重机由支撑行走门架2、桥式起重机1、吊具,门架的设计采用抬高下横梁的方法,使边桥面板的中心能超过门架横梁中心而铺设边桥板,在门架的四条支腿上各设一台悬臂吊6,悬臂吊6前后对门吊行走轨道进行倒运和铺设,实行铺板门机节段式前行或后退;门架上的桥式起重机在门架上进行取板和铺板;吊具采用吊板吊架式,能360º全回转;绳具9采用双耳绳和卸扣锁紧式,能方便快速挂索和取索。The bridge deck laying gantry crane of the present invention is composed of a supporting traveling gantry 2, a bridge crane 1, and a spreader. For the bridge deck, a cantilever crane 6 is installed on each of the four legs of the gantry. The cantilever crane 6 reverses and lays the walking track of the gantry crane before and after, and implements the segmental forward or backward movement of the paving door machine; the bridge type on the gantry The crane takes boards and lays boards on the gantry; the hanger adopts the hanging board hanger type, which can turn 360°;
图1所示起重机总图为:The general drawing of the crane shown in Figure 1 is:
1.桥式起重机 ,整机能没门架作整机移动,能调整取板和铺板定位于;1. Bridge crane, the whole machine can be moved without a mast, and can adjust the position of taking board and laying board;
2.门架钢结构总成,作为铺板门机的主要承重部件,桥式起重机在其上行走, 门架框架结构的外形能满足桥梁铺板工位要求,为便于桥梁板在旋转定位落板定位,抬高下横梁离轨面高度,定为1904mm; 门架主梁采用悬臂结构,使铺板机能铺设桥梁的边板;门架主梁采用分段高强螺栓联接,便于运输和转场重复使用,并能实现有限变跨使用;2. The gantry steel structure assembly is the main load-bearing part of the decking door machine, and the bridge crane walks on it. The shape of the gantry frame structure can meet the requirements of the bridge decking station. In order to facilitate the positioning of the bridge plate during rotation and positioning , raise the height of the lower beam from the rail surface, which is set at 1904mm; the main girder of the gantry adopts a cantilever structure, so that the decking machine can lay the side plates of the bridge; And can realize the use of limited variable span;
3.走台、梯子、栏杆,在其上布置电气设备,作为检修通道;3. Walking platforms, ladders, and railings, on which electrical equipment is arranged as maintenance channels;
4.为大车运行机构,其驱动方为三合一驱动,作为铺板机移机用和调整铺板机工位用;4. It is the running mechanism of the cart, and its driving side is a three-in-one drive, which is used for moving the planking machine and adjusting the position of the planking machine;
5.为夹轨器作为铺板机驻车防风安全和在有坡度路面施工作为安全装置;5. It is used as a safety device for the rail clamp as a windproof parking machine for paving machines and as a safety device for construction on sloped roads;
6.悬臂吊6作为铺板机前移或后退轨道倒运用,为铺板机的重要辅助功能部件,实现轨道预先过跨,大大缩短移机辅助时间;6. The cantilever crane 6 is used as the planking machine to move forward or retreat the track, and is an important auxiliary functional part of the planking machine to realize the pre-span of the track and greatly shorten the auxiliary time of moving the machine;
7.吊具作为铺板板作业时重要功能部件,在设计上有较大改进和突破,已有工艺采用吊索无吊架,这样整个吊装高度比较高,设备高相应也提高了,对于有些桥梁如钢拱桥无法通过起吊设备,本吊具采用吊架式大大缩短吊装高度,在吊架主架上面设有多道圆弧槽,以适应各种长度尺寸规格的桥面板的挂索,双耳绳索挂在吊架主架上面的圆弧槽内,能左右摆动,以适应各种宽度尺寸规格的桥面板,吊具有通用性和方便操作性。7. The spreader is an important functional part of the decking operation, and there have been great improvements and breakthroughs in the design. The existing technology uses a sling without a hanger, so that the entire lifting height is relatively high, and the height of the equipment is correspondingly increased. For some bridges If the steel arch bridge cannot pass through the lifting equipment, the hanger adopts the hanger type to greatly shorten the hoisting height, and there are multiple arc grooves on the main frame of the hanger to adapt to the hanging cables of bridge decks of various lengths and sizes. The rope is hung in the arc groove on the main frame of the hanger and can swing left and right to adapt to bridge decks of various widths and sizes. The hanger has versatility and convenient operation.
桥面板铺设门式起重机的典型作业步骤如下:The typical operation steps of the bridge deck laying gantry crane are as follows:
桥面板铺设门式起重机安装调整到正常工作关态→就位→运梁平板车运输桥面板到门吊下方→桥吊上的小车后退到桥面板重心上方处取板→小车前行和桥吊移位到安装位置并转正桥面板→并安装桥面板(中板)到位→平板车运输桥面板(边板)→桥吊上的小车后退取边板前行到安装位置并转正边板→起重机下落边板到位→安装另一块边板→倒运轨道→过跨→重复起重机上述工作过程。The bridge deck laying gantry crane is installed and adjusted to the normal working off state → in place → the beam platform truck transports the bridge deck to the bottom of the gate crane → the trolley on the bridge crane retreats to the center of gravity of the bridge deck to take the deck → the trolley moves forward and the bridge crane moves Go to the installation position and turn the bridge deck → install the bridge deck (middle plate) in place → transport the bridge deck (side plate) with a flatbed truck → move the trolley on the bridge crane back and take the side plate forward to the installation position and turn the side plate → the crane drops the side plate Put it in place → install another side plate → reverse the track → cross the span → repeat the above working process of the crane.
原桥面铺板因辅助时间长,一天最多只能铺设12块板,现一台铺板门式起重机在湘江大桥投入使用后,一天能铺板25块。Due to the long auxiliary time of the original bridge deck slabs, only 12 slabs can be laid at most in one day. Now, after the Xiangjiang Bridge is put into use, a slab decking gantry crane can lay 25 slabs a day.
由此可见,本发明铺板门式起重机与原有技术相比,具有实质性特点和进步,其实施的有益效果也是非常显著。This shows that compared with the prior art, the decking gantry crane of the present invention has substantive features and progress, and the beneficial effect of its implementation is also very remarkable.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310346971.7A CN104370217B (en) | 2013-08-12 | 2013-08-12 | Portal crane for paving bridge decks |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310346971.7A CN104370217B (en) | 2013-08-12 | 2013-08-12 | Portal crane for paving bridge decks |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104370217A CN104370217A (en) | 2015-02-25 |
| CN104370217B true CN104370217B (en) | 2017-04-19 |
Family
ID=52549465
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310346971.7A Expired - Fee Related CN104370217B (en) | 2013-08-12 | 2013-08-12 | Portal crane for paving bridge decks |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104370217B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107150958A (en) * | 2017-06-23 | 2017-09-12 | 李雨林 | A kind of road and bridge construction crane |
| CN108221696A (en) * | 2018-02-02 | 2018-06-29 | 南昌大学 | A kind of special hoisting sling of prefabricated bridge |
| CN110763185B (en) * | 2019-11-29 | 2025-06-03 | 石家庄华燕交通科技有限公司 | Single-side bridge wheel fall detection system, method and device |
| CN118723824B (en) * | 2024-09-02 | 2024-11-15 | 中国水利水电第七工程局有限公司 | Underground factory building construction hoist and mount system |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1090827A (en) * | 1992-11-11 | 1994-08-17 | 嫩青利布海尔·维克有限公司 | Crane in bridge type |
| CN201068369Y (en) * | 2007-04-30 | 2008-06-04 | 中铁十七局集团有限公司 | Tyre type full-hydraulic cantilever gantry crane |
| CN201077720Y (en) * | 2007-08-06 | 2008-06-25 | 中铁工程机械研究设计院有限公司 | Tyre type doors hanging |
| CN201620358U (en) * | 2009-04-10 | 2010-11-03 | 武汉通联路桥机械技术有限公司 | Gantry crane for down-type bridge-erecting machine |
| CN202245811U (en) * | 2011-09-16 | 2012-05-30 | 姜清海幕墙系统工程武汉有限公司 | Combined curtain wall hoisting equipment |
| CN202988598U (en) * | 2012-11-09 | 2013-06-12 | 辽宁铭鹏防爆起重机有限公司 | Gate-type container overturn crane |
| CN203382408U (en) * | 2013-08-12 | 2014-01-08 | 湖北鄂南起重运输机械有限公司 | Portal crane for paving bridge decks |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102006047997A1 (en) * | 2006-10-09 | 2008-04-10 | Hans Künz GmbH | crane |
-
2013
- 2013-08-12 CN CN201310346971.7A patent/CN104370217B/en not_active Expired - Fee Related
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1090827A (en) * | 1992-11-11 | 1994-08-17 | 嫩青利布海尔·维克有限公司 | Crane in bridge type |
| CN201068369Y (en) * | 2007-04-30 | 2008-06-04 | 中铁十七局集团有限公司 | Tyre type full-hydraulic cantilever gantry crane |
| CN201077720Y (en) * | 2007-08-06 | 2008-06-25 | 中铁工程机械研究设计院有限公司 | Tyre type doors hanging |
| CN201620358U (en) * | 2009-04-10 | 2010-11-03 | 武汉通联路桥机械技术有限公司 | Gantry crane for down-type bridge-erecting machine |
| CN202245811U (en) * | 2011-09-16 | 2012-05-30 | 姜清海幕墙系统工程武汉有限公司 | Combined curtain wall hoisting equipment |
| CN202988598U (en) * | 2012-11-09 | 2013-06-12 | 辽宁铭鹏防爆起重机有限公司 | Gate-type container overturn crane |
| CN203382408U (en) * | 2013-08-12 | 2014-01-08 | 湖北鄂南起重运输机械有限公司 | Portal crane for paving bridge decks |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104370217A (en) | 2015-02-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103015325B (en) | Construction method of cast-in-place concrete crash barrier with eaves | |
| CN103726421B (en) | Height and span adjustable track paver for metro construction | |
| CN100572673C (en) | Span continuous beam bridge fabrication machine in a kind of | |
| CN100476076C (en) | Mobile integral construction platform, construction method and special spreader | |
| CN106400701B (en) | A kind of list girder low level balanced cantilever assembly Bridge Erector | |
| CN105293315B (en) | A hoisting device for prefabricated building components | |
| CN201679506U (en) | Auxiliary traction device of large tonnage lining trolley for lining construction of steep slope inclined shaft | |
| CN105060135A (en) | Tower crane | |
| CN104370217B (en) | Portal crane for paving bridge decks | |
| CN213328698U (en) | Prefabricated member mounting equipment for high-speed railway bridge deck system | |
| CN209835463U (en) | Prefabricated bridge deck hoisting equipment | |
| CN205369055U (en) | Rotatory lifting device of suspension bridge stiffening beam | |
| CN105484168B (en) | Rotary hoisting equipment for stiffening beam of suspension bridge and erecting method of stiffening beam | |
| CN204023336U (en) | A kind of subway track-laying machine | |
| CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
| CN202880701U (en) | Trackless gantry crane | |
| CN102071641B (en) | Cement beam packs bridge machine cloth supporting leg type integration of transporting and building Bridge Erector and bridge formation engineering method thereof | |
| CN204151699U (en) | A kind of frame plate machine for changing steel truss girder bridge bridge deck | |
| CN203382408U (en) | Portal crane for paving bridge decks | |
| CN204492846U (en) | Movable type with inverted arch lining device crosses car trestle | |
| CN201459548U (en) | Track plate-felting machine of cantilever arm folding type | |
| CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
| CN211256692U (en) | Transport beam structure of newly-built upper bridge on current bridge | |
| CN104929130B (en) | High abrupt slope track traction type concrete slip-form adjusting apparatus | |
| JP2024074895A (en) | Deck replacement method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170419 |