[go: up one dir, main page]

CN104405062A - Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment - Google Patents

Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment Download PDF

Info

Publication number
CN104405062A
CN104405062A CN201410587827.7A CN201410587827A CN104405062A CN 104405062 A CN104405062 A CN 104405062A CN 201410587827 A CN201410587827 A CN 201410587827A CN 104405062 A CN104405062 A CN 104405062A
Authority
CN
China
Prior art keywords
concrete
plate
unitary strip
insulation wall
wall plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410587827.7A
Other languages
Chinese (zh)
Inventor
张领然
张前
李俊强
马兆龙
徐科化
张利敏
张利宁
张利振
张利静
王新萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410587827.7A priority Critical patent/CN104405062A/en
Publication of CN104405062A publication Critical patent/CN104405062A/en
Priority to PCT/CN2015/092150 priority patent/WO2016062224A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
    • E04C2/288Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Building Environments (AREA)

Abstract

The invention aims to overcome the complicated techniques of pillar form erecting and pouring and specially provides a production technique and a building technique of an integrated column-equipped heat preservation wallboard. The techniques include the following steps: firstly, during production, a pillar steel reinforcement cage and an integrated heat preservation wallboard steel reinforcement net frame are respectively fabricated and then are connected through steel bars. According to the column-equipped heat preservation wallboard, the production technique and the building technique, the multiple construction processes such as wall building, wall whitewashing, external thermal conservation and pouring are omitted; more material, supplies and labor hours are saved, and a large amount of electric power and water resource are saved. According to estimation, for every hundred square meters of a building, 4 tons of water is saved, 100 Kilowatt hours are saved, 10 tons of concrete is saved, 60 labor hours is saved, the construction cost of the building is reduced by one third, and the construction duration is brought forward by a half.

Description

Unitary strip post heat-insulation wall plate and the equipment produced construction process and match
One, technical field
The present invention relates to walling to produce and construction process, particularly unitary strip post heat-insulation wall plate and production construction process.
Two, background technology
Now under construction, no matter be brick mix structure, frame construction or wall plate structure, all adopt the technique of cast beam, post, this technique has following shortcoming in construction: 1, need a large amount of templates, Zhi Mu and material.2, time-consuming, complex process, restriction duration.
Three, summary of the invention
The present invention is in order to overcome complicated technologies such as building now central post, formwork, cast, and spy proposes unitary strip post heat-insulation wall plate and production technology and construction process
First the present invention is achieved in that, when producing, carries out pillar reinforcing cage respectively, integral heat insulation reinforcing steel bars of wallboards rack, the two with bar connecting, leaves gap.When stand is smeared after trigger completes bottom concrete in the baffle plate frame of ground, the reinforcing cage combined and bar frame are placed on concrete, and bottom surface reinforcing cage, bar frame bottom are shaken in concrete, afterwards, when doing insulation layer, dividing plate is put at reinforcing cage and bar frame gap, heat insulating material, as foam cement, foam beads slurry pour in bar frame by certain thickness, must not flow in pillar reinforcing cage, after insulation layer solidifies, take out the dividing plate between reinforcing cage and bar frame, if make dividing plate with cement plate, do not need to take out.Finally, spread surface concrete layer with panel spreading and applying machine stand, according to heat preservation plate materials such as bar frame polyphenyl foam plates, slightly solidifying after the bottom concrete that shakes, can directly on layer of concrete above.The unitary strip post heat-insulation wall plate surrounding dew bar connecting head made, peripheral band groove, the reinforcing bar of the reinforcing cage in the top and bottom of pillar will grow concrete surface, and the reinforcing bar of the top and bottom of pillar also can pre-buried attaching nut.
Unitary strip post heat-insulation wall plate can adopt unsettled cast connection method, half unsettled cast connection method and Plate Welding connection method with basis, post when being connected:
1, unsettledly build connection method: when completing soon in basis, put (mistake) beam steel cage time, in reinforcing cage, put into spacer, spacing is suitable, is highly same as lintel.Unitary strip post heat-insulation wall plate hangs on spacer, put on right position, fix support regulating bracket, adjust verticality, post two end bar is welded with lintel reinforcing cage and bottom column muscle or is connected, integral heat insulation wallboard upper and lower side bar connecting head welds with upper and lower lintel reinforcing cage respectively, and cope match-plate pattern fluid concrete, charging aperture was higher than depth of beam.If during cast roof, end face will exceed above lintel, unitary strip post heat-insulation wall plate bottom surface 1-2 centimetre.
2, half unsettled casting: first pour into a mould the lintel sections except post muscle, roof sections, plaster after to be solidified, then hang on unitary strip post heat-insulation wall plate, make unitary strip post insulated wall sheet-pile muscle connector weld with foundation pole rib or be connected, cope match-plate pattern fluid concrete again, charging aperture is higher than pouring section.
3, Plate Welding method: unitary strip post heat-insulation wall plate also can adopt the upper and lower end face pre-embedded steel slab of post when producing, lay stand, unitary strip post heat-insulation wall plate place on basis and smear mortar ash, unitary strip post heat-insulation wall plate hangs on basis, pre-embedded steel slab alignment on post lower end steel plate and basis, steel plate can not there is husky ash, upper support regulating bracket, correction, vertical wallboard, the Plate Welding on the steel plate of post lower end and basis.
Unitary strip post heat-insulation wall plate, the connection of adjacent two blocks of wallboards can adopt conjugation and 45 degree of connection methods:
1, conjugation: the end face of unitary strip post heat-insulation wall plate is to side end face, or post side end face coupled columns surface shape being aligned connects, T-shaped connects, right angle connects, and stay suitable gap, with soldering iron, each connector is welded, gap pea gravel concreten tamps.
2,45 degree of connection methods: miter angle can be made when producing in two pieces, unitary strip post insulated wall board house angle, synthesize an angle of 90 degrees during construction and installation, form corner post, stay suitable gap, with soldering iron, each connector is welded, gap note sand-stone concrete.
After unitary strip post heat-insulation wall plate installs completion, cast-in-place topmast mould adopts lintel poling formwork method:
Lintel poling formwork method: this method is lintel two side template, by certain altitude, the lower 3 centimeters of places's (two-layer template is thick) in bottom surface, cast-in-place top excavate numerous hole at a certain distance, size can be as the criterion through shelf pipe plastic pipe sleeve, plastic pipe sleeve through lintel reinforcing cage, wall two side template is put on, then shelf pipe is penetrated, shelf pipe stretches out 1 meter outside wall, the other end inserts in the lintel pattern hole on abutment wall, spacer on plastic pipe sleeve underlay in lintel reinforcing cage, in order to support shelves pipe, shelf pipe is in outer suitable position boring within the walls, latch, fixing reinforcing cage two side template, the inboard template of reinforcing cage and inside wall formwork will lower than exterior sheathing cast-in-place heights of roofs and template thickness, side adds some wood under the tube, at the wide template bar of shelf Guan Shangshun pipe pad 5 centimeters, again in lath upper berth template, carry out cement casting.After concrete setting, remove Zhi Mu, lath, latch, take out shelf pipe, go template, plugging hole.Shelf pipe goes out 1 meter to do construction exterior rack and eaves falsework.
Unitary strip post heat-insulation wall plate, through solidifying maintenance, will carry out hoisting transportation, but because weight is large, volume is greatly not easily moved from place when playing plate, wallboard welds suspension ring time-consuming, the pre-buried lifting part when making, not only time-consuming, when producing, mold is not easy to operate.Convenient in order to play wallboard handling, spy has invented the trigger matched, play trigger and have two groups of crossbeams, one of two crossbeams is welded with a perpendicular thick stick below, perpendicular thick stick height will exceed wallboard thickness, a rigid staybolt is connected on two crossbeam other ends, respectively suspension ring are welded outward at rigid staybolt, then two groups of crossbeams to be staggeredly placed alignment by an on one side perpendicular thick stick, in the middle of two groups of four crossbeams, weldering four steel pipes do axis hole, insert in two groups of steel pipes with two axles, on four crossbeams, fixing hole and latch two groups are established in diagonal angle, and four suspension ring are connected with wire rope.When hanging screen plate, two end faces of wall put into by two perpendicular thick sticks, and extract Fixed latches, hang the wire rope on four lifting hole(eyelet)s with crane, two of suspension ring is lifted, and wallboard end face is just blocked until sling inflexibly in two of perpendicular thick stick.
Unitary strip post heat-insulation wall plate hangs on basis and also wants vertical correction and fix, spy has invented, correction support regulating bracket vertical with the wallboard that unitary strip post heat-insulation wall plate construction process matches, it is by top ∩ type card, fixed screw is had under inside ∩ type card, upper right quarter is welded with hinge and fastener for connection, and there is set screw steel pipe middle and lower part, and the bottom steel pipe of set screw has hinge, and be connected with base, be welded with steel nail below base.When unitary strip post heat-insulation wall plate hangs on basis, ∩ type card blocks wallboard top, and screw tightens, and ballast on base, mixes up verticality by set screw, and crane hook can remove.
Unitary strip post heat-insulation wall plate and production construction process have following function and characteristics:
1, assembled architecture: the component such as wall, post, insulation layer, finish coat of unitary strip post heat-insulation wall plate and production construction process is all complete in factory, account for 80 percent of building operations amount, Jian Yizuo building, can as putting up a house making in factory automobile.
2, structure, body of wall, heat insulation integrated: unitary strip post heat-insulation wall plate and produce construction process, body of wall and heat insulation integrated, beam column and integrated with wall body, flooring are integrated with beam column, whole house is exactly the entirety of pouring concrete, and this technique constitutes one complete " integral heat insulation wallboard building system ".
3, four joint one environmental protection: unitary strip post heat-insulation wall plate and production construction process eliminate the many operations in building, as construction of building a wall, white washed wall construction, construction of exterior insulation system, water post construction etc., can a lot of material, consumptive material and man-hour be saved, can a large amount of electric energy and water resource be saved; Body of wall general thickness is 15-20 centimetre, adds floor space than common buildings, and the house integral structure built up has earthquake resistance and prevention, heat-insulation warm keeping, insulation layer and building same life-span, Maintenance free, comfort level high.Substantially there is no waste material, waste gas, soot emissions in building site, protect environment.It is estimated, the building of every hundred square metres can save 4 tons, water, electricity 100 degree, and save cement 10 tons, save man-hour 60, building can reduce by the cost of 1/3rd, can shift to an earlier date the duration of 1/2nd.
In a word; unitary strip post heat-insulation wall plate and production construction process can be produced in factory in industrialization; assemble at the scene; building structure, body of wall, heat insulation integrated can be made; make building water-saving and water, energy-conservation, material-saving and protection of the environment; the star of green building worthy of the name, in the great cause building beautiful China, applying the huge economic benefit of generation and social benefit of it.
Four, accompanying drawing explanation
Accompanying drawing 1 is unitary strip post heat-insulation wall plate flat and stereo planing surface figure: (1) unitary strip post heat-insulation wall plate, (2) pillar reinforcing cage, (3) bar connecting head, (4) wallboard groove, (5) glass fiber mesh, (6) reinforcing steel bars of wallboards rack, (7) window, (8) doorway, (9) outlet switch, (10) layer of concrete, (11) insulation layer.
Accompanying drawing 2 is that two pieces, corner unitary strip post heat-insulation wall plate connects and is connected unsettled casting and constructing figure with basis: figure (1) is unitary strip post heat-insulation wall plate, (2) pillar reinforcing cage, (3) bar connecting head, (4) wallboard groove, (12) soldering iron, (13) two pieces of wallboard gaps, (14) sand-stone concrete, (15) basis, (16) upper lower prop muscle pad, (17) lintel reinforcing cage, (18) spacer, (20) transverse slat.
Accompanying drawing 3 is unitary strip post heat-insulation wall plate and lintel poling formwork construction figure: (1) unitary strip post heat-insulation wall plate, (2) pillar reinforcing bar, (3) bar connecting head, (4) wallboard groove, (16) upper and lower pillar steel bar welding contact, (17) lintel reinforcing cage, (18) spacer, (19) tower bolt, (20) template, (21) plastic pipe sleeve, (22) shelf pipe, (23) ∩ type card, (24) hinge, (25) fixed screw (26) adjustment screw, (27) base, (28) steel nail, (29) weight laminate, (30) pole.
Accompanying drawing 4 is that unitary strip post heat-insulation wall plate plays trigger: (31) wire rope, (32) suspension ring, (33) crossbeam, (34) perpendicular thick stick, (35) central siphon, (36) axle, (37) fixing hole (38) Fixed latches.
Five, embodiment
Do unitary strip post heat-insulation wall plate (1), first do pillar reinforcing cage (2), bar frame (6), the two (2) and (6) are used bar connecting, leave gap, wallboard panel spreading and applying machine is used concrete (10) on the ground in baffle plate frame, (2), (6) are placed on concrete (10), and (2), (6) bottom are shaken in concrete (10).Dividing plate is put in (2), (6) gap, foam cement or foam beads slurry are put into reinforcing steel bars of wallboards rack (6) by certain altitude, to be solidified, insulation layer (11) completes, take out dividing plate, spread layer concrete (10) with wallboard panel spreading and applying machine stand again, solidify maintenance, unitary strip post heat-insulation wall plate (1) is made.
When unitary strip post heat-insulation wall plate (10) will be sling, crane has hung up properly trigger wire rope (31), be put on wallboard (1) play trigger, perpendicular thick stick (34) blocks wallboard (1) end face, extract Fixed latches (38) out, crane promotes, crossbeam (33) has one of suspension ring (32) upwards to rise, and perpendicular thick stick (34) tightly blocks wallboard (1) two ends until wallboard (1) is mentioned.
Wallboard and basis, when wallboard is connected with wallboard, first lintel reinforcing cage (17) is placed on ground (15), spacer (18) is put in reinforcing cage (17), adjacent two pieces of unitary strip post heat-insulation wall plates (1) are hung on basis (15), wallboard (1) upper end is blocked by support regulating bracket ∩ type card (23), tighten the screw (25), weight (29) is pressed on base (27), adjustment screw (26) vertical good wallboard (1), pillar reinforcing bar (2) is welded (16) with foundation pole rib (2), with soldering iron (12), bar connecting head (3) is welded, concrete material (14) cope match-plate pattern (20) is inserted in gap (13), fluid concrete, unitary strip post heat-insulation wall plate (1) wallboard and wallboard, wallboard has been connected with basis.

Claims (12)

1. a unitary strip post heat-insulation wall plate, comprising: wallboard two sides is layer of concrete, inside there are glass fiber mesh and steel mesh reinforcement, intermediate layer is that insulation layer (heat insulating material such as foam cement or polyphenyl foam plate) oblique cutting reinforcing bar connects into cage of reinforcement through insulation layer two sides steel mesh reinforcement, door, window, water, electricity, gas pipeline are made in the lump, surrounding is fluted, there is bar connecting head, the feature of this technique is: at end face, pillar is made when unitary strip post heat-insulation wall plate is produced, pillar whole concrete bar construction, be connected with wallboard, form unitary strip post heat-insulation wall plate.
2. according to claim 1, described in unitary strip post heat-insulation wall plate production technology it is characterized in that: produce time, carry out pillar reinforcing cage respectively, integral wall bar frame, the two is used bar connecting, leave gap, when stand is smeared after trigger completes bottom concrete in baffle plate, the pillar reinforcing cage combined and integral wall bar frame are placed on concrete, and bottom is shaken in concrete, when doing insulation layer, dividing plate is put between pillar reinforcing cage and integral wall bar frame, heat insulating material slurry (as foam cement, foam beads slurry etc.) pour in integral wall bar frame by certain thickness, after insulation layer solidifies, take out reinforcing cage and bar frame space bar, surface concrete layer is spread with panel spreading and applying machine stand.
3. according to claim 1, described in unitary strip post heat-insulation wall plate production technology it is characterized in that: produce time, carry out pillar reinforcing cage, integral wall cystosepiment steel mesh reinforcement frame plate respectively, the two is used bar connecting, when stand is smeared after trigger completes bottom concrete in baffle plate, the pillar reinforcing cage be combined and integral wall reinforced foam network frame plate are placed on concrete, bottom shakes in concrete, slightly solidifying, spreads surface concrete layer with panel spreading and applying machine stand.
4. according to claim 1, described unitary strip post heat-insulation wall plate under construction with the Joining Technology on basis, it is characterized in that: unsettled cast connection method, when local (mistake) beam steel cage is placed on basis, several spacers are put in reinforcing cage, unitary strip post wallboard is hung on cushion block, fix adjustment support, put on right position, align verticality, end bar under post is welded with foundation pole rib, and with the interconnection of grade beam reinforcing cage, cope match-plate pattern fluid concrete, charging aperture higher than cross depth of beam.
5. according to claim 1, described unitary strip post heat-insulation wall plate under construction with basic Joining Technology, it is characterized in that: adopt half unsettled casting, first pour into a mould the lintel sections except post muscle, roof sections, plaster again after solidifying, hang on unitary strip post heat-insulation wall plate, wallboard post muscle is welded with foundation pole rib or is connected, then cope match-plate pattern fluid concrete.
6. according to claim 1, described unitary strip post heat-insulation wall plate under construction with the Joining Technology on basis, it is characterized in that: Plate Welding method, unitary strip post heat-insulation wall plate adopts the upper and lower end face pre-embedded steel slab of post when producing, a little higher than wall bottom surface, the basis corresponding with post also pre-embedded steel slab, crossing () beam is plastered hangs on unitary strip post heat-insulation wall plate, post lower end steel plate is alignd with the steel plate on basis, align wallboard verticality with secured adjusted support, welded.
7. adopt direct welding according to claim 1, described unitary strip post heat-insulation wall plate when connecting for adjacent two pieces, it is characterized in that: wallboard band post side end face is to side end face or side end face coupled columns surface, form connection that is linear, T-shaped, right angle type, suitable gap can be stayed, with soldering iron, each connector is welded, gap sandstone concrete tamps.
8. according to claim 1, described unitary strip post heat-insulation wall plate under construction the adjacent two blocks of wallboards in angle, room connection adopt 45 degree of connection methods, it is characterized in that: the end face of unitary strip post insulated wall sheet-pile makes miter angle, two blocks of wallboards synthesize an an angle of 90 degrees, form a corner post, stay suitable gap, with soldering iron, each connector is welded, tamp with sandstone concrete.
9. according to claim 1, described in unitary strip post heat-insulation wall plate, it is characterized in that: there is finish coat in inside and outside face.
10. according to claim 1, 2, 3, 4, 5, 6, 7, 8, the post heat-insulation wall plate of unitary strip described in 9 and production and construction process, lintel poling formwork method is adopted when cast-in-place topmast mould, it is characterized in that: lintel two side template by certain altitude---numerous hole is excavated on cast-in-place top below lower 3 centimeters of places's (two-layer template thickness) at a certain distance, size can pass plastic pipe sleeve, plastic pipe sleeve put into (mistake) beam steel cage, wall two side template is put on, then shelf pipe is worn, shelf pipe stretches out 1 meter outside wall, the other end inserts in the beam form plate hole on abutment wall, in lintel, and cement small cushion block on plastic pipe sleeve underlay, in order to support shelves pipe, shelf pipe is within the walls, the boring of outer appropriate location, latch, fixing reinforcing cage two side template, the inboard template of wall and inside wall formwork will lower than exterior sheathing cast-in-place heights of roofs and template thickness, a Zhi Mu under shelf pipe, at shelf Guan Shangshun pipe pad about 5 centimeters of wide laths, on lath, complete template again, carry out pouring concrete, after solidifying, remove Zhi Mu, remove lath, remove pin, take out shelf pipe, go template, plugging hole, shelf pipe goes out 1 meter to be used as construction exterior rack or eaves falsework.
11. 1 kinds and claim 1, 2, what technique described in 3 matched plays trigger, it is characterized in that: playing trigger has two groups of crossbeams, one of two crossbeams is welded with a perpendicular thick stick below, perpendicular thick stick height will exceed wallboard thickness, a rigid staybolt is connected on two crossbeam other ends, respectively suspension ring are welded outward at rigid staybolt, then two groups of crossbeams to be staggeredly placed alignment by an on one side perpendicular thick stick, in the middle of two groups of four crossbeams, weldering four steel pipes do axis hole, insert in two groups of steel pipes with two axles, on four crossbeams, fixing hole and latch two groups are established in diagonal angle, four suspension ring are connected with wire rope.
12. support regulating brackets matched according to technique described in claim 1,2,3,4,5,6,7,8,9, it is characterized in that: top ∩ type card, fixed screw is had under inside ∩ type card, upper right quarter is welded with hinge and fastener for connection, there is set screw steel pipe middle and lower part, the bottom steel pipe of set screw has hinge, and is connected with base, is welded with steel nail below base.
CN201410587827.7A 2014-10-19 2014-10-19 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment Pending CN104405062A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410587827.7A CN104405062A (en) 2014-10-19 2014-10-19 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
PCT/CN2015/092150 WO2016062224A1 (en) 2014-10-19 2015-10-19 Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410587827.7A CN104405062A (en) 2014-10-19 2014-10-19 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment

Publications (1)

Publication Number Publication Date
CN104405062A true CN104405062A (en) 2015-03-11

Family

ID=52642720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410587827.7A Pending CN104405062A (en) 2014-10-19 2014-10-19 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment

Country Status (2)

Country Link
CN (1) CN104405062A (en)
WO (1) WO2016062224A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016062224A1 (en) * 2014-10-19 2016-04-28 张领然 Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
CN108952188A (en) * 2018-08-02 2018-12-07 绍兴职业技术学院 A kind of fixation device of assembling type outer wall plate
CN109667335A (en) * 2017-10-13 2019-04-23 李杰民 A kind of Reactive Powder Concrete laminated type structures
CN116944639A (en) * 2023-09-20 2023-10-27 晋西铁路车辆有限责任公司 Railway wagon plate column type end wall assembly welding process

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106854913A (en) * 2017-01-22 2017-06-16 大美砼艺(天津)建筑科技发展有限公司 A kind of Multifunction environmental protection combined wall board
CN107571389B (en) * 2017-09-21 2023-06-09 安徽建工建筑工业有限公司 Detachable and reusable wallboard hanging device
CN107476491A (en) * 2017-09-28 2017-12-15 深圳市华阳国际工程设计股份有限公司 Fill concrete wallboard and its manufacture method in a kind of prefabricated thermal insulation
CN108202388B (en) * 2017-12-27 2023-05-26 东南大学 A parameter-adjustable mold that can be used for the production of interior and exterior wall panels and its application
CN109098316A (en) * 2018-09-05 2018-12-28 布雷尼建筑科技(苏州)有限公司 High-strength nano inorganic gel fire-retardant heat insulation assembled inner partition plate
CN109057083A (en) * 2018-10-09 2018-12-21 袁绍宽 A kind of new A S assembled negative oxygen ion self heat insulation wall
CN109853785A (en) * 2019-01-22 2019-06-07 河南聚誉帆工程技术咨询有限公司 Assembled integral fills partition wall and fabrication and installation method
CN110029759B (en) * 2019-05-27 2024-04-09 大庆市碧千里科技开发有限公司 Environment-friendly, energy-saving and safe simple passive house
CN113882539A (en) * 2021-11-01 2022-01-04 辽宁众一节能科技(集团)有限公司 An integrated structure and construction method for external thermal insulation and support of building enclosure walls
CN114703987B (en) * 2022-04-02 2023-05-23 东莞职业技术学院 High-rise shear wall casting method and high-rise stairwell casting method
CN115613732A (en) * 2022-11-07 2023-01-17 北京达诺筑工科技发展有限公司 Embedded integrated wall installation method
CN116815955A (en) * 2023-05-04 2023-09-29 广东特美纳建设有限公司 A modular prefabricated green energy-saving building structure

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1025837A (en) * 1996-07-11 1998-01-27 Matsushita Electric Works Ltd Wall panel mounting structure
CN2466264Y (en) * 2000-10-20 2001-12-19 邹光洪 Combined prefabricated component for fabricated structure building
CN2723409Y (en) * 2004-08-16 2005-09-07 天津港第一港埠公司 Special clamp for loading and unloading 8 ton aluminium ingot
CN2897963Y (en) * 2006-04-30 2007-05-09 郑州安彩耐火材料有限公司 Clamp
US20080141598A1 (en) * 2006-12-19 2008-06-19 Cook Charlie E Framed Opening Bracing System
CN201502176U (en) * 2009-09-24 2010-06-09 山西省第一建筑工程公司 Constructional column sleeve bolt formwork erecting system
CN103287990A (en) * 2013-05-22 2013-09-11 马鞍山十七冶工程科技有限责任公司 Transportation crane for light-weight wall plates
CN103352537A (en) * 2013-07-09 2013-10-16 张领然 Integral load-bearing heat-insulating wall plate and production and construction technology thereof
CN103395689A (en) * 2013-07-26 2013-11-20 张宗楼 Horizontal hoisting clamp for wallboard
CN103938792A (en) * 2014-05-12 2014-07-23 韩秀军 Built-in beam column composite wall plate
CN104074367A (en) * 2014-07-18 2014-10-01 防城港中一重工有限公司 Mounting adjustment device for prefabricated wall panel

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4489530A (en) * 1981-12-23 1984-12-25 Chi Ming Chang Sandwich wall structure and the method for constructing the same
CN201381177Y (en) * 2009-03-13 2010-01-13 东莞市科绿盛实业有限公司 Board lifting machine for high density wallboard
CN201517255U (en) * 2009-03-18 2010-06-30 张领然 Integral cement composite heat-insulating external wall
CN101761174B (en) * 2009-12-28 2012-02-15 张吉华 Prefabricated interior thermal insulation wall body with integrated pillar, beam and wall
US8844227B1 (en) * 2013-03-15 2014-09-30 Romeo Ilarian Ciuperca High performance, reinforced insulated precast concrete and tilt-up concrete structures and methods of making same
CN104405062A (en) * 2014-10-19 2015-03-11 张领然 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1025837A (en) * 1996-07-11 1998-01-27 Matsushita Electric Works Ltd Wall panel mounting structure
CN2466264Y (en) * 2000-10-20 2001-12-19 邹光洪 Combined prefabricated component for fabricated structure building
CN2723409Y (en) * 2004-08-16 2005-09-07 天津港第一港埠公司 Special clamp for loading and unloading 8 ton aluminium ingot
CN2897963Y (en) * 2006-04-30 2007-05-09 郑州安彩耐火材料有限公司 Clamp
US20080141598A1 (en) * 2006-12-19 2008-06-19 Cook Charlie E Framed Opening Bracing System
CN201502176U (en) * 2009-09-24 2010-06-09 山西省第一建筑工程公司 Constructional column sleeve bolt formwork erecting system
CN103287990A (en) * 2013-05-22 2013-09-11 马鞍山十七冶工程科技有限责任公司 Transportation crane for light-weight wall plates
CN103352537A (en) * 2013-07-09 2013-10-16 张领然 Integral load-bearing heat-insulating wall plate and production and construction technology thereof
CN103395689A (en) * 2013-07-26 2013-11-20 张宗楼 Horizontal hoisting clamp for wallboard
CN103938792A (en) * 2014-05-12 2014-07-23 韩秀军 Built-in beam column composite wall plate
CN104074367A (en) * 2014-07-18 2014-10-01 防城港中一重工有限公司 Mounting adjustment device for prefabricated wall panel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016062224A1 (en) * 2014-10-19 2016-04-28 张领然 Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
CN109667335A (en) * 2017-10-13 2019-04-23 李杰民 A kind of Reactive Powder Concrete laminated type structures
CN109667335B (en) * 2017-10-13 2023-12-19 北京惠诚基业工程技术有限责任公司 Active powder concrete laminated structure
CN108952188A (en) * 2018-08-02 2018-12-07 绍兴职业技术学院 A kind of fixation device of assembling type outer wall plate
CN116944639A (en) * 2023-09-20 2023-10-27 晋西铁路车辆有限责任公司 Railway wagon plate column type end wall assembly welding process
CN116944639B (en) * 2023-09-20 2023-12-26 晋西铁路车辆有限责任公司 Railway wagon plate column type end wall assembly welding process

Also Published As

Publication number Publication date
WO2016062224A1 (en) 2016-04-28

Similar Documents

Publication Publication Date Title
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN101818539B (en) Assembled integral building and construction method thereof
CN105317137B (en) Prefabricated wall body, wall panel and construction method thereof, and production method of prefabricated wall panel
CN104060629B (en) The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo
CN201738600U (en) Assembled integrated type building
CN110359601A (en) A kind of one-time formed energy saving form walls of one-piece casting and construction method
CN105507476B (en) Construction method of multi-arch roof
CN103352537B (en) Overall load bearing heat preserving wallboard and production construction process thereof
CN108005387A (en) A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers
CN103590486B (en) Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method
CN102644382B (en) Mounting technology of large-module wall
CN113958043B (en) A structurally integrated prefabricated hollow wall without formwork removal and construction technology
CN105672664A (en) Integral heat insulation wallboard building system
CN107476583A (en) A kind of concrete assembled building builds construction method
CN203924116U (en) Portable side wall formwork jumbo
CN114164977A (en) Method for combining construction of aluminum template and laminated slab
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
JP2011069151A (en) Concrete panel form
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN216787893U (en) Prefabricated shear wall positioner
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN208309616U (en) A kind of assembled prefabricated house prefabricated foundation that piece is staggered
CN112681511B (en) Construction method of reinforced concrete structure by replacing part of steel bars with section steel
CN109339100A (en) An open-cut tunnel formwork support system and construction method
CN103437440B (en) Building energy conservation heat insulation system and building heat preservation top-down construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Lingran

Inventor after: Zhang Lijing

Inventor after: Wang Xinping

Inventor after: Liu Yu

Inventor after: Zhang Qian

Inventor after: Li Junqiang

Inventor after: Ma Zhaolong

Inventor after: Xu Kehua

Inventor after: Zhang Limin

Inventor after: Zhang Lining

Inventor after: Zhang Lizhen

Inventor before: Zhang Lingran

Inventor before: Wang Xinping

Inventor before: Zhang Qian

Inventor before: Li Junqiang

Inventor before: Ma Zhaolong

Inventor before: Xu Kehua

Inventor before: Zhang Limin

Inventor before: Zhang Lining

Inventor before: Zhang Lizhen

Inventor before: Zhang Lijing

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20150311

RJ01 Rejection of invention patent application after publication