CN104405062A - Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment - Google Patents
Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment Download PDFInfo
- Publication number
- CN104405062A CN104405062A CN201410587827.7A CN201410587827A CN104405062A CN 104405062 A CN104405062 A CN 104405062A CN 201410587827 A CN201410587827 A CN 201410587827A CN 104405062 A CN104405062 A CN 104405062A
- Authority
- CN
- China
- Prior art keywords
- concrete
- plate
- unitary strip
- insulation wall
- wall plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 13
- 238000004321 preservation Methods 0.000 title abstract description 5
- 239000004567 concrete Substances 0.000 claims abstract description 36
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 238000010276 construction Methods 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 7
- 230000002787 reinforcement Effects 0.000 claims abstract 6
- 238000009413 insulation Methods 0.000 claims description 68
- 230000003014 reinforcing effect Effects 0.000 claims description 35
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 239000006260 foam Substances 0.000 claims description 10
- 239000004568 cement Substances 0.000 claims description 8
- 238000005516 engineering process Methods 0.000 claims description 8
- 239000000725 suspension Substances 0.000 claims description 8
- 238000009415 formwork Methods 0.000 claims description 7
- 125000006850 spacer group Chemical group 0.000 claims description 7
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 210000003205 muscle Anatomy 0.000 claims description 6
- 238000005476 soldering Methods 0.000 claims description 6
- 239000012530 fluid Substances 0.000 claims description 5
- 230000001105 regulatory effect Effects 0.000 claims description 5
- 238000003892 spreading Methods 0.000 claims description 5
- 238000005266 casting Methods 0.000 claims description 4
- 239000002002 slurry Substances 0.000 claims description 4
- 239000011324 bead Substances 0.000 claims description 3
- 239000011810 insulating material Substances 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 2
- 239000003365 glass fiber Substances 0.000 claims description 2
- 239000011505 plaster Substances 0.000 claims description 2
- 229920006389 polyphenyl polymer Polymers 0.000 claims description 2
- 238000003466 welding Methods 0.000 claims description 2
- 238000005304 joining Methods 0.000 claims 3
- 238000005520 cutting process Methods 0.000 claims 1
- -1 electricity Substances 0.000 claims 1
- 239000000463 material Substances 0.000 abstract description 6
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000021615 conjugation Effects 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 239000011449 brick Substances 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000004071 soot Substances 0.000 description 1
- 239000002912 waste gas Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/26—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
- E04C2/284—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
- E04C2/288—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Building Environments (AREA)
Abstract
Description
Claims (12)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410587827.7A CN104405062A (en) | 2014-10-19 | 2014-10-19 | Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment |
| PCT/CN2015/092150 WO2016062224A1 (en) | 2014-10-19 | 2015-10-19 | Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410587827.7A CN104405062A (en) | 2014-10-19 | 2014-10-19 | Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104405062A true CN104405062A (en) | 2015-03-11 |
Family
ID=52642720
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410587827.7A Pending CN104405062A (en) | 2014-10-19 | 2014-10-19 | Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN104405062A (en) |
| WO (1) | WO2016062224A1 (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2016062224A1 (en) * | 2014-10-19 | 2016-04-28 | 张领然 | Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof |
| CN108952188A (en) * | 2018-08-02 | 2018-12-07 | 绍兴职业技术学院 | A kind of fixation device of assembling type outer wall plate |
| CN109667335A (en) * | 2017-10-13 | 2019-04-23 | 李杰民 | A kind of Reactive Powder Concrete laminated type structures |
| CN116944639A (en) * | 2023-09-20 | 2023-10-27 | 晋西铁路车辆有限责任公司 | Railway wagon plate column type end wall assembly welding process |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106854913A (en) * | 2017-01-22 | 2017-06-16 | 大美砼艺(天津)建筑科技发展有限公司 | A kind of Multifunction environmental protection combined wall board |
| CN107571389B (en) * | 2017-09-21 | 2023-06-09 | 安徽建工建筑工业有限公司 | Detachable and reusable wallboard hanging device |
| CN107476491A (en) * | 2017-09-28 | 2017-12-15 | 深圳市华阳国际工程设计股份有限公司 | Fill concrete wallboard and its manufacture method in a kind of prefabricated thermal insulation |
| CN108202388B (en) * | 2017-12-27 | 2023-05-26 | 东南大学 | A parameter-adjustable mold that can be used for the production of interior and exterior wall panels and its application |
| CN109098316A (en) * | 2018-09-05 | 2018-12-28 | 布雷尼建筑科技(苏州)有限公司 | High-strength nano inorganic gel fire-retardant heat insulation assembled inner partition plate |
| CN109057083A (en) * | 2018-10-09 | 2018-12-21 | 袁绍宽 | A kind of new A S assembled negative oxygen ion self heat insulation wall |
| CN109853785A (en) * | 2019-01-22 | 2019-06-07 | 河南聚誉帆工程技术咨询有限公司 | Assembled integral fills partition wall and fabrication and installation method |
| CN110029759B (en) * | 2019-05-27 | 2024-04-09 | 大庆市碧千里科技开发有限公司 | Environment-friendly, energy-saving and safe simple passive house |
| CN113882539A (en) * | 2021-11-01 | 2022-01-04 | 辽宁众一节能科技(集团)有限公司 | An integrated structure and construction method for external thermal insulation and support of building enclosure walls |
| CN114703987B (en) * | 2022-04-02 | 2023-05-23 | 东莞职业技术学院 | High-rise shear wall casting method and high-rise stairwell casting method |
| CN115613732A (en) * | 2022-11-07 | 2023-01-17 | 北京达诺筑工科技发展有限公司 | Embedded integrated wall installation method |
| CN116815955A (en) * | 2023-05-04 | 2023-09-29 | 广东特美纳建设有限公司 | A modular prefabricated green energy-saving building structure |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1025837A (en) * | 1996-07-11 | 1998-01-27 | Matsushita Electric Works Ltd | Wall panel mounting structure |
| CN2466264Y (en) * | 2000-10-20 | 2001-12-19 | 邹光洪 | Combined prefabricated component for fabricated structure building |
| CN2723409Y (en) * | 2004-08-16 | 2005-09-07 | 天津港第一港埠公司 | Special clamp for loading and unloading 8 ton aluminium ingot |
| CN2897963Y (en) * | 2006-04-30 | 2007-05-09 | 郑州安彩耐火材料有限公司 | Clamp |
| US20080141598A1 (en) * | 2006-12-19 | 2008-06-19 | Cook Charlie E | Framed Opening Bracing System |
| CN201502176U (en) * | 2009-09-24 | 2010-06-09 | 山西省第一建筑工程公司 | Constructional column sleeve bolt formwork erecting system |
| CN103287990A (en) * | 2013-05-22 | 2013-09-11 | 马鞍山十七冶工程科技有限责任公司 | Transportation crane for light-weight wall plates |
| CN103352537A (en) * | 2013-07-09 | 2013-10-16 | 张领然 | Integral load-bearing heat-insulating wall plate and production and construction technology thereof |
| CN103395689A (en) * | 2013-07-26 | 2013-11-20 | 张宗楼 | Horizontal hoisting clamp for wallboard |
| CN103938792A (en) * | 2014-05-12 | 2014-07-23 | 韩秀军 | Built-in beam column composite wall plate |
| CN104074367A (en) * | 2014-07-18 | 2014-10-01 | 防城港中一重工有限公司 | Mounting adjustment device for prefabricated wall panel |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4489530A (en) * | 1981-12-23 | 1984-12-25 | Chi Ming Chang | Sandwich wall structure and the method for constructing the same |
| CN201381177Y (en) * | 2009-03-13 | 2010-01-13 | 东莞市科绿盛实业有限公司 | Board lifting machine for high density wallboard |
| CN201517255U (en) * | 2009-03-18 | 2010-06-30 | 张领然 | Integral cement composite heat-insulating external wall |
| CN101761174B (en) * | 2009-12-28 | 2012-02-15 | 张吉华 | Prefabricated interior thermal insulation wall body with integrated pillar, beam and wall |
| US8844227B1 (en) * | 2013-03-15 | 2014-09-30 | Romeo Ilarian Ciuperca | High performance, reinforced insulated precast concrete and tilt-up concrete structures and methods of making same |
| CN104405062A (en) * | 2014-10-19 | 2015-03-11 | 张领然 | Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment |
-
2014
- 2014-10-19 CN CN201410587827.7A patent/CN104405062A/en active Pending
-
2015
- 2015-10-19 WO PCT/CN2015/092150 patent/WO2016062224A1/en active Application Filing
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1025837A (en) * | 1996-07-11 | 1998-01-27 | Matsushita Electric Works Ltd | Wall panel mounting structure |
| CN2466264Y (en) * | 2000-10-20 | 2001-12-19 | 邹光洪 | Combined prefabricated component for fabricated structure building |
| CN2723409Y (en) * | 2004-08-16 | 2005-09-07 | 天津港第一港埠公司 | Special clamp for loading and unloading 8 ton aluminium ingot |
| CN2897963Y (en) * | 2006-04-30 | 2007-05-09 | 郑州安彩耐火材料有限公司 | Clamp |
| US20080141598A1 (en) * | 2006-12-19 | 2008-06-19 | Cook Charlie E | Framed Opening Bracing System |
| CN201502176U (en) * | 2009-09-24 | 2010-06-09 | 山西省第一建筑工程公司 | Constructional column sleeve bolt formwork erecting system |
| CN103287990A (en) * | 2013-05-22 | 2013-09-11 | 马鞍山十七冶工程科技有限责任公司 | Transportation crane for light-weight wall plates |
| CN103352537A (en) * | 2013-07-09 | 2013-10-16 | 张领然 | Integral load-bearing heat-insulating wall plate and production and construction technology thereof |
| CN103395689A (en) * | 2013-07-26 | 2013-11-20 | 张宗楼 | Horizontal hoisting clamp for wallboard |
| CN103938792A (en) * | 2014-05-12 | 2014-07-23 | 韩秀军 | Built-in beam column composite wall plate |
| CN104074367A (en) * | 2014-07-18 | 2014-10-01 | 防城港中一重工有限公司 | Mounting adjustment device for prefabricated wall panel |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2016062224A1 (en) * | 2014-10-19 | 2016-04-28 | 张领然 | Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof |
| CN109667335A (en) * | 2017-10-13 | 2019-04-23 | 李杰民 | A kind of Reactive Powder Concrete laminated type structures |
| CN109667335B (en) * | 2017-10-13 | 2023-12-19 | 北京惠诚基业工程技术有限责任公司 | Active powder concrete laminated structure |
| CN108952188A (en) * | 2018-08-02 | 2018-12-07 | 绍兴职业技术学院 | A kind of fixation device of assembling type outer wall plate |
| CN116944639A (en) * | 2023-09-20 | 2023-10-27 | 晋西铁路车辆有限责任公司 | Railway wagon plate column type end wall assembly welding process |
| CN116944639B (en) * | 2023-09-20 | 2023-12-26 | 晋西铁路车辆有限责任公司 | Railway wagon plate column type end wall assembly welding process |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2016062224A1 (en) | 2016-04-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104405062A (en) | Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment | |
| CN101818539B (en) | Assembled integral building and construction method thereof | |
| CN105317137B (en) | Prefabricated wall body, wall panel and construction method thereof, and production method of prefabricated wall panel | |
| CN104060629B (en) | The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo | |
| CN201738600U (en) | Assembled integrated type building | |
| CN110359601A (en) | A kind of one-time formed energy saving form walls of one-piece casting and construction method | |
| CN105507476B (en) | Construction method of multi-arch roof | |
| CN103352537B (en) | Overall load bearing heat preserving wallboard and production construction process thereof | |
| CN108005387A (en) | A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers | |
| CN103590486B (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
| CN102644382B (en) | Mounting technology of large-module wall | |
| CN113958043B (en) | A structurally integrated prefabricated hollow wall without formwork removal and construction technology | |
| CN105672664A (en) | Integral heat insulation wallboard building system | |
| CN107476583A (en) | A kind of concrete assembled building builds construction method | |
| CN203924116U (en) | Portable side wall formwork jumbo | |
| CN114164977A (en) | Method for combining construction of aluminum template and laminated slab | |
| CN207110214U (en) | A kind of prefabricated interior fill concrete wallboard | |
| JP2011069151A (en) | Concrete panel form | |
| CN106894538A (en) | Filling wall and agent structure concrete integral shaping method | |
| CN216787893U (en) | Prefabricated shear wall positioner | |
| CN205224332U (en) | Prefabricated wall body and prefabricated wallboard | |
| CN208309616U (en) | A kind of assembled prefabricated house prefabricated foundation that piece is staggered | |
| CN112681511B (en) | Construction method of reinforced concrete structure by replacing part of steel bars with section steel | |
| CN109339100A (en) | An open-cut tunnel formwork support system and construction method | |
| CN103437440B (en) | Building energy conservation heat insulation system and building heat preservation top-down construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB03 | Change of inventor or designer information |
Inventor after: Zhang Lingran Inventor after: Zhang Lijing Inventor after: Wang Xinping Inventor after: Liu Yu Inventor after: Zhang Qian Inventor after: Li Junqiang Inventor after: Ma Zhaolong Inventor after: Xu Kehua Inventor after: Zhang Limin Inventor after: Zhang Lining Inventor after: Zhang Lizhen Inventor before: Zhang Lingran Inventor before: Wang Xinping Inventor before: Zhang Qian Inventor before: Li Junqiang Inventor before: Ma Zhaolong Inventor before: Xu Kehua Inventor before: Zhang Limin Inventor before: Zhang Lining Inventor before: Zhang Lizhen Inventor before: Zhang Lijing |
|
| CB03 | Change of inventor or designer information | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150311 |
|
| RJ01 | Rejection of invention patent application after publication |