[go: up one dir, main page]

CN104695923A - Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls - Google Patents

Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls Download PDF

Info

Publication number
CN104695923A
CN104695923A CN201310651652.7A CN201310651652A CN104695923A CN 104695923 A CN104695923 A CN 104695923A CN 201310651652 A CN201310651652 A CN 201310651652A CN 104695923 A CN104695923 A CN 104695923A
Authority
CN
China
Prior art keywords
well
fracturing
horizontal well
construction
bunch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310651652.7A
Other languages
Chinese (zh)
Inventor
王广涛
赵振峰
李宪文
张矿生
唐梅荣
薛小佳
王文雄
闫永萍
吴顺林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310651652.7A priority Critical patent/CN104695923A/en
Publication of CN104695923A publication Critical patent/CN104695923A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a method for realizing horizontal well subsection multi-cluster fracturing by adopting soluble balls, which is designed for solving the problem that the opening probability of each cluster of each section of the existing horizontal well is too low, namely, a plurality of clusters of perforation are adopted in each section of the horizontal well; performing fracturing construction, adding a certain amount of soluble balls in the construction process to block the clusters which are already fractured, and forcing fracturing liquid to flow to clusters which are not fractured so as to cause multiple clusters to be fractured; after fracturing construction is completed, the soluble balls are dissolved automatically; and repeating the steps until the fracturing operation of all intervals of the operation well is completed. The method can solve the problem that the opening rate of each cluster of each section of the existing horizontal well is too low, and the broken clusters are temporarily blocked by the soluble balls, so that the probability of simultaneous breaking of a plurality of clusters can be increased, and the perforation cannot be blocked, so that the yield of an oil well is influenced.

Description

Solvable ball is adopted to realize the method for horizontal well in segments many bunches of pressure breaks
Technical field
The present invention relates to a kind of method adopting solvable ball to realize horizontal well in segments many bunches of pressure breaks, belong to technical field of oil production engineering.
Background technology
In recent years, " horizontal well+segmentation many bunches volume fracturing " method has become the effective means that exploitation unconventionaloil pool is hidden, and the method carries out segmentation many showers hole, many bunches of concurrent fracturings, and unconventional single hop perforation, single hop pressure break mode to sleeve pipe.At present, external main employing waterpower bridging plug segmentation many bunches of fracturing technologies, namely speed bored bridging plug and perforating gun by waterpower pumping or coiled tubing to join and make drilling tool down to precalculated position, setting and after discharging bridging plug, depart from perforating gun, on carry perforating gun to perforating site, carry out many showers hole by design, adopt low viscosity clear water or mixing water to carry out huge discharge, large liquid measure pressing crack construction, realize many bunches of unlatchings, form crack, under enter new speed and bore bridging plug and perforating gun and join and make drilling tool; Repeat above-mentioned steps, complete multiple interval operation successively from bottom to top, finally adopt continuous tubing drill bridging plug, go into operation.Domestic main employing hydraulic sand blasting segmentation many bunches of fracturing technologies, namely by lower horizontal well jetting segmentation many bunches of fracturing strings to design attitude; Carry out perforation and huge discharge, the large liquid measure fracturing work of first paragraph many bunches; Repeat above step, until the transformation of this well all intervals is complete.
Mainly there is following problem in said method: due to the impact by reservoir heterogeneity, uses original " many showers hole concurrent fracturing " method, and the probability that each bunch of horizontal well every section is opened only has 30-40%.
Summary of the invention
The object of the present invention is to provide a kind of method adopting solvable ball to realize horizontal well in segments many bunches of pressure breaks, open all too low problem of probability to solve each bunch of every section, existing level well.
Concrete technology contents of the present invention is as follows:
Horizontal well every section adopts many showers hole; Carry out pressing crack construction, and add the solubility ball of some in construction midway, block crack initiation bunch, force fracturing fluid flow to not yet crack initiation bunch, cause many bunches of crack initiations; After pressing crack construction completes, solubility ball dissolves voluntarily; Repeat above-mentioned steps, until complete the whole interval fracturing work of described well in operation.
The inventive method can solve all too low problem of every section, existing level well each bunch of unlatching rate, by the stifled crack initiation temporarily of solubility ball bunch, the probability of many bunches of crack initiations simultaneously can be increased, and can not eyelet be blocked, affect oil well output.
Accompanying drawing explanation
Fig. 1 is that conventional levels well part bunch opens schematic diagram.
Fig. 2 opens schematic diagram for adopting solubility ball to realize horizontal well many bunches.
Fig. 3 is the horizontal well many bunches of schematic diagrames after solubility ball dissolves voluntarily.
Detailed description of the invention
Embodiment:
Further illustrate below in conjunction with Fig. 1 to 3 pair of embodiments of the invention:
The concrete operation step of the inventive method is as follows:
1) drift size gauge tool drifting is used; Drifting is to the artificial bottom of a well of well in operation, and guarantee that pit shaft is clean, whether the internal diameter of Inspection well meets standard, if well in operation has distortion or blocking, then examines the biggest size of element that well in operation can pass through, if do not meet pressure break requirement, then and well workover, then implement pressure break;
2) adopt firepower many showers hole or hydraulic sand blasting many bunches to horizontal well first paragraph perforation;
3) waterpower bridging plug segmentation many bunches of fracturing technologies or hydraulic sand blasting segmentation many bunches of fracturing technologies are adopted to carry out pressing crack construction;
4) in pressing crack construction, when part bunch fracture initiation, extend after, according to horizontal well split waveguide result, in fracturing fluid, add solubility ball, block crack initiation bunch, with force fracturing fluid flow to not yet crack initiation bunch;
5) solubility ball dissolves voluntarily after pressing crack construction is complete;
6) above-mentioned steps construction is repeated, the whole interval of fracturing work well;
7) open flow, ask product and completion.

Claims (2)

1. adopt solvable ball to realize a method for horizontal well in segments many bunches of pressure breaks, it is characterized in that this method main contents are as follows:
Horizontal well every section adopts many showers hole; Carry out pressing crack construction, and add the solubility ball of some in construction midway, block crack initiation bunch, force fracturing fluid flow to not yet crack initiation bunch, cause many bunches of crack initiations; After pressing crack construction completes, solubility ball dissolves voluntarily; Repeat above-mentioned steps, until complete the whole interval fracturing work of described well in operation.
2. the solvable ball of employing according to claim 1 realizes the method for horizontal well in segments many bunches of pressure breaks, it is characterized in that its concrete operation step is as follows:
1) drift size gauge tool drifting is used; Drifting is to the artificial bottom of a well of well in operation, and guarantee that pit shaft is clean, whether the internal diameter of Inspection well meets standard, if well in operation has distortion or blocking, then examines the biggest size of element that well in operation can pass through, if do not meet pressure break requirement, then and well workover, then implement pressure break;
2) adopt firepower many showers hole or hydraulic sand blasting many bunches to horizontal well first paragraph perforation;
3) waterpower bridging plug segmentation many bunches of fracturing technologies or hydraulic sand blasting segmentation many bunches of fracturing technologies are adopted to carry out pressing crack construction;
4) in pressing crack construction, when part bunch fracture initiation, extend after, according to horizontal well split waveguide result, in fracturing fluid, add solubility ball, block crack initiation bunch, with force fracturing fluid flow to not yet crack initiation bunch;
5) solubility ball dissolves voluntarily after pressing crack construction is complete;
6) above-mentioned steps construction is repeated, the whole interval of fracturing work well;
7) open flow, ask product and completion.
CN201310651652.7A 2013-12-05 2013-12-05 Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls Pending CN104695923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310651652.7A CN104695923A (en) 2013-12-05 2013-12-05 Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310651652.7A CN104695923A (en) 2013-12-05 2013-12-05 Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls

Publications (1)

Publication Number Publication Date
CN104695923A true CN104695923A (en) 2015-06-10

Family

ID=53343424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310651652.7A Pending CN104695923A (en) 2013-12-05 2013-12-05 Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls

Country Status (1)

Country Link
CN (1) CN104695923A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989358A (en) * 2015-06-18 2015-10-21 中国石油化工股份有限公司华东分公司采油厂 Shale gas horizontal well bridge plug separation and ball throwing segmented fracturing process
CN105484719A (en) * 2015-12-29 2016-04-13 中国石油天然气股份有限公司 Method for improving multi-cluster cracking effectiveness by adopting multi-scale soluble ball to seal seam
CN107120101A (en) * 2016-02-24 2017-09-01 中国石油化工股份有限公司 A kind of fracturing process of middle high-order coal bed gas well
CN107191157A (en) * 2017-07-06 2017-09-22 中国石油集团渤海钻探工程有限公司 A kind of solvable packing completion method of full-bore
CN107420081A (en) * 2017-09-08 2017-12-01 中国石油天然气股份有限公司 Fracturing method for realizing effective partial pressure of compact heterogeneous reservoir
CN107605449A (en) * 2017-08-03 2018-01-19 中国石油天然气股份有限公司 Ball-throwing temporary plugging layered fracturing method for heterogeneous reservoir
CN109812247A (en) * 2019-02-21 2019-05-28 中国石油天然气股份有限公司 Perforation and fracturing method for improving transformation degree of compact oil horizontal well
CN110242269A (en) * 2019-06-21 2019-09-17 北京捷贝通石油技术股份有限公司 A kind of overstocked cracking method of casing deformation well chemical packer segmented body
CN111648755A (en) * 2020-05-20 2020-09-11 中国石油化工股份有限公司 Method for promoting balanced expansion of multiple clusters of cracks through ball throwing and temporary plugging

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101146888A (en) * 2005-01-21 2008-03-19 费尔蒙特矿物有限公司 Soluble deverting agents
US7380600B2 (en) * 2004-09-01 2008-06-03 Schlumberger Technology Corporation Degradable material assisted diversion or isolation
CN101553552A (en) * 2006-10-24 2009-10-07 普拉德研究及开发股份有限公司 Degradable material assisted steering
CN202900060U (en) * 2012-11-12 2013-04-24 中国石油天然气股份有限公司 Coiled tubing perforation, casing fracturing and bridge plug packing process pipe string

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7380600B2 (en) * 2004-09-01 2008-06-03 Schlumberger Technology Corporation Degradable material assisted diversion or isolation
CN101146888A (en) * 2005-01-21 2008-03-19 费尔蒙特矿物有限公司 Soluble deverting agents
CN103352683A (en) * 2005-12-05 2013-10-16 普拉德研究及开发股份有限公司 Method of formation protection while performing downhole operation
CN101553552A (en) * 2006-10-24 2009-10-07 普拉德研究及开发股份有限公司 Degradable material assisted steering
CN202900060U (en) * 2012-11-12 2013-04-24 中国石油天然气股份有限公司 Coiled tubing perforation, casing fracturing and bridge plug packing process pipe string

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989358A (en) * 2015-06-18 2015-10-21 中国石油化工股份有限公司华东分公司采油厂 Shale gas horizontal well bridge plug separation and ball throwing segmented fracturing process
CN105484719A (en) * 2015-12-29 2016-04-13 中国石油天然气股份有限公司 Method for improving multi-cluster cracking effectiveness by adopting multi-scale soluble ball to seal seam
CN107120101A (en) * 2016-02-24 2017-09-01 中国石油化工股份有限公司 A kind of fracturing process of middle high-order coal bed gas well
CN107191157A (en) * 2017-07-06 2017-09-22 中国石油集团渤海钻探工程有限公司 A kind of solvable packing completion method of full-bore
CN107605449A (en) * 2017-08-03 2018-01-19 中国石油天然气股份有限公司 Ball-throwing temporary plugging layered fracturing method for heterogeneous reservoir
CN107420081A (en) * 2017-09-08 2017-12-01 中国石油天然气股份有限公司 Fracturing method for realizing effective partial pressure of compact heterogeneous reservoir
CN107420081B (en) * 2017-09-08 2020-07-14 中国石油天然气股份有限公司 Fracturing method for realizing effective partial pressure of compact heterogeneous reservoir
CN109812247A (en) * 2019-02-21 2019-05-28 中国石油天然气股份有限公司 Perforation and fracturing method for improving transformation degree of compact oil horizontal well
CN109812247B (en) * 2019-02-21 2021-07-02 中国石油天然气股份有限公司 Perforation and fracturing method for improving transformation degree of compact oil horizontal well
CN110242269A (en) * 2019-06-21 2019-09-17 北京捷贝通石油技术股份有限公司 A kind of overstocked cracking method of casing deformation well chemical packer segmented body
CN111648755A (en) * 2020-05-20 2020-09-11 中国石油化工股份有限公司 Method for promoting balanced expansion of multiple clusters of cracks through ball throwing and temporary plugging

Similar Documents

Publication Publication Date Title
CN104695923A (en) Method for realizing staged multi-cluster fracturing of horizontal well by adopting soluble balls
CN105484719A (en) Method for improving multi-cluster cracking effectiveness by adopting multi-scale soluble ball to seal seam
CN102518419B (en) High-efficiency fracturing combined device for multi-stage horizontal well
CN109812247B (en) Perforation and fracturing method for improving transformation degree of compact oil horizontal well
CN104278978B (en) Soluble bridge plug fracturing process pipe column and fracturing method thereof
CN108952655B (en) Normal-pressure shale gas screen pipe well completion hydraulic jet volume fracturing method
CN101915083B (en) Method for extracting coalbed gases from coal mines by upper and lower combination
CN103850711B (en) Salt hole air reserved storeroom twin-well banking process
CN108661618B (en) Reservoir transformation method for L type horizontal well of coal bed gas
CN203394493U (en) Soluble bridge plug fracturing technology pipe column
CN103867177A (en) Horizontal well fracturing method
CN109751036B (en) Method for delaying effective fracture reconstruction volume decrement of deep shale gas
CN104564003A (en) Drilling plug-free pumping type hydraulic bridge plug staged fracturing method
CN103306645B (en) Horizontal well the pressure of the drill splits completion tubular column and technique thereof
CN105888639A (en) Feeding-controlling full-bore sliding sleeve sectional fracturing tube column
CN104879110B (en) Cluster perforation and staged fracturing combined process
CN104594870A (en) Fracturing production increasing method
CN102877824A (en) Horizontal well hydraulic jet staged multi-cluster fracturing method
CN104278979A (en) Coiled tubing perforation bridge plug packing fracturing method
CN105822274A (en) Horizontal well process pipe column
CN104563997A (en) Hydraulic jet and bridge plug combined process pipe column and working method thereof
CN106593387B (en) Method for realizing staged multi-cluster fracturing of horizontal well
CN105041274A (en) Short-range two-layer oil-gas reservoir commingled production technique
CN107762408B (en) Cave-making method for coal bed gas directional well
CN204457716U (en) Horizontal well process pipe column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150610