[go: up one dir, main page]

CN105089598B - Blasting starting sliding sleeve - Google Patents

Blasting starting sliding sleeve Download PDF

Info

Publication number
CN105089598B
CN105089598B CN201510505046.3A CN201510505046A CN105089598B CN 105089598 B CN105089598 B CN 105089598B CN 201510505046 A CN201510505046 A CN 201510505046A CN 105089598 B CN105089598 B CN 105089598B
Authority
CN
China
Prior art keywords
rupture disk
piston
top connection
sliding sleeve
upper joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510505046.3A
Other languages
Chinese (zh)
Other versions
CN105089598A (en
Inventor
胡开斌
张文星
慕立俊
张华光
王治国
薛晓伟
张安康
刘明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201510505046.3A priority Critical patent/CN105089598B/en
Publication of CN105089598A publication Critical patent/CN105089598A/en
Application granted granted Critical
Publication of CN105089598B publication Critical patent/CN105089598B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Safety Valves (AREA)
  • Pressure Vessels And Lids Thereof (AREA)

Abstract

The invention belongs to the technical field of fracturing modification of oil and gas wells, and particularly relates to a blasting starting sliding sleeve designed for multi-layer series fracturing modification of an oil and gas well, which comprises an upper joint and a lower joint which are connected through threads, wherein a plurality of vertical strip-shaped fracturing ports are uniformly distributed on the pipe wall of the upper joint along the circumferential direction, a piston is arranged in the upper joint, and the fracturing ports are blocked by the piston; the pipe wall of the upper part of the upper joint is provided with a rupture disk holder, the rupture disk holder penetrates through the pipe wall of the upper joint, one end, located inside the upper joint, of the rupture disk holder is provided with a rupture disk, the rupture disk is in a disk shape identical to the inner diameter of the upper joint, a separation piece for separating the upper joint is formed in the upper joint, the rupture disk is located on the upper part of the piston, and when the multi-layer multi-section fracturing construction of the sleeve sliding sleeve is realized, the starting sliding sleeve of the first-stage fracturing removes perforation operation from, improves the construction efficiency, saves the construction cost and reduces the construction difficulty and risk.

Description

A kind of explosion starts sliding sleeve
Technical field
The invention belongs to well fracturing renovation technique field, is designed particularly directed to the more series of strata fracturing reforms of Oil/gas Well A kind of explosion start sliding sleeve.
Background technology
At present, the domestic limited level carried out, infinite stages sliding sleeve of bushing multilayer multistage pressing crack construction, stratum is being opened, is being carried out During first order pressure break, pressure break often is carried out using perforating modes, it has the following disadvantages:
1st, long construction period;
2nd, construction cost is high;
3rd, in horizontal well construction, perforation, difficulty of construction are big.
So as to need a kind of startup sliding sleeve of design badly, remove perforation construction from, shorten construction period, save construction cost, reduce Sliding sleeve of bushing first order pressing crack construction difficulty and risk.
The content of the invention
Present invention aim to address existing sliding sleeve of bushing in first order perforating and fracturing, long construction period be present, apply The problems such as work cost is high, difficulty of construction is big, a kind of startup sliding sleeve is designed, removes perforation construction from, shortens construction period, save construction Cost, reduce sliding sleeve of bushing first order pressing crack construction difficulty and risk.
Therefore, the invention provides a kind of explosion to start sliding sleeve, including the top connection and lower contact being connected through a screw thread, on Multiple perpendicular strip pressure break ports it have been evenly distributed on joint tube wall, piston are housed inside top connection, piston is by pressure break port Block;Rupture disk clamper is installed, rupture disk clamper passes through the tube wall of top connection, quick-fried on described top connection top tube wall One end that fragmentation clamper is located inside top connection is equipped with rupture disk, rupture disk be with top connection internal diameter identical disc-shaped, The partition of a blockage top connection is formed in top connection, described rupture disk is located at upper piston area.
Described piston is located inside lower contact and piston coordinates installation with lower contact gap, is filled on the outside of piston lower portion Have a jump ring, described lower contact inner wall lower is provided with jump-ring slot, the distance between jump ring and jump-ring slot be more than piston upper end with The distance between pressure break port bottom.
Described piston is placed in top connection by way of gap coordinates installation, and is fixed piston by shear pin On top connection inwall.
Described rupture disk clamper has multiple and circumferential uniform on top connection tube wall, rupture disk and all explosions Piece clamper the inner is all connected with.
Described described rupture disk clamper has two, is arranged symmetrically on top connection tube wall, two rupture disk clampings Device holds rupture disk.
Between described upper piston area and top connection inwall, between piston lower portion and lower contact inwall and top connection with O-ring seal is equipped with the joint face of joint.
Beneficial effects of the present invention:This explosion of the present invention starts sliding sleeve, and sliding sleeve of bushing multilayer multistage pressure break can be achieved During construction, the startup sliding sleeve of first order pressure break, remove perforating job from, improve efficiency of construction, save construction cost, it is tired to reduce construction Difficult and risk.
The present invention is described in further details below with reference to accompanying drawing.
Brief description of the drawings
Fig. 1 is the structural representation that explosion starts sliding sleeve.
Description of reference numerals:1st, top connection;2nd, rupture disk clamper;3rd, pressure break port;4th, piston;5th, shear pin;6、 Rupture disk;7th, jump ring;8th, lower contact;9th, jump-ring slot.
Embodiment
Embodiment 1:
The present embodiment provides a kind of explosion and starts sliding sleeve, as shown in figure 1, the top connection 1 including being connected through a screw thread and under Joint 8, multiple perpendicular strip pressure break ports 3 are evenly distributed on the tube wall of top connection 1, the inside of top connection 1 be equipped with piston 4, work Plug 4 blocks pressure break port 3;Rupture disk clamper 2 is installed on the described top tube wall of top connection 1, rupture disk clamper 2 is worn The tube wall of top connection 1 is crossed, one end that rupture disk clamper 2 is located inside top connection 1 is equipped with rupture disk 6, and rupture disk 6 is with above connecing First 1 internal diameter identical disc-shaped, the partition of a blockage top connection 1 is formed in top connection 1, described rupture disk 6 is positioned at work Fill in 4 tops.
In order to ensure that suitable explosion starts pressure, it is necessary to calculate down-hole pressure before tripping in instrument, preferably The suitable rupture disk of pressure loads in clamper.Then the device of the present invention is connected to pressure break using top connection 1 and lower contact 8 In tubing string, when explosion starts sliding sleeve start-up operation, by tubing string suppress in sleeve pipe.
When pressure rises to the predetermined disruptive pressure of rupture disk, rupture disk is breakdown, forms pressure channel, liquid-driving Piston 4 is descending, piston 4 is displaced downwardly to the bottom of lower contact 8, now, is removed because piston 4 is descending, exposes the strip in top connection 1 Type pressure break port 3, it can now carry out pressing crack construction.
Embodiment 2:
On the basis of embodiment 1, in the present embodiment, the lower end of piston 4 is located at the inside of lower contact 8 and piston 4 and lower contact 8 Gap coordinates installation, and the lower outside of piston 4 is equipped with jump ring 7, and the described inner wall lower of lower contact 8 is provided with jump-ring slot 9, jump ring 7 The distance between jump-ring slot 9 is more than the distance between the upper end of piston 4 and the bottom of pressure break port 3.
On the basis of above-mentioned implementation process, when the piston 4 in the present embodiment comes downwards to 8 bottom of lower contact, it is located at The jump ring 7 of the lower outside of piston 4 is just fallen within the jump-ring slot 9 of the inner wall lower of lower contact 8, is locked in down piston 4 by jump ring 7 In jump-ring slot 9 in joint 8, the up closure pressure break port 3 of piston 4 is prevented, ensures being smoothed out for fracturing process.
Embodiment 3:
On the basis of above-mentioned two embodiment, the present embodiment is further improved and illustrated, in the present embodiment, piston 4 is logical Crossing gap coordinates the mode of installation to be placed in top connection 1, and piston 4 is fixed on the inwall of top connection 1 by shear pin 5.
When usually, piston 4 is fixed on the inwall of top connection 1 by shear pin 5, starts work when explosion starts sliding sleeve When making, by tubing string suppress in sleeve pipe, when pressure rises to the predetermined disruptive pressure of rupture disk, rupture disk is breakdown, Pressure channel is formed, liquid-driving piston 4 is descending, because now piston 4 is fixed on the inwall of top connection 1, so with pressure Rise, the shearing force being subject on shear pin 5 constantly increases, until shear pin 5 is cut, piston 4 just starts descending, completion Subsequent process, such a construction ensures the stability of whole device, only when pressure reaches to a certain degree, shear pin 5 ability are cut, and piston 4 could be descending.
Rupture disk clamper 2 has multiple and circumferential uniform on the tube wall of top connection 1, rupture disk 6 and all rupture disk folders The inner of holder 2 is all connected with.More specifically, in the present embodiment, rupture disk clamper 2 has two, the symmetrical cloth on the tube wall of top connection 1 Put, two rupture disk clampers 2 hold rupture disk 6, and two conducts of rupture disk clampers 2 are used in parallel, to improve explosion The successful firing rate of piece.
In order that air chamber mechanism has good sealing, sealing mechanism is optimized, design profile error gap And sealing ring compression ratio, in the present embodiment, between the top of piston 4 and the inwall of top connection 1, the bottom of piston 4 and the inwall of lower contact 8 it Between and the joint face of top connection 1 and lower contact 8 on be equipped with O-ring seal.
In summary, this explosion of the invention starts sliding sleeve, when sliding sleeve of bushing multilayer multistage pressing crack construction can be achieved, the The startup sliding sleeve of one-level pressure break, remove perforating job from, improve efficiency of construction, save construction cost, reduce constructional difficulties and risk.
It is exemplified as above be only to the present invention for example, do not form the limitation to protection scope of the present invention, it is all It is to be belonged to the same or analogous design of the present invention within protection scope of the present invention.

Claims (5)

1. a kind of explosion starts sliding sleeve, including the top connection being connected through a screw thread(1)And lower contact(8), it is characterised in that:On connect Head(1)Multiple perpendicular strip pressure break ports have been evenly distributed on tube wall(3), top connection(1)Inside is equipped with piston(4), piston (4)By pressure break port(3)Block;Described top connection(1)Rupture disk clamper is installed on the tube wall of top(2), rupture disk folder Holder(2)Through top connection(1)Tube wall, rupture disk clamper(2)Positioned at top connection(1)Internal one end is equipped with rupture disk (6), rupture disk(6)For with top connection(1)Internal diameter identical disc-shaped, in top connection(1)One blockage top connection of interior formation(1) Partition, described rupture disk(6)Positioned at piston(4)Top;
Described piston(4)Lower end is located at lower contact(8)Internal and piston(4)With lower contact(8)Gap coordinates installation, piston (4)Lower outside is equipped with jump ring(7), described lower contact(8)Inner wall lower is provided with jump-ring slot(9), jump ring(7)With jump-ring slot (9)The distance between be more than piston(4)Upper end and pressure break port(3)The distance between bottom.
2. explosion as claimed in claim 1 starts sliding sleeve, it is characterised in that:Described piston(4)Coordinated by gap and installed Mode be placed in top connection(1)It is interior, and pass through shear pin(5)By piston(4)It is fixed on top connection(1)On inwall.
3. explosion as claimed in claim 1 starts sliding sleeve, it is characterised in that:Described rupture disk clamper(2)Have it is multiple, and In top connection(1)It is circumferential uniform on tube wall, rupture disk(6)With all rupture disk clampers(2)The inner is all connected with.
4. explosion as claimed in claim 3 starts sliding sleeve, it is characterised in that:Described rupture disk clamper(2)There are two, Top connection(1)It is arranged symmetrically on tube wall, two rupture disk clampers(2)Hold rupture disk(6).
5. explosion as claimed in claim 1 starts sliding sleeve, it is characterised in that:Described piston(4)Top and top connection(1)It is interior Between wall, piston(4)Bottom and lower contact(8)Between inwall and top connection(1)With lower contact(8)Joint face on be equipped with O-ring seal.
CN201510505046.3A 2015-08-18 2015-08-18 Blasting starting sliding sleeve Active CN105089598B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510505046.3A CN105089598B (en) 2015-08-18 2015-08-18 Blasting starting sliding sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510505046.3A CN105089598B (en) 2015-08-18 2015-08-18 Blasting starting sliding sleeve

Publications (2)

Publication Number Publication Date
CN105089598A CN105089598A (en) 2015-11-25
CN105089598B true CN105089598B (en) 2018-04-03

Family

ID=54570831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510505046.3A Active CN105089598B (en) 2015-08-18 2015-08-18 Blasting starting sliding sleeve

Country Status (1)

Country Link
CN (1) CN105089598B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761545A (en) * 2017-02-28 2017-05-31 中国石油天然气股份有限公司 Oil and gas well cementing pipe column and cementing method
CN108104769A (en) * 2018-02-02 2018-06-01 西南石油大学 A kind of explosion chip fracturing control valve
CN113323626A (en) * 2020-02-28 2021-08-31 中国石油化工股份有限公司 Differential pressure sliding sleeve and oil-gas well fracturing construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203516896U (en) * 2013-10-25 2014-04-02 大连理工安全装备有限公司 Positioning structure of rupture disc safety device
CN104088614A (en) * 2014-06-30 2014-10-08 中国石油集团川庆钻探工程有限公司 Excitation type differential pressure sliding sleeve
CN204002700U (en) * 2014-08-23 2014-12-10 中国石油集团渤海钻探工程有限公司 Oil gas well cementing operation pressure reduction sliding sleeve
CN204941507U (en) * 2015-08-18 2016-01-06 中国石油天然气股份有限公司 Blasting starting sliding sleeve

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9353599B2 (en) * 2012-11-09 2016-05-31 Watson Well Solutions, Llc Pressure response fracture port tool for use in hydraulic fracturing applications

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203516896U (en) * 2013-10-25 2014-04-02 大连理工安全装备有限公司 Positioning structure of rupture disc safety device
CN104088614A (en) * 2014-06-30 2014-10-08 中国石油集团川庆钻探工程有限公司 Excitation type differential pressure sliding sleeve
CN204002700U (en) * 2014-08-23 2014-12-10 中国石油集团渤海钻探工程有限公司 Oil gas well cementing operation pressure reduction sliding sleeve
CN204941507U (en) * 2015-08-18 2016-01-06 中国石油天然气股份有限公司 Blasting starting sliding sleeve

Also Published As

Publication number Publication date
CN105089598A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN105089598B (en) Blasting starting sliding sleeve
CN103541887B (en) Sand-proof and gas-proof integrated oil production device
CN105507849A (en) Fracturing is with removing bridge plug certainly
CN103867177A (en) Horizontal well fracturing method
CN108386157A (en) Piston pressure opening type sliding sleeve switch and hydraulic fracturing construction method
CN114961680B (en) Near-coal-seam roof directional perforation-fracturing integrated device and use method thereof
RU2620667C1 (en) Method of application of electrical centrifugal pump with multiphase pump and packer
CN205382910U (en) Fracturing is with removing bridge plug certainly
CN107654213B (en) High-energy negative pressure blocking remover
CN103470208B (en) A kind of recyclable lower brill calker of oil gas field
NO20101750A1 (en) Parallel fracturing system for wellbores
CN204941507U (en) Blasting starting sliding sleeve
CN105840167A (en) Segmented completion string
CN205225224U (en) Multi-cluster perforation fracturing well completion device
CN106285620A (en) High gas-oil ratio (HGOR) oil well gas-liquid piece-rate system
CN103291238A (en) Secondary expansion patching device passing through patching pipe
CN103225498B (en) Multi-stage composite deep penetration perforating device
RU2726096C1 (en) Method for completion of construction of production well with horizontal end of wellbore
CN105201443B (en) A kind of blanking plug in oil pipe launched for steel wire
CN204002699U (en) Oil gas well cementing operation pitching sliding sleeve
CN204186340U (en) Segmented fracturing acidizing controllable setting packer for oil-gas well
CN106703740A (en) Hydraulic control and inside and outside biaxial compression packer
CN204082082U (en) Circulation blanking plug
CN114427421A (en) An integrated device for sand control and fracturing
CN104912514B (en) Anti-stopping excluder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant