CN105954839B - A kind of the installation discharge mechanism and its installation method of module - Google Patents
A kind of the installation discharge mechanism and its installation method of module Download PDFInfo
- Publication number
- CN105954839B CN105954839B CN201610488622.2A CN201610488622A CN105954839B CN 105954839 B CN105954839 B CN 105954839B CN 201610488622 A CN201610488622 A CN 201610488622A CN 105954839 B CN105954839 B CN 105954839B
- Authority
- CN
- China
- Prior art keywords
- pedestal
- shaft
- hole
- plane
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 21
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims 20
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 239000000835 fiber Substances 0.000 abstract 1
- 230000000903 blocking effect Effects 0.000 description 12
- 238000010586 diagram Methods 0.000 description 12
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 239000013307 optical fiber Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000003287 optical effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G02—OPTICS
- G02B—OPTICAL ELEMENTS, SYSTEMS OR APPARATUS
- G02B6/00—Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
- G02B6/24—Coupling light guides
- G02B6/42—Coupling light guides with opto-electronic elements
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Casings For Electric Apparatus (AREA)
- Distribution Board (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种模块的安装卸载装置及其安装方法,包括上盖(100)、螺钉(200)、上弹片(300)、凸块(400)、短弹簧(500)、限位盖(600)、长弹簧(700)、转动杆(800)、拉环(900)、制动片(1000)、下弹片(1100)、底座(1200)、大腔体(1300)和器件(1400)。本发明的有益效果是:可适用于限制光纤出口高度的低成本光电模块;可适用于端口更加密集的通信设备;安装简单,可靠性高。
The invention discloses a module installation and unloading device and an installation method thereof, comprising an upper cover (100), a screw (200), an upper elastic piece (300), a bump (400), a short spring (500), a limit cover ( 600), long spring (700), rotating rod (800), pull ring (900), brake pad (1000), lower shrapnel (1100), base (1200), large cavity (1300) and device (1400) . The beneficial effects of the invention are: it can be applied to the low-cost photoelectric module with limited fiber outlet height; it can be applied to the communication equipment with denser ports; the installation is simple and the reliability is high.
Description
技术领域technical field
本发明涉及一种安装卸载装置及其安装方法,具体是一种模块的安装卸载装置及其安装方法,属于光通信技术领域。The invention relates to an installation and unloading device and an installation method thereof, in particular to a module installation and unloading device and an installation method thereof, and belongs to the technical field of optical communication.
背景技术Background technique
现如今,系统厂商对光电模块在设备中的的高密要求越来越高,留给模块安装卸载装置的空间越来越小。与此同时,市场对光通讯网络设备降成本的需求越来越强烈,迫使光电模块结构做出巨大变化,比如光纤出口高度不能根据外围结构需要设计,这种限制对安装卸载装置影响较大。Nowadays, system manufacturers have higher and higher requirements for the high density of photoelectric modules in the equipment, leaving less and less space for module installation and unloading devices. At the same time, the market's demand for cost reduction of optical communication network equipment is becoming stronger and stronger, forcing a huge change in the structure of the photoelectric module. For example, the height of the optical fiber outlet cannot be designed according to the needs of the peripheral structure. This limitation has a greater impact on the installation and unloading device.
目前模块的安装卸载方式主要有两种:滑块向前推开或翘起屏蔽笼锁扣和闩锁缩入模块内脱离屏蔽笼锁扣。第一种方式的缺点是比较依赖笼子、面板本身的结构以及相互之间的装配关系,适用范围较窄,并且模块安装卸载时需要顶起笼子上的锁孔,对笼子的使用寿命有较大影响;第二种方式属于自解锁,即不依赖外界设备结构,适用范围很广,对设备能起到很好的保护作用。中国专利ZL200620098737.2中模块的安装卸载方式是第二种,虽然具备了前述优点,同时也存在一些不足:1)当在更加密集的设备上使用时,安装卸载装置在运动过程中有可能相互干涉;不能适用于对光纤出口高度有特殊要求的低成本模块,因为钢丝拉环手柄处占用了较大的高度空间;2)在安装卸载过程中拉动钢丝拉环,拉环受力易变形,安装卸载装置组装时需要锁螺钉,效率不高,并且其可靠性完全依赖螺钉锁紧与否,有一定风险。At present, there are mainly two ways to install and uninstall the module: the slider is pushed forward or the shielding cage lock is tilted, and the latch is retracted into the module and released from the shielding cage lock. The disadvantage of the first method is that it is more dependent on the cage, the structure of the panel itself and the assembly relationship between them, the scope of application is narrow, and the keyhole on the cage needs to be lifted when the module is installed and unloaded, which has a great impact on the service life of the cage. Influence; the second method is self-unlocking, that is, it does not depend on the structure of external devices, has a wide range of applications, and can play a very good role in protecting the device. The installation and unloading method of the module in the Chinese patent ZL200620098737.2 is the second one. Although it has the aforementioned advantages, it also has some shortcomings: 1) When used on more intensive equipment, the installation and unloading device may interact with each other during the movement process. Interference; it cannot be applied to low-cost modules that have special requirements for the height of the optical fiber outlet, because the handle of the steel wire pull ring occupies a large height space; 2) Pull the steel wire pull ring during installation and unloading, and the pull ring is easily deformed due to force. The installation and unloading device needs to lock the screws when assembling, which is not efficient, and its reliability depends entirely on whether the screws are locked or not, which has certain risks.
发明内容Contents of the invention
针对上述现有技术存在的问题,本发明提供一种模块的安装卸载装置及其安装方法,该安装卸载装置能够在密集的设备上使用,并且避免了可能存在的干涉,并且能够避免使用螺钉,提高了安装卸载效率,降低了因使用螺钉而存在的风险,可靠性更高,适用范围更广。Aiming at the problems existing in the above-mentioned prior art, the present invention provides a module installation and uninstallation device and its installation method. The installation and uninstallation device can be used on dense equipment, avoid possible interference, and avoid the use of screws. The installation and uninstallation efficiency is improved, the risk caused by the use of screws is reduced, the reliability is higher, and the application range is wider.
本发明通过以下技术方案来实现上述目的:一种模块的安装卸载装置,包括带有限位盖的底座;The present invention achieves the above object through the following technical solutions: a module installation and unloading device, including a base with a limit cover;
所述底座一端安装有转动杆和与所述转动杆装配在一起的拉环;A rotating rod and a pull ring assembled with the rotating rod are installed at one end of the base;
所述底座上设有水平滑槽和竖直滑槽,所述水平滑槽内依次放置有长弹簧和制动片,所述竖直滑槽内依次放置有短弹簧和凸块;The base is provided with a horizontal chute and a vertical chute, a long spring and a brake piece are placed in the horizontal chute in turn, and a short spring and a bump are placed in the vertical chute in turn;
所述底座上一体成型有大腔体,所述大腔体内放置有器件和与所述器件连接的电路板;A large cavity is integrally formed on the base, and a device and a circuit board connected to the device are placed in the large cavity;
所述底座上套有上弹片和下弹片。The base is covered with an upper elastic piece and a lower elastic piece.
进一步,还包括螺钉,所述大腔体上放置有上盖,所述上盖通过螺钉固定于所述大腔体上。Further, screws are also included, an upper cover is placed on the large cavity, and the upper cover is fixed on the large cavity by screws.
进一步,所述转动杆包括依次连接的第一转轴、凸轮结构和第二转轴,所述第一转轴和第二转轴以所述凸轮结构为中心呈对称分布,且所述第一转轴和第二转轴中心线重合;Further, the rotating rod includes a first rotating shaft, a cam structure and a second rotating shaft connected in sequence, the first rotating shaft and the second rotating shaft are symmetrically distributed around the cam structure, and the first rotating shaft and the second rotating shaft The centerlines of the shafts coincide;
所述第一转轴外侧设有第一平面和第二平面,所述第二转轴外侧设有第三平面和第四平面。A first plane and a second plane are provided outside the first rotating shaft, and a third plane and a fourth plane are provided outside the second rotating shaft.
进一步,所述拉环包括依次连接的第一挡壁、第一连接臂、第一侧臂、手柄、第二侧臂、第二连接臂、第二挡壁;所述第一侧臂上设有第一方孔,所述第二侧壁上设有第二方孔。Further, the pull ring includes a first blocking wall, a first connecting arm, a first side arm, a handle, a second side arm, a second connecting arm, and a second blocking wall connected in sequence; There is a first square hole, and the second side wall is provided with a second square hole.
进一步,所述底座上对称设置有开口方向一致的第一卡孔和第二卡孔,所述第一卡孔内安装第一转轴,所述第二卡孔内安装有第二转轴;所述第一卡孔一侧设有第一让位腔,所述第二卡孔一侧设有第二让位腔;所述底座两侧分别设有第一凹坑和第二凹坑。Further, the base is symmetrically provided with a first locking hole and a second locking hole with the same opening direction, a first rotating shaft is installed in the first locking hole, and a second rotating shaft is installed in the second locking hole; A first relief cavity is provided on one side of the first clamping hole, a second relief cavity is provided on one side of the second clamping hole; a first recess and a second recess are respectively provided on both sides of the base.
进一步,所述限位盖包括依次连接的左侧壁、顶板和右侧壁;所述左侧壁上设有向内凹陷且呈弧形的第一卡扣,所述右侧壁上设有与所述第一卡扣相同形状的第二卡扣;所述第一卡扣安装于所述第一凹坑内,所述第二卡扣安装于所述第二凹坑内。Further, the limit cover includes a left side wall, a top plate and a right side wall connected in sequence; the left side wall is provided with an inwardly concave and arc-shaped first buckle, and the right side wall is provided with a A second buckle having the same shape as the first buckle; the first buckle is installed in the first recess, and the second buckle is installed in the second recess.
进一步,所述顶板上对称安装有第一开口挡圈和第二开口挡圈;所述第一开口挡圈和第二开口挡圈分别设于所述第一让位腔和第二让位腔中;其中,所述第一开口挡圈上设有第一末端,所述第二开口挡圈上设有第二末端,所述第一末端和第二末端分别设于所述第一卡孔和第二卡孔的开口处。Further, a first retaining ring and a second retaining ring are symmetrically installed on the top plate; the first retaining ring and the second retaining ring are respectively arranged in the first relief chamber and the second relief chamber wherein, the first retaining ring is provided with a first end, the second retaining ring is provided with a second end, and the first end and the second end are respectively arranged in the first clamping hole and the opening of the second card hole.
一种模块的安装卸载装置的安装方法,该安装方法包括如下步骤:An installation method of a module installation and uninstallation device, the installation method comprising the following steps:
1)掰开拉环的第一侧臂和第二侧臂,将转动杆的第一转轴、第二转轴分别插入拉环的第一方孔和第二方孔,使转动杆的第一平面、第二平面与拉环的第一方孔的其中两条对边重合,使拉环转动杆的第三平面、第四平面与拉环的第二方孔的其中两条对边重合,拉环与转动杆形成封闭环;1) Open the first side arm and the second side arm of the pull ring, insert the first shaft and the second shaft of the rotating rod into the first square hole and the second square hole of the ring respectively, so that the first plane of the rotating rod , the second plane coincides with the two opposite sides of the first square hole of the pull ring, so that the third plane and the fourth plane of the pull ring rotation rod coincide with two of the opposite sides of the second square hole of the pull ring, and the pull The ring forms a closed loop with the rotating rod;
2)将短弹簧放入底座的竖直滑槽中,然后将凸块放入竖直滑槽中,压在短弹簧上;2) Put the short spring into the vertical chute of the base, then put the bump into the vertical chute, and press it on the short spring;
3)将长弹簧放入底座的水平滑槽两侧,然后将制动片放入底座的水平滑槽中,压在长弹簧前方;3) Put the long spring into both sides of the horizontal chute of the base, then put the brake pad into the horizontal chute of the base, and press it in front of the long spring;
4)先用一只手顶住制动片头部,然后将转动杆连同拉环从底座的第一让位腔和第二让位腔上方放入,直至转动杆的第一转轴和第二转轴放到底座的第一卡孔和第二卡孔1的开口处;4) Hold the head of the brake pad with one hand first, then put the rotating rod together with the pull ring from above the first and second relief chambers of the base until the first rotating shaft and the second rotating shaft of the rotating rod Place the rotating shaft at the opening of the first card hole and the second card hole 1 of the base;
5)松开制动片头部,借助长弹簧传递给制动片的弹力,转动杆的第一转轴和第二转轴被顶入底座的第一卡孔和第二卡孔内;5) Loosen the head of the brake pad, and with the help of the elastic force transmitted to the brake pad by the long spring, the first rotating shaft and the second rotating shaft of the rotating rod are pushed into the first clamping hole and the second clamping hole of the base;
6)将限位盖套在底座前上方。6) Put the limit cover on the front top of the base.
一种模块的安装方法,该安装方法包括如下步骤:A module installation method, the installation method includes the following steps:
1)将器件、电路板放入底座的大腔体中;1) Put the device and circuit board into the large cavity of the base;
2)将上盖放在底座的大腔体之上;2) Put the upper cover on the large cavity of the base;
3)将上弹片从上向下罩在底座上;3) Cover the upper shrapnel on the base from top to bottom;
4)将下弹片从下向上罩在底座上。4) Cover the lower spring on the base from bottom to top.
本发明的有益效果是:1)可适用于限制光纤出口高度的低成本光电模块;The beneficial effects of the present invention are: 1) low-cost photoelectric modules that can be applied to limit the exit height of optical fibers;
2)可适用于端口更加密集的通信设备;2) Applicable to communication equipment with denser ports;
3)安装简单,可靠性高。3) Simple installation and high reliability.
附图说明Description of drawings
图1为本发明整体模块结构爆炸示意图;Fig. 1 is the explosion schematic diagram of integral module structure of the present invention;
图2为本发明整体模块结构立体示意图;Fig. 2 is a three-dimensional schematic diagram of the overall module structure of the present invention;
图3为本发明的转动杆装配在拉环上的立体示意图;Fig. 3 is a three-dimensional schematic diagram of the rotating rod of the present invention assembled on the pull ring;
图4为本发明的转动杆立体示意图之一;Fig. 4 is one of three-dimensional schematic diagrams of the rotating rod of the present invention;
图5为本发明的转动杆立体示意图之二;Fig. 5 is the second perspective view of the rotating rod of the present invention;
图6为本发明的拉环立体示意图之一;Figure 6 is one of the three-dimensional schematic diagrams of the pull ring of the present invention;
图7为本发明的拉环立体示意图之二;Fig. 7 is the second perspective view of the pull ring of the present invention;
图8为本发明的底座立体示意图之一;Fig. 8 is one of the three-dimensional schematic diagrams of the base of the present invention;
图9为本发明的底座立体示意图之二;Fig. 9 is the second perspective view of the base of the present invention;
图10为本发明的限位盖立体示意图之一;Fig. 10 is one of the three-dimensional schematic diagrams of the limiting cover of the present invention;
图11为本发明的限位盖立体示意图之二;Fig. 11 is the second perspective view of the limiting cover of the present invention;
图12为本发明的限位盖与底座组合装配立体示意图之一;Figure 12 is one of the three-dimensional schematic diagrams of the combined assembly of the limiting cover and the base of the present invention;
图13为本发明的限位盖与底座组合装配立体示意图之二;Fig. 13 is the second perspective view of the combination assembly of the limiting cover and the base of the present invention;
图14为本发明的限位盖与底座组合装配立体示意图之三;Fig. 14 is the third three-dimensional schematic diagram of the combined assembly of the limiting cover and the base of the present invention;
图15为本发明的限位盖与底座组合装配完成后的立体示意图之一;Fig. 15 is one of the three-dimensional schematic diagrams after the assembly of the limiting cover and the base of the present invention is completed;
图16为本发明的限位盖与底座组合装配完成后的立体示意图之二;Fig. 16 is the second perspective view of the combined assembly of the limiting cover and the base of the present invention;
图17为器件高度受限的模块剖视示意图;FIG. 17 is a schematic cross-sectional view of a module with a limited device height;
图18为器件高度不受限的模块剖视示意图;18 is a schematic cross-sectional view of a module with unlimited device height;
图19为本发明在设备中的位置关系平面示意图;Fig. 19 is a schematic plan view of the positional relationship of the present invention in the device;
图20为现有技术在设备中的位置关系平面示意图;Fig. 20 is a schematic plan view of the positional relationship in the device in the prior art;
图中:100、上盖,200、螺钉,300、上弹片,400、凸块,500、短弹簧,600、限位盖,601、第一开口挡圈,6011、第一末端,602、第二开口挡圈,6021、第二末端,603、第一卡扣,604、第二卡扣,605、第一侧壁,606、第二侧壁,700、长弹簧,800、转动杆,801、凸轮结构,802、第一转轴,803、第二转轴,804、第一平面,805、第二平面,806、第三平面,807、第四平面,900、拉环,901、第一方孔,902、第二方孔,903、第一侧臂,904、第二侧臂,905、第一挡壁,906、第二挡壁,907、第一连接臂,908、第二连接臂,909、手柄,1000、制动片,1100、下弹片,1200、底座,1201、第一卡孔,1202、第二卡孔,1203、第一让位腔,1204、第二让位腔,1205、水平滑槽,1206、竖直滑槽,1207、第一凹坑,1208、第二凹坑,1209、第一挡面,1210、第二挡面,1211、大腔体,1300、电路板,1400、器件,2301、拉环手柄。In the figure: 100, upper cover, 200, screw, 300, upper shrapnel, 400, bump, 500, short spring, 600, limit cover, 601, first opening retaining ring, 6011, first end, 602, second Two open retaining rings, 6021, second end, 603, first buckle, 604, second buckle, 605, first side wall, 606, second side wall, 700, long spring, 800, rotating rod, 801 , cam structure, 802, first shaft, 803, second shaft, 804, first plane, 805, second plane, 806, third plane, 807, fourth plane, 900, pull ring, 901, first party Hole, 902, second square hole, 903, first side arm, 904, second side arm, 905, first stop wall, 906, second stop wall, 907, first connecting arm, 908, second connecting arm , 909, handle, 1000, brake pad, 1100, lower shrapnel, 1200, base, 1201, first clamping hole, 1202, second clamping hole, 1203, first relief chamber, 1204, second relief chamber, 1205, horizontal chute, 1206, vertical chute, 1207, first pit, 1208, second pit, 1209, first retaining surface, 1210, second retaining surface, 1211, large cavity, 1300, circuit Board, 1400, device, 2301, pull ring handle.
具体实施方式Detailed ways
下面将结合本发明的实施例,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
如图1所示,该图为模块的爆炸结构示意图。该模块安装卸载装置包括上盖100、螺钉200、上弹片300、凸块400、短弹簧500、限位盖600、长弹簧700、转动杆800、拉环900、制动片1000、下弹片1100、底座1200、大腔体1300和器件1400。如图2所示,为模块装配完成的结构示意图。As shown in Figure 1, this figure is a schematic diagram of the exploded structure of the module. The module installation and uninstallation device includes an upper cover 100, a screw 200, an upper spring 300, a bump 400, a short spring 500, a limit cover 600, a long spring 700, a rotating rod 800, a pull ring 900, a brake plate 1000, and a lower spring 1100. , base 1200, large cavity 1300 and device 1400. As shown in Figure 2, it is a schematic diagram of the completed structure of the module assembly.
如图4和图5所示:转动杆800是中间带有凸起的杆状结构,可由钢丝加工而成。转动杆包括依次连接的第一转轴802、凸轮结构801、第二转轴803。凸轮结构801与第一转轴802和第二转轴803通过斜杆连接。第一转轴802、第二转轴803以凸轮结构801为中心呈对称分布。第一转轴802和第二转轴803中心线重合。第一转轴802末端外侧设有第一平面804和第二平面805;第二转轴803末端设有第三平面806和第四平面807,这四个平面相互平行。As shown in Figure 4 and Figure 5: the rotating rod 800 is a rod-shaped structure with a protrusion in the middle, which can be processed by steel wire. The rotating rod includes a first rotating shaft 802 , a cam structure 801 , and a second rotating shaft 803 connected in sequence. The cam structure 801 is connected with the first rotating shaft 802 and the second rotating shaft 803 through a diagonal rod. The first rotating shaft 802 and the second rotating shaft 803 are symmetrically distributed around the cam structure 801 . The centerlines of the first rotating shaft 802 and the second rotating shaft 803 coincide. A first plane 804 and a second plane 805 are provided outside the end of the first rotating shaft 802 ; a third plane 806 and a fourth plane 807 are provided at the end of the second rotating shaft 803 , and these four planes are parallel to each other.
如图6和图7所示:拉环900是带有弹性的开口金属环,通过钣金冲压方式加工而成。拉环900包括依次连接的第一挡壁905、第一连接臂907、第一侧臂903、手柄909、第二侧臂904、第二连接臂908、第二挡壁906。第一挡壁905和第二挡壁906以不影响装配转动杆800为前提,能够适当变换形状。其中,所述第一侧臂903上设有第一方孔,所述第二侧臂904上设有第二方孔902。As shown in FIGS. 6 and 7 , the pull ring 900 is an elastic split metal ring, which is processed by sheet metal stamping. The pull ring 900 includes a first blocking wall 905 , a first connecting arm 907 , a first side arm 903 , a handle 909 , a second side arm 904 , a second connecting arm 908 , and a second blocking wall 906 connected in sequence. The shape of the first blocking wall 905 and the second blocking wall 906 can be appropriately changed on the premise that the assembly of the rotating rod 800 is not affected. Wherein, the first side arm 903 is provided with a first square hole, and the second side arm 904 is provided with a second square hole 902 .
如图3所示:转动杆800与拉环900装配在一起。掰开第一侧臂903和第二侧臂904,将转动杆800的第一转轴802、第二转轴803靠近两端的部分插入第一方孔901和第二方孔902,第一平面804、第二平面805与第一方孔901的其中两条对边重合,第三平面806、第四平面807与第二方孔902的其中两条对边重合,装配完成后,转动杆800和拉环900不会产生相对转动。As shown in FIG. 3 : the rotating rod 800 and the pull ring 900 are assembled together. Split the first side arm 903 and the second side arm 904, and insert the parts of the first rotating shaft 802 and the second rotating shaft 803 near the two ends of the rotating rod 800 into the first square hole 901 and the second square hole 902, the first plane 804, The second plane 805 coincides with the two opposite sides of the first square hole 901, the third plane 806, the fourth plane 807 coincides with the two opposite sides of the second square hole 902, after the assembly is completed, the rotating rod 800 and the pull The ring 900 does not allow relative rotation.
如图8和图9所示:底座1200是一种金属长形腔体。底座1200上设有一体成型的大腔体1211。大腔体1211内安装有器件1400,和与所述器件1400连接的电路板1300。所述底座1200的前端设有水平滑槽1205和竖直滑槽1206。所述水平滑槽1205两边设置有长弹簧700,中间设置有制动片1000,制动片1000两翼顶住长弹簧700,使其处于压缩状态。所述竖直滑槽1206内安装有短弹簧500和凸块400,其中,凸块400被制动片1000后方的细长杆结构压住,从而使其不会从底座1200中脱出。As shown in Figure 8 and Figure 9: the base 1200 is a metal elongated cavity. The base 1200 is provided with an integrally formed large cavity 1211 . A device 1400 and a circuit board 1300 connected to the device 1400 are installed in the large cavity 1211 . The front end of the base 1200 is provided with a horizontal chute 1205 and a vertical chute 1206 . Long springs 700 are arranged on both sides of the horizontal chute 1205, and brake pads 1000 are arranged in the middle, and the two wings of the brake pads 1000 withstand the long springs 700 so that they are in a compressed state. A short spring 500 and a lug 400 are installed in the vertical chute 1206 , wherein the lug 400 is pressed by the elongated rod structure behind the brake pad 1000 so that it will not come out of the base 1200 .
大腔体1211前端的左右两侧壁分别设置有第一凹坑1207和第二凹坑1208。The left and right side walls of the front end of the large cavity 1211 are respectively provided with a first pit 1207 and a second pit 1208 .
第一卡孔1201中放置转动杆800的第一转轴802,第二卡孔1202中放置转动杆800的第二转轴803,转动杆800的凸轮结构801顶在制动片1000前方端面,拉环900受到长弹簧700产生并通过制动片1000、转动杆800传递过来的推力,两侧壁竖直贴在底座1200前方两侧。第一卡孔601和第二卡孔602的后方分别设置有第一让位腔1203和第二让位腔1204。第一卡孔601内侧有第一挡面1209,第二卡孔602内侧有第二挡面1210,拉环900和转动杆800一齐装在底座1200上后,第一挡面1209和第二挡面1210可限制拉环900的第一挡壁905和第二挡壁906向外侧移动,防止拉环900从转动杆800两端脱出。The first rotating shaft 802 of the rotating rod 800 is placed in the first clamping hole 1201, the second rotating shaft 803 of the rotating rod 800 is placed in the second clamping hole 1202, the cam structure 801 of the rotating rod 800 pushes against the front end surface of the brake pad 1000, and the pull ring The 900 receives the thrust generated by the long spring 700 and transmitted through the brake pad 1000 and the rotating rod 800 , and the two side walls are vertically attached to the two sides in front of the base 1200 . A first relief cavity 1203 and a second relief cavity 1204 are provided behind the first clamping hole 601 and the second clamping hole 602 respectively. There is a first blocking surface 1209 inside the first clamping hole 601, and a second blocking surface 1210 is arranged inside the second clamping hole 602. After the pull ring 900 and the rotating rod 800 are installed on the base 1200 together, the first blocking surface 1209 and the second blocking surface The surface 1210 can limit the movement of the first blocking wall 905 and the second blocking wall 906 of the pull ring 900 to the outside, preventing the pull ring 900 from coming out from the two ends of the rotating rod 800 .
如图10和图11所示:限位盖600是一种带有侧壁的薄壁壳体。所述限位盖600包括依次连接的左侧壁605、顶板(图中未标出)和右侧壁606。所述左侧壁605上设有向内凹陷且呈弧形的第一卡扣603,所述右侧壁606上设有与所述第一卡扣603相同形状的第二卡扣604。As shown in FIGS. 10 and 11 , the limit cover 600 is a thin-walled shell with side walls. The limit cover 600 includes a left side wall 605 , a top plate (not shown in the figure) and a right side wall 606 connected in sequence. The left side wall 605 is provided with an inwardly concave and arc-shaped first buckle 603 , and the right side wall 606 is provided with a second buckle 604 having the same shape as the first buckle 603 .
如图12至16所示:限位盖600套在底座1200的前端上方,第一侧壁605上的第一卡扣603设置在底座1200的第一凹坑1207中,第二侧壁606上的第二卡扣604设置在底座1200的第二凹坑1208中。第一开口挡圈601和第二开口挡圈602分别设置在底座1200的第一让位腔1203和第二让位腔1204中,当拉环900转动时,拉环的900的第一连接臂907和第二连接臂908从开口挡圈的开口处旋转到开口挡圈内。As shown in Figures 12 to 16: the limit cover 600 is set above the front end of the base 1200, the first buckle 603 on the first side wall 605 is set in the first recess 1207 of the base 1200, and the second side wall 606 The second buckle 604 is disposed in the second recess 1208 of the base 1200 . The first retaining ring 601 and the second retaining ring 602 are respectively arranged in the first relief chamber 1203 and the second relief chamber 1204 of the base 1200. When the pull ring 900 rotates, the first connecting arm of the pull ring 900 907 and the second connecting arm 908 rotate from the opening of the split ring into the split ring.
第一开口挡圈601的第一末端6011设置在底座1200的第一卡孔1201的开口处,第二开口挡圈602的第二末端6021设置在底座1200的第二卡孔1202的开口处,防止转动杆800的第一转轴802和第二转轴803从底座1200的第一卡孔1201和第二卡孔1202中脱出。The first end 6011 of the first stop ring 601 is set at the opening of the first hole 1201 of the base 1200 , the second end 6021 of the second stop ring 602 is set at the opening of the second hole 1202 of the base 1200 , Prevent the first rotating shaft 802 and the second rotating shaft 803 of the rotating rod 800 from coming out of the first locking hole 1201 and the second locking hole 1202 of the base 1200 .
如图17和图18所示:器件高度受限和不受限的模块剖视图,器件的尺寸为国际多元协议规定的尺寸。图18的器件A2100与器件B2200之间为柔性连接,器件A2100的高度H2可根据安装卸载装置的需要调整大小。图17的器件1400固定在电路板1300上,器件1400的高度H1受到电路板的限制不能变化。现有技术存在的装置应用于器件高度不受限的模块结构上时,H2≤H1-0.4mm,但如果现有技术存在的装置应用在器件高度受限的模块结构上时,拉环手柄2301的高度会超出标准。而本发明的手柄为扁平式结构,应用在器件高度受限的模块结构上,拉环手柄高度也能满足的标准。As shown in Figure 17 and Figure 18: the cross-sectional view of the module with limited and unlimited height of the device, the size of the device is the size stipulated by the international multi-component agreement. The connection between the device A2100 and the device B2200 in FIG. 18 is flexible, and the height H2 of the device A2100 can be adjusted according to the needs of the installation and unloading device. The device 1400 in FIG. 17 is fixed on the circuit board 1300, and the height H1 of the device 1400 cannot be changed due to the limitation of the circuit board. When the device in the prior art is applied to a module structure with unlimited device height, H2≤H1-0.4mm, but if the device in the prior art is applied to a module structure with a limited device height, the ring handle 2301 The height will exceed the standard. However, the handle of the present invention has a flat structure, and is applied to a module structure with a limited height of the device, and the height of the handle of the pull ring can also meet the standard.
如图19和图20所示分别为本发明实施例和现有技术存在的装置安装在设备中与相邻模块的一种位置关系平面图。当遇到端口密度较高的设备时,本发明实施例在卸载过程中可以正常使用,而现有技术的装置上方模块拉环转动时会与下方模块干涉,从而不能正常卸载。Fig. 19 and Fig. 20 are plan views showing the positional relationship between the device installed in the device and the adjacent modules in the embodiment of the present invention and in the prior art. When encountering equipment with a high port density, the embodiment of the present invention can be used normally during the unloading process, while the pull ring of the upper module of the prior art device will interfere with the lower module when it rotates, so that it cannot be unloaded normally.
一种模块的安装卸载装置的安装方法,该安装方法包括如下步骤:An installation method of a module installation and uninstallation device, the installation method comprising the following steps:
1)掰开拉环900的第一侧臂903和第二侧臂904,将转动杆800的第一转轴802、第二转轴803靠近两端的部分插入拉环900的第一方孔901和第二方孔902,使转动杆800的第一平面804、第二平面805与拉环900的第一方孔901的其中两条对边重合,使拉环转动杆800的第三平面806、第四平面807与拉环900的第二方孔902的其中两条对边重合,拉环900与转动杆800形成封闭环;1) Open the first side arm 903 and the second side arm 904 of the pull ring 900, and insert the parts of the first shaft 802 and the second shaft 803 of the rotation rod 800 near the two ends into the first square hole 901 and the second side of the pull ring 900. Two square holes 902 make the first plane 804 and the second plane 805 of the rotating rod 800 coincide with two opposite sides of the first square hole 901 of the pull ring 900, so that the third plane 806 and the second plane 806 of the pull ring rotating rod 800 The four planes 807 coincide with two opposite sides of the second square hole 902 of the pull ring 900, and the pull ring 900 and the rotating rod 800 form a closed ring;
2)将短弹簧500放入底座1200的竖直滑槽1206中,然后将凸块400放入竖直滑槽1206中,压在短弹簧500上;2) Put the short spring 500 into the vertical chute 1206 of the base 1200, then put the bump 400 into the vertical chute 1206, and press it on the short spring 500;
3)将长弹簧700放入底座1200的水平滑槽1205两侧,然后将制动片1000放入底座1200的水平滑槽中,压在长弹簧700前方;3) Put the long spring 700 into both sides of the horizontal chute 1205 of the base 1200, then put the brake pad 1000 into the horizontal chute of the base 1200, and press it in front of the long spring 700;
4)先用一只手顶住制动片1000头部,然后将转动杆800连同拉环900从底座1200的第一让位腔1203和第二让位腔1204上方放入,直至转动杆800的第一转轴802和第二转轴803放到底座1200的第一卡孔1201和第二卡孔1202的开口处;4) Hold the head of the brake pad 1000 with one hand first, and then put the rotating rod 800 together with the pull ring 900 from above the first relief chamber 1203 and the second relief chamber 1204 of the base 1200 until the rotating rod 800 Put the first rotating shaft 802 and the second rotating shaft 803 into the openings of the first locking hole 1201 and the second locking hole 1202 of the base 1200;
5)松开制动片1000头部,借助长弹簧700传递给制动片1000的弹力,转动杆800的第一转轴802和第二转轴803被顶入底座1200的第一卡孔1201和第二卡孔1202内;5) Loosen the head of the brake pad 1000, and with the elastic force transmitted to the brake pad 1000 by the long spring 700, the first rotating shaft 802 and the second rotating shaft 803 of the rotating rod 800 are pushed into the first clamping hole 1201 and the second locking hole 1201 of the base 1200. Inside the second card hole 1202;
6)将限位盖600套在底座1200前上方。6) Set the limit cover 600 on the front and upper side of the base 1200 .
一种模块的安装方法,该安装方法包括如下步骤:A module installation method, the installation method includes the following steps:
1)将器件1400、电路板1300放入底座1200的大腔体1211中;1) Put the device 1400 and the circuit board 1300 into the large cavity 1211 of the base 1200;
2)将上盖100放在底座1200的大腔体1209之上;2) Put the upper cover 100 on the large cavity 1209 of the base 1200;
3)将上弹片300从上向下罩在底座1200上;3) Cover the upper elastic piece 300 on the base 1200 from top to bottom;
4)将下弹片1100从下向上罩在底座1200上。4) Cover the lower elastic piece 1100 on the base 1200 from bottom to top.
以上所举实施例为本发明的较佳实施方式,仅用来方便说明本发明,并非对本发明作任何形式上的限制,任何所属技术领域中具有通常知识者,若在不脱离本发明所提技术特征的范围内,利用本发明所揭示技术内容所作出局部更动或修饰的等效实施例,并且未脱离本发明的技术特征内容,均仍属于本发明技术特征的范围内。The above examples are preferred implementations of the present invention, and are only used to illustrate the present invention conveniently, and are not intended to limit the present invention in any form. Anyone with ordinary knowledge in the technical field, if they do not depart from the present invention, Within the scope of the technical features, the equivalent embodiments that utilize the technical content disclosed in the present invention to make partial changes or modifications without departing from the technical features of the present invention still belong to the scope of the technical features of the present invention.
Claims (5)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610488622.2A CN105954839B (en) | 2016-06-28 | 2016-06-28 | A kind of the installation discharge mechanism and its installation method of module |
| PCT/CN2016/110329 WO2018000759A1 (en) | 2016-06-28 | 2016-12-16 | Module mounting and unloading apparatus and mounting method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610488622.2A CN105954839B (en) | 2016-06-28 | 2016-06-28 | A kind of the installation discharge mechanism and its installation method of module |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105954839A CN105954839A (en) | 2016-09-21 |
| CN105954839B true CN105954839B (en) | 2018-09-28 |
Family
ID=56901600
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610488622.2A Active CN105954839B (en) | 2016-06-28 | 2016-06-28 | A kind of the installation discharge mechanism and its installation method of module |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN105954839B (en) |
| WO (1) | WO2018000759A1 (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105954839B (en) * | 2016-06-28 | 2018-09-28 | 武汉电信器件有限公司 | A kind of the installation discharge mechanism and its installation method of module |
| CN109239864A (en) * | 2018-10-11 | 2019-01-18 | 菲尼萨光电通讯(上海)有限公司 | A kind of optical module unlocking mechanism |
| CN109212692A (en) * | 2018-11-12 | 2019-01-15 | 河北华美光电子有限公司 | A kind of optical module of rotating block unlocking mechanism and its optical module of application |
| CN110244413B (en) * | 2019-05-22 | 2024-06-11 | 广东瑞谷光网通信股份有限公司 | Optical module unblock reset structure |
| CN111324089A (en) * | 2020-03-04 | 2020-06-23 | 河源市凯航自动化科技有限公司 | Numerical control program converter of three-coordinate measuring machine |
| CN111443439B (en) * | 2020-04-30 | 2025-01-14 | 深圳市亚派光电器件有限公司 | Housing components |
| CN115734552B (en) * | 2022-11-26 | 2025-06-03 | 南京美均电子科技有限公司 | A PCB board fixing structure |
| PT119179A (en) * | 2023-12-28 | 2025-06-30 | Altice Labs S A | BUCKLE COVER MECHANISM FOR A SUBSCRIBER-TYPE CONNECTOR-PLUGGABLE OPTICAL TRANSCEIVER |
| CN118055340B (en) * | 2024-02-21 | 2024-08-27 | 广东云百智联科技有限公司 | Data acquisition gateway based on industrial Internet of things |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200962597Y (en) * | 2006-08-30 | 2007-10-17 | 武汉电信器件有限公司 | Pull loop unlock reset device of hot plug photoelectrical module |
| US20130071072A1 (en) * | 2011-09-15 | 2013-03-21 | Boping Xie | Optical module including a clamp |
Family Cites Families (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3745860B2 (en) * | 1996-05-28 | 2006-02-15 | 古河電気工業株式会社 | Optical semiconductor device package and manufacturing method thereof |
| EP1180703A1 (en) * | 2000-08-11 | 2002-02-20 | Delphi Technologies, Inc. | Optoelectronic module with spring bearing for optical transmitter and receiver |
| US6575770B2 (en) * | 2001-08-01 | 2003-06-10 | Agilent Technologies, Inc. | Optoelectronic module apparatus and method of assembly |
| CN2738478Y (en) * | 2004-11-11 | 2005-11-02 | 深圳飞通光电股份有限公司 | SFP optical receiving and transmitting integral module |
| CN2864720Y (en) * | 2006-01-19 | 2007-01-31 | 深圳思达光电通信技术有限公司 | Small-sized plug-in type optical transmitting-receiving module |
| CN201215594Y (en) * | 2008-07-15 | 2009-04-01 | 深圳新飞通光电子技术有限公司 | Unlocking resetting device for SFP light transceiving integrated module |
| CN101614850A (en) * | 2009-07-21 | 2009-12-30 | 武汉电信器件有限公司 | A kind of draw-ring type unlocking device for photoelectric module |
| CN102183826B (en) * | 2011-05-03 | 2012-10-17 | 武汉电信器件有限公司 | Module and mounting and dismounting device thereof |
| CN102902023B (en) * | 2011-07-26 | 2015-07-22 | 住友电气工业株式会社 | Optical transceiver with finger tightly fastened to housing |
| CN102998755A (en) * | 2012-10-16 | 2013-03-27 | 绍兴飞泰光电技术有限公司 | Coarse identical-wavelength division multiplexing bidirectional light receiving and transmitting integrated module with tail fiber type structure and single fiber |
| CN203519884U (en) * | 2013-09-23 | 2014-04-02 | 无锡市恒英盛电子科技有限公司 | Unlocking mechanism of small hot plug optical transceiver |
| CN203521988U (en) * | 2013-10-10 | 2014-04-02 | 南通东源电力智能设备有限公司 | Electric chassis controller |
| CN203521984U (en) * | 2013-11-18 | 2014-04-02 | 浙江时通电气制造有限公司 | A 35kV mobile substation |
| CN104345414B (en) * | 2014-10-31 | 2016-08-31 | 武汉电信器件有限公司 | Module backing type installs discharge mechanism |
| CN104516067B (en) * | 2014-12-04 | 2017-01-04 | 武汉电信器件有限公司 | A kind of optical-electric module is locked and unlocking mechanism |
| CN104865652B (en) * | 2015-06-01 | 2016-08-10 | 武汉电信器件有限公司 | A kind of modular structure |
| CN105954839B (en) * | 2016-06-28 | 2018-09-28 | 武汉电信器件有限公司 | A kind of the installation discharge mechanism and its installation method of module |
-
2016
- 2016-06-28 CN CN201610488622.2A patent/CN105954839B/en active Active
- 2016-12-16 WO PCT/CN2016/110329 patent/WO2018000759A1/en not_active Ceased
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200962597Y (en) * | 2006-08-30 | 2007-10-17 | 武汉电信器件有限公司 | Pull loop unlock reset device of hot plug photoelectrical module |
| US20130071072A1 (en) * | 2011-09-15 | 2013-03-21 | Boping Xie | Optical module including a clamp |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105954839A (en) | 2016-09-21 |
| WO2018000759A1 (en) | 2018-01-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105954839B (en) | A kind of the installation discharge mechanism and its installation method of module | |
| CN109254360A (en) | Optical transceiver module shell and optical transceiver module | |
| US20180275357A1 (en) | Latch Fitting, De-Latching Mechanism and Optical Module Including the Same | |
| CN104617445A (en) | Small pluggable connector with locking and unlocking mechanism | |
| US20210405312A1 (en) | Unlocking structure of pluggable optical module | |
| US20070173077A1 (en) | Universal serial bus (usb) network adapter connectable to external antenna | |
| CN107797196A (en) | A kind of vertical pulling Self-sinking type module is locked and discharge mechanism | |
| CN106941767A (en) | A kind of communication equipment of push-pull structure and the application push-pull structure | |
| CN109298490A (en) | A kind of module Straight pull charging crane and its installation method | |
| CN108243594B (en) | Power module and plug frame assembly | |
| CN102141658B (en) | XFP module of 10 Gigabit Small Form-Factor Pluggable transceiver | |
| CN204887080U (en) | A communication terminal with a latch | |
| CN100504084C (en) | Profile connector | |
| CN214706379U (en) | Socket shutter structure | |
| CN210430282U (en) | Push-pull connector and plug | |
| EP2541296A1 (en) | Unlocking device for optical module | |
| CN102455470A (en) | Unlocking and resetting device for XFP optical transceiving integrated module | |
| CN216251276U (en) | Lift socket | |
| CN210776966U (en) | Locking structure of express delivery cabinet | |
| CN207096511U (en) | A kind of SFP optical module | |
| CN104563607B (en) | Lock body, lock cylinder and anti-pick lock | |
| CN209001942U (en) | A kind of wire intercommunication that safety is high | |
| CN104614821B (en) | Press-fit unlocking device and RJ45 electric port SFP module thereof | |
| CN215117767U (en) | A wireless lighting remote control using electronic technology | |
| CN208623033U (en) | A kind of retaining mechanism of electric connector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |