CN106223956A - Medium-length hole courtyard mining afterwards filling method - Google Patents
Medium-length hole courtyard mining afterwards filling method Download PDFInfo
- Publication number
- CN106223956A CN106223956A CN201610717932.7A CN201610717932A CN106223956A CN 106223956 A CN106223956 A CN 106223956A CN 201610717932 A CN201610717932 A CN 201610717932A CN 106223956 A CN106223956 A CN 106223956A
- Authority
- CN
- China
- Prior art keywords
- ore
- mining
- hole
- courtyard
- medium
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005065 mining Methods 0.000 title claims abstract description 42
- 238000000034 method Methods 0.000 title claims abstract description 37
- 238000005553 drilling Methods 0.000 claims abstract description 47
- 238000005422 blasting Methods 0.000 claims abstract description 15
- 238000004519 manufacturing process Methods 0.000 claims abstract description 11
- 239000011435 rock Substances 0.000 claims abstract description 10
- 239000012141 concentrate Substances 0.000 claims abstract description 3
- 239000002360 explosive Substances 0.000 claims description 5
- 229910052500 inorganic mineral Inorganic materials 0.000 claims 2
- 239000011707 mineral Substances 0.000 claims 2
- 238000007598 dipping method Methods 0.000 claims 1
- 239000000843 powder Substances 0.000 claims 1
- 238000004064 recycling Methods 0.000 claims 1
- 238000005520 cutting process Methods 0.000 abstract description 3
- 230000014759 maintenance of location Effects 0.000 abstract description 3
- 238000000605 extraction Methods 0.000 abstract description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000010790 dilution Methods 0.000 description 1
- 239000012895 dilution Substances 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Remote Sensing (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
本发明公开了一种中深孔天井采矿嗣后充填法,矿块沿矿体走向布置,在垂高上划分为阶段;矿块两端布置采准天井,矿块底部布置平底出矿结构,矿块上部布置天井钻机硐室,采用天井钻机钻凿采准天井;采用天井钻机提升系统提升凿岩、爆破工作平台,潜孔钻机从天井两侧钻凿水平平行或环形中深孔炮孔,集中凿岩,分次爆破,集中出矿,嗣后充填。该法主要适用于急倾斜薄至中厚矿体,克服了留矿法、分段空场法或上向分层充填采矿法存在的问题,具有采切工程量少,采场机械化作业程度高,生产效率高,生产能力大,人员无需进入采场作业,安全条件好等优点。
The invention discloses a filling method after medium and deep hole raise mining. The ore block is arranged along the ore body direction and divided into stages in terms of vertical height; the two ends of the ore block are arranged with a mining quasi-raise, and the bottom of the ore block is arranged with a flat-bottom ore-out structure. Raise drilling rig chambers are arranged on the upper part of the block, and the raised wells are drilled by the raised drilling rig; the rock drilling and blasting work platform is lifted by the raising system of the raised drilling rig, and the down-the-hole drilling rig drills horizontal parallel or circular medium-deep holes from both sides of the raised well, and concentrates Rock drilling, staged blasting, concentrated ore extraction, and subsequent filling. This method is mainly suitable for steeply inclined thin to medium-thick ore bodies. It overcomes the problems existing in the ore retention method, the segmented open field method or the upward layered filling mining method. It has the advantages of less mining and cutting engineering and a high degree of stope mechanization. , high production efficiency, large production capacity, no need for personnel to enter the stope operation, and good safety conditions.
Description
技术领域technical field
本发明属于采矿领域,尤其涉及一种中深孔天井采矿嗣后充填法。The invention belongs to the field of mining, and in particular relates to a method of filling after medium and deep hole raise mining.
背景技术Background technique
急倾斜薄矿体至中厚矿体常用留矿法、分段空场法或上向分层充填法开采。其中,留矿法采场暴露面积大,机械化程度低,劳动强度大,作业不安全等;分段空场法则存在着采切比大,采场矿石损失贫化率高等不足;按照分层充填采矿法开采时,由于作业循环多,回采工艺复杂,造成生产效率低,劳动强度大,采矿成本高,矿山生产能力小等不足。而且,上述采矿方法都需要掘进采准天井,但传统的采准天井掘进方法,掘进速度慢、工效低、安全性差。For steeply inclined thin ore bodies to medium-thick ore bodies, the ore retention method, segmented open field method or upward layered filling method are commonly used for mining. Among them, the mine-retaining method has a large stope exposure area, low degree of mechanization, high labor intensity, and unsafe operation; the segmented open field method has disadvantages such as a large cutting ratio and a high rate of ore loss and dilution in the stope; according to layered filling During the mining method, due to the many operation cycles and the complex mining process, the production efficiency is low, the labor intensity is high, the mining cost is high, and the mine production capacity is small. Moreover, the above-mentioned mining methods all need to excavate a quasi-raised shaft, but the traditional method of digging a quasi-raised shaft has slow driving speed, low work efficiency and poor safety.
发明内容Contents of the invention
本发明要解决的技术问题是提供一种作业安全、机械化程度高、劳动强度小、生产能力大、回采时间短的中深孔天井采矿嗣后充填法,该法主要适用于矿体较规则且要求生产能力大、效率高的急倾斜薄至中厚矿体开采。The technical problem to be solved by the present invention is to provide a medium and deep hole raise mining subsequent filling method with safe operation, high degree of mechanization, low labor intensity, large production capacity and short mining time. Mining of steeply inclined thin to medium-thick ore bodies with large production capacity and high efficiency.
为解决上述技术问题,本发明提供的中深孔天井采矿嗣后充填法采用以下技术方案:矿块沿矿体走向布置,在垂高上划分为阶段;矿块两端布置采准天井,矿块底部布置平底出矿结构,矿块上部布置天井钻机硐室,采用天井钻机钻凿采准天井;采用天井钻机提升系统提升凿岩、爆破工作平台;潜孔钻机从天井两侧钻凿水平平行或环形中深孔炮孔,集中凿岩,分次爆破,集中出矿,嗣后充填。In order to solve the above-mentioned technical problems, the method of filling the medium and deep hole raise mining provided by the present invention adopts the following technical scheme: the ore block is arranged along the ore body direction, and is divided into stages on the vertical height; A flat-bottom mining structure is arranged at the bottom, and a raise drilling rig chamber is arranged on the upper part of the ore block. The raise drilling rig is used to drill the mining quasi-raise; the raising system of the raise drilling rig is used to lift the rock drilling and blasting working platform; The ring-shaped medium-deep blast hole is drilled intensively, blasted in stages, and the ore is extracted in a concentrated manner, and then filled.
矿体为急倾斜薄至中厚矿体。The ore body is steeply inclined thin to medium thick ore body.
上述的中深孔天井采矿嗣后充填法,按以下步骤操作进行:The subsequent filling method of the above-mentioned medium and deep hole raise mining is carried out according to the following steps:
a)矿块沿矿体走向布置,划分为矿房和矿柱,矿柱包括间柱和顶柱;a) The ore blocks are arranged along the ore body trend, and are divided into ore rooms and ore pillars, and the ore pillars include inter-pillars and top pillars;
b)沿矿体走向布置出矿平巷,沿矿体底部布置拉底巷道,用装矿进路联通出矿平巷与拉底巷道;矿块两端布置采准天井,矿块上部布置天井钻机硐室,采用天井钻机钻凿采准天井;b) Arrange the exit level roadway along the direction of the ore body, arrange the bottom roadway along the bottom of the ore body, and use the ore loading route to connect the exit level roadway and the bottom roadway; arrange mining pits at both ends of the ore block, and arrange a patio on the upper part of the ore block Drilling rig chamber, use raise drilling rig to drill and drill quasi-raise;
c)采准天井完成后,采用天井钻机提升系统下放潜孔钻机和潜孔钻机工作平台至作业面;潜孔钻机从天井两侧钻凿水平平行或环形中深炮孔;c) After the completion of the standard well, use the raising system of the well drilling rig to lower the down-the-hole drilling rig and the working platform of the down-the-hole drilling rig to the working surface; the down-the-hole drilling rig drills horizontal parallel or circular medium-depth blastholes from both sides of the well;
d)在拉底巷道内扩邦、挑顶形成3-6m高的拉底空间后,用天井钻机提升系统沿天井下放工作平台和装药器至装药工作面,采用装药器装填散状炸药,自下而上分次爆破,根据需要确定每次的爆破排数。爆破下的矿石通过铲运机,从装矿进路中铲出,沿出矿平巷送至附近溜井中。为了保护天井,距孔口4m这一段不装药,爆破后天井两侧各留下约3m宽的矿柱。d) After expanding the bottom roadway and raising the roof to form a 3-6m high bottom space, use the lifting system of the well drilling rig to lower the working platform and the charge device to the charge working surface along the patio, and use the charge device to fill the bulk Explosives are blasted in batches from bottom to top, and the number of blasting rows is determined according to needs. The ore under blasting is shoveled out from the ore loading route by the scraper, and sent to the nearby chute along the mine exit roadway. In order to protect the patio, no explosives were charged in the section 4m away from the hole, and pillars about 3m wide were left on both sides of the patio after blasting.
e)矿房回采出矿后,根据相邻采场情况再回收矿柱,最后采用充填法处理采空区。e) After the ore is recovered from the mine, the ore pillar is recovered according to the conditions of the adjacent stope, and the goaf is finally treated by filling method.
步骤(a)中矿块长40-50m,宽为矿体厚度,阶段高度50-80m,间柱宽度6-8m,顶柱厚度3-6m。In the step (a), the length of the ore block is 40-50m, the width is the thickness of the ore body, the stage height is 50-80m, the width of the inter-pillar is 6-8m, and the thickness of the top pillar is 3-6m.
步骤(b)中出矿平巷距矿体下盘8-10m,装矿进路间距6-8m。In step (b), the distance between the ore exit level roadway and the footwall of the ore body is 8-10m, and the ore loading approach distance is 6-8m.
步骤(c)中炮孔孔径为50-70mm,孔深20-25m,炮孔排距1.0-2.0m,炮孔间距0.8-2.5m。In the step (c), the hole diameter of the blast hole is 50-70mm, the hole depth is 20-25m, the row spacing of the blast hole is 1.0-2.0m, and the blast hole spacing is 0.8-2.5m.
针对急倾斜薄至中厚矿体采用留矿法、分段空场法或上向分层充填采矿法开采时存在的不足,发明人建立一种中深孔天井采矿嗣后充填法,相对于现有技术,本发明的优势在于:Aiming at the deficiencies that exist when steeply inclined thin to medium-thick ore bodies are mined by the ore retention method, the segmented open field method or the upward layered filling mining method, the inventor has established a method of medium and deep hole raise mining followed by filling. There is technology, the advantage of the present invention is:
<1>本发明以阶段全高进行回采,在矿块两端布置采准天井,矿块底部布置平底出矿结构,矿块上部布置天井钻机硐室,结构简单,采切工程量小。<1>The present invention carries out mining at the full height of the stage, and arranges a mining raise at both ends of the ore block, arranges a flat-bottomed ore-out structure at the bottom of the ore block, and arranges a raise drilling rig chamber at the upper part of the ore block, with a simple structure and a small amount of mining and cutting work.
<2>本发明采用天井钻机钻凿天井,成井质量好、劳动作业条件好、生产安全、机械化程度高;回采作业是从天井两侧钻凿水平平行或环形中深孔炮孔,采用装药器装药,工人无需进入采场内工作,劳动作业条件好、生产安全、机械化程度高。<2> The present invention adopts the raised well drilling rig to drill the raised well, which has good well quality, good working conditions, safe production and high mechanization degree; The machine is loaded with medicine, workers do not need to enter the stope to work, the working conditions are good, the production is safe, and the degree of mechanization is high.
<3>本发明采用天井钻机钻凿天井,成井速度快、工效高;采用中深孔落矿,集中凿岩,分次爆破,铲运机出矿,生产能力大,生产效率高,成本低。<3> The present invention adopts a raised well drilling rig to drill a raised well, which has a fast speed of forming a well and high work efficiency; it adopts medium and deep holes for falling ore, concentrated rock drilling, blasting in stages, and a scraper for mining, with large production capacity, high production efficiency and low cost .
附图说明Description of drawings
图1是应用本发明中深孔天井采矿嗣后充填法的参考图。Fig. 1 is the reference diagram of applying the method of filling after medium and deep hole raise mining of the present invention.
图2是沿图1中的I-I线的剖示图。Fig. 2 is a sectional view along line I-I in Fig. 1 .
图中:1出矿平巷,2装矿进路,3天井联络道,4采准天井,5拉底巷道,6天井钻机硐室,7水平平行中深炮孔,8工作平台,9间柱,10天井钻机,11钻头,12提升系统,13顶柱,14潜孔钻机,15装药器。In the picture: 1 mine exit level roadway, 2 ore loading approach road, 3 raised well connection road, 4 mining quasi-raised well, 5 bottom roadway, 6 raised well drilling rig chamber, 7 horizontal parallel medium-depth blast holes, 8 working platform, 9 rooms columns, 10 raise drilling rigs, 11 drill bits, 12 hoisting systems, 13 top columns, 14 down-the-hole drilling rigs, and 15 chargeers.
具体实施方式detailed description
本发明中深孔天井采矿嗣后充填法的基本原理The Basic Principle of the Subsequent Filling Method for Medium and Deep Hole Raise Mining in the Present Invention
针对急倾斜薄至中厚矿体,矿块沿矿体走向布置,在垂高上划分为阶段;矿块两端布置采准天井,矿块底部布置平底出矿结构,矿块上部布置天井钻机硐室;采用天井钻机钻凿采准天井;采用天井钻机提升系统提升凿岩、爆破工作平台;潜孔钻机从天井两侧钻凿水平平行或环形中深孔炮孔,集中凿岩,分次爆破,集中出矿,嗣后充填。For steeply inclined thin to medium-thick ore bodies, the ore blocks are arranged along the ore body trend and divided into stages in terms of vertical height; mining quasi-raises are arranged at both ends of the ore blocks, flat-bottomed mining structures are arranged at the bottom of the ore blocks, and a raise drilling rig is arranged at the upper part of the ore blocks Chamber; use raise drilling rigs to drill quasi-raised wells; use raise drilling rig lifting system to lift rock drilling and blasting work platforms; down-the-hole drilling rigs drill horizontal parallel or circular medium-deep holes from both sides of the raise well, concentrate rock drilling, and divide Blasting, concentrated ore extraction, and subsequent filling.
该法具体操作步骤如下:The specific operation steps of this method are as follows:
a)矿块沿矿体走向布置,划分为矿房和矿柱,矿柱包括间柱9和顶柱13;矿块长40-50m,宽为矿体厚度,阶段高度50-80m,间柱9宽度6-8m,顶柱13厚度3-6m。a) The ore blocks are arranged along the ore body trend, divided into mine rooms and ore pillars. The ore pillars include inter-pillars 9 and top pillars 13; 9 width 6-8m, top column 13 thickness 3-6m.
b)距矿体下盘8-10m沿矿体走向布置出矿平巷1,沿矿体底部布置拉底巷道5,用装矿进路2联通出矿平巷与拉底巷道,装矿进路间距6-8m;矿块两端布置采准天井4,矿块上部布置天井钻机硐室6,采用天井钻机10钻凿采准天井;采准天井4与出矿平巷1通过天井联络道3联通;b) 8-10m away from the footwall of the ore body and arrange the exit tunnel 1 along the direction of the ore body, arrange the bottom tunnel 5 along the bottom of the ore body, use the ore loading approach 2 to connect the exit tunnel and the bottom tunnel, The distance between the roads is 6-8m; the mining pit 4 is arranged at both ends of the ore block, and the raised drilling rig chamber 6 is arranged on the upper part of the ore block, and the mining pit is drilled by the raised drilling rig 10; 3 China Unicom;
c)采准天井完成后,将天井钻机10的钻头11卸下;采用天井钻机提升系统12连接工作平台8,潜孔钻机14固定在工作平台8上,沿天井4下放至凿岩工作面后;潜孔钻机从天井两侧钻凿水平平行(或环形)中深炮孔7,孔径为50-70mm,孔深20-25m,炮孔排距1.0-2.0m,炮孔间距0.8-2.5m;c) After the drilling of the raised well is completed, the drill bit 11 of the raised well drilling rig 10 is unloaded; the raising system 12 of the raised well drilling rig is used to connect the working platform 8, the down-the-hole drilling rig 14 is fixed on the working platform 8, and is lowered along the raised well 4 to the rock drilling face The down-the-hole drilling rig drills horizontal parallel (or circular) medium-depth blastholes 7 from both sides of the patio, with a diameter of 50-70mm, a hole depth of 20-25m, a row spacing of blastholes of 1.0-2.0m, and a spacing of blastholes of 0.8-2.5m ;
d)在拉底巷道5内扩邦、挑顶形成3-6m高的拉底空间后,天井钻机提升系统12连接工作平台8,装药器15装药固定在工作平台8上,沿天井下放至装药工作面后,采用装药器15装填散状炸药,根据需要确定每次的爆破排数,自下而上分次爆破,爆破下的矿石通过铲运机,从装矿进路2中铲出,沿出矿平巷1送至附近溜井中。;为了保护天井,距孔口4m这一段不装药,爆破后天井两侧各留下3m宽的矿柱;d) After expanding the bottom tunnel 5 and raising the roof to form a 3-6m high bottom space, the raising system 12 of the well drilling rig is connected to the working platform 8, and the charging device 15 is charged and fixed on the working platform 8, and lowered along the patio After arriving at the charge working face, use charge device 15 to load bulk explosives, determine the number of blasting rows each time according to needs, and blast in stages from bottom to top. Shovel it out and send it to the nearby chute along the mining level roadway 1. ;In order to protect the patio, the section 4m away from the orifice is not filled with explosives, leaving 3m wide ore pillars on both sides of the patio after blasting;
e)矿房回采出矿后,根据相邻采场情况再回收间柱9和顶柱13,最后采用充填法处理采空区。e) After mining in the mine house, recover the spacer column 9 and the top column 13 according to the conditions of the adjacent stope, and finally use the filling method to treat the goaf.
Claims (6)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610521210 | 2016-06-30 | ||
| CN2016105212104 | 2016-06-30 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106223956A true CN106223956A (en) | 2016-12-14 |
| CN106223956B CN106223956B (en) | 2018-08-21 |
Family
ID=57555424
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610717932.7A Active CN106223956B (en) | 2016-06-30 | 2016-08-24 | Medium-length hole courtyard mining afterwards filling method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106223956B (en) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106677780A (en) * | 2017-02-21 | 2017-05-17 | 中冶北方(大连)工程技术有限公司 | Upward and downward staged rock drilling, sublevel bottom cutting and ore removal subsequent backfilling mining method |
| CN107448201A (en) * | 2017-05-31 | 2017-12-08 | 陕西冶金设计研究院有限公司 | A kind of steeply inclined thin is to the flat ore removal structure of middle strong vein and method |
| CN108086979A (en) * | 2017-11-27 | 2018-05-29 | 西北矿冶研究院 | Mining process of vertical deep hole columnar cartridge bag ore breaking stage by using chamber method |
| CN108590652A (en) * | 2018-05-09 | 2018-09-28 | 中冶北方(大连)工程技术有限公司 | A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend |
| CN109322683A (en) * | 2018-10-24 | 2019-02-12 | 临沂会宝岭铁矿有限公司 | Underground Large chamber medium-length hole controls blasting construction method |
| CN110966005A (en) * | 2019-11-22 | 2020-04-07 | 西北矿冶研究院 | A new type of mine room method for medium and deep holes in the falling stage |
| CN111779485A (en) * | 2020-07-01 | 2020-10-16 | 长沙矿山研究院有限责任公司 | Combined hole segmented open stope subsequent filling mining method |
| CN111963175A (en) * | 2020-07-28 | 2020-11-20 | 广西大学 | Thick ore body mining method |
| CN115075821A (en) * | 2022-07-04 | 2022-09-20 | 山东黄金矿业科技有限公司深井开采实验室分公司 | A kind of deep ore body masonry structure continuous mining and subsequent filling mining method |
| CN116537788A (en) * | 2023-05-04 | 2023-08-04 | 山东黄金矿业(玲珑)有限公司 | Construction method and device for medium and deep hole drilling rig in patio |
| CN119195770A (en) * | 2024-09-20 | 2024-12-27 | 湖北省地质矿业开发有限责任公司 | A mechanized strip mining method |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6848748B2 (en) * | 2000-09-20 | 2005-02-01 | Dbt Gmbh | Mining system with drilling, loading, conveyor, and support |
| CN101737050A (en) * | 2008-11-25 | 2010-06-16 | 宝钢集团上海梅山有限公司 | Deep hole arranging method in mining |
| CN103527200A (en) * | 2013-10-25 | 2014-01-22 | 河北省矾山磷矿有限公司 | Sill-pillar-free sublevel rhombus room subsequent filling mining method |
| CN103615250A (en) * | 2013-12-09 | 2014-03-05 | 中南大学 | Subsection-studding all-open-stoping backfilling collaborative mining method |
| CN104154830A (en) * | 2014-08-08 | 2014-11-19 | 西北矿冶研究院 | Medium-length hole blasting method for underground mining |
-
2016
- 2016-08-24 CN CN201610717932.7A patent/CN106223956B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6848748B2 (en) * | 2000-09-20 | 2005-02-01 | Dbt Gmbh | Mining system with drilling, loading, conveyor, and support |
| CN101737050A (en) * | 2008-11-25 | 2010-06-16 | 宝钢集团上海梅山有限公司 | Deep hole arranging method in mining |
| CN103527200A (en) * | 2013-10-25 | 2014-01-22 | 河北省矾山磷矿有限公司 | Sill-pillar-free sublevel rhombus room subsequent filling mining method |
| CN103615250A (en) * | 2013-12-09 | 2014-03-05 | 中南大学 | Subsection-studding all-open-stoping backfilling collaborative mining method |
| CN104154830A (en) * | 2014-08-08 | 2014-11-19 | 西北矿冶研究院 | Medium-length hole blasting method for underground mining |
Non-Patent Citations (2)
| Title |
|---|
| 张敬东: "水平中深孔采矿方法应用", 《黑龙江冶金》 * |
| 胡旭东等: "胡旭东等", 《企业技术开发》 * |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106677780A (en) * | 2017-02-21 | 2017-05-17 | 中冶北方(大连)工程技术有限公司 | Upward and downward staged rock drilling, sublevel bottom cutting and ore removal subsequent backfilling mining method |
| CN107448201A (en) * | 2017-05-31 | 2017-12-08 | 陕西冶金设计研究院有限公司 | A kind of steeply inclined thin is to the flat ore removal structure of middle strong vein and method |
| CN108086979A (en) * | 2017-11-27 | 2018-05-29 | 西北矿冶研究院 | Mining process of vertical deep hole columnar cartridge bag ore breaking stage by using chamber method |
| CN108590652A (en) * | 2018-05-09 | 2018-09-28 | 中冶北方(大连)工程技术有限公司 | A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend |
| CN109322683A (en) * | 2018-10-24 | 2019-02-12 | 临沂会宝岭铁矿有限公司 | Underground Large chamber medium-length hole controls blasting construction method |
| CN110966005A (en) * | 2019-11-22 | 2020-04-07 | 西北矿冶研究院 | A new type of mine room method for medium and deep holes in the falling stage |
| CN111779485A (en) * | 2020-07-01 | 2020-10-16 | 长沙矿山研究院有限责任公司 | Combined hole segmented open stope subsequent filling mining method |
| CN111963175A (en) * | 2020-07-28 | 2020-11-20 | 广西大学 | Thick ore body mining method |
| CN115075821A (en) * | 2022-07-04 | 2022-09-20 | 山东黄金矿业科技有限公司深井开采实验室分公司 | A kind of deep ore body masonry structure continuous mining and subsequent filling mining method |
| CN116537788A (en) * | 2023-05-04 | 2023-08-04 | 山东黄金矿业(玲珑)有限公司 | Construction method and device for medium and deep hole drilling rig in patio |
| CN119195770A (en) * | 2024-09-20 | 2024-12-27 | 湖北省地质矿业开发有限责任公司 | A mechanized strip mining method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106223956B (en) | 2018-08-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106223956B (en) | Medium-length hole courtyard mining afterwards filling method | |
| CN110644997B (en) | Sublevel rock drilling and sublevel mining subsequent filling mining method | |
| CN102635356B (en) | Medium-length hole mining method in multiple blasting free faces of high dipping thin veins | |
| CN108442930B (en) | A mining method for inclined medium-thick metal ore body | |
| CN108625856B (en) | Mining method for one ore removal roadway of two adjacent stopes of underground mine | |
| CN104806244B (en) | Filling mining method for slant middle-thick ore body | |
| WO2023005072A1 (en) | Open stope mining method for steeply inclined veined ore body | |
| CN104481539B (en) | From kerve tight-face blasting caved stopes | |
| CN104481543B (en) | Stage shrink caved stopes | |
| CN105952450B (en) | A kind of new method of the double stope collaboration exploitations in underground mine underground | |
| CN104153780B (en) | Lean ore body sublevel caving stays ore deposit continuous stoping technique | |
| CN110905512B (en) | Open stope mining method for gently inclined medium-thickness ore body | |
| CN103590831A (en) | Novel mining method of gently-inclined thin and medium thickness ore bodies | |
| CN110644996B (en) | An open-field subsequent filling mining method suitable for gently dipping medium-thick orebodies | |
| CN112502709B (en) | Pre-controlled roof intelligent mining method for vertical medium and deep hole VCR falling and filling immediately after blasting | |
| CN104453901A (en) | Sublevel open-stoping mining method with subsequent backfilling for long-hole caving in thin ore bodies | |
| CN102493806A (en) | Mechanized continuous mining method for wall-type gentle-inclined thin ore body | |
| CN108625855B (en) | Mining method under filling body | |
| CN111963175B (en) | Thick ore body mining method | |
| CN105178961A (en) | Open-stope subsequent filling mining method in wide stope borehole drilling phase | |
| CN111594170B (en) | A method for mining residual ore body on the roof and floor of a gently inclined ore body | |
| CN105201506B (en) | The mining methods of afterwards filling are reinforced before a kind of heir | |
| CN105927226A (en) | Medium-length hole ore-breaking continuous sectional horizontal filling mining method | |
| CN115306393B (en) | A method for processing goaf areas in open-pit to underground mining mines | |
| CN102337893B (en) | Method for processing suspension top by medium-deep hole blasting on upper and lower shoes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |