[go: up one dir, main page]

CN106238547A - Spinning product front gets wet cooling system and spinning product front cool-down method - Google Patents

Spinning product front gets wet cooling system and spinning product front cool-down method Download PDF

Info

Publication number
CN106238547A
CN106238547A CN201610749731.5A CN201610749731A CN106238547A CN 106238547 A CN106238547 A CN 106238547A CN 201610749731 A CN201610749731 A CN 201610749731A CN 106238547 A CN106238547 A CN 106238547A
Authority
CN
China
Prior art keywords
spinning
gets wet
blank
heat sink
product front
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610749731.5A
Other languages
Chinese (zh)
Inventor
刘帅
张大勇
王建强
王蕊
付亚男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN LIZHONG WHEEL CO Ltd
Original Assignee
TIANJIN LIZHONG WHEEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN LIZHONG WHEEL CO Ltd filed Critical TIANJIN LIZHONG WHEEL CO Ltd
Priority to CN201610749731.5A priority Critical patent/CN106238547A/en
Publication of CN106238547A publication Critical patent/CN106238547A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D22/00Shaping without cutting, by stamping, spinning, or deep-drawing
    • B21D22/14Spinning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/16Heating or cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D53/00Making other particular articles
    • B21D53/26Making other particular articles wheels or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

The invention discloses a kind of spinning product front to get wet cooling system and cool-down method, this system includes spinning preheating furnace, spinning machine, spinning mechanical hand between described spinning preheating furnace and described spinning machine, is positioned at the heat sink that gets wet of described spinning mechanical hand stroke section;Described spinning mechanical hand for being carried to the heat sink that gets wet by the blank after preheating in spinning preheating furnace, and the blank after the cooling that gets wet being processed is carried to spinning machine and carries out spinning;The described heat sink that gets wet processes for the cooling that gets wet the front of blank.Use technique scheme, the positive surface temperature of blank can be made to reduce hardening, improve the rib deformation drawing-die situation caused due to the downward thrust of the pressure of platen during spinning, three spinning rollers and demoulding thrust, scrappage of standing after reduction, reduce cost, increase the benefit.

Description

Spinning product front gets wet cooling system and spinning product front cool-down method
Technical field
The present invention relates to a kind of spinning product front get wet cooling system and spinning product front cool-down method, belong to machinery Manufacture processing technique field.
Background technology
Automobile tire production technology is often used spinning process, automotive hub is carried out spinning manufacture.Along with automobile work The development of industry, spinning product wheel-type is on the increase, and the problem that product exposes also gets more and more: as overproof in drawing-die, deformation, dynamic balancing Etc., rear station scrappage is higher, and even some wheel-type is due to moulding problem, and during spinning, positive facial disfigurement cannot overcome, so that cannot Normal production.
Summary of the invention
Therefore, it is an object of the invention to overcome defect of the prior art, it is provided that product blank when one overcomes spinning The spinning product front of positive facial disfigurement gets wet cooling system and spinning product front cool-down method.
To achieve these goals, a kind of spinning product front of the present invention gets wet cooling system, including spinning preheating furnace, Spinning machine, spinning mechanical hand between described spinning preheating furnace and described spinning machine, it is positioned at described spinning mechanical hand stroke The heat sink that gets wet in interval;Described spinning mechanical hand is for being carried to, by the blank after preheating in spinning preheating furnace, the fall that gets wet Temperature device, and carry out spinning for the blank after the cooling process that gets wet is carried to spinning machine;The described heat sink that gets wet is used Process in cooling that the front of blank is got wet.
The described heat sink that gets wet includes water tank, the supporting slider being positioned at water tank side, is arranged in described supporting slider Slide block, the L-shaped bracing frame that is installed on described slide block, described slide block can move up and down in described supporting slider, Thus drive described L-shaped bracing frame downwardly into below the water surface of described water tank and drive described L-shaped bracing frame to rise to More than the water surface of described water tank.
Described slide block is horizontally disposed tabular.
Described water tank is provided with water inlet and outlet.
The side of described spinning preheating furnace is additionally provided with temperature measuring equipment.
A kind of spinning product front cool-down method, comprises the following steps:
1) blank after preheating will be carried to get wet heat sink and just facing in spinning preheating furnace by spinning mechanical hand Lower placement;
2) blank is moved down after making its front be immersed in the water 5 seconds by the heat sink that gets wet, and will pipette out the water surface on it;
3) by spinning mechanical hand, the blank after the cooling that gets wet is carried to spinning machine and carries out spinning.
Using technique scheme, the spinning product front of the present invention gets wet cooling system and spinning product front cooling side Method, it is possible to make the positive surface temperature of blank reduce hardening, improve due to the pressure of platen, three spinning roller downward pushing away during spinning Power and demoulding thrust and the rib deformation drawing-die situation that causes, scrappage of standing after reduction, reduce cost, increase the benefit.
Accompanying drawing explanation
Fig. 1 is the system schematic of the present invention.
Fig. 2 is the front view of heat sink of getting wet in the present invention.
Fig. 3 is the right view of Fig. 2.
Detailed description of the invention
Below by way of the drawings and specific embodiments, the present invention is described in further detail.
The cooling system as it can be seen, a kind of spinning product front of the present embodiment offer gets wet, including spinning preheating furnace 1, rotation Press 2, between described spinning preheating furnace 1 and described spinning machine the spinning mechanical hand 3 of 2, be positioned at described spinning mechanical hand 3 row The heat sink 4 that gets wet in journey interval;Described spinning mechanical hand 3 is for being carried to the blank after preheating in spinning preheating furnace 1 Get wet heat sink 4, and the blank after the cooling that gets wet being processed is carried to spinning machine 2 and carries out spinning;The described fall that gets wet Temperature device 4 processes for the cooling that gets wet the front of blank.
The described heat sink 4 that gets wet includes water tank 41, the supporting slider 42 being positioned at water tank 41 side, is arranged at described support Slide block 43 on slide bar, the L-shaped bracing frame 44 being installed on described slide block 43, described slide block 43 can be in described supporting slider 42 On move up and down, thus drive described L-shaped bracing frame 44 downwardly into below the water surface of described water tank 41 and drive Described L-shaped bracing frame 44 rises to more than the water surface of described water tank 41.
Described slide block 43 is horizontally disposed tabular.
Described water tank 41 is provided with water inlet 411 and outlet 412.
The side of described spinning preheating furnace 1 is additionally provided with temperature measuring equipment 5.
A kind of spinning product front cool-down method, comprises the following steps:
1) blank after preheating will be carried to get wet heat sink and just facing in spinning preheating furnace by spinning mechanical hand Lower placement;
2) blank is moved down after making its front be immersed in the water 5 seconds by the heat sink that gets wet, and will pipette out the water surface on it;
3) by spinning mechanical hand, the blank after the cooling that gets wet is carried to spinning machine and carries out spinning.
Using technique scheme, the spinning product front of the present invention gets wet cooling system and spinning product front cooling side Method, it is possible to make the positive surface temperature of blank reduce hardening, improve due to the pressure of platen, three spinning roller downward pushing away during spinning Power and demoulding thrust and the rib deformation drawing-die situation that causes, scrappage of standing after reduction, reduce cost, increase the benefit.
Obviously, above-described embodiment is only for clearly demonstrating example, and not restriction to embodiment.For For those of ordinary skill in the field, change or the change of other multi-form can also be made on the basis of the above description Dynamic.Here without also cannot all of embodiment be given exhaustive.And the obvious change thus extended out or change Move among still in the protection domain of the invention.

Claims (6)

1. a spinning product front gets wet cooling system, it is characterised in that: include spinning preheating furnace, spinning machine, be positioned at described Spinning mechanical hand between spinning preheating furnace and described spinning machine, it is positioned at the cooling that gets wet of described spinning mechanical hand stroke section Device;Described spinning mechanical hand is for being carried to, by the blank after preheating in spinning preheating furnace, the heat sink that gets wet, and is used for Blank after the cooling that gets wet being processed is carried to spinning machine and carries out spinning;The described heat sink that gets wet is for entering the front of blank The capable cooling that gets wet processes.
2. spinning product front as claimed in claim 1 gets wet cooling system, it is characterised in that get wet described in: heat sink bag Include water tank, be positioned at the supporting slider of water tank side, the slide block being arranged in described supporting slider, the L that is installed on described slide block Shape bracing frame, described slide block can move up and down in described supporting slider, thus drives described L-shaped bracing frame to enter downwards Enter below the water surface of described water tank and drive described L-shaped bracing frame to rise to more than the water surface of described water tank.
3. spinning product front as claimed in claim 2 gets wet cooling system, it is characterised in that: described slide block is for being horizontally disposed with Tabular.
4. spinning product front as claimed in claim 3 gets wet cooling system, it is characterised in that: it is provided with on described water tank Water inlet and outlet.
5. spinning product front as claimed in claim 4 gets wet cooling system, it is characterised in that: the one of described spinning preheating furnace Side is additionally provided with temperature measuring equipment.
6. a spinning product front cool-down method, it is characterised in that comprise the following steps:
1) blank after preheating will be carried to get wet heat sink and just facing in spinning preheating furnace by spinning mechanical hand Lower placement;
2) blank is moved down after making its front be immersed in the water 5 seconds by the heat sink that gets wet, and will pipette out the water surface on it;
3) by spinning mechanical hand, the blank after the cooling that gets wet is carried to spinning machine and carries out spinning.
CN201610749731.5A 2016-08-30 2016-08-30 Spinning product front gets wet cooling system and spinning product front cool-down method Pending CN106238547A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610749731.5A CN106238547A (en) 2016-08-30 2016-08-30 Spinning product front gets wet cooling system and spinning product front cool-down method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610749731.5A CN106238547A (en) 2016-08-30 2016-08-30 Spinning product front gets wet cooling system and spinning product front cool-down method

Publications (1)

Publication Number Publication Date
CN106238547A true CN106238547A (en) 2016-12-21

Family

ID=57597075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610749731.5A Pending CN106238547A (en) 2016-08-30 2016-08-30 Spinning product front gets wet cooling system and spinning product front cool-down method

Country Status (1)

Country Link
CN (1) CN106238547A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020139161A1 (en) * 2001-03-28 2002-10-03 Gary Gates Rotary forging and quenching apparatus and method
CN201933118U (en) * 2010-12-29 2011-08-17 天津立中车轮有限公司 Wheel hub cooling water tank
CN102274885A (en) * 2011-08-09 2011-12-14 中信戴卡轮毂制造股份有限公司 Aluminum wheel hot spinning process
CN102343404A (en) * 2010-08-04 2012-02-08 六和轻合金(昆山)有限公司 Manufacturing device of aluminum alloy wheel
CN105478618A (en) * 2015-12-10 2016-04-13 福建申利卡铝业发展有限公司 Machining process of spinning rim

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020139161A1 (en) * 2001-03-28 2002-10-03 Gary Gates Rotary forging and quenching apparatus and method
CN102343404A (en) * 2010-08-04 2012-02-08 六和轻合金(昆山)有限公司 Manufacturing device of aluminum alloy wheel
CN201933118U (en) * 2010-12-29 2011-08-17 天津立中车轮有限公司 Wheel hub cooling water tank
CN102274885A (en) * 2011-08-09 2011-12-14 中信戴卡轮毂制造股份有限公司 Aluminum wheel hot spinning process
CN105478618A (en) * 2015-12-10 2016-04-13 福建申利卡铝业发展有限公司 Machining process of spinning rim

Similar Documents

Publication Publication Date Title
CN104624763B (en) A kind of solar water heater incubator end cap roll forming device
CN104438840A (en) Multi-station hot forming device and hot forming method for high-strength parts
CN205021501U (en) Sealing strip rolling press device
CN204672736U (en) A kind of efficient sheet material apparatus for shaping
CN204414428U (en) Can mobile mould emptier
CN204353311U (en) A kind of high-strength part multistation thermal forming device
CN104259306B (en) The processing method for stamping of a kind of hood outer panel and device thereof
CN106238547A (en) Spinning product front gets wet cooling system and spinning product front cool-down method
CN106564208B (en) Full automatic car inner decoration production line and production method
CN108687279A (en) A kind of ring rolls of processing cage retainer
CN109909351B (en) Stamping equipment for improving material utilization rate and operation method thereof
CN104259420B (en) A kind of method that die casting machine and mould are separated automatically with die casting machine
CN103121044B (en) Novel method and novel device for treating stalled aluminum ingots
CN216282428U (en) Drying-machine is used in spare part production
CN201989048U (en) Automatic detection device for grinding inner circle of wing-type bearing support
CN106623570B (en) An adjustable roll forming equipment
CN204934219U (en) Hydrophilic coating line for foil aluminium degreasing unit
CN204135137U (en) A kind of cold moudling mechanism of U-shaped part
CN210257234U (en) Automatic plastic uptake machine structure
CN205436743U (en) Cylinder aluminum pot spinning former
CN104128438A (en) Process for progressively manufacturing rear cover products
CN205393304U (en) Vehicle audio stamping workpiece automatic production line
CN206154766U (en) Molding machine mold changes mobile auxiliary mechanism
CN104029336B (en) A kind of injecting products manufactures the automatic cleaner of mould
CN105834270B (en) A kind of vehicle exhaust gas extraction system urea box metal tube bulge forming machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 300457 Tianjin economic and Technological Development Zone in the Western District Guanghua Street, No. 58

Applicant after: Tianjin Lizhong group Limited by Share Ltd

Address before: 300457 in Tianjin Binhai Economic and Technological Development Zone West Guanghua Street No. 58

Applicant before: Tianjin Lizhong Wheel Co.,Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161221