CN106411747A - Switch message forwarding method and system for intelligent substation - Google Patents
Switch message forwarding method and system for intelligent substation Download PDFInfo
- Publication number
- CN106411747A CN106411747A CN201610790156.3A CN201610790156A CN106411747A CN 106411747 A CN106411747 A CN 106411747A CN 201610790156 A CN201610790156 A CN 201610790156A CN 106411747 A CN106411747 A CN 106411747A
- Authority
- CN
- China
- Prior art keywords
- smart machine
- forward table
- intelligent substation
- title
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/02—Topology update or discovery
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0866—Checking the configuration
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Environmental & Geological Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种交换机报文转发技术,具体涉及一种应用于智能变电站交换机报文转发的方法和系统。The invention relates to a message forwarding technology of an exchange, in particular to a method and system for forwarding messages of an exchange in an intelligent substation.
背景技术Background technique
目前,国内各网省公司都进行了智能变电站试点。未来,在智能电网建设的大背景下,智能变电站快速发展是必然趋势,而如何更加高效的提高智能变电站的调试与建设效率是一个急需解决的问题。现阶段变电站的发展过程中,无论是综自站、数字化站还是智能站,变化更多的发生于信息流的传输。但由于继电保护的原理没有变,所以电力系统技术人员遇到的问题也集中于智能变电站中信息流传输过程中。At present, companies in various domestic network provinces have carried out pilot projects of smart substations. In the future, under the background of smart grid construction, the rapid development of smart substations is an inevitable trend, and how to improve the commissioning and construction efficiency of smart substations more efficiently is an urgent problem to be solved. In the development process of substations at the present stage, no matter it is a comprehensive substation, a digital substation or an intelligent substation, more changes occur in the transmission of information flow. However, since the principle of relay protection has not changed, the problems encountered by power system technicians are also concentrated in the process of information flow transmission in smart substations.
目前智能变电站中,继电保护通信网络信息流划分依靠人工划分的现状,根本的原因在于电力系统对交换机的应用是基于通信方式的,由于应用场合和应用环境的不同,对交换机应用的过程的易用程度产生很大的区别,尤其体现在调试,运维阶段。虽然可以通过配置静态组播或是动态组播的方式提升一些用户体验,但是这几种方法并没有从根本上解决智能变电站中,继电保护通信网络信息流划分中的问题,对于电力调试和运维也没提供便捷的方法。At present, in smart substations, the information flow division of the relay protection communication network relies on manual division. The fundamental reason is that the application of the switch in the power system is based on the communication method. There is a big difference in the ease of use, especially in the debugging and operation and maintenance stages. Although some user experience can be improved by configuring static multicast or dynamic multicast, these methods have not fundamentally solved the problem of information flow division in relay protection communication networks in smart substations. Operation and maintenance does not provide a convenient method.
发明内容Contents of the invention
为了克服上述现有技术的不足,本发明提供一种应用于智能变电站交换机报文转发的方法和系统,本发明对当前智能变电站内的智能设备进行统一性校验,提高校验完整性与准确性,并且有利于后期维护。In order to overcome the above-mentioned deficiencies in the prior art, the present invention provides a method and system for message forwarding applied to switches in smart substations. The present invention performs unified verification on the smart devices in the current smart substation to improve the integrity and accuracy of the verification sex, and is conducive to later maintenance.
为了实现上述发明目的,本发明采取如下技术方案:In order to realize the above-mentioned purpose of the invention, the present invention takes the following technical solutions:
一种应用于智能变电站交换机报文转发的方法,所述方法包括以下步骤:A method for message forwarding applied to an intelligent substation switch, the method comprising the following steps:
(1)统计智能变电站内智能设备的数量和种类;(1) Count the number and types of smart devices in the smart substation;
(2)定义所述智能设备的名称;(2) defining the name of the smart device;
(3)自定义转发表;(3) Custom forwarding table;
(4)对转发表进行校验。(4) Verify the forwarding table.
优选的,所述步骤(1)还包括对所述智能变电站中的功能控制块进行统计归类,所述功能控制块为所述智能设备的子集,用于在智能变电站系统中完成一个特定功能的控制块信息。Preferably, the step (1) further includes statistically classifying the function control blocks in the smart substation, the function control blocks are a subset of the smart devices, and are used to complete a specific function in the smart substation system Control block information for the function.
优选的,所述步骤(2)中,所述定义所述智能设备的名称采用英文字符的形式,区分大小写,所述智能设备名称定义之间不能出现重复。Preferably, in the step (2), the definition of the name of the smart device is in the form of English characters, which is case-sensitive, and the definition of the name of the smart device cannot be repeated.
优选的,所述步骤(3)包括如下步骤:Preferably, said step (3) comprises the steps of:
步骤3-1、按照所述智能变电站配置文件即SCD文件中定义的智能设备订阅关系,完成自定义转发表的建立,所述转发表包括订阅方和被订阅方两个条目;Step 3-1. Complete the establishment of a custom forwarding table according to the smart device subscription relationship defined in the smart substation configuration file, that is, the SCD file, and the forwarding table includes two entries of a subscriber and a subscribed party;
步骤3-2、按照所述SCD文件中的订阅关系将所述智能设备的名称填入所述转发表中。Step 3-2: Fill the name of the smart device into the forwarding table according to the subscription relationship in the SCD file.
优选的,所述步骤(4)包括如下步骤:Preferably, said step (4) comprises the steps of:
步骤4-1、对所述智能设备名称进行统计;Step 4-1, performing statistics on the names of the smart devices;
步骤4-2、所述智能设备名称是否符合命名规则,所述命名规则是一种对于智能设备名称命名的一种特定约定规范,能够在智能设备的名称中体现该设备所属的间隔信息和功能信息,若符合则执行步骤4-3,否则对名称进行修正,并跳转到步骤4-1;Step 4-2. Whether the name of the smart device conforms to the naming rule, the naming rule is a specific convention specification for naming the name of the smart device, which can reflect the interval information and function of the device in the name of the smart device information, if it matches, go to step 4-3, otherwise, modify the name and jump to step 4-1;
步骤4-3、对转发订阅进行统计;Step 4-3, making statistics on forwarding subscriptions;
步骤4-4、对照SCD文件中规定的订阅关系校验转发表中的订阅双方描述是否正确,若正确则校验结束,否则对订阅关系进行修正,并跳转至步骤4-3。Step 4-4. Check whether the descriptions of both subscribers in the forwarding table are correct against the subscription relationship specified in the SCD file. If correct, the verification ends. Otherwise, modify the subscription relationship and jump to step 4-3.
优选的,一种应用于智能变电站交换机报文转发的系统,所述系统包括依次相连的智能设备归类模块、智能设备名称定义模块、自定义转发表模块和转发表校验模块,所述智能设备归类模块,用于统计智能变电站内智能设备的数量和种类;Preferably, a system for message forwarding applied to switches in smart substations, the system includes a sequentially connected smart device classification module, smart device name definition module, custom forwarding table module and forwarding table verification module, the smart The equipment classification module is used to count the number and types of intelligent equipment in the intelligent substation;
所述智能设备名称定义模块,用于定义所述智能设备的名称;The smart device name definition module is used to define the name of the smart device;
所述自定义转发表模块,用于自定义转发表;The custom forwarding table module is used for customizing the forwarding table;
所述转发表校验模块,用于校验转发表。The forwarding table verification module is used to verify the forwarding table.
与最接近的现有技术比,本发明提供的技术方案具有以下优异效果:Compared with the closest prior art, the technical solution provided by the present invention has the following excellent effects:
本发明对当前智能变电站内的智能设备进行统一性校验,即在数量和功能完整性上校验,可以保证自定义转发表中的智能设备的完整性和名称的合理性,进而提高了校验的完整性和准确性。The present invention checks the uniformity of the smart devices in the current smart substation, that is, checks the quantity and functional integrity, which can ensure the integrity of the smart devices in the self-defined forwarding table and the rationality of the names, thereby improving the verification efficiency. completeness and accuracy of the test.
本发明在后期维护上提供电力系统人员理解的内容辅助完成网络交换问题的处理,有助于网络交换的后期维护。The present invention provides content understood by power system personnel to assist in completing the processing of network exchange problems in later maintenance, and is helpful for later maintenance of network exchange.
附图说明Description of drawings
图1是本发明应用于智能变电站交换机报文转发方法的流程图,Fig. 1 is a flow chart of the present invention applied to the message forwarding method of the smart substation switch,
图2是图1中转发表校验步骤的流程图,Fig. 2 is a flow chart of the forwarding table verification step in Fig. 1,
图3是本发明提供的用于智能变电站交换机报文转发系统的示意图Fig. 3 is a schematic diagram of a message forwarding system for an intelligent substation switch provided by the present invention
具体实施方式detailed description
下面结合附图对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings.
本发明提供一种应用于智能变电站的基于智能设备名称识别的自定义转发表的交换机报文转发方法,包括以下流程,如图1所示:The present invention provides a switch message forwarding method based on a self-defined forwarding table identified by a smart device name applied to a smart substation, including the following process, as shown in Figure 1:
步骤1、智能设备归类:智能变电站中的二次设备种类在智能变电站完成设计后基本确定,本步骤在完成智能变电站设计后需要统计该智能变电站内的设备数量与种类,如该站有多少台线路保护,多少台测控等。Step 1. Classification of intelligent equipment: The types of secondary equipment in the intelligent substation are basically determined after the design of the intelligent substation is completed. In this step, after the design of the intelligent substation is completed, it is necessary to count the number and types of equipment in the intelligent substation, such as how many Line protection, how many measurement and control units, etc.
对所述智能变电站中的功能控制块进行统计归类,功能控制块指在智能变电站系统中完成一个特定功能的控制块信息,功能控制块是智能设备的子集,即同一智能设备可包含不同的功能控制块。Statistically classify the function control blocks in the smart substation. The function control block refers to the control block information that completes a specific function in the smart substation system. The function control block is a subset of smart devices, that is, the same smart device can contain different function control block.
步骤2、智能设备名称定义。Step 2, smart device name definition.
本步骤在上一步骤完成的智能设备归类统计的基础上,完成对各类智能设备的名称定义上,名称定义采用英文字符的形式,区分大小写,名称定义时可以将一个智能设备的应用环境特征描述的较为清楚,如一台应用于xx线路的测控设备,可以将其名称定义为xxck等,此定义方式完全结合电力系统业务特征,可以将问题通俗化,利于电力系统运维人员的识别与使用。此步骤的基本原则是智能设备名称定义之间不能出现重复,即一个名称对应一个智能设备,对于单个智能设备存在多个不同用途的控制块的情况,可以进一步在名称中定义控制块用途以示区别。In this step, on the basis of the classification and statistics of smart devices completed in the previous step, the names of various smart devices are defined. The names are defined in the form of English characters and are case-sensitive. The description of environmental characteristics is relatively clear. For example, a measurement and control equipment applied to xx line can be defined as xxck, etc. This definition method is completely combined with the business characteristics of the power system, which can popularize the problem and facilitate the identification of power system operation and maintenance personnel with use. The basic principle of this step is that there should be no duplication between definitions of smart device names, that is, one name corresponds to one smart device. If there are multiple control blocks with different purposes in a single smart device, you can further define the purpose of the control block in the name to show the difference.
其中智能设备的命名规则的制定需要根据电力系统运行要求和运维人员的理解方式进行,从而保证生成的智能设备名称定义一方面符合电力系统要求,二方面便于运维人员理解。Among them, the formulation of the naming rules of smart devices needs to be carried out according to the operation requirements of the power system and the understanding of operation and maintenance personnel, so as to ensure that the definition of the generated smart device names meets the requirements of the power system on the one hand, and is easy to understand by operation and maintenance personnel on the other hand.
步骤3、自定义转发表。Step 3. Customize the forwarding table.
在完成了智能设备名称定义后,技术人员按照智能变电站配置文件即SCD文件中定义的智能设备订阅关系,完成自定义转发表的建立,转发表主要有两个条目,即订阅方和被订阅方。技术人员只需按照SCD文件中的订阅关系将先前定义的智能设备名称填入该表即可。After completing the definition of the smart device name, the technician completes the establishment of the custom forwarding table according to the smart device subscription relationship defined in the smart substation configuration file, that is, the SCD file. The forwarding table mainly has two entries, namely, the subscriber and the subscribed party . The technician only needs to fill in the table with the previously defined smart device name according to the subscription relationship in the SCD file.
步骤4、转发表校验:Step 4. Forwarding table verification:
该步骤主要完成对先前几个步骤合理性的校验工作,合理性校验工作主要有两项,第一项为根据自定义好的智能设备名称进行智能设备名称的合理性和智能设备的反校验,通过该项检查可以保证自定义转发表中的智能设备的完整性和名称的合理性。第二项为校验转发表的正确性,通过对照SCD文件中规定的订阅关系校验转发表中的订阅双方描述是否正确。This step mainly completes the verification of the rationality of the previous steps. There are two main tasks for the verification of rationality. The first item is the rationality of the smart device name and the reflection Check, through this check can ensure the integrity of the smart device in the custom forwarding table and the rationality of the name. The second item is to verify the correctness of the forwarding table, and check whether the descriptions of both parties in the forwarding table are correct by comparing the subscription relationship specified in the SCD file.
如图2所示,校验转发表包括如下步骤:As shown in Figure 2, verifying the forwarding table includes the following steps:
步骤a、对所述智能设备名称进行统计;Step a, counting the names of the smart devices;
步骤b、所述智能设备名称是否符合命名规则,若符合则执行步骤c,否则对名称进行修正,并跳转到步骤a;Step b, whether the name of the smart device complies with the naming rules, if so, execute step c, otherwise, modify the name and jump to step a;
命名规则是一种对于智能设备名称命名的一种特定约定规范,即希望在智能设备的名称中体现该设备所属的间隔信息和功能信息,如110kV茂文线合并单元,其名称中体现了该智能设备的所属间隔信息为110kV茂文线和功能信息为合并单元,完成数据采样功能。The naming rule is a specific convention specification for the naming of smart devices, that is, it is hoped that the name of the smart device will reflect the interval information and functional information to which the device belongs, such as the merging unit of the 110kV Maowen line. The interval information of the equipment is the 110kV Maowen line and the function information is the merging unit to complete the data sampling function.
步骤c、对转发订阅进行统计;Step c, making statistics on forwarding subscriptions;
步骤d、对照SCD文件中规定的订阅关系校验转发表中的订阅双方描述是否正确,若正确则校验结束,否则对订阅关系进行修正,并跳转至步骤c。Step d. Check whether the descriptions of both subscribers in the forwarding table are correct against the subscription relationship specified in the SCD file. If correct, the verification ends. Otherwise, modify the subscription relationship and jump to step c.
如图3所示,一种应用于智能变电站交换机报文转发的系统,所述系统包括依次相连的智能设备归类模块、智能设备名称定义模块、自定义转发表模块和转发表校验模块,所述智能设备归类模块,用于统计智能变电站内智能设备的数量和种类;As shown in Figure 3, a system applied to message forwarding of switches in smart substations, the system includes sequentially connected smart device classification modules, smart device name definition modules, custom forwarding table modules and forwarding table verification modules, The smart device classification module is used to count the number and types of smart devices in the smart substation;
所述智能设备名称定义模块,用于定义所述智能设备的名称;The smart device name definition module is used to define the name of the smart device;
所述自定义转发表模块,用于自定义转发表;The custom forwarding table module is used for customizing the forwarding table;
所述转发表校验模块,用于校验转发表。The forwarding table verification module is used to verify the forwarding table.
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that: the present invention can still be Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention shall be covered by the scope of the claims of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610790156.3A CN106411747B (en) | 2016-08-31 | 2016-08-31 | Method and system applied to intelligent substation switch message forwarding |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610790156.3A CN106411747B (en) | 2016-08-31 | 2016-08-31 | Method and system applied to intelligent substation switch message forwarding |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106411747A true CN106411747A (en) | 2017-02-15 |
| CN106411747B CN106411747B (en) | 2021-08-27 |
Family
ID=58000987
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610790156.3A Active CN106411747B (en) | 2016-08-31 | 2016-08-31 | Method and system applied to intelligent substation switch message forwarding |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106411747B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109462669A (en) * | 2018-11-13 | 2019-03-12 | 四川长虹电器股份有限公司 | The method of the system platform and the name of specification terminal device of the name of specification terminal device |
Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103729805A (en) * | 2014-01-04 | 2014-04-16 | 国家电网公司 | 500kV intelligent substation security arrangement ticket expert system |
| CN104036429A (en) * | 2014-02-27 | 2014-09-10 | 国家电网公司 | Intelligent transformer station configuration file standardized management system and file verification method |
| US9001990B2 (en) * | 2005-03-21 | 2015-04-07 | Tekelec, Inc. | Methods, systems, and computer program products for providing telecommunications services between a session initiation protocol (SIP) network and a signaling system 7 (SS7) network |
| CN104851056A (en) * | 2015-05-26 | 2015-08-19 | 中国电力科学研究院 | Intelligent transformer station secondary system model standard library management system and method |
| CN104868596A (en) * | 2015-05-19 | 2015-08-26 | 中国南方电网有限责任公司 | Method for rapid positioning variation influence scope of secondary virtual loop of intelligent transformer station |
| CN105117305A (en) * | 2015-08-25 | 2015-12-02 | 国网浙江省电力公司 | Data management apparatus for intelligent device of intelligent substation |
| CN105138752A (en) * | 2015-08-13 | 2015-12-09 | 国网安徽省电力公司 | Differentiation comparison and display method for SCD documents in intelligent substation with historical retrospect function |
| CN105227350A (en) * | 2015-08-31 | 2016-01-06 | 河北省电力建设调整试验所 | Based on the intelligent substation IED configuration file management-control method of CRC check code |
| CN105224511A (en) * | 2015-09-23 | 2016-01-06 | 山东网聪信息科技有限公司 | A kind of method of calibration of intelligent substation SCD file |
| CN105354137A (en) * | 2015-09-30 | 2016-02-24 | 国家电网公司 | Static model detection method based on IEC61850 protocol |
| CN105404757A (en) * | 2015-12-18 | 2016-03-16 | 山东网聪信息科技有限公司 | Intelligent transformer station SCD file standardization degree verification method |
| US20160127471A1 (en) * | 2012-07-27 | 2016-05-05 | Hitachi, Ltd. | Method and apparatus of redundant path validation before provisioning |
| CN105678028A (en) * | 2016-03-02 | 2016-06-15 | 湖北省电力勘测设计院 | Transformer-station secondary-system configuration scheme constructing method based on design specification |
-
2016
- 2016-08-31 CN CN201610790156.3A patent/CN106411747B/en active Active
Patent Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9001990B2 (en) * | 2005-03-21 | 2015-04-07 | Tekelec, Inc. | Methods, systems, and computer program products for providing telecommunications services between a session initiation protocol (SIP) network and a signaling system 7 (SS7) network |
| US20160127471A1 (en) * | 2012-07-27 | 2016-05-05 | Hitachi, Ltd. | Method and apparatus of redundant path validation before provisioning |
| CN103729805A (en) * | 2014-01-04 | 2014-04-16 | 国家电网公司 | 500kV intelligent substation security arrangement ticket expert system |
| CN104036429A (en) * | 2014-02-27 | 2014-09-10 | 国家电网公司 | Intelligent transformer station configuration file standardized management system and file verification method |
| CN104868596A (en) * | 2015-05-19 | 2015-08-26 | 中国南方电网有限责任公司 | Method for rapid positioning variation influence scope of secondary virtual loop of intelligent transformer station |
| CN104851056A (en) * | 2015-05-26 | 2015-08-19 | 中国电力科学研究院 | Intelligent transformer station secondary system model standard library management system and method |
| CN105138752A (en) * | 2015-08-13 | 2015-12-09 | 国网安徽省电力公司 | Differentiation comparison and display method for SCD documents in intelligent substation with historical retrospect function |
| CN105117305A (en) * | 2015-08-25 | 2015-12-02 | 国网浙江省电力公司 | Data management apparatus for intelligent device of intelligent substation |
| CN105227350A (en) * | 2015-08-31 | 2016-01-06 | 河北省电力建设调整试验所 | Based on the intelligent substation IED configuration file management-control method of CRC check code |
| CN105224511A (en) * | 2015-09-23 | 2016-01-06 | 山东网聪信息科技有限公司 | A kind of method of calibration of intelligent substation SCD file |
| CN105354137A (en) * | 2015-09-30 | 2016-02-24 | 国家电网公司 | Static model detection method based on IEC61850 protocol |
| CN105404757A (en) * | 2015-12-18 | 2016-03-16 | 山东网聪信息科技有限公司 | Intelligent transformer station SCD file standardization degree verification method |
| CN105678028A (en) * | 2016-03-02 | 2016-06-15 | 湖北省电力勘测设计院 | Transformer-station secondary-system configuration scheme constructing method based on design specification |
Non-Patent Citations (3)
| Title |
|---|
| 傅龙辉,戴美胜,龙霏,朱林: "广东电网厂站及输电线路调度命名规范研究", 《机电工程技术》 * |
| 孙一民,裘愉涛,杨庆伟,刘明坤: "智能变电站设计配置一体化技术及方案", 《电力系统自动化》 * |
| 高磊,石慧,杨毅,曹卫国: "智能变电站配置描述文件管控系统的研究与实现", 《电网技术》 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109462669A (en) * | 2018-11-13 | 2019-03-12 | 四川长虹电器股份有限公司 | The method of the system platform and the name of specification terminal device of the name of specification terminal device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106411747B (en) | 2021-08-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101094051B (en) | System and method for synchronizing comparison of data consistency | |
| CN110795921B (en) | Automatic generation and verification method for monitoring information of intelligent substation equipment | |
| CN108776856B (en) | Electric power standing book data verification method and device based on traceability relation | |
| CN106408207A (en) | Modeling method and system for secondary virtual loop of intelligent substation | |
| CN104125103B (en) | Intelligent transformer substation process layer network communication fault locating method based on list of proof | |
| CN107085159A (en) | GOOSE input point-to-point automatic test method based on CCD file | |
| CN113014517B (en) | Real-time comparison method of switch forwarding information based on CSD file | |
| CN102075378A (en) | IEC61850 standard-based GOOSE communication simulation method | |
| CN101943734A (en) | Method for automatically detecting terminals in batch based on IEC62056 protocol | |
| CN103632307A (en) | Method for checking consistency between SCD and virtual loop table of intelligent substation | |
| CN104485748B (en) | A kind of transformer station ups power monitoring system and method | |
| CN117439264A (en) | Automatic acceptance checking system for monitoring information of substation of dispatching master station | |
| CN111027284A (en) | Standardized output method based on flexible data access | |
| CN115061013B (en) | Low-voltage common fault studying and judging method and system based on power failure event big data analysis | |
| CN105225164A (en) | Intelligent substation GOOSE virtual secondary circuit graphic method | |
| CN106506190B (en) | A communication network operating system and operating method | |
| CN108960439A (en) | A kind of intelligent O&M method towards GOOSE/SV soft pressing plate | |
| CN104518568A (en) | Method for realizing network message selection in intelligent substation | |
| CN109992497A (en) | A method and system for updating and publishing distribution automation terminal standard test cases | |
| CN106411747A (en) | Switch message forwarding method and system for intelligent substation | |
| CN104504537B (en) | A kind of transformer station's AC power monitoring system and method | |
| CN102738897B (en) | Offline configuration resource information fusion method for intelligent substation | |
| CN107169175A (en) | One kind verification rational method and system of overhead transmission line topology design | |
| CN104243218B (en) | A kind of communication of power system mode list preparation method based on more schedule constraints | |
| CN103647279A (en) | Plant wiring information based anticipatory fault set generation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |