CN106646085B CN201710026298.7A CN201710026298A CN106646085B CN 106646085 B CN106646085 B CN 106646085B CN 201710026298 A CN201710026298 A CN 201710026298A CN 106646085 B CN106646085 B CN 106646085B
Authority
CN
China
Prior art keywords
terminal
current value
power supply
leakage
command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710026298.7A
Other languages
Chinese (zh)
Other versions
CN106646085A (en
Inventor
张强
孔凡红
廖福椿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Oppo Mobile Telecommunications Corp Ltd
Original Assignee
Guangdong Oppo Mobile Telecommunications Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Oppo Mobile Telecommunications Corp Ltd filed Critical Guangdong Oppo Mobile Telecommunications Corp Ltd
Priority to CN201710026298.7A priority Critical patent/CN106646085B/en
Publication of CN106646085A publication Critical patent/CN106646085A/en
Application granted granted Critical
Publication of CN106646085B publication Critical patent/CN106646085B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M1/00Substation equipment, e.g. for use by subscribers
    • H04M1/24Arrangements for testing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The embodiment of the invention discloses a kind of leakage tests method, apparatus and equipment;The embodiment of the present invention uses to terminal and sends the first sleep command, so that the terminal enters dormant state according to the first sleep command, then, it is retrieved as the first current value of the external power supply of terminal power supply, it controls the terminal and exits dormant state, and the second sleep command is sent to terminal, so that the terminal opens the power supply of corresponding device in the terminal according to second sleep command, and enter dormant state, it is retrieved as the second current value of the external power supply of terminal power supply, according to the current differential between first current value and second current value, determine whether the device leaks electricity.The accuracy of leakage tests can be improved in the program.

Description

Leakage tests method, apparatus and equipment
Technical field
The present invention relates to terminal test technical field more particularly to a kind of leakage tests method, apparatus and equipment.
Background technique
Mobile phone can all carry out leakage tests before factory in producing line, to detect whether the device of mobile phone has damage.Mesh The leakage tests mode of preceding mobile phone is main are as follows: whether the supply current by detecting mobile phone, which is greater than some threshold value to determine mobile phone, is No electric leakage.
However, in some cases, the supply current of mobile phone is smaller, the leakage tests mode of mobile phone, which is examined, at present is not measured Whether mobile phone leaks electricity, and therefore, the accuracy of leakage tests is lower.
Summary of the invention
The embodiment of the present invention provides a kind of leakage tests method, apparatus and equipment, and the accuracy of leakage tests can be improved.
The embodiment of the present invention provides a kind of leakage tests method, comprising:
The first sleep command is sent to terminal, so that the terminal enters dormant state according to the first sleep command;
It is retrieved as the first current value of the external power supply of the terminal power supply;
Control the terminal and exit dormant state, and send the second sleep command to terminal so that the terminal according to Second sleep command opens the power supply of corresponding device in the terminal, and enters dormant state;
It is retrieved as the second current value of the external power supply of the terminal power supply;
According to the current differential between first current value and second current value, determine whether the device leaks Electricity.
Correspondingly, the embodiment of the invention provides a kind of earth leakage testers, comprising:
Command sending module, for sending the first sleep command to terminal, so that the terminal is ordered according to the first suspend mode It enables and enters dormant state;
First electric current obtains module, the first current value of the external power supply for being retrieved as the terminal power supply;
Control module exits dormant state for controlling the terminal, and sends the second sleep command to terminal, so that The terminal opens the power supply of corresponding device in the terminal according to second sleep command, and enters dormant state;
Second electric current obtains module, the second current value of the external power supply for being retrieved as the terminal power supply;
It leaks electricity determining module, for according to the current differential between first current value and second current value, really Whether the fixed device leaks electricity.
Correspondingly, it the embodiment of the invention provides a kind of leakage tests equipment, including memory, processor and is stored in On reservoir and the computer program that can run on a processor, the processor are realized as described above when executing the computer program Method.
The embodiment of the present invention use to terminal send the first sleep command so that the terminal according to the first sleep command into Enter dormant state, then, is retrieved as the first current value of the external power supply of terminal power supply, controls the terminal and exit suspend mode shape State, and the second sleep command is sent to terminal, so that the terminal opens corresponding device in the terminal according to second sleep command The power supply of part, and enter dormant state, be retrieved as the terminal power supply external power supply the second current value, according to this first Current differential between current value and second current value, determines whether the device leaks electricity.The program can be tested dynamically The electric current of terminal part under dormant state, and terminal part is determined based on the current differential in the case of power supply open and close Whether electric leakage is had, and the accuracy of leakage tests can be improved in the program.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those skilled in the art, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is a kind of flow diagram of leakage tests method provided in an embodiment of the present invention.
Fig. 2 is the schematic diagram of leakage tests system provided in an embodiment of the present invention.
Fig. 3 is the flow diagram of another leakage tests method provided in an embodiment of the present invention.
Fig. 4 is a kind of structural schematic diagram of earth leakage tester provided in an embodiment of the present invention.
Fig. 5 is the structural schematic diagram of another earth leakage tester provided in an embodiment of the present invention.
Fig. 6 is the structural schematic diagram of another earth leakage tester provided in an embodiment of the present invention.
Fig. 7 is the structural schematic diagram of leakage tests equipment provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those skilled in the art's every other implementation obtained without creative efforts Example, shall fall within the protection scope of the present invention.
Term " first ", " second ", " third " and " the 4th " in the present invention etc. be for distinguishing different objects, rather than It is used to describe a particular order.In addition, term " includes " and " having " and their any deformations, it is intended that cover non-exclusive Include.Such as contain a series of steps or units process, method, system, product or equipment be not limited to it is listed Step or unit, but optionally further comprising the step of not listing or unit, or optionally further comprising for these processes, side The intrinsic other step or units of method, product or equipment.
Referenced herein " embodiment " is it is meant that a particular feature, structure, or characteristic described can wrap in conjunction with the embodiments Containing at least one embodiment of the present invention.Each position in the description occur the phrase might not each mean it is identical Embodiment, nor the independent or alternative embodiment with other embodiments mutual exclusion.Those skilled in the art explicitly and Implicitly understand, embodiment described herein can be combined with other embodiments.
The executing subject of leakage tests method provided in an embodiment of the present invention can be electric leakage provided in an embodiment of the present invention Test device, or be integrated with the test terminal of the earth leakage tester, the earth leakage tester can using hardware or The mode of person's software is realized;The described test terminal of the embodiment of the present invention can be smart phone (such as Android phone, Windows Phone mobile phone etc.), tablet computer, palm PC, laptop or mobile internet device (MID, Mobile Internet Devices), above-mentioned terminal is only citing, and non exhaustive, including but not limited to above-mentioned terminal.
The embodiment of the present invention provides a kind of leakage tests method, apparatus and equipment.It will be described in detail respectively below.
In a preferred embodiment, a kind of leakage tests test method is provided, as shown in Figure 1, process can be such that
101, the first sleep command is sent to terminal, so that the terminal enters dormant state according to the first sleep command.
Wherein, which is the terminal in producing line, i.e. the terminal is to be fitted without the terminal of battery, forms final products Terminal.In the present embodiment in leakage tests, need through external power supply to be terminal power supply.
Specifically, the first sleep command can be sent to terminal based on the communication connection between terminal.For example, to terminal Before sending sleep command, it can establish and communicate to connect with terminal.
Wherein, communication connection can connect (such as bluetooth connection), wifi connection etc. for USB connection, Near Field Communication.
For example, test equipment is established USB with terminal and is connect, and then, is connected by the USB when communication connection is USB connection It connects to terminal and sends the first sleep command.
102, it is retrieved as the first current value of the external power supply of terminal power supply.
By terminal in this present embodiment be producing line on terminal, therefore, needed in leakage tests by external power supply to Terminal power supply, to be tested.The external power supply can be programmable power supply, which can obtain source current automatically Size.
For example, the current value of external power supply can be obtained based on the communication connection between external power supply.External power supply is read It is derived from the power supply current value of body, and the power supply current value is sent to by test equipment by the connection.
In practical application, if general terminal is difficult in the presence of communication connection between test equipment and terminal Or cannot be introduced into real suspend mode, the accuracy of leakage tests can be reduced in this way.The present embodiment is stopped in lower transmission first It sleeps after instructing, it is also necessary to the communication connection between terminal is disconnected, then, in the current value for obtaining external power supply.Namely step Suddenly " the first current value for being retrieved as the external power supply of terminal power supply " may include:
The communication connection between terminal is disconnected, and is retrieved as the first current value of the external power supply of terminal power supply.
The first sleep command is sent for example, connecting by USB to terminal, and disconnects the USB connection, then obtains external electrical The current value I1 in source.
103, control the terminal and exit dormant state, and send the second sleep command to terminal so that the terminal according to Second sleep command opens the power supply of corresponding device in the terminal, and enters dormant state.
In the present embodiment, controlling terminal exit dormant state mode can there are many, for example, due between the terminal Communication connection in the presence of, general terminal will exit dormant state, and therefore, the present embodiment can be by between recovery and terminal Communication connection so that the terminal exits dormant state, it is then possible to send the second suspend mode to terminal by the communication connection Order.Namely step " control the terminal and exit dormant state, and this sends the second sleep command to terminal " may include:
Restore the communication connection between the terminal, so that the terminal exits dormant state;
The second sleep command is sent to terminal based on the communication connection.
For example, terminal exits dormant state at this time when restoring the USB connection between terminal, then, it is based on USB connection The second sleep command is sent to terminal.
Each device has a corresponding power supply in the terminal, which is used to power to the device, and one As be known as Ido power supply (linear direct current regulated power supply).For example, the microphone of mobile phone, receiver, bluetooth module, radio frequency chip are equal It is each to have an Ido power supply by oneself.In leakage tests, which element leakage is tested if necessary, then just needing which device opened The power supply of part.For example, when whether leaking electricity if necessary to test radio frequency chip, then just needing to open the confession of the radio frequency chip Power supply such as Ido power supply can send the second sleep command to terminal at this time, so that terminal opens the power supply of the radio frequency chip Power supply, and enter dormant state.
104, it is retrieved as the second current value of the external power supply of terminal power supply.
In some cases, if being also to maintain due to the communication connection between terminal, then terminal is receiving not It sleeps after ordering or does not enter dormant state, lead to the current value obtained inaccuracy, thereby reduce the accurate of leakage tests Property.In order to overcome the problem, the present embodiment can obtain the electric current of external power supply after the communication connection between disconnected end Value.Namely step " the second current value for being retrieved as the external power supply of terminal power supply " may include:
The communication connection between terminal is disconnected, and is retrieved as the second current value I2 of the external power supply of terminal power supply.
For example, when communication connection is USB connection the communication connection between terminal can be disconnected, and be retrieved as terminal The power values of the programmable power supply of power supply.
105, according to the current differential between first current value and second current value, determine whether the device leaks electricity.
When the current differential between first current value and second current value is greater than preset threshold, determine that the device leaks Electricity;
When the current differential is not more than preset threshold, determine the device it is normal for example,
For example, the current differential Δ I=I2-I1 between the first current value and second current value is obtained, as Δ I > i, The element leakage is then determined, conversely, then determining that device is normal.Wherein, preset threshold i can set according to actual needs such as 1~ 2ma etc..
Optionally, in order to improve the accuracys of leakage tests, which can also be the minimum leakage electric current of device Value imin.As Δ I > iminWhen determine the element leakage.In the present embodiment, minimum leakage electric current can be estimated based on the parameter of device It calculates, namely before step 101, the present embodiment leakage tests method can also include:
Determine the device for needing to carry out leakage tests;
Go out the minimum leakage current value of the device according to the parameter estimation of the device, and using the minimum leakage current value as The preset threshold.
Wherein, the parameter of device may include: rated current, voltage rating, device type, power etc..For example, can be with base In the rated current of the device come the minimum leakage current value etc. that estimates device.
Optionally, in the present embodiment when determining the element leakage, user can also be prompted, and marks the device For electric leakage device etc..
From the foregoing, it will be observed that the embodiment of the present invention, which is used to terminal, sends the first sleep command, so that the terminal is according to first Sleep command enters dormant state, then, is retrieved as the first current value of the external power supply of terminal power supply, controls the terminal and move back Dormant state out, and the second sleep command is sent to terminal, so that the terminal opens the terminal according to second sleep command The power supply of interior corresponding device, and enter dormant state, it is retrieved as the second current value of the external power supply of terminal power supply, root According to the current differential between first current value and second current value, determine whether the device leaks electricity.The program can dynamic The electric current of terminal part in the dormant state is tested on ground, and is determined based on the current differential in the case of power supply open and close Whether terminal part has electric leakage, and the accuracy of leakage tests can be improved in the program.
In a preferred embodiment, will be with earth leakage tester integration testing equipment, and terminal to be measured is next for mobile phone Introduce leakage tests method of the invention.Wherein, which can be mobile phone, apparatus such as computer.
With reference to Fig. 2, is connected between test equipment and mobile phone by USB data line, USB is established between test equipment and mobile phone Connection.For example, the both ends USB are inserted into the USB interface of test equipment, mobile phone respectively in test, and then, test equipment and hand Machine establishes USB connection.With reference to Fig. 2, wherein programmable power supply and mobile phone are connected as mobile phone power supply, and test equipment also with it is program-controlled Power supply connection, to obtain the power supply current value of programmable power supply.
With reference to Fig. 3, the process for carrying out leakage tests using leakage tests system shown in Fig. 2 is as follows:
201, test equipment is connected to mobile phone by USB and sends the first sleep command, then, is disconnected between mobile phone USB connection.
202, the terminal enters dormant state according to the first sleep command.
203, test equipment obtains the current current value I1 of programmable power supply.
204, test equipment restores the USB connection between mobile phone.
205, test equipment is connected to mobile phone by the USB and sends the second sleep command, then, is disconnected between mobile phone USB connection.
206, mobile phone opens the Ido power supply of target devices according to the second sleep command, and enters dormant state.
207, test equipment obtains the current current value I2 of programmable power supply.
208, test equipment obtains the current differential Δ I between I1 and I2.
209, test equipment judges whether Δ I is greater than predetermined current threshold i, if more than, 210 are thened follow the steps, otherwise, Execute step 211.
210, test equipment determines that the target devices leak electricity, and is prompted.
211, test equipment determines that target devices are normal.
From the foregoing, it will be observed that the embodiment of the present invention, which is used to terminal, sends the first sleep command, so that the terminal is according to first Sleep command enters dormant state, then, is retrieved as the first current value of the external power supply of terminal power supply, controls the terminal and move back Dormant state out, and the second sleep command is sent to terminal, so that the terminal opens the terminal according to second sleep command The power supply of interior corresponding device, and enter dormant state, it is retrieved as the second current value of the external power supply of terminal power supply, root According to the current differential between first current value and second current value, determine whether the device leaks electricity.The program can dynamic The electric current of terminal part in the dormant state is tested on ground, and is determined based on the current differential in the case of power supply open and close Whether terminal part has electric leakage, and the accuracy of leakage tests can be improved in the program.
In a preferred embodiment, a kind of earth leakage tester is also provided.The earth leakage tester specifically can integrate In terminal device, which can be the equipment such as PC, laptop, smart phone.
As shown in figure 4, the earth leakage tester 300 may include command sending module 301, the first electric current acquisition module 302, control module 303, the second electric current obtain module 304 and electric leakage determining module 305, as follows:
Command sending module 301, for sending the first sleep command to terminal, so that the terminal is ordered according to the first suspend mode It enables and enters dormant state;
First electric current obtains module 302, the first current value of the external power supply for being retrieved as terminal power supply;
Control module 303 exits dormant state for controlling the terminal, and sends the second sleep command to terminal, so that The power supply that the terminal opens corresponding device in the terminal according to second sleep command is obtained, and enters dormant state;
Second electric current obtains module 304, the second current value of the external power supply for being retrieved as terminal power supply;
Electric leakage determining module 305, for determining according to the current differential between first current value and second current value Whether the device leaks electricity.
Wherein, command sending module 301, for sending the first suspend mode life to terminal based on the communication connection between terminal It enables.The communication connection can be USB connection etc..
Optionally, with reference to Fig. 5, the control module 303, comprising:
Restore submodule 3031, for restoring the communication connection between the terminal, so that the terminal exits suspend mode shape State;
Order sending submodule 3032, for sending the second sleep command to terminal based on the communication connection.
At this point, the second electric current obtains module 304, for the communication connection between disconnection and terminal, and it is retrieved as the terminal Second current value of the external power supply of power supply.
Optionally, the electric leakage determining module 305, is specifically used for:
When the current differential between first current value and second current value is greater than preset threshold, determine that the device leaks Electricity;
When the current differential is not more than preset threshold, determine that the device is normal.
Optionally, in order to improve the accuracys of leakage tests, with reference to Fig. 6, the present embodiment earth leakage tester 300 can be with Module 307 is obtained including device determining module 306 and threshold value;
The device determining module 306, for determining and needing before command sending module 301 sends the first sleep command Carry out the device of leakage tests;
The threshold value obtains module 307, and the minimum leakage current value of the device is gone out for the parameter estimation according to the device, and Using the minimum leakage current value as the preset threshold.
When it is implemented, the above modules can be used as independent entity to realize, any combination can also be carried out, is made It is realized for same or several entities, the specific implementation of the above modules can be found in the embodiment of the method for front, herein not It repeats again.
From the foregoing, it will be observed that the embodiment of the present invention sends the first sleep command to terminal using command sending module 301, so that The terminal enters dormant state according to the first sleep command, then, obtains module 302 by the first electric current and is retrieved as terminal power supply External power supply the first current value, which is controlled by control module 303 and exits dormant state, and sends second to terminal and stops It sleeps and orders, so that the terminal opens the power supply of corresponding device in the terminal according to second sleep command, and enter and stop Dormancy state obtains the second current value that module 304 is retrieved as the external power supply of terminal power supply by the second electric current, is determined by electric leakage Module 305 determines whether the device leaks electricity according to the current differential between first current value and second current value.The program The electric current of terminal part in the dormant state can be dynamically tested, and based on the electric current in the case of power supply open and close Difference determines whether terminal part has electric leakage, and the accuracy of leakage tests can be improved in the program.
In a preferred embodiment, additionally provide a kind of leakage tests equipment, the leakage tests equipment include: memory, Processor and storage are on a memory and the computer program that can run on a processor, the processor execute the computer program Shi Shixian leakage tests method as described above.
For example, the leakage tests equipment can be terminal device, such as computer, mobile phone.
For example, referring to FIG. 7, the leakage tests equipment 400 may include having one or more computer-readable to deposit The memory 401 of storage media, input unit 402, display unit 403, voicefrequency circuit 404, include one or more than one The components such as the processor 405 and power supply 406 of processing core.It will be understood by those skilled in the art that equipment knot shown in Fig. 7 Structure does not constitute the restriction to equipment, may include perhaps combining certain components or not than illustrating more or fewer components Same component layout.
Input unit 402 can be used for receiving the number or character information of input, and generate and user setting and function Control related keyboard, mouse, operating stick, optics or trackball signal input.Specifically, in a specific embodiment In, input unit 402 may include touch sensitive surface and other input equipments.Touch sensitive surface, also referred to as touch display screen or touching Control plate, collect user on it or nearby touch operation (such as user using any suitable object such as finger, stylus or Operation of the attachment on touch sensitive surface or near touch sensitive surface), and corresponding connection dress is driven according to preset formula It sets.Optionally, touch sensitive surface may include both touch detecting apparatus and touch controller.Wherein, touch detecting apparatus is examined The touch orientation of user is surveyed, and detects touch operation bring signal, transmits a signal to touch controller;Touch controller from Touch information is received on touch detecting apparatus, and is converted into contact coordinate, then gives processor 405, and can reception processing Order that device 405 is sent simultaneously is executed.Furthermore, it is possible to a variety of using resistance-type, condenser type, infrared ray and surface acoustic wave etc. Type realizes touch sensitive surface.In addition to touch sensitive surface, input unit 402 can also include other input equipments.Specifically, other are defeated Entering equipment can include but is not limited to physical keyboard, function key (such as volume control button, switch key etc.), trace ball, mouse One of mark, operating stick, fingerprint recognition mould group etc. are a variety of.
Display unit 403 can be used for showing information input by user or be supplied to user information and equipment it is various Graphical user interface, these graphical user interface can be made of figure, text, icon, video and any combination thereof.Display Unit 403 may include display panel, optionally, can using liquid crystal display (LCD, Liquid Crystal Display), The forms such as Organic Light Emitting Diode (OLED, Organic Light-Emitting Diode) configure display panel.Further , touch sensitive surface can cover display panel, after touch sensitive surface detects touch operation on it or nearby, send processing to Device 408 is followed by subsequent processing device 405 and is provided on a display panel accordingly according to the type of touch event to determine the type of touch event Visual output.Although touch sensitive surface and display panel are to realize input and input as two independent components in Fig. 7 Function, but in some embodiments it is possible to touch sensitive surface and display panel are integrated and realizes and outputs and inputs function.
Voicefrequency circuit 404 can provide the audio interface between user and equipment by loudspeaker, microphone.Voicefrequency circuit The audio data received can be converted into electric signal by 404, be transferred to loudspeaker, be converted to voice signal output by loudspeaker; On the other hand, the voice signal of collection is converted to electric signal by microphone, is converted to audio number after being received by voicefrequency circuit 404 According to, then by after the processing of audio data output processor 405, audio data is exported to memory 401 to be further processed.Sound Frequency circuit 404 is also possible that earphone jack, to provide the communication of peripheral hardware earphone and equipment.
Processor 405 is the control centre of equipment, using the various pieces of various interfaces and connection whole equipment, is led to It crosses operation or executes the software program and/or module being stored in memory 401, and call and be stored in memory 401 Data execute the various functions and processing data of equipment, to carry out integral monitoring to equipment.Optionally, processor 405 can wrap Include one or more processing cores;Preferably, processor 405 can integrate application processor and modem processor, wherein answer With the main processing operation system of processor, user interface and application program etc., modem processor mainly handles wireless communication. It is understood that above-mentioned modem processor can not also be integrated into processor 405.
Equipment further includes the power supply 406 (such as battery) powered to all parts.Preferably, power supply can pass through power supply pipe Reason system and processor 406 are logically contiguous, to realize management charging, electric discharge and power managed by power-supply management system Etc. functions.Power supply 406 can also include one or more direct current or AC power source, recharging system, power failure inspection The random components such as slowdown monitoring circuit, power adapter or inverter, power supply status indicator.
Although being not shown, equipment can also packet usb interface module, bluetooth module, camera etc., details are not described herein.
Specifically in the present embodiment, the processor 405 in equipment can be according to following instruction, will be one or more The corresponding executable file of the process of application program is loaded into memory 401, and is run by processor 405 and be stored in storage Application program in device 401, to realize various functions:
The first sleep command is sent to terminal, so that the terminal enters dormant state according to the first sleep command, then, It is retrieved as the first current value of the external power supply of terminal power supply, the terminal is controlled and exits dormant state, and sends the to terminal Two sleep commands are gone forward side by side so that the terminal opens the power supply of corresponding device in the terminal according to second sleep command Enter dormant state, be retrieved as the second current value of the external power supply of terminal power supply, according to first current value and second electricity Current differential between flow valuve, determines whether the device leaks electricity.
Wherein, the first sleep command is sent to terminal, comprising: send the to terminal based on the communication connection between terminal One sleep command;It is retrieved as the first current value of the external power supply of terminal power supply, comprising:
The communication connection between terminal is disconnected, and is retrieved as the first current value of the external power supply of terminal power supply.
Control the terminal and exit dormant state, and this sends the second sleep command to terminal, including restore with the terminal it Between communication connection so that the terminal exits dormant state;The second sleep command is sent to terminal based on the communication connection;
It is retrieved as the second current value of the external power supply of terminal power supply, including the communication connection between disconnection and terminal, And it is retrieved as the second current value of the external power supply of terminal power supply.
From the foregoing, it will be observed that the leakage tests equipment is used to terminal the embodiment of the invention provides a kind of leakage tests equipment The first sleep command is sent, so that the terminal enters dormant state according to the first sleep command, then, is retrieved as terminal confession First current value of the external power supply of electricity controls the terminal and exits dormant state, and sends the second sleep command to terminal, so that The power supply that the terminal opens corresponding device in the terminal according to second sleep command is obtained, and enters dormant state, is obtained For the terminal power supply external power supply the second current value, according to the current difference between first current value and second current value Value, determines whether the device leaks electricity.The program can dynamically test the electric current of terminal part in the dormant state, and based on confession Current differential in the case of electric electric power starting and closing determines whether terminal part has electric leakage, and leakage tests can be improved in the program Accuracy.
Those of ordinary skill in the art will appreciate that all or part of the steps in the various methods of above-described embodiment is can It is completed with instructing relevant hardware by program, which can be stored in a computer readable storage medium, storage Medium may include: read-only memory (ROM, Read Only Memory), random access memory (RAM, Random Access Memory), disk or CD etc..
It is provided for the embodiments of the invention a kind of leakage tests method, apparatus above and equipment is described in detail, A specific example illustrates the principle and implementation of the invention for program used herein, and the explanation of above embodiments is only It is to be used to help understand method and its core concept of the invention;Meanwhile for those skilled in the art, according to the present invention Thought, there will be changes in specific embodiment and range of applications, in conclusion the content of the present specification should not manage Solution is limitation of the present invention.

Claims (12)

1.一种漏电测试方法,其特征在于,包括:1. a leakage test method, is characterized in that, comprises: 测试设备向终端发送第一休眠命令,以使得所述终端根据第一休眠命令进入休眠状态,所述终端为没有安装电池的终端;The test equipment sends a first sleep command to the terminal, so that the terminal enters a sleep state according to the first sleep command, and the terminal is a terminal without a battery; 测试设备获取为所述终端供电的外部电源的第一电流值;The test equipment obtains the first current value of the external power supply that supplies power to the terminal; 测试设备控制所述终端退出休眠状态,并向终端发送第二休眠命令,以使得所述终端根据所述第二休眠命令打开所述终端内相应器件的供电电源,并进入休眠状态;The test equipment controls the terminal to exit the sleep state, and sends a second sleep command to the terminal, so that the terminal turns on the power supply of the corresponding device in the terminal according to the second sleep command, and enters the sleep state; 测试设备获取为所述终端供电的外部电源的第二电流值;The test equipment obtains the second current value of the external power supply that supplies power to the terminal; 测试设备根据所述第一电流值和所述第二电流值之间的电流差值,确定所述器件是否漏电。The testing device determines whether the device is leaking according to the current difference between the first current value and the second current value. 2.如权利要求1所述的漏电测试方法,其特征在于,向终端发送第一休眠命令,包括:基于与终端之间的通信连接向终端发送第一休眠命令;2. The leakage test method according to claim 1, wherein sending the first dormancy command to the terminal comprises: sending the first dormancy command to the terminal based on a communication connection with the terminal; 所述获取为所述终端供电的外部电源的第一电流值,包括:The acquiring the first current value of the external power supply that supplies power to the terminal includes: 断开与终端之间的通信连接,并获取为所述终端供电的外部电源的第一电流值。The communication connection with the terminal is disconnected, and the first current value of the external power supply that supplies power to the terminal is obtained. 3.如权利要求2所述的漏电测试方法,其特征在于,控制所述终端退出休眠状态,并所述向终端发送第二休眠命令,包括:3. The leakage test method according to claim 2, wherein controlling the terminal to exit the dormant state, and sending the second dormancy command to the terminal, comprises: 恢复与所述终端之间的通信连接,以使得所述终端退出休眠状态;recovering the communication connection with the terminal, so that the terminal exits the dormant state; 基于所述通信连接向终端发送第二休眠命令;sending a second sleep command to the terminal based on the communication connection; 所述获取为所述终端供电的外部电源的第二电流值,包括:The acquiring the second current value of the external power supply that supplies power to the terminal includes: 断开与终端之间的通信连接,并获取为所述终端供电的外部电源的第二电流值。The communication connection with the terminal is disconnected, and the second current value of the external power supply for powering the terminal is obtained. 4.如权利要求1所述的漏电测试方法,其特征在于,根据所述第一电流值和所述第二电流值之间的电流差值,确定所述器件是否漏电,包括:4. The leakage test method according to claim 1, wherein determining whether the device is leakage according to the current difference between the first current value and the second current value, comprising: 当所述第一电流值和所述第二电流值之间的电流差值大于预设阈值时,确定所述器件漏电;When the current difference between the first current value and the second current value is greater than a preset threshold, determining that the device is leaking; 当所述电流差值不大于预设阈值时,确定所述器件正常。When the current difference is not greater than a preset threshold, it is determined that the device is normal. 5.如权利要求4所述的漏电测试方法,其特征在于,在终端发送第一休眠命令之前,所述漏电测试方法还包括:5. The leakage test method according to claim 4, wherein before the terminal sends the first sleep command, the leakage test method further comprises: 确定需要进行漏电测试的器件;Determine the devices that need to be tested for leakage current; 根据所述器件的参数估算出所述器件的最小漏电电流值,并将所述最小漏电电流值作为所述预设阈值。The minimum leakage current value of the device is estimated according to the parameters of the device, and the minimum leakage current value is used as the preset threshold. 6.一种漏电测试装置,其特征在于,应用于测试设备,包括:6. A leakage test device, characterized in that, applied to test equipment, comprising: 命令发送模块,用于向终端发送第一休眠命令,以使得所述终端根据第一休眠命令进入休眠状态,所述终端为没有安装电池的终端;A command sending module, configured to send a first dormancy command to a terminal, so that the terminal enters a dormant state according to the first dormancy command, and the terminal is a terminal without a battery; 第一电流获取模块,用于获取为所述终端供电的外部电源的第一电流值;a first current acquisition module, configured to acquire a first current value of an external power supply that supplies power to the terminal; 控制模块,用于控制所述终端退出休眠状态,并向终端发送第二休眠命令,以使得所述终端根据所述第二休眠命令打开所述终端内相应器件的供电电源,并进入休眠状态;a control module, configured to control the terminal to exit the sleep state, and send a second sleep command to the terminal, so that the terminal turns on the power supply of the corresponding device in the terminal according to the second sleep command, and enters the sleep state; 第二电流获取模块,用于获取为所述终端供电的外部电源的第二电流值;a second current acquisition module, configured to acquire a second current value of an external power supply that supplies power to the terminal; 漏电确定模块,用于根据所述第一电流值和所述第二电流值之间的电流差值,确定所述器件是否漏电。A leakage determination module, configured to determine whether the device has leakage according to the current difference between the first current value and the second current value. 7.如权利要求6所述的漏电测试装置,其特征在于,所述命令发送模块,用于基于与终端之间的通信连接向终端发送第一休眠命令;7. The leakage test device according to claim 6, wherein the command sending module is used to send the first sleep command to the terminal based on the communication connection with the terminal; 所述第一电流获取模块,用于断开与终端之间的通信连接,并获取为所述终端供电的外部电源的第一电流值。The first current acquisition module is configured to disconnect the communication connection with the terminal, and acquire the first current value of the external power supply that supplies power to the terminal. 8.如权利要求7所述的漏电测试装置,其特征在于,所述控制模块,包括:8. The leakage test device according to claim 7, wherein the control module comprises: 恢复子模块,用于恢复与所述终端之间的通信连接,以使得所述终端退出休眠状态;a recovery submodule for recovering the communication connection with the terminal, so that the terminal exits the dormant state; 命令发送子模块,用于基于所述通信连接向终端发送第二休眠命令;A command sending submodule, configured to send a second sleep command to the terminal based on the communication connection; 所述第二电流获取模块,用于断开与终端之间的通信连接,并获取为所述终端供电的外部电源的第二电流值。The second current acquisition module is configured to disconnect the communication connection with the terminal, and acquire the second current value of the external power supply that supplies power to the terminal. 9.如权利要求6所述的漏电测试装置,其特征在于,所述漏电确定模块,具体用于:9. The leakage test device according to claim 6, wherein the leakage determination module is specifically used for: 当所述第一电流值和所述第二电流值之间的电流差值大于预设阈值时,确定所述器件漏电;When the current difference between the first current value and the second current value is greater than a preset threshold, determining that the device is leaking; 当所述电流差值不大于预设阈值时,确定所述器件正常。When the current difference is not greater than a preset threshold, it is determined that the device is normal. 10.如权利要求9所述的漏电测试装置,其特征在于,还包括:器件确定模块和阈值获取模块;10. The leakage test device according to claim 9, further comprising: a device determination module and a threshold acquisition module; 所述器件确定模块,用于在命令发送模块发送第一休眠命令之前,确定需要进行漏电测试的器件;The device determining module is used to determine the device that needs to be tested for leakage before the command sending module sends the first sleep command; 所述阈值获取模块,用于根据所述器件的参数估算出所述器件的最小漏电电流值,并将所述最小漏电电流值作为所述预设阈值。The threshold value acquisition module is configured to estimate the minimum leakage current value of the device according to the parameters of the device, and use the minimum leakage current value as the preset threshold value. 11.一种漏电测试设备,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,该处理器执行该计算机程序时实现如权利要求1-5任一项所述的方法。11. A leakage test device, comprising a memory, a processor and a computer program stored on the memory and running on the processor, when the processor executes the computer program, the method described in any one of claims 1-5 is realized method. 12.一种存储介质,其特征在于,所述存储介质中存储有计算机程序,当所述计算机程序在计算机上运行时,使得所述计算机执行权利要求1至5任一项所述的漏电测试方法。12. A storage medium, characterized in that, a computer program is stored in the storage medium, and when the computer program is run on a computer, the computer is made to perform the leakage test according to any one of claims 1 to 5 method.
CN201710026298.7A 2017-01-13 2017-01-13 Leakage tests method, apparatus and equipment Expired - Fee Related CN106646085B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710026298.7A CN106646085B (en) 2017-01-13 2017-01-13 Leakage tests method, apparatus and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710026298.7A CN106646085B (en) 2017-01-13 2017-01-13 Leakage tests method, apparatus and equipment

Publications (2)

Publication Number Publication Date
CN106646085A CN106646085A (en) 2017-05-10
CN106646085B true CN106646085B (en) 2019-04-16

Family

ID=58844358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710026298.7A Expired - Fee Related CN106646085B (en) 2017-01-13 2017-01-13 Leakage tests method, apparatus and equipment

Country Status (1)

Country Link
CN (1) CN106646085B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107608854A (en) * 2017-09-07 2018-01-19 维沃移动通信有限公司 A kind of detection method and electronic equipment of quiescent current value
CN108761187B (en) * 2018-06-06 2021-06-25 Oppo(重庆)智能科技有限公司 A substrate current testing method, system and terminal equipment
CN111970164A (en) * 2020-07-29 2020-11-20 深圳市广和通无线股份有限公司 System, method, device, terminal and storage medium for detecting state of communication module

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100506969B1 (en) * 1997-12-12 2005-11-01 삼성전자주식회사 How to test the leakage of semiconductor devices
CN201789266U (en) * 2010-08-19 2011-04-06 福瑞特国际电气(中山)有限公司 Electric leakage monitoring circuit for electrical appliance device
CN103176091A (en) * 2011-12-21 2013-06-26 深圳富泰宏精密工业有限公司 System and method for electric leakage detection of electronic device
CN105514924A (en) * 2015-12-14 2016-04-20 广东欧珀移动通信有限公司 Terminal equipment electric leakage protection method and device
WO2016101224A1 (en) * 2014-12-25 2016-06-30 华为技术有限公司 Terminal leaked current detection system
CN106291060A (en) * 2016-08-29 2017-01-04 深圳天珑无线科技有限公司 A kind of current test of mobile telephone system and current test of mobile telephone method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100506969B1 (en) * 1997-12-12 2005-11-01 삼성전자주식회사 How to test the leakage of semiconductor devices
CN201789266U (en) * 2010-08-19 2011-04-06 福瑞特国际电气(中山)有限公司 Electric leakage monitoring circuit for electrical appliance device
CN103176091A (en) * 2011-12-21 2013-06-26 深圳富泰宏精密工业有限公司 System and method for electric leakage detection of electronic device
WO2016101224A1 (en) * 2014-12-25 2016-06-30 华为技术有限公司 Terminal leaked current detection system
CN106164686A (en) * 2014-12-25 2016-11-23 华为技术有限公司 A kind of leakage current test system of terminal
CN105514924A (en) * 2015-12-14 2016-04-20 广东欧珀移动通信有限公司 Terminal equipment electric leakage protection method and device
CN106291060A (en) * 2016-08-29 2017-01-04 深圳天珑无线科技有限公司 A kind of current test of mobile telephone system and current test of mobile telephone method

Also Published As

Publication number Publication date
CN106646085A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106340925B (en) A charging control method, device and terminal
CN105320598B (en) Method for testing software and device
CN111239617B (en) Control method and device for charge and discharge test, storage medium and system
KR102229006B1 (en) Method and apparatus for processing input using touch screen
CN106786961B (en) Charging method, device and terminal
CN106484555B (en) Abnormity detection and recovery method and mobile terminal
CN106549464A (en) A charging control method, device and computer equipment
CN106951850B (en) A kind of method and mobile terminal controlling fingerprint recognition mould group
CN106646440B (en) Method and device for detecting drop height
CN106646085B (en) Leakage tests method, apparatus and equipment
CN109565171A (en) Charging protection method, terminal and charger
CN105807908B (en) A kind of method and apparatus of switching working mode
CN107066090B (en) Method for controlling fingerprint identification module and mobile terminal
WO2018218686A1 (en) Method for detecting swelling of rechargeable battery, and portable electronic device
CN108810284B (en) Mode switching method of camera and electronic equipment
CN105700620B (en) A kind of method and apparatus executing control instruction
CN108139899A (en) Terminal device and the method for control charging
CN109413256A (en) Contact person information processing method, device, storage medium and electronic equipment
CN106500751B (en) Calibration method of proximity sensor and mobile terminal
CN106254673B (en) Terminal falls detection method and device
CN109860743B (en) A charging method and terminal device
CN106484141B (en) Threshold setting method and mobile terminal
CN104751333B (en) A kind of method, apparatus and system of information exchange
CN109639370A (en) Near-field communication aerial detection method, device, mobile terminal and storage medium
CN109687922A (en) Signal monitoring method, device, storage medium and the mobile terminal of wireless network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 523860 No. 18, Wu Sha Beach Road, Changan Town, Dongguan, Guangdong

Applicant after: GUANGDONG OPPO MOBILE TELECOMMUNICATIONS Corp.,Ltd.

Address before: 523860 No. 18, Wu Sha Beach Road, Changan Town, Dongguan, Guangdong

Applicant before: GUANGDONG OPPO MOBILE TELECOMMUNICATIONS Corp.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190416