Background technique
China's water resource preservation is abundant, and surface water, underground latent water, underground underground river and artesian water are widely distributed.In coal mine and
Tunnel Engineering is normally exploited in digging process, is often invaded and harassed problem by different degrees of water damage.For example, in shallow buried coal seam
In the exploitation and digging process in tunnel, extensive development is penetrated through by exploitation disturbance and overlying strata braking effect, roof fracture, is involved
Earth's surface wide area water source induces large-scale engineering infiltration or water bursting disaster;Exploitation for medium and deep coal seam, also due to coal seam
Exploitation disturbance and top plate, which collapse to break on a large scale, to be influenced, and after rich water rock stratum, underground underground river or artesian aquifer is connected in overlying strata crack, will be given
Coal mine and Tunnel Engineering normally produce and excavation brings serious gushing water hidden danger, threaten worker's life security, tremendous economic is caused to damage
It loses;The trend of deep mining is turned to coal resources, frequent preservation has coal seam goaf product above Deep Thick and super high seam
The wide areas rich water water source such as water, water table aquifer, artesian aquifer, underground underground river, in addition the large space top after high and extra-high seam mining
The hardened a wide range of unstability of structure collapses the disconnected heavily stressed comprehensive function in joint deep, and overlying strata water producing fractures, which easily penetrate through, covers wide area rich water
Area is unfavorable for safety in production and the excavation of mine and Tunnel Engineering, to social economy to bury different degrees of gushing water hidden danger
It makes a very bad impression with benefit.
Reinforce the advanced physical prospecting in water source in consideration of it, often taking during colliery scene and constructing tunnel, adhere to visiting water and puts
The technical measures that water combines prevent and treat the gushing water hidden danger of hydrous fluids in production and construction operation process.However, being assigned for wide area water source
Under the conditions of depositing, take conventional extraction water measure both unrealistic or uneconomical, and limited by water source exploration technology acuracy,
On the basis of reinforcing water source aided detection technology, water hole is largely visited by complement again toward contact and reinforce prevention, dramatically increased
Drill project amount and the cost of drilling visit water in addition and dewatering orifice set the determination of the parameters such as position, direction and depth still
There are certain blindness, will often visit water and dewatering orifice is set in anhydrous or poor-water area, can not link up country rock in time and dominate water crack
Gap be easy to cause huge engineering and economic loss.At the same time, release influence is adopted based on coal petrography, in view of stope and lane
Road near region country rock water producing fractures are developed, and by taking the measure that slip casting blocks in hole in engineering practice, attempt to block country rock completely
Water producing fractures prevent and treat the generation of rich water coal petrography gushing water hidden danger, but setting there are blindness due to water blockoff drilling, often result in and enclose
Rock drilling, which is set, cannot accurately link up main conduit pipe.When drilling set anhydrous, poor-water or closing Fractured zone when, will lead to
Bored grouting water blockoff loses meaning, or even if setting drilling in country rock time water producing fractures, and has effectively blocked part time
Water producing fractures channel, but since country rock primary and secondary water producing fractures perforation degree is little, the slip casting in drilling local secondary crack blocks not
It is able to achieve effective closure that aquaporin is dominated to country rock, in leading aquaporin under the continuous action of artesian water, main water producing fractures
Will again link up injected hole block range other than other secondary water producing fractures, and then realize country rock water producing fractures channel reconstruct with
Change its course, also results in wall rock drill-hole grouting for water blocking less effective.
It to sum up analyzes, the extraction sluicing measure under wide area water source occurrence condition was both unrealistic or uneconomical, therefore accurately looked for
To or link up country rock and dominate and aquaporin and carry out timely slip casting closure, be to solve under wide area water condition in coal mine and Tunnel Engineering
The key of gushing water hidden danger, the underwater coal petrography deep hole pressure-bearing microexplosion grouting and sealing technique of wide area provided by the invention, by coal petrography
Multiple groups drilling is set, using pressure-bearing microexplosion technology in hole, the intracorporal release increasing of coal petrography had not only been effectively increased and has split space, but also sufficiently hair
The efficient uniform posting characteristic for having waved solid-liquid coupling propagation of explosion medium in powder charge periphery in hole, realizes primary and secondary water producing fractures in country rock
Abundant perforation, compensate for the leting speeper blindness that sets of drilling initial stage, subsequent high-pressure slip-casting blocks operation and will more have in addition
Conducive to comprehensive closure of water producing fractures in coal and rock.The perforation extensively of coal and rock blasting crack hole pattern and primary and secondary water producing fractures is auxiliary
It is blocked with high-pressure slip-casting, conducive to the grouting for water blocking curtain for forming wide area, water plugging effect is significant, and it is super dynamic to realize explosive charge in hole
Static broken rock under load effect increases the comprehensive closure split with country rock wide area crack, has extensive Technique Popularizing and application value.
Summary of the invention
Coal mine and the tunnel exploitation that the present invention is directed under wide area water source occurrence condition are asked with the water-inrush prevention in excavation project
Topic, provide the underwater coal petrography deep hole pressure-bearing microexplosion grouting water blocking method of wide area, based in hole solid-liquid coupling propagation of explosion medium it is efficient
Uniform posting characteristic, realizes the extensive perforation of primary and secondary water producing fractures in country rock, makes up leting speeper drilling and sets when position is chosen
Blindness, subsequent high-pressure slip-casting blocks the comprehensive closure for being more advantageous to water producing fractures in coal and rock in addition, can be preferably real
Static broken rock increasing in existing hole under the super Under Dynamic Load of explosive charge is split and the comprehensive plugging effect in country rock wide area crack.
The technical solution adopted by the present invention are as follows: a kind of underwater coal petrography deep hole pressure-bearing microexplosion grouting water blocking method of wide area, including
Drilling lays, quickly process is ignited in fluid injection, exhaust and powder charge in injection hole sealing and hole in powder charge and pipeline arrangement, hole in hole,
Specifically includes the following steps:
1) it is directed to specific rich water mining area and constructing tunnel condition, specifies grouting for water blocking spatial dimension, designs drilling parameter,
Determine reasonable hole depth, pitch of holes, layer the position ,/parameters such as elevation angle degree and aperture of inclining;Made using high-power drilling machine progress sequence punching
Industry, strict control drilling machine are drilled precision.
2) before borehole charge, blast hole is cleaned in advance, remaining coal petrography powder, sequence are packed into quantitative solid explosive in cleaning hole
(under the conditions of liquid explosive wouldn't powder charge), synchronous installation liquid injection pipe and exhaust pipe, and by primacord in conjunction with liquid injection pipe and exhaust pipe
Outside hole wall arrangement fairlead.
3) the quick injection hole sealing device of soft plasticity is used, porous synchronous carries out quick injection hole sealing work to coal petrography sealing section
Industry, sealing of hole segment length are consistent.
4) after coal petrography sealing section grout cures, porous synchronous fluid injection, exhaust operation.When there is liquid stream persistently to flow in exhaust pipe
When out, exhaust pipe shut-off valve is closed, liquid injection pipe continues fluid injection pressurization, while binding primacord and detonator, carrying out big gun line line work
Industry, after personnel remove safety place, explosive in detonating primer and hole.
5) it in hole after explosive initiation, checks that drilling in coal and rock blocks situation, secondary envelope is taken in time for microexplosion punching drilling
It is stifled, after the secondary solidification of sealing section slurries, water blockoff Grouting Pipe is connected to high-pressure injection pump, explosion coal and rock is carried out big empty
Between, comprehensive high-pressure slip-casting block operation.
Preferably, drilling parameter is arranged in the step 1): selected drilling should be advisable with large aperture, generally 60
On the one hand~100mm or so provides sufficient release increasing for coal and rock and splits space, be on the other hand then conducive to the later period powder charge,
Sealing of hole and high-pressure slip-casting operation;Based on the efficient posting characteristic of powder charge periphery solid-liquid coupling propagation of explosion medium, to meet country rock near region
The stabilization of Coal-body Structure, what injection hole sealing length was generally drillable length 40%~60% is advisable;For the spacing of wells and hole
Depth is main depending on coal petrography intensity and stress of primary rock condition, should follow short-bore depth, small spacing principle as far as possible for hard coal petrography, protect
It demonstrate,proves hard coal petrography crack sufficiently to extend and penetrate through, should suitably increase hole depth and pitch of holes vice versa for soft coal petrography.
Preferably, borehole charge and pipeline arrange process in the step 2): for general drilling in coal and rock, setting
The drilling for tendency of facing upward is beneficial to the borehole cleaning operation of the row fortune and later period of coal petrography powder during drilling, at this time the note in blast hole
Liquid pipe installing depth only requires more than 0.1~0.3m of sealing section, and exhaust pipe then needs to be installed up to bottom hole position;For nutation tendency
Drilling then need to clear coal petrography powder remaining in hole, need liquid injection pipe being installed up to hole at this time by corresponding auxiliary borehole cleaning facility
Bottom, and be more than 0.1~0.3m of drilling and sealing section by exhaust pipe.Meanwhile it need to be by primacord in conjunction with liquid injection pipe and exhaust pipe edge respectively
Hole wall arranges outside fairlead.
Preferably, explosive payload is generally less than the 1/3 of drilling overall length conventional charge blasting condition in the step 2) mesoporous,
When selecting liquid explosive, the liquid explosives of low energy, low sensitivity can only be generally selected, such as nitroglycerine base liquid explosives EL-389-
B, water base thickening liquid explosives NO.1286646, nitroparaffin hydrocarbon based liquids explosive, passivation TAL-1005-C etc., explosive blasting energy
Equivalent is lower than the 1/3 of rock explosive blasting energy.
Preferably, the soft quick injection hole sealing device of plasticity described in the step 3), is a kind of with water blockoff slip casting
The rapid hole sealing device of pipe;
The rapid hole sealing device end with water blockoff Grouting Pipe opens up the matched side of size depending on water blockoff Grouting Pipe bore
To inclined hole, water blockoff Grouting Pipe is drawn by lateral inclined hole, and is realized to block by the biconial pipe fitting of two-tube end and be imitated with slip casting
Fruit;
The water blockoff Grouting Pipe and the quick injection hole sealing device of soft plasticity are the soft plastic tube that cracks, wherein for sealing of hole
Grouting Pipe position of cracking is located in coal petrography sealing section, and water blockoff Grouting Pipe is cracked, position is located at other than drilling and sealing section.
The rapid hole sealing device with water blockoff Grouting Pipe is installed, first by annular smooth umbrella buckle by device end cover to
It is more than the lateral inclined hole position in end;Then by water blockoff Grouting Pipe by the front end insertion of the quick injection hole sealing device of soft plasticity and by filling
The lateral inclined hole of set terminal draws 0.5~1.0m;Annular salient angle umbrella is buckled again and is inserted in by the front end of water blockoff Grouting Pipe, soft modeling is filled in
Front end in the quick injection hole sealing device pipe of property;Finally the intact device that combination finishes is filled in injected hole, and device is last
The smooth umbrella of the annular at end, which is buckled, is pushed into the position away from 0.2~0.5m of aperture along tube wall.
Preferably, process is ignited in fluid injection, exhaust and powder charge in the step 4) mesoporous: being directed to coal and rock unit section hole
Reticular density is larger or the higher condition of damaged degree, and water body filter loss is relatively large in coal petrography hole, should select larger aperture as far as possible
Liquid injection pipe carry out porous synchronous fluid injection operation;Conversely, should suitably reduce aperture and the liquid injection pipe item number of fluid injection pipeline.Coal petrography bores
In the injection process of hole, when exhaust pipe continues flow liquid, exhaust pipe shut-off valve is closed, liquid injection pipe continues fluid injection pressurization, and in hole
Before explosive initiation, pressure-bearing medium is always maintained at band pressure condition in hole.
Preferably, institute's fluid injection body is broadly divided into two major classes in the step 4) mesoporous, when explosive is solid-state or coagulates in hole
When poly- state, institute's fluid injection body is the mixed liquor of water, salt water or doped portion hardening agent such as fine sand, iron powder etc.;When using liquid explosive
When carrying out explosion, directly selection liquid explosives should have low sensitivity and enough stability as propagation of explosion medium.
Preferably, the subsequent high pressure slip-casting water-blocking operation in the step 5), will select according to the filter loss of coal and rock
The matched grouting for water blocking material of property.For the larger condition of filter loss, choose as far as possible have both setting time is short, early strength is high,
Steadily in the long term, the water shutoff material of the characteristics such as excellent, indissoluble water of expansion character, such as polyurethane, rapid expanding cement etc.;Conversely, right
In the little condition of filter loss, material selection standard can suitably relax, such as ordinary cement, mud etc..
Passed through using pressure-bearing microexplosion technology in hole based on the efficient uniform posting characteristic of solid-liquid coupling propagation of explosion medium in hole
Multiple groups drilling is set in coal petrography, is expanded coal and rock internal drilling release increasing and is split range, primary and secondary water producing fractures is big in realization coal body
Space, comprehensive perforation, subsequent high-pressure slip-casting blocks the comprehensive closure for being more advantageous to primary and secondary water producing fractures in coal and rock in addition,
It can preferably realize that the static broken rock increasing in hole under the super moving load condition of explosive charge is split to block comprehensively with country rock wide area crack.
Beneficial effects of the present invention:
It is in coal and rock 1. the porous arrangement of coal and rock internal drilling, effectively increases the discharge space in coal petrography unit volume
The abundant extension and perforation of primary and secondary water producing fractures provide steric requirements.
2. splitting technology using pressure-bearing microexplosion increasing in hole, the efficient uniform posting of solid-liquid coupling propagation of explosion medium is made full use of
Can, blasting energy sphere of action is improved, the country rock extensive disruption purpose under a small amount of charging condition, powder charge energy in hole are realized
Amount utilization rate significantly improves.
3. coal petrography deep hole pressure-bearing microexplosion powder charge is few, intensity is low, reduces explosive charge high-energy and the concentration of single hole is acted on
Intensity effectively reduces the punching possibility of sealing material, is conducive to the stabilization of country rock near region coal and rock.
4. being effectively reduced using deep hole pressure-bearing microexplosion technology based on the posting characteristic of solid-liquid coupling propagation of explosion medium in hole
The super dynamic load effect of explosive charge expands coal and rock release increasing and splits range, adequately achieves the big of primary and secondary water producing fractures in coal body
Space, comprehensive perforation effectively compensate for the blindness visited and put drilling initial stage when setting.
Specific embodiment
By taking the deep hole pressure-bearing microexplosion grouting for water blocking under the conditions of 1 overlying strata water-bearing layer of rich water tunnel, 2 wide area rich water as an example, carries out and bore
3 slip casting of hole blocks operation and realizes that the wide area of the main water producing fractures 4 of country rock and time water producing fractures 5 blocks comprehensively.In conjunction with attached drawing to this hair
It is bright to be further described:
As depicted in figs. 1 and 2, it is assumed that 1 wall rock drill-hole of rich water tunnel, 3 depth is 25m, bore diameter 100mm, and design is bored
Injection hole sealing section 6 length in hole is 15m, arranges two groups of drillings 3 up and down, and adjacent drillhole blasting hole spacing keeps 1~3m, is selected solid
Body explosive carries out coal petrography microexplosion increasing and splits, and selects the mine water of 2MPa as propagation of explosion medium.
Using deep hole pressure-bearing microexplosion method, preparatory powder charge is carried out to blast hole, and install liquid injection pipe (length 25m, outer diameter
10mm, internal diameter 6mm) and exhaust pipe (length 30m, outer diameter 10mm, internal diameter 6mm), it drills for facing upward, is in advance inserted into exhaust pipe
Blasting boreholes bottom.Powder charge installing length is 2m in hole, and designated length is the primacord of 19m, and one end insertion well in advance is prevented
In the hole of water in powder charge, bagging waterproof measure is carried out again, is filled in blast hole, and use flexible tubing (length 20m, outside
Diameter 60mm, internal diameter 40mm) explosive is sent to predetermined position in hole, fluid injection is bundled for the concluding volume waterproof powder stick in blast hole
Guan Hou is sent into blast hole according to identical loading method.
To have the selected water blockoff Grouting Pipe 8 of the rapid hole sealing device 7 of water blockoff Grouting Pipe in present case convenient for being intubated operation
Bore be 45mm, length 25m, the bore of the soft quick injection hole sealing device 9 of plasticity is 70mm, length 18m.For having
The rapid hole sealing device 7 of water blockoff Grouting Pipe is installed, and annular smooth umbrella is first buckled 10 and is covered by device end to the lateral inclined hole in end
It is more than 11 positions;Then by water blockoff slip casting 8 by the front end insertion of the quick injection hole sealing device 9 of soft plasticity and by the side of device end
0.5~1.0m is drawn to inclined hole 11;Annular salient angle umbrella is buckled 12 again to be inserted in by the front end of water blockoff Grouting Pipe 8, it is fast to fill in soft plasticity
Front end in fast 9 pipe of injection hole sealing device;Finally the intact device that finishes of combination is filled in injected hole, and by device end
Annular smooth umbrella buckles 10 and is pushed into the position away from 0.2~0.5m of aperture along tube wall.
The quick injection hole sealing device 9 of soft plasticity and slip casting hose 14 are connected by biconial pipe fitting 13, is carried out porous same
Walk injection hole sealing operation.After country rock sealing section grout cures, starts to fill the water blast hole, is vented operation, when exhaust pipe is held
When continuous water outflow, the shut-off valve of exhaust pipe is closed, water injection pipe continues water filling pressurization, while binding primacord and detonator, to personnel
After removing safety place, powder charge in hole is ignited.
After the completion of coal petrography deep hole pressure-bearing microexplosion operation, manual cleaning coal petrography blasting environment goes through drilling in coal and rock closure
Situation takes secondary plugging in time for microexplosion punching drilling, after the secondary solidification of sealing section slurries, using biconial pipe fitting
13 connect water blockoff Grouting Pipe 8 and slip casting hose 14, carry out large space, comprehensive to coal and rock crack hole pattern and water producing fractures
High-pressure slip-casting blocks operation.
It should be pointed out that for those skilled in the art, without departing from the principle of the present invention,
Several improvements and modifications can also be made, these modifications and embellishments should also be considered as the scope of protection of the present invention.In the present embodiment not
The available prior art of specific each component part is realized.