[go: up one dir, main page]

CN106773900B - A kind of intelligent switch - Google Patents

A kind of intelligent switch Download PDF

Info

Publication number
CN106773900B
CN106773900B CN201611033334.4A CN201611033334A CN106773900B CN 106773900 B CN106773900 B CN 106773900B CN 201611033334 A CN201611033334 A CN 201611033334A CN 106773900 B CN106773900 B CN 106773900B
Authority
CN
China
Prior art keywords
electrical equipment
main control
control chip
equipment
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611033334.4A
Other languages
Chinese (zh)
Other versions
CN106773900A (en
Inventor
陆高飞
沈智浩
夏鑫磊
莫辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG WEIQI ELECTRIC Co Ltd
Original Assignee
ZHEJIANG WEIQI ELECTRIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG WEIQI ELECTRIC Co Ltd filed Critical ZHEJIANG WEIQI ELECTRIC Co Ltd
Priority to CN201611033334.4A priority Critical patent/CN106773900B/en
Publication of CN106773900A publication Critical patent/CN106773900A/en
Application granted granted Critical
Publication of CN106773900B publication Critical patent/CN106773900B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • HELECTRICITY
    • H03ELECTRONIC CIRCUITRY
    • H03KPULSE TECHNIQUE
    • H03K17/00Electronic switching or gating, i.e. not by contact-making and –breaking
    • H03K17/22Modifications for ensuring a predetermined initial state when the supply voltage has been applied
    • H03K17/223Modifications for ensuring a predetermined initial state when the supply voltage has been applied in field-effect transistor switches
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/21Pc I-O input output
    • G05B2219/21013Microcontroller and power output switches integrated on same chip

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The invention discloses a kind of intelligent switch, comprising: operation panel includes at least two electrical equipment operation modules on operation panel, for controlling different types of electrical equipment;The main control chip being connect with electrical equipment operation module, for the operation information according to electrical equipment operation module, the corresponding target electrical equipment of parsing operation information and target execute movement, and send corresponding object control information to the control equipment of target electrical equipment;Equipment is controlled, for after receiving object control information, control target electrical equipment performance objective to execute movement.Since the intelligent switch includes at least two electrical equipment operation modules, main control chip parses the operation information received, it parses electrical equipment corresponding to the information and executes movement, corresponding control information is then sent to the corresponding control equipment of the electrical equipment.It can be seen that the control to multiple electrical equipments may be implemented by the intelligent switch.

Description

A kind of intelligent switch
Technical field
The present invention relates to wireless communication control technology fields, more particularly to a kind of intelligent switch.
Background technique
With the raising of technical level of science and technology, wireless communication technique is applied more and more extensive.It (such as is illuminated in electric appliance Lamp, air-conditioning, TV etc.) aspect is controlled, wireless communication technique is also applied, and has had already appeared WIFI communication currently on the market Remote control wiring board, wireless intelligent switch etc. with ZigBee communication, for example, the intelligent lighting of control all the way in house is opened It closes, user is by radio operation, and long-range control headlamp is switched on and off, to realize the intelligent control to house intraoral illumination; Or switch and the control equipment of electrical equipment, such as controller carries out wireless communication, and passes through and realizes with the communication of control equipment Control to electrical equipment.But function is all fairly simple, can only realize single control, and an intelligent switch can not be passed through Realize the control to multiple electric appliances.
Therefore, how by intelligent switch realize to the control of multiple electrical equipments be those skilled in the art urgently The technical issues of solution.
Summary of the invention
The object of the present invention is to provide a kind of intelligent switch, for realizing the control to multiple electrical equipments.
In order to solve the above technical problems, the present invention provides a kind of intelligent switch, comprising: operation panel, the operation panel Upper includes at least two electrical equipment operation modules, for controlling different types of electrical equipment;
The main control chip being connect with the electrical equipment operation module, for the behaviour according to the electrical equipment operation module Make information, parses the corresponding target electrical equipment of the operation information, and send to the control equipment of the target electrical equipment The operation information;
The control equipment for determining that target executes movement after receiving the operation information, and controls the mesh Mark electrical equipment executes the target and executes movement.
Preferably, the electrical equipment operation module includes switch module and function point analysis module, the correspondingly operation Information includes: out operation information, closes operation information or adjusts operation information.
It preferably, further include being connected with the main control chip, for resetting the reset circuit of the main control chip.
Preferably, the reset circuit specifically includes first resistor, first capacitor and the first reset switch, first electricity The first end of appearance, the second end of the first resistor are connected with the first end of first reset switch, the common end of three with The main control chip reset pin connection, the second end ground connection of the first capacitor, the first end of the first resistor and first Power supply connection, the second end ground connection of first reset switch, when the control terminal of first reset switch is pressed, described the The short circuit of one reset switch.
Preferably, the reset circuit specifically includes second resistance, 3rd resistor, the second capacitor, third capacitor, inductance, PMOS and the second reset switch, the first end of the inductance are connect with the positive electricity source pin of the main control chip, the master control core The negative electricity source pin of piece is grounded, the source electrode, described of the first end of the second end of the inductance and the third capacitor, the PMOS The first end of second reset switch and the connection of the first end of second capacitor, the second end ground connection of the third capacitor, institute The second end for stating the second reset switch is connect with the first end of the second resistance, the second end of the second resistance and described the The grid of the first end of three resistance, the second end of second capacitor and the PMOS connects, and the second of the 3rd resistor End ground connection, the drain electrode of the PMOS are connect with second source.
Preferably, the electrical equipment includes air-conditioning and headlamp, then correspondingly the control equipment is respectively air-conditioning control Device and control relay circuit processed.
It preferably, further include the temperature sensor being connected with the main control chip, the liquid being connect with the temperature sensor Brilliant display module, liquid crystal display drive circuit and liquid crystal back light circuit.
It preferably, further include being connected with the main control chip, for debugging the debugging electricity of the main control chip running parameter Road.
Preferably, the main control chip is connect with the control equipment by 433MHz wireless communication module.
It preferably, further include the wiring board being connect with the electrical equipment, the wiring board has wireless communication module, with The main control chip wireless communication connection, for being switched on or switched off the electrical equipment and electricity according to the control of the main control chip The connection in source.
A kind of intelligent switch provided by the present invention, comprising: operation panel includes that at least two electricity consumptions are set on operation panel Standby operation module, for controlling different types of electrical equipment;The main control chip connecting with electrical equipment operation module is used for root According to the operation information of electrical equipment operation module, parses the corresponding target electrical equipment of operation information and target executes movement, and Corresponding object control information is sent to the control equipment of target electrical equipment;Equipment is controlled, for receiving target control After information, control target electrical equipment performance objective executes movement.Since the intelligent switch includes at least two electrical equipments Operation module, main control chip parse the operation information received, parse electrical equipment corresponding to the information and hold Action is made, and corresponding control information is then sent to the corresponding control equipment of the electrical equipment.It can be seen that passing through the intelligence The control to multiple electrical equipments may be implemented in switch.
Detailed description of the invention
In order to illustrate the embodiments of the present invention more clearly, attached drawing needed in the embodiment will be done simply below It introduces, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ordinary skill people For member, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of structure chart of intelligent switch provided in an embodiment of the present invention;
Fig. 2 is the structure chart of another intelligent switch provided in an embodiment of the present invention;
Fig. 3 is a kind of reset circuit figure provided in an embodiment of the present invention;
Fig. 4 is another reset circuit figure provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole embodiments.Based on this Embodiment in invention, those of ordinary skill in the art are without making creative work, obtained every other Embodiment belongs to the scope of the present invention.
Core of the invention is to provide a kind of intelligent switch, for realizing the control to multiple electrical equipments.
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description The present invention is described in further detail.
Fig. 1 is a kind of structure chart of intelligent switch provided in an embodiment of the present invention.As shown in Figure 1, comprising: operation panel 10, it include at least two electrical equipment operation modules 11 on operation panel 10, for controlling different types of electrical equipment;
The main control chip 12 being connect with electrical equipment operation module 11, for the operation according to electrical equipment operation module 11 Information, the corresponding target electrical equipment of parsing operation information, and operation information is sent to the control equipment of target electrical equipment;
Equipment 13 is controlled, for determining that target executes movement after receiving operation information, and controls target electrical equipment Performance objective executes movement.
It is understood that Fig. 1 is a kind of specific application scenarios, 10 on operating surface in addition to including 2 use in Fig. 1 Outside electric equipment operation module 11, it can also be other quantity.It should be noted that electrical equipment operation module 11 be user to Various switch modules, function point analysis module that electric equipment is operated etc..For example, electricity consumption is set if electrical equipment is air-conditioning Standby operation module is exactly various buttons used in operating air conditioner, such as switch module, for carrying out switch operation to air-conditioning;Function It is adjustable module, air quantity adjusting (air quantity increases, air quantity reduces), (temperature increases, temperature drops for temperature setting for carrying out to air-conditioning It is low), function setting (cool wind mode, warm wind mode, dehumidification mode) etc. operation.
Main control chip 12 is directly connected to electrical equipment operation module, for each electrical equipment operation module of real-time monitoring Operation information, when having monitored operation information, so that it may which showing that the information is by the channel that operation information is transmitted will be to which A electrical equipment is operated, such as the information is inputted by the transmission channel of control air-conditioning, then may determine that current use Family is operated to the corresponding electrical equipment operation module 11 of air-conditioning, and target electricity consumption has also been determined that during the judgement Equipment and the corresponding control equipment 13 of target electrical equipment.And main control chip 12 also needs to send control information to control Control equipment 13.The control parsing of equipment 13 operation information corresponds to target and executes movement, such as the operation information is out operation information, i.e., Target electrical equipment is opened, target electrical equipment performance objective is controlled after being parsed and executes movement.
It should be noted that control equipment 13 can be using existing, this embodiment is not repeated, it is to be understood that Control equipment 13 is usually wireless communication with main control chip 12, and control equipment 13 is arranged near electrical equipment, and intelligent switch It can be set in places such as halls.User passes through an intelligent switch, so that it may realize the long-range control to multiple electrical equipments. Main control chip 12 can be connect with control equipment 13 by 433MHz wireless communication module.Main control chip 12 can use The chip of STM32F103RBT6.
Intelligent switch provided in this embodiment includes at least two electrical equipment operation modules, and main control chip is to reception To operation information parsed, parse electrical equipment corresponding to the information and execute movement, then by corresponding control Information is sent to the corresponding control equipment of the electrical equipment.It can be seen that may be implemented by the intelligent switch to multiple electricity consumptions The control of equipment.
Fig. 2 is the structure chart of another intelligent switch provided in an embodiment of the present invention.As shown in Fig. 2, in above-described embodiment On the basis of, preferably embodiment, electrical equipment operation module 11 include switch module and function point analysis module, accordingly Ground operation information includes: out operation information, closes operation information or adjusts operation information.
It is understood that electrical equipment operation module 11 specifically include which kind of module be will be according to actual electrical equipment It determines, it is not limited to both modules mentioned in the present embodiment.
On the basis of the above embodiments, preferably embodiment, further includes connecting with main control chip 12, for multiple The reset circuit 14 of position main control chip 12.
The crash of main control chip 12 in order to prevent causes intelligent switch to paralyse, and in the present embodiment, increases reset circuit 14.It can With understanding, reset circuit 14 be can be set in operation panel 10, and there are the first reset switches on operating surface 10. Preferably embodiment, reset circuit 14 specifically include first resistor R1, first capacitor C1 and the first reset switch SR1, First end, the second end of first resistor R1 of first capacitor C1 is connected with the first end of the first reset switch SR1, and three's is public End is connect with the reset pin of main control chip 12, the second end ground connection of first capacitor C1, the first end of first resistor R1 and first Power supply (3.3V) connection, the second end ground connection of the first reset switch SR1, when the control terminal of the first reset switch SR1 is pressed, the One reset switch SR1 short circuit, the reset pin power-off of main control chip 12, to realize reset.
There are many modes of reset circuit, as shown in Figure 3.Reset circuit 14 shown in Fig. 3 is answering by main control chip Position pin resets main control chip.Such operation is capable of resetting most of crash phenomenon, but when main control chip crash just not It is capable of resetting.Therefore, in another embodiment, another a kind of reset circuit is also provided, which can incite somebody to action The power supply of main control chip 12 directly disconnects, as shown in Figure 4.Reset circuit 14 specifically includes second resistance R2,3rd resistor R3, the Two capacitor C2, third capacitor C3, inductance L1, PMOS (figure label Q1) and the second reset switch SR2, the first end of inductance L1 It is connect with the positive electricity source pin of main control chip 12, the negative electricity source pin ground connection of main control chip 12, the second end and third of inductance L1 The first end connection of the first end of capacitor C3, the source electrode of PMOS, the first end of the second reset switch SR1 and the second capacitor C2, The second end of third capacitor C3 is grounded, and the second end of the second reset switch SR1 is connect with the first end of second resistance R2, the second electricity The second end of resistance R2 is connect with the grid of the first end of 3rd resistor R3, the second end of the second capacitor C2 and PMOS, third electricity The second end ground connection of R3 is hindered, the drain electrode of PMOS is connect with second source (5V).
On the basis of the above embodiments, preferably embodiment, electrical equipment include air-conditioning and headlamp, then phase Controlling equipment 13 with answering is respectively air-conditioner controller and control relay circuit.
Since air-conditioner controller and control relay circuit are well known to the skilled person ground technology, It is repeated no more in the present embodiment.
On the basis of the above embodiments, preferably embodiment, further includes the temperature connecting with main control chip 12 Sensor 15, the LCD MODULE 16 being connect with temperature sensor 15, liquid crystal display drive circuit 17 and liquid crystal back light circuit 18.
In specific implementation, LCD MODULE 16 can be used as the screen of operation panel, then user is in the corresponding use of operation It can see current temperature when electric equipment operation module 11 from LCD MODULE 16 in passing.Specific embodiment is as follows: Temperature sensor 15 acquires current temperature, and current temperature is then transmitted to main control chip 12, and main control chip controls liquid crystal Display module 16 carries out temperature display, and for driving LCD MODULE 16, liquid crystal back light circuit 18 mentions liquid crystal display drive circuit 17 For backlight illumination.
Furthermore it is possible to adaptable programming program is carried out to main control chip, if current temperature value is lower than first threshold, Air-conditioning is automatically turned on, and is warm wind mode, if Current Temperatures are higher than second threshold, automatically turns on air-conditioning, and be cold wind mould Formula, this embodiment is not repeated.
On the basis of the above embodiments, preferably embodiment, further includes connecting with main control chip 12, for adjusting Try the debug circuit 19 of 12 running parameter of main control chip.
In specific implementation, the effect of debug circuit 19 is to carry out debugging process, debug circuit and master to main control chip 12 Control the debugging pin connection of chip 12.Debug circuit 19 can be chosen according to the specific form of main control chip 12, and the present embodiment is not It repeats again.
On the basis of the above embodiments, preferably embodiment, further includes the wiring board connecting with electrical equipment 20, wiring board 20 has wireless communication module, wirelessly communicates and connects with main control chip 12, for the control according to main control chip 12 It is switched on or switched off the connection of electrical equipment and power supply.
In specific implementation, wireless communication module is provided in wiring board 20, it is to be understood that have in wiring board 20 Adaptable control circuit, in the connection signal for receiving wireless communication module, control wiring board 20 connect electrical equipment and The connection of power supply, in the connection signal for not receiving wireless communication module, control wiring board 20 disconnects electrical equipment and power supply Connection.It can be seen that can remotely control being switched on or switched off for wiring board 20 in the present embodiment, can be convenient control electricity consumption The connection of equipment and power supply not only reduces power consumption, but also safer.
On the basis of the above embodiments, preferably embodiment further includes and electrical equipment operation module 11 connects The boom unit connect, when electrical equipment operation module 11 is triggered, buzzing is prompted.
It is understood that boom unit can increase the input induction experience of user, as using what type of bee Ring device can select according to the actual situation, and this embodiment is not limited.
On the basis of the above embodiments, preferably embodiment, electrical equipment operation module 11 are key or people Body induction module.
Electrical equipment operation module 11 is not easy to cause maloperation using key form, but user is needed directly to contact, And press, human body sensing form easily causes maloperation, but it is more convenient to operate.
Intelligent switch provided by the present invention is described in detail above.Each embodiment is using progressive in specification Mode describe, each embodiment focuses on the differences from other embodiments, identical between each embodiment Similar portion may refer to each other.For the device disclosed in the embodiment, since it is corresponded to the methods disclosed in the examples, So being described relatively simple, reference may be made to the description of the method.It should be pointed out that for the common of the art , without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention for technical staff, these Improvement and modification are also fallen within the protection scope of the claims of the present invention.

Claims (7)

1. a kind of intelligent switch characterized by comprising operation panel includes that at least two electricity consumptions are set on the operation panel Standby operation module, for controlling different types of electrical equipment;
The main control chip being connect with the electrical equipment operation module, for being believed according to the operation of the electrical equipment operation module Breath parses the corresponding target electrical equipment of the operation information, and to described in the transmission of the control equipment of the target electrical equipment Operation information;
The control equipment for determining that target executes movement after receiving the operation information, and controls the target and uses Electric equipment executes the target and executes movement;
It further include being connected with the main control chip, for resetting the reset circuit of the main control chip;
The reset circuit specifically includes second resistance, 3rd resistor, the second capacitor, third capacitor, inductance, and PMOS and second is multiple Bit switch, the first end of the inductance are connect with the positive electricity source pin of the main control chip, and the negative supply of the main control chip draws Foot ground connection, the second end of the inductance and the first end of the third capacitor, the source electrode of the PMOS, second reset switch First end and second capacitor first end connection, the third capacitor second end ground connection, it is described second reset open The second end of pass is connect with the first end of the second resistance, and the first of the second end of the second resistance and the 3rd resistor The grid connection at end, the second end of second capacitor and the PMOS, the second end ground connection of the 3rd resistor are described The drain electrode of PMOS is connect with second source.
2. intelligent switch according to claim 1, which is characterized in that the electrical equipment operation module includes switch module With function point analysis module, correspondingly the operation information includes: out operation information, closes operation information or adjusts operation information.
3. intelligent switch according to claim 1, which is characterized in that the electrical equipment includes air-conditioning and headlamp, then Correspondingly the control equipment is respectively air-conditioner controller and control relay circuit.
4. intelligent switch according to claim 1, which is characterized in that further include that the temperature being connected with the main control chip passes Sensor, the LCD MODULE being connect with the temperature sensor, liquid crystal display drive circuit and liquid crystal back light circuit.
5. intelligent switch according to claim 1, which is characterized in that further include being connected with the main control chip, for adjusting Try the debug circuit of the main control chip running parameter.
6. intelligent switch according to claim 1, which is characterized in that the main control chip passes through with the control equipment The connection of 433MHz wireless communication module.
7. intelligent switch according to claim 6, which is characterized in that further include the plug wire being connect with the electrical equipment Plate, the wiring board have wireless communication module, wirelessly communicate and connect with the main control chip, for according to the main control chip Control be switched on or switched off the connection of the electrical equipment and power supply.
CN201611033334.4A 2016-11-16 2016-11-16 A kind of intelligent switch Active CN106773900B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611033334.4A CN106773900B (en) 2016-11-16 2016-11-16 A kind of intelligent switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611033334.4A CN106773900B (en) 2016-11-16 2016-11-16 A kind of intelligent switch

Publications (2)

Publication Number Publication Date
CN106773900A CN106773900A (en) 2017-05-31
CN106773900B true CN106773900B (en) 2019-04-05

Family

ID=58971761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611033334.4A Active CN106773900B (en) 2016-11-16 2016-11-16 A kind of intelligent switch

Country Status (1)

Country Link
CN (1) CN106773900B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101160010A (en) * 2007-11-12 2008-04-09 南开大学 Adaptive Controller for Luminance of Fluorescent Lamps
CN103048983A (en) * 2013-01-15 2013-04-17 深圳市民益得信息科技有限公司 Hotel guest room intelligent control system
CN204086970U (en) * 2014-09-23 2015-01-07 南京宝昇鸿电子科技有限公司 Based on the cloud controller of Internet of Things
CN104345661A (en) * 2013-08-07 2015-02-11 天津吉鼎万通绿化有限公司 Intelligent household electrical appliance control system based on WIFI (wireless fidelity)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3249449B2 (en) * 1997-10-06 2002-01-21 三洋電機株式会社 Centralized control system for multiple devices

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101160010A (en) * 2007-11-12 2008-04-09 南开大学 Adaptive Controller for Luminance of Fluorescent Lamps
CN103048983A (en) * 2013-01-15 2013-04-17 深圳市民益得信息科技有限公司 Hotel guest room intelligent control system
CN104345661A (en) * 2013-08-07 2015-02-11 天津吉鼎万通绿化有限公司 Intelligent household electrical appliance control system based on WIFI (wireless fidelity)
CN204086970U (en) * 2014-09-23 2015-01-07 南京宝昇鸿电子科技有限公司 Based on the cloud controller of Internet of Things

Also Published As

Publication number Publication date
CN106773900A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN204389961U (en) A kind of integrated monitoring socket and jack system
KR101843820B1 (en) Smart multitap and smart multitap system using thereof
CN108063349A (en) Intelligent socket and intelligent socket control system
CN205717087U (en) A kind of controlled LED string
CN105263233A (en) Intelligent lamplight control system based on WIFI and control method
CN103208709B (en) Wireless intelligent socket
CN109028508A (en) Air-conditioning line control machine power supply communication circuit
CN108011788A (en) A kind of switch display system based on smart home
CN106025726A (en) Smart socket
CN100411075C (en) Multi-functional safe touch power supply switch
CN207867255U (en) A kind of intelligent things home control device of traditional home appliance
CN201557305U (en) Dimming controller based on zigbee technology
CN105576455A (en) Intelligent socket
CN106773900B (en) A kind of intelligent switch
CN108427309A (en) Intelligent home control system
CN219642104U (en) Energy-saving management device for electrical equipment
CN207895305U (en) A kind of intelligent reset switch panel
CN201213177Y (en) Controllable electric power wiring board
CN206118147U (en) Intelligence switch device and intelligent control equipment
CN203242852U (en) Wireless intelligent socket
CN205491377U (en) Intelligence switch subassembly
CN208256081U (en) A kind of control circuit device of Bluetooth switch
CN106681215A (en) Intelligent switching control system
CN207851525U (en) A kind of standard trajectory intelligent domestic system
CN206923100U (en) A kind of LED light supplement lamp remote controllers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant