[go: up one dir, main page]

CN107264765A - Ventilation for cabin room system - Google Patents

Ventilation for cabin room system Download PDF

Info

Publication number
CN107264765A
CN107264765A CN201610212830.XA CN201610212830A CN107264765A CN 107264765 A CN107264765 A CN 107264765A CN 201610212830 A CN201610212830 A CN 201610212830A CN 107264765 A CN107264765 A CN 107264765A
Authority
CN
China
Prior art keywords
ventilation
cabin
explosion
room system
manhole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610212830.XA
Other languages
Chinese (zh)
Inventor
孙卫民
徐跃鹰
张伟
江啸涛
沈荔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Offshore Engineering Project Management Co.,Ltd.
Original Assignee
Shanghai Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shipyard Co Ltd filed Critical Shanghai Shipyard Co Ltd
Priority to CN201610212830.XA priority Critical patent/CN107264765A/en
Publication of CN107264765A publication Critical patent/CN107264765A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J2/00Arrangements of ventilation, heating, cooling, or air-conditioning
    • B63J2/02Ventilation; Air-conditioning
    • B63J2/06Ventilation; Air-conditioning of engine rooms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Ventilation (AREA)

Abstract

The invention discloses a kind of ventilation for cabin room system, it includes a cabin, two ventilation ducts and an explosion-proof fan, the explosion-proof fan is arranged at the cabin exterior, there is a cabin manhole in the cabin, two ventilation ducts are embedded at the cabin manhole, and the one end of two ventilation ducts is embedded in the explosion-proof fan, the direction of ventilation of two ventilation ducts is identical and diameter is 120mm.Solve the small problem for placing personnel's turnover difficulty after airduct of cabin manhole so that workmen can be easier to turnover cabin and be safeguarded and be escaped.

Description

Ventilation for cabin room system
Technical field
The present invention relates to a kind of ventilating system, more particularly to a kind of ventilation for cabin room system.
Background technology
Most of modern times ship type is smaller and complicated, for arranging that explosion-proof fan is used to lead in coating process Wind difficulty is larger, the manhole of oil, water tank room manhole (600*400) more common bulk goods and case ship in cabin (800*600) is small, and normal adult human shoulder breadth 360-400mm, such as placed diameter 200mm ventilation The diameter 250mm dehumidifier airducts that pipe and guarantee processing quality requirement need to be placed, meet and are applied after ventilation requirement Workman person can not free in and out cabin manhole, influence safe escape, there is potential safety hazard.
Utility model content
The technical problem to be solved in the present invention is that there is provided a kind of cabin is logical in order to overcome the defect of prior art Wind system.
The present invention is to solve above-mentioned technical problem by following technical proposals:
A kind of ventilation for cabin room system, it includes a cabin, two ventilation ducts and an explosion-proof fan, described anti- Quick-fried blower fan, which is arranged in the cabin exterior, the cabin, has a cabin manhole, two ventilation ducts The cabin manhole is embedded at, and the one end of two ventilation ducts is embedded at the explosion-proof fan In, the direction of ventilation of two ventilation ducts is identical and diameter is 120mm.
It is preferred that the power of the explosion-proof fan is 11KW~18.5KW.
It is preferred that the power of the explosion-proof fan is 18.5KW.
It is preferred that the ventilation for cabin room system also includes a dehumidifier airduct, the dehumidifier airduct is embedded It is embedded with the one end of the cabin manhole, and the dehumidifier airduct in a dehumidifier, the dehumidifying Machine is arranged at the cabin exterior.
It is preferred that a diameter of 250mm of the dehumidifier airduct.
It is preferred that the cross section of the cabin manhole is ellipse, the length of the oval major axis is 600mm, The length of the oval short axle is 400mm.
It is preferred that the length of each ventilation duct is 4m, the other end difference of two ventilation ducts M roots and N root additional vent pipes are arranged or are embedded with, the length of each additional vent pipe is 4m, M and N are the positive integer more than or equal to 1.
It is preferred that M and N are respectively less than or equal to 7.
It is preferred that M is differed with N.
On the basis of common sense in the field is met, above-mentioned each optimum condition can be combined, produce this hair Bright each preferred embodiments.
The positive effect of the present invention is:
By improving airduct bore, configuration standard ventilation equipment of being constructed to cabin, it is ensured that ventilation is effective;Together When to ventilation duct system arrange and arrange carry out standard fixation, solve cabin manhole it is small place airduct descendant The difficult problem of member's turnover so that workmen can be easier to turnover cabin and be safeguarded and be escaped.
Brief description of the drawings
Fig. 1 is cabin manhole structure's schematic diagram of prior art of the present invention.
Fig. 2 is cabin manhole structure's schematic diagram of present pre-ferred embodiments.
Fig. 3 is the cabin structure schematic diagram of present pre-ferred embodiments
Cabin manhole 1
Dehumidifier airduct 2
New explosion venting pipe 3
Cabin 4
The quick-fried ventilation duct 5 in place where troops were originally stationed
Cabin manhole major axis 11
Cabin manhole short axle 12
Dehumidifier dust diameter 21
New explosion venting pipe diameter 31
The quick-fried ventilation pipe diameter 51 in place where troops were originally stationed
Embodiment
The present invention is further illustrated below by the mode of embodiment, but is not therefore limited the present invention to Among described scope of embodiments.
As shown in figure 1, in ventilation for cabin room system of the prior art, the quick-fried ventilation duct 5 in a place where troops were originally stationed and remove Wet machine airduct 2 is by cabin manhole 1, and the diameter 51 of the quick-fried ventilation duct 5 in place where troops were originally stationed is 200mm;Such as Fig. 2 institutes Show, in the ventilation for cabin room system after improvement, two new explosion venting pipes 3 and dehumidifier airduct 2 pass through cabin Room manhole 1, the diameter 31 of every new explosion venting pipe 3 is 120mm, the diameter 21 of dehumidifier airduct 2 All it is 250mm, as shown in figure 3, explosion-proof fan is all arranged at outside the cabin 4, new explosion venting The one end of pipe 3 is embedded in explosion-proof fan, and the direction of ventilation of two new explosion venting pipes 5 is identical, The cross section of cabin manhole 1 is ellipse, and the length of the oval major axis 11 is 600mm, the ellipse Short axle 12 length be 400mm.
The sectional area of the quick-fried ventilation duct 5 in a piece place where troops were originally stationed and a new explosion venting pipe 3 is calculated as follows: The quick-fried sectional area S1=π r of ventilation duct 5 in place where troops were originally stationed2=π (d/2)2=3.14* (0.2/2)2=0.0314m2, The new sectional area S2=π r of explosion venting pipe 32=π (d/2)2=3.14* (0.12/2)2=0.011304m 2
The new explosion venting pipes 3 of a piece 120mm reduce 64% compared with the quick-fried sectional area of ventilation duct 5 in 200mm places where troops were originally stationed, Take in the case of two new ventilations of explosion venting pipes 3, take sectional area and reduce 28%, i.e., former explosion venting Than two new explosion venting pipe area occupied 0.008792m more than 3 of the occupied area of pipe 52, so, use New explosion venting pipe 3, which is aerated, may be such that workmen can be easier to access manhole.
It is guarantee cabin after ventilation to ensure closed in space's large area painting operation ventilation principles and requirements Oxygen content control is within 18%--21% and spray painting is until the quality requirement dried.To ensure ventilation not It is impacted, 7.5KM, former explosion-proof fan and new explosion-proof fan parameter pair are lifted on the quick-fried power of fan in place where troops were originally stationed Such as table 1:
Table 1
The quick-fried ventilation duct 5 in place where troops were originally stationed and the new parameter comparison of explosion venting pipe 3 such as table 2:
Table 2
Sequence Parameter The quick-fried ventilation duct in place where troops were originally stationed New explosion venting pipe Remarks
1 Diameter 200mm 120mm Diameter reduces 40%
2 Length 4m 4m Length is identical
Experiment is carried out by using the ventilation of the former explosion-proof fan in Tables 1 and 2 and new explosion-proof fan to draw Data such as table 3:
Table 3
Wind Coverage Calculation formula in table 3:S*V=π r2*V
When new explosion-proof fan is placed on the first deck, the new access of explosion venting pipe 3 ventilation for cabin room is taken, The one end of two ventilation ducts is embedded in new explosion-proof fan, and the other end is arranged or be embedded respectively additional Ventilation duct, the length of additional vent pipe is 4m, the length up to 32m of new explosion venting pipe 3, altogether 8 ventilation ducts, which can just be connected to two new explosion venting pipes 3 in cabin bottom, new explosion-proof fan, to be grown Degree is different, so can reach cabin bottom, another new explosion venting pipe with a new explosion venting pipe 3 3 reach cabin stage casing, can be controlled with the oxygen content for ensureing cabin after significantly more efficient ventilation in 18%--21% Effect.
As shown in Figure 1, Figure 2 and Figure 3, the oxygen content for guarantee cabin is controlled within 18%--21% With paint dry mass technological requirement, in addition it is also necessary to increase by a dehumidifier, dehumidifier is arranged at outside cabin 4, The one end of dehumidifier airduct 2 is embedded in dehumidifier, and dehumidifier airduct 2 is embedded at cabin manhole 1, The diameter 21 of dehumidifier airduct 2 is 250mm.
To choose 12000HP ship type forepeaks 315.4m3It is ventilation object (foundation company SHS/AQ-16-66A/0《The Security Administration of ventilation equipment》6.4.2 closed in space's large area application Operation ventilation principles and requirements:From spray painting during drying, ventilation rate should be maintained at 5 times/H More than.):
Forepeak needs ventilation:Q=5*V=5*315.4=1577M3/ H,
Experiment calculation air quantity is carried out by the ventilation of the Central Plains explosion-proof fan of table 3 and new explosion-proof fan as follows:
(1) (blower fan is placed on first to the new explosion-proof fan cooperation quick-fried ventilation ducts 5 in 200mm places where troops were originally stationed of 18.5KW Deck, 8 ventilation ducts are connected to cabin bottom)
Ventilation:Q=0.12* π * 3600*13.59=0.01*3.14*3600*13.59 ≈ 1536M3/ H (takes Integer before decimal point)
(2) (blower fan is placed on the first first to the former explosion-proof fan cooperation quick-fried ventilation ducts 5 in 200mm places where troops were originally stationed of 11KW Plate, 8 airducts are connected to cabin bottom)
Q=0.12* π * 3600*7.9=0.01*3.14*3600*7.9 ≈ 893M3/ H (takes whole before decimal point Number)
(3) (blower fan is placed on first to the new explosion venting pipes 3 of the new explosion-proof fan cooperation 120mm of 18.5KW Deck, takes the two new access of explosion venting pipe 3 ventilation for cabin room, and 8 ventilation ducts are connected to cabin bottom, 7 Root ventilation duct is connected to cabin stage casing)
8 ventilation duct air quantity:Q1=0.062*π*3600*18.6≈757M3/ H (takes whole before decimal point Number)
7 ventilation duct air quantity:Q2=0.062*π*3600*19.8≈806M3/ H (takes whole before decimal point Number)
Q1+Q2=1563M3/H
(4) (blower fan is placed on the first first to the new explosion venting pipes 3 of the former explosion-proof fan cooperation 120mm of 11KW Plate, takes the two new access of explosion venting pipe 3 ventilation for cabin room, and 8 airducts are connected to cabin bottom, 7 Airduct is connected to cabin stage casing)
8 airduct air quantity:Q1=0.062*π*3600*11.1≈452M3/ H (takes integer before decimal point)
7 airduct air quantity:Q2=0.062*π*3600*12.8≈521M3/ H (takes integer before decimal point)
Q1+Q2=973M3/H
Pass through the ventilation data such as table 4 below of former explosion-proof fan and new explosion-proof fan:
Table 4
Data in table 4 can be drawn:
New explosion-proof fan, in the new explosion-proof fans of cooperation 18.5KW, is led to using two new explosion venting pipes 3 Air quantity is compared with the quick-fried ventilation duct 5 big 1.76% in a place where troops were originally stationed, along with coordinating dehumidifier air duct blow, with except Wet fan delivery is 3000M3/ H, can meet forepeak ventilation requirement;Two new explosion venting pipes 3 with When closing 11KW original explosion-proof fans, ventilation can not expire compared with the quick-fried ventilation duct 5 big 8.96% in a place where troops were originally stationed Sufficient forepeak ventilation requirement, to meet ventilation for cabin room from spray painting during drying, ventilation rate should 5 times/more than H is maintained at, by determining to can be used for 190m after calculating3Following ventilation for cabin room.
According to different zones not co-content cabin select ventilation form such as table 5:
Table 5
Although the foregoing describing the embodiment of the present invention, those skilled in the art should manage Solution, this is merely illustrative of, and protection scope of the present invention is defined by the appended claims.Ability The technical staff in domain, can be to these embodiments on the premise of the principle and essence without departing substantially from the present invention Various changes or modifications are made, but these changes and modification each fall within protection scope of the present invention.

Claims (9)

1. a kind of ventilation for cabin room system, it is characterised in that it includes a cabin, two ventilation ducts and one Explosion-proof fan, the explosion-proof fan, which is arranged in the cabin exterior, the cabin, has a cabin manhole, Two ventilation ducts are embedded at the cabin manhole, and the one end of two ventilation ducts is embedded In the explosion-proof fan, the direction of ventilation of two ventilation ducts is identical and diameter is 120mm.
2. ventilation for cabin room system as claimed in claim 1, it is characterised in that the explosion-proof fan Power is 11KW~18.5KW.
3. ventilation for cabin room system as claimed in claim 2, it is characterised in that the explosion-proof fan Power is 18.5KW.
4. ventilation for cabin room system as claimed in claim 1, it is characterised in that the ventilation for cabin room system System also includes a dehumidifier airduct, and the dehumidifier airduct is embedded at the cabin manhole, and the dehumidifying The one end of machine airduct is embedded with a dehumidifier, and the dehumidifier is arranged at the cabin exterior.
5. ventilation for cabin room system as claimed in claim 4, it is characterised in that the dehumidifier airduct A diameter of 250mm.
6. ventilation for cabin room system as claimed in claim 1, it is characterised in that the cabin manhole Cross section is ellipse, and the length of the oval major axis is 600mm, and the length of the oval short axle is 400mm。
7. ventilation for cabin room system as claimed in claim 1, it is characterised in that each ventilation duct Length be 4m, the other end of two ventilation ducts is arranged or is embedded with respectively M roots and N roots are additional Ventilation duct, the length of each additional vent pipe is that 4m, M and N are more than or equal to 1 just Integer.
8. ventilation for cabin room system as claimed in claim 7, it is characterised in that M and N are respectively less than or waited In 7.
9. ventilation for cabin room system as claimed in claim 7, it is characterised in that M is differed with N.
CN201610212830.XA 2016-04-07 2016-04-07 Ventilation for cabin room system Pending CN107264765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610212830.XA CN107264765A (en) 2016-04-07 2016-04-07 Ventilation for cabin room system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610212830.XA CN107264765A (en) 2016-04-07 2016-04-07 Ventilation for cabin room system

Publications (1)

Publication Number Publication Date
CN107264765A true CN107264765A (en) 2017-10-20

Family

ID=60052311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610212830.XA Pending CN107264765A (en) 2016-04-07 2016-04-07 Ventilation for cabin room system

Country Status (1)

Country Link
CN (1) CN107264765A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4794956A (en) * 1987-07-10 1989-01-03 Saddle Vent Inc. Air conduit for manhole
JP2000104966A (en) * 1998-09-29 2000-04-11 Yoshida Komuten:Kk Air supply/exhaust unit for manhole
CN1813137A (en) * 2003-06-25 2006-08-02 通风系统公司 Electrically conductive confined space ventilator conduit
CN201280949Y (en) * 2008-12-26 2009-07-29 杭州萧宏建设集团有限公司 Downhole safety rescue ventilating duct
JP3165459U (en) * 2010-11-04 2011-01-20 株式会社竹村製作所 Blower
CN202810912U (en) * 2012-08-27 2013-03-20 沈福昌 Coal mine safe escape device
CN203476382U (en) * 2013-08-16 2014-03-12 煤炭工业合肥设计研究院 Emergency escape and rescue system used for underground mine engineering
CN204436456U (en) * 2015-02-02 2015-07-01 福建高新源工程科技有限公司 Safe escape channel
CN205469753U (en) * 2016-04-07 2016-08-17 上海船厂船舶有限公司 Cabin ventilation system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4794956A (en) * 1987-07-10 1989-01-03 Saddle Vent Inc. Air conduit for manhole
JP2000104966A (en) * 1998-09-29 2000-04-11 Yoshida Komuten:Kk Air supply/exhaust unit for manhole
CN1813137A (en) * 2003-06-25 2006-08-02 通风系统公司 Electrically conductive confined space ventilator conduit
CN201280949Y (en) * 2008-12-26 2009-07-29 杭州萧宏建设集团有限公司 Downhole safety rescue ventilating duct
JP3165459U (en) * 2010-11-04 2011-01-20 株式会社竹村製作所 Blower
CN202810912U (en) * 2012-08-27 2013-03-20 沈福昌 Coal mine safe escape device
CN203476382U (en) * 2013-08-16 2014-03-12 煤炭工业合肥设计研究院 Emergency escape and rescue system used for underground mine engineering
CN204436456U (en) * 2015-02-02 2015-07-01 福建高新源工程科技有限公司 Safe escape channel
CN205469753U (en) * 2016-04-07 2016-08-17 上海船厂船舶有限公司 Cabin ventilation system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王金鑫等, 哈尔滨工程大学出版社 *

Similar Documents

Publication Publication Date Title
CN105311911B (en) Vent cabinet filter is used in one kind experiment
CN206357673U (en) A kind of corona treatment ozone collects tapping equipment
CN206837766U (en) A kind of dust arrester being used in 3D printer
CN105986833A (en) Inclined shaft auxiliary type tunnel ventilation system with partition plates
CN205240325U (en) Portable medical kit of wet function of band elimination
CN205995902U (en) A kind of dedusting ventilating system
CN205469753U (en) Cabin ventilation system
CN206847351U (en) A kind of vacuum solidification stove
CN107264765A (en) Ventilation for cabin room system
CN202316914U (en) Sand floating machine
CN207222531U (en) A kind of ventilation hoods for laboratories
CN206387844U (en) A kind of ammeter box dry heat loss structure
CN206572697U (en) Paper machine room with air draft dehumidification equipment
CN204612427U (en) Environment protection-type film drying unit
CN206205412U (en) The anti-object strike outer construction operation platform of building of industrialization assembled engineering
CN108954648A (en) A kind of interlayer wind pushing air circulatory system
CN107327985A (en) A kind of air fast purification system for being applicable radioactivity computer room
CN208242572U (en) Novel ventilated henhouse
CN207476096U (en) Antirust ventilating mechanisms
CN207154365U (en) A kind of compensating ventilation cabinet laboratory hood
CN205128574U (en) Deflector of ventilation hood
CN206875595U (en) A kind of jet induces ceiling suspended type dehumidifier
CN204880572U (en) Printing workshop environment control system
CN207451383U (en) It is a kind of to keep the elevator that there was dampness in the air
CN209662943U (en) High humidity waste gas condensation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220106

Address after: 202156 room 421, floor 4, building 1, No. 955, Gaoxiang Road, Pudong New Area, Shanghai

Applicant after: Shanghai Waigaoqiao Shipbuilding Offshore Engineering Project Management Co.,Ltd.

Address before: No.1 Jimo Road, Pudong New Area, Shanghai 202164

Applicant before: SHANGHAI SHIPYARD Co.,Ltd.

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171020

WD01 Invention patent application deemed withdrawn after publication