CN107264765A - Ventilation for cabin room system - Google Patents
Ventilation for cabin room system Download PDFInfo
- Publication number
- CN107264765A CN107264765A CN201610212830.XA CN201610212830A CN107264765A CN 107264765 A CN107264765 A CN 107264765A CN 201610212830 A CN201610212830 A CN 201610212830A CN 107264765 A CN107264765 A CN 107264765A
- Authority
- CN
- China
- Prior art keywords
- ventilation
- cabin
- explosion
- room system
- manhole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009423 ventilation Methods 0.000 title claims abstract description 89
- 230000007306 turnover Effects 0.000 abstract description 4
- 238000004880 explosion Methods 0.000 description 26
- 238000013022 venting Methods 0.000 description 26
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 3
- 108010066278 cabin-4 Proteins 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 229910052760 oxygen Inorganic materials 0.000 description 3
- 239000001301 oxygen Substances 0.000 description 3
- 238000007592 spray painting technique Methods 0.000 description 3
- 238000001035 drying Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000000576 coating method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63J—AUXILIARIES ON VESSELS
- B63J2/00—Arrangements of ventilation, heating, cooling, or air-conditioning
- B63J2/02—Ventilation; Air-conditioning
- B63J2/06—Ventilation; Air-conditioning of engine rooms
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Ventilation (AREA)
Abstract
The invention discloses a kind of ventilation for cabin room system, it includes a cabin, two ventilation ducts and an explosion-proof fan, the explosion-proof fan is arranged at the cabin exterior, there is a cabin manhole in the cabin, two ventilation ducts are embedded at the cabin manhole, and the one end of two ventilation ducts is embedded in the explosion-proof fan, the direction of ventilation of two ventilation ducts is identical and diameter is 120mm.Solve the small problem for placing personnel's turnover difficulty after airduct of cabin manhole so that workmen can be easier to turnover cabin and be safeguarded and be escaped.
Description
Technical field
The present invention relates to a kind of ventilating system, more particularly to a kind of ventilation for cabin room system.
Background technology
Most of modern times ship type is smaller and complicated, for arranging that explosion-proof fan is used to lead in coating process
Wind difficulty is larger, the manhole of oil, water tank room manhole (600*400) more common bulk goods and case ship in cabin
(800*600) is small, and normal adult human shoulder breadth 360-400mm, such as placed diameter 200mm ventilation
The diameter 250mm dehumidifier airducts that pipe and guarantee processing quality requirement need to be placed, meet and are applied after ventilation requirement
Workman person can not free in and out cabin manhole, influence safe escape, there is potential safety hazard.
Utility model content
The technical problem to be solved in the present invention is that there is provided a kind of cabin is logical in order to overcome the defect of prior art
Wind system.
The present invention is to solve above-mentioned technical problem by following technical proposals:
A kind of ventilation for cabin room system, it includes a cabin, two ventilation ducts and an explosion-proof fan, described anti-
Quick-fried blower fan, which is arranged in the cabin exterior, the cabin, has a cabin manhole, two ventilation ducts
The cabin manhole is embedded at, and the one end of two ventilation ducts is embedded at the explosion-proof fan
In, the direction of ventilation of two ventilation ducts is identical and diameter is 120mm.
It is preferred that the power of the explosion-proof fan is 11KW~18.5KW.
It is preferred that the power of the explosion-proof fan is 18.5KW.
It is preferred that the ventilation for cabin room system also includes a dehumidifier airduct, the dehumidifier airduct is embedded
It is embedded with the one end of the cabin manhole, and the dehumidifier airduct in a dehumidifier, the dehumidifying
Machine is arranged at the cabin exterior.
It is preferred that a diameter of 250mm of the dehumidifier airduct.
It is preferred that the cross section of the cabin manhole is ellipse, the length of the oval major axis is 600mm,
The length of the oval short axle is 400mm.
It is preferred that the length of each ventilation duct is 4m, the other end difference of two ventilation ducts
M roots and N root additional vent pipes are arranged or are embedded with, the length of each additional vent pipe is 4m,
M and N are the positive integer more than or equal to 1.
It is preferred that M and N are respectively less than or equal to 7.
It is preferred that M is differed with N.
On the basis of common sense in the field is met, above-mentioned each optimum condition can be combined, produce this hair
Bright each preferred embodiments.
The positive effect of the present invention is:
By improving airduct bore, configuration standard ventilation equipment of being constructed to cabin, it is ensured that ventilation is effective;Together
When to ventilation duct system arrange and arrange carry out standard fixation, solve cabin manhole it is small place airduct descendant
The difficult problem of member's turnover so that workmen can be easier to turnover cabin and be safeguarded and be escaped.
Brief description of the drawings
Fig. 1 is cabin manhole structure's schematic diagram of prior art of the present invention.
Fig. 2 is cabin manhole structure's schematic diagram of present pre-ferred embodiments.
Fig. 3 is the cabin structure schematic diagram of present pre-ferred embodiments
Cabin manhole 1
Dehumidifier airduct 2
New explosion venting pipe 3
Cabin 4
The quick-fried ventilation duct 5 in place where troops were originally stationed
Cabin manhole major axis 11
Cabin manhole short axle 12
Dehumidifier dust diameter 21
New explosion venting pipe diameter 31
The quick-fried ventilation pipe diameter 51 in place where troops were originally stationed
Embodiment
The present invention is further illustrated below by the mode of embodiment, but is not therefore limited the present invention to
Among described scope of embodiments.
As shown in figure 1, in ventilation for cabin room system of the prior art, the quick-fried ventilation duct 5 in a place where troops were originally stationed and remove
Wet machine airduct 2 is by cabin manhole 1, and the diameter 51 of the quick-fried ventilation duct 5 in place where troops were originally stationed is 200mm;Such as Fig. 2 institutes
Show, in the ventilation for cabin room system after improvement, two new explosion venting pipes 3 and dehumidifier airduct 2 pass through cabin
Room manhole 1, the diameter 31 of every new explosion venting pipe 3 is 120mm, the diameter 21 of dehumidifier airduct 2
All it is 250mm, as shown in figure 3, explosion-proof fan is all arranged at outside the cabin 4, new explosion venting
The one end of pipe 3 is embedded in explosion-proof fan, and the direction of ventilation of two new explosion venting pipes 5 is identical,
The cross section of cabin manhole 1 is ellipse, and the length of the oval major axis 11 is 600mm, the ellipse
Short axle 12 length be 400mm.
The sectional area of the quick-fried ventilation duct 5 in a piece place where troops were originally stationed and a new explosion venting pipe 3 is calculated as follows:
The quick-fried sectional area S1=π r of ventilation duct 5 in place where troops were originally stationed2=π (d/2)2=3.14* (0.2/2)2=0.0314m2,
The new sectional area S2=π r of explosion venting pipe 32=π (d/2)2=3.14* (0.12/2)2=0.011304m
2
The new explosion venting pipes 3 of a piece 120mm reduce 64% compared with the quick-fried sectional area of ventilation duct 5 in 200mm places where troops were originally stationed,
Take in the case of two new ventilations of explosion venting pipes 3, take sectional area and reduce 28%, i.e., former explosion venting
Than two new explosion venting pipe area occupied 0.008792m more than 3 of the occupied area of pipe 52, so, use
New explosion venting pipe 3, which is aerated, may be such that workmen can be easier to access manhole.
It is guarantee cabin after ventilation to ensure closed in space's large area painting operation ventilation principles and requirements
Oxygen content control is within 18%--21% and spray painting is until the quality requirement dried.To ensure ventilation not
It is impacted, 7.5KM, former explosion-proof fan and new explosion-proof fan parameter pair are lifted on the quick-fried power of fan in place where troops were originally stationed
Such as table 1:
Table 1
The quick-fried ventilation duct 5 in place where troops were originally stationed and the new parameter comparison of explosion venting pipe 3 such as table 2:
Table 2
| Sequence | Parameter | The quick-fried ventilation duct in place where troops were originally stationed | New explosion venting pipe | Remarks |
| 1 | Diameter | 200mm | 120mm | Diameter reduces 40% |
| 2 | Length | 4m | 4m | Length is identical |
Experiment is carried out by using the ventilation of the former explosion-proof fan in Tables 1 and 2 and new explosion-proof fan to draw
Data such as table 3:
Table 3
Wind Coverage Calculation formula in table 3:S*V=π r2*V
When new explosion-proof fan is placed on the first deck, the new access of explosion venting pipe 3 ventilation for cabin room is taken,
The one end of two ventilation ducts is embedded in new explosion-proof fan, and the other end is arranged or be embedded respectively additional
Ventilation duct, the length of additional vent pipe is 4m, the length up to 32m of new explosion venting pipe 3, altogether
8 ventilation ducts, which can just be connected to two new explosion venting pipes 3 in cabin bottom, new explosion-proof fan, to be grown
Degree is different, so can reach cabin bottom, another new explosion venting pipe with a new explosion venting pipe 3
3 reach cabin stage casing, can be controlled with the oxygen content for ensureing cabin after significantly more efficient ventilation in 18%--21%
Effect.
As shown in Figure 1, Figure 2 and Figure 3, the oxygen content for guarantee cabin is controlled within 18%--21%
With paint dry mass technological requirement, in addition it is also necessary to increase by a dehumidifier, dehumidifier is arranged at outside cabin 4,
The one end of dehumidifier airduct 2 is embedded in dehumidifier, and dehumidifier airduct 2 is embedded at cabin manhole 1,
The diameter 21 of dehumidifier airduct 2 is 250mm.
To choose 12000HP ship type forepeaks 315.4m3It is ventilation object (foundation company
SHS/AQ-16-66A/0《The Security Administration of ventilation equipment》6.4.2 closed in space's large area application
Operation ventilation principles and requirements:From spray painting during drying, ventilation rate should be maintained at 5 times/H
More than.):
Forepeak needs ventilation:Q=5*V=5*315.4=1577M3/ H,
Experiment calculation air quantity is carried out by the ventilation of the Central Plains explosion-proof fan of table 3 and new explosion-proof fan as follows:
(1) (blower fan is placed on first to the new explosion-proof fan cooperation quick-fried ventilation ducts 5 in 200mm places where troops were originally stationed of 18.5KW
Deck, 8 ventilation ducts are connected to cabin bottom)
Ventilation:Q=0.12* π * 3600*13.59=0.01*3.14*3600*13.59 ≈ 1536M3/ H (takes
Integer before decimal point)
(2) (blower fan is placed on the first first to the former explosion-proof fan cooperation quick-fried ventilation ducts 5 in 200mm places where troops were originally stationed of 11KW
Plate, 8 airducts are connected to cabin bottom)
Q=0.12* π * 3600*7.9=0.01*3.14*3600*7.9 ≈ 893M3/ H (takes whole before decimal point
Number)
(3) (blower fan is placed on first to the new explosion venting pipes 3 of the new explosion-proof fan cooperation 120mm of 18.5KW
Deck, takes the two new access of explosion venting pipe 3 ventilation for cabin room, and 8 ventilation ducts are connected to cabin bottom, 7
Root ventilation duct is connected to cabin stage casing)
8 ventilation duct air quantity:Q1=0.062*π*3600*18.6≈757M3/ H (takes whole before decimal point
Number)
7 ventilation duct air quantity:Q2=0.062*π*3600*19.8≈806M3/ H (takes whole before decimal point
Number)
Q1+Q2=1563M3/H
(4) (blower fan is placed on the first first to the new explosion venting pipes 3 of the former explosion-proof fan cooperation 120mm of 11KW
Plate, takes the two new access of explosion venting pipe 3 ventilation for cabin room, and 8 airducts are connected to cabin bottom, 7
Airduct is connected to cabin stage casing)
8 airduct air quantity:Q1=0.062*π*3600*11.1≈452M3/ H (takes integer before decimal point)
7 airduct air quantity:Q2=0.062*π*3600*12.8≈521M3/ H (takes integer before decimal point)
Q1+Q2=973M3/H
Pass through the ventilation data such as table 4 below of former explosion-proof fan and new explosion-proof fan:
Table 4
Data in table 4 can be drawn:
New explosion-proof fan, in the new explosion-proof fans of cooperation 18.5KW, is led to using two new explosion venting pipes 3
Air quantity is compared with the quick-fried ventilation duct 5 big 1.76% in a place where troops were originally stationed, along with coordinating dehumidifier air duct blow, with except
Wet fan delivery is 3000M3/ H, can meet forepeak ventilation requirement;Two new explosion venting pipes 3 with
When closing 11KW original explosion-proof fans, ventilation can not expire compared with the quick-fried ventilation duct 5 big 8.96% in a place where troops were originally stationed
Sufficient forepeak ventilation requirement, to meet ventilation for cabin room from spray painting during drying, ventilation rate should
5 times/more than H is maintained at, by determining to can be used for 190m after calculating3Following ventilation for cabin room.
According to different zones not co-content cabin select ventilation form such as table 5:
Table 5
Although the foregoing describing the embodiment of the present invention, those skilled in the art should manage
Solution, this is merely illustrative of, and protection scope of the present invention is defined by the appended claims.Ability
The technical staff in domain, can be to these embodiments on the premise of the principle and essence without departing substantially from the present invention
Various changes or modifications are made, but these changes and modification each fall within protection scope of the present invention.
Claims (9)
1. a kind of ventilation for cabin room system, it is characterised in that it includes a cabin, two ventilation ducts and one
Explosion-proof fan, the explosion-proof fan, which is arranged in the cabin exterior, the cabin, has a cabin manhole,
Two ventilation ducts are embedded at the cabin manhole, and the one end of two ventilation ducts is embedded
In the explosion-proof fan, the direction of ventilation of two ventilation ducts is identical and diameter is 120mm.
2. ventilation for cabin room system as claimed in claim 1, it is characterised in that the explosion-proof fan
Power is 11KW~18.5KW.
3. ventilation for cabin room system as claimed in claim 2, it is characterised in that the explosion-proof fan
Power is 18.5KW.
4. ventilation for cabin room system as claimed in claim 1, it is characterised in that the ventilation for cabin room system
System also includes a dehumidifier airduct, and the dehumidifier airduct is embedded at the cabin manhole, and the dehumidifying
The one end of machine airduct is embedded with a dehumidifier, and the dehumidifier is arranged at the cabin exterior.
5. ventilation for cabin room system as claimed in claim 4, it is characterised in that the dehumidifier airduct
A diameter of 250mm.
6. ventilation for cabin room system as claimed in claim 1, it is characterised in that the cabin manhole
Cross section is ellipse, and the length of the oval major axis is 600mm, and the length of the oval short axle is
400mm。
7. ventilation for cabin room system as claimed in claim 1, it is characterised in that each ventilation duct
Length be 4m, the other end of two ventilation ducts is arranged or is embedded with respectively M roots and N roots are additional
Ventilation duct, the length of each additional vent pipe is that 4m, M and N are more than or equal to 1 just
Integer.
8. ventilation for cabin room system as claimed in claim 7, it is characterised in that M and N are respectively less than or waited
In 7.
9. ventilation for cabin room system as claimed in claim 7, it is characterised in that M is differed with N.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610212830.XA CN107264765A (en) | 2016-04-07 | 2016-04-07 | Ventilation for cabin room system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610212830.XA CN107264765A (en) | 2016-04-07 | 2016-04-07 | Ventilation for cabin room system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107264765A true CN107264765A (en) | 2017-10-20 |
Family
ID=60052311
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610212830.XA Pending CN107264765A (en) | 2016-04-07 | 2016-04-07 | Ventilation for cabin room system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107264765A (en) |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4794956A (en) * | 1987-07-10 | 1989-01-03 | Saddle Vent Inc. | Air conduit for manhole |
| JP2000104966A (en) * | 1998-09-29 | 2000-04-11 | Yoshida Komuten:Kk | Air supply/exhaust unit for manhole |
| CN1813137A (en) * | 2003-06-25 | 2006-08-02 | 通风系统公司 | Electrically conductive confined space ventilator conduit |
| CN201280949Y (en) * | 2008-12-26 | 2009-07-29 | 杭州萧宏建设集团有限公司 | Downhole safety rescue ventilating duct |
| JP3165459U (en) * | 2010-11-04 | 2011-01-20 | 株式会社竹村製作所 | Blower |
| CN202810912U (en) * | 2012-08-27 | 2013-03-20 | 沈福昌 | Coal mine safe escape device |
| CN203476382U (en) * | 2013-08-16 | 2014-03-12 | 煤炭工业合肥设计研究院 | Emergency escape and rescue system used for underground mine engineering |
| CN204436456U (en) * | 2015-02-02 | 2015-07-01 | 福建高新源工程科技有限公司 | Safe escape channel |
| CN205469753U (en) * | 2016-04-07 | 2016-08-17 | 上海船厂船舶有限公司 | Cabin ventilation system |
-
2016
- 2016-04-07 CN CN201610212830.XA patent/CN107264765A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4794956A (en) * | 1987-07-10 | 1989-01-03 | Saddle Vent Inc. | Air conduit for manhole |
| JP2000104966A (en) * | 1998-09-29 | 2000-04-11 | Yoshida Komuten:Kk | Air supply/exhaust unit for manhole |
| CN1813137A (en) * | 2003-06-25 | 2006-08-02 | 通风系统公司 | Electrically conductive confined space ventilator conduit |
| CN201280949Y (en) * | 2008-12-26 | 2009-07-29 | 杭州萧宏建设集团有限公司 | Downhole safety rescue ventilating duct |
| JP3165459U (en) * | 2010-11-04 | 2011-01-20 | 株式会社竹村製作所 | Blower |
| CN202810912U (en) * | 2012-08-27 | 2013-03-20 | 沈福昌 | Coal mine safe escape device |
| CN203476382U (en) * | 2013-08-16 | 2014-03-12 | 煤炭工业合肥设计研究院 | Emergency escape and rescue system used for underground mine engineering |
| CN204436456U (en) * | 2015-02-02 | 2015-07-01 | 福建高新源工程科技有限公司 | Safe escape channel |
| CN205469753U (en) * | 2016-04-07 | 2016-08-17 | 上海船厂船舶有限公司 | Cabin ventilation system |
Non-Patent Citations (1)
| Title |
|---|
| 王金鑫等, 哈尔滨工程大学出版社 * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105311911B (en) | Vent cabinet filter is used in one kind experiment | |
| CN206357673U (en) | A kind of corona treatment ozone collects tapping equipment | |
| CN206837766U (en) | A kind of dust arrester being used in 3D printer | |
| CN105986833A (en) | Inclined shaft auxiliary type tunnel ventilation system with partition plates | |
| CN205240325U (en) | Portable medical kit of wet function of band elimination | |
| CN205995902U (en) | A kind of dedusting ventilating system | |
| CN205469753U (en) | Cabin ventilation system | |
| CN206847351U (en) | A kind of vacuum solidification stove | |
| CN107264765A (en) | Ventilation for cabin room system | |
| CN202316914U (en) | Sand floating machine | |
| CN207222531U (en) | A kind of ventilation hoods for laboratories | |
| CN206387844U (en) | A kind of ammeter box dry heat loss structure | |
| CN206572697U (en) | Paper machine room with air draft dehumidification equipment | |
| CN204612427U (en) | Environment protection-type film drying unit | |
| CN206205412U (en) | The anti-object strike outer construction operation platform of building of industrialization assembled engineering | |
| CN108954648A (en) | A kind of interlayer wind pushing air circulatory system | |
| CN107327985A (en) | A kind of air fast purification system for being applicable radioactivity computer room | |
| CN208242572U (en) | Novel ventilated henhouse | |
| CN207476096U (en) | Antirust ventilating mechanisms | |
| CN207154365U (en) | A kind of compensating ventilation cabinet laboratory hood | |
| CN205128574U (en) | Deflector of ventilation hood | |
| CN206875595U (en) | A kind of jet induces ceiling suspended type dehumidifier | |
| CN204880572U (en) | Printing workshop environment control system | |
| CN207451383U (en) | It is a kind of to keep the elevator that there was dampness in the air | |
| CN209662943U (en) | High humidity waste gas condensation structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20220106 Address after: 202156 room 421, floor 4, building 1, No. 955, Gaoxiang Road, Pudong New Area, Shanghai Applicant after: Shanghai Waigaoqiao Shipbuilding Offshore Engineering Project Management Co.,Ltd. Address before: No.1 Jimo Road, Pudong New Area, Shanghai 202164 Applicant before: SHANGHAI SHIPYARD Co.,Ltd. |
|
| TA01 | Transfer of patent application right | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171020 |
|
| WD01 | Invention patent application deemed withdrawn after publication |