CN108265743A - A kind of positioning device and its construction method in wind driven generator base prestress anchorage cable duct - Google Patents

A kind of positioning device and its construction method in wind driven generator base prestress anchorage cable duct Download PDF

Info

Publication number
CN108265743A
CN108265743A CN201810195127.1A CN201810195127A CN108265743A CN 108265743 A CN108265743 A CN 108265743A CN 201810195127 A CN201810195127 A CN 201810195127A CN 108265743 A CN108265743 A CN 108265743A
Authority
CN
China
Prior art keywords
plate
positioning
arm
disk
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810195127.1A
Other languages
Chinese (zh)
Other versions
CN108265743B (en
Inventor
徐惠
方卫星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810195127.1A priority Critical patent/CN108265743B/en
Publication of CN108265743A publication Critical patent/CN108265743A/en
Application granted granted Critical
Publication of CN108265743B publication Critical patent/CN108265743B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

The present invention is a kind of positioning device and its construction method in wind driven generator base prestress anchorage cable duct, belong to wind-driven generator construction auxiliary device and its construction method, it is characterized in that the positioning device in the anchor cable duct further includes location structure, support construction, ring moulds plate, bottom plate and duct pipe, the location structure includes positioning disk, it is interior, outer baffle, location hole and positioning seat, location hole is opened up on positioning disk, be welded guide pile on base disk, by cross-arm, vertical load, vertical brace, diagonal brace and bottom bracing group are welded into support construction, it will be horizontal, vertical load is placed on the upper of ring moulds plate, positioning disk is placed on horizontal stroke, in vertical load, each base disk is placed in bottom plate, the providing holes deferent between each guide pile and each location hole, a kind of construction method in anchor cable duct, its construction procedure is:One), preparation of construction, two), mounting ring template, three), installation positioning disk, four), installation support construction, five), installation guide pile, duct pipe;It is rational in infrastructure, improve construction precision and quality.

Description

A kind of positioning device in wind driven generator base prestress anchorage cable duct and its construction Method
Technical field
The invention belongs to wind-driven generator construction auxiliary device and its construction method, more particularly, to a kind of wind-driven generator base The positioning device and its construction method of plinth prestress anchorage cable.
Background technology
Prestress anchorage cable wind driven generator base (hereinafter referred to as blower foundation) is a kind of novel blower foundation, using pre- Stress anchor cable links into an integrated entity cast-in-place blower foundation and prefabricated concrete bottom section pylon, then carries out tensioning and fixes, in advance Stress anchor cable is reeved form after being, i.e., after the concrete casting complete of blower foundation, several anchor cables are passed through on blower foundation The prestress anchorage cable duct reserved on reserved prestress anchorage cable duct and prefabricated concrete bottom section pylon, after gradation tensioning An entirety is formed, therefore, when blower foundation is constructed, the verticality in prestress anchorage cable duct, the precision of spacing are directly related to Whether can smoothly reeve and the installation accuracy of blower foundation and top precast concrete tower, because this kind of blower foundation form is new Type blower foundation, domestic construction is less at present, through patent consulting, does not find to record the comparison money about the positioning in anchor cable duct Material.
Invention content
Positioning device and its construction the purpose of the present invention is to propose to a kind of wind driven generator base prestress anchorage cable duct Method, it is not only rational in infrastructure, it is safe and reliable, and ensure the spacing and verticality in anchor cable duct, it is reeving and the later stage To anchor cable effective protection, the construction precision and quality in anchor cable duct can be improved during drawing.
The object of the present invention is achieved like this:A kind of positioning device in wind driven generator base prestress anchorage cable duct (positioning device in abbreviation anchor cable duct), the bottom reinforcement bars including blower foundation, it is characterized in that:The positioning device in the anchor cable duct Location structure, support construction, ring moulds plate, bottom plate and duct pipe are further included, wherein:The location structure includes positioning disk, interior Baffle, outer baffle, location hole, partition board and positioning seat, the positioning disk are circular ring shape, and the interior circular diameter of the positioning disk can be 7m, outside diameter can be 8m, and be welded the Internal baffle put on vertically along the inner circle periphery of the positioning disk, along the positioning disk Circumferential periphery be welded it is vertical on the outer baffle put, open up to circumference uniform distribution on the positioning disk between the inside and outside baffle Location hole can open up to circumference uniform distribution 40 location holes on the positioning disk between the inside and outside baffle, the location hole Diameter can be 11cm, be welded respectively on the corresponding position being located between location hole adjacent two-by-two between the inside and outside baffle The partition board of one piece of semicircular arc is filled, and hook on hole is opened up respectively on four pieces of partition boards mutually in 90 ° of angles;
The positioning seat includes base disk and guide pile, and the base disk is circular ring shape steel plate, which can be used Thickness is that the steel plate of 1.50cm is cut, and the interior circular diameter of the base disk can be 9cm, and the outside diameter of the base disk can be 16cm, be welded the guide pile put on vertically along the inner circle periphery of the base disk, and the guide pile is the circle with head cover Pipe, it can be 20cm that the overall diameter of the guide pile, which can be 9cm, length, on the upper surface of the base disk it is corresponding be located at position The peripheral part of stake opens up annular groove, and the overall diameter of the annular groove is more than the overall diameter of duct pipe, and the width of the annular groove can be 0.5cm, depth can be 0.5cm, and the corresponding outside left positioned at annular groove opens up arranged in square on the base disk Four fixed bolt holes;
The support construction includes cross-arm, vertical load, vertical brace, diagonal brace and bottom bracing, wherein:The vertical load be in it is front and rear to The straight-bar of setting, the cross-arm are the straight-bar to setting in left and right, are in crisscross to be welded by the cross-arm and vertical load One, the cross-arm, the vertical equal available slot steel of load are made, and the cross-arm, the vertical length carried on a shoulder pole can be 12m, and the bottom bracing is four Root straight-bar, the bottom bracing make in crisscross arrangement and corresponding up and down with cross-arm, vertical load, the bottom bracing available slot steel and Length into, the bottom bracing can be 5m, by the cross-arm, vertical load upper and bottom bracing lower is arranged, in the cross-arm or vertical The corresponding vertical brace that is welded between the outer end section of load and the outer end section of bottom bracing, described positioned at the cross-arm of the same side or vertical load and bottom bracing Between the corresponding intersection that is welded diagonal brace (totally four groups, every group two of the diagonal brace), the circle of a diameter of 2cm can be used in the vertical brace, diagonal brace Steel is made, the duct pipe for interior diameter be more than guide pile overall diameter pipe, the duct pipe can use overall diameter × Interior diameter × length is that the pvc pipe of 10cm × 9cm × 40cm is made;
The ring moulds plate is the cylindrical tube made with welded steel plate, the diameter of the ring moulds plate, highly according to wind The type of power generator determines that the ring moulds plate available thickness is that the welded steel plate of 2cm forms, the outside diameter of the ring moulds plate Less than or equal to the interior circular diameter of positioning disk, the bottom plate is circular ring shape plate, and the interior circular diameter of the bottom plate is more than or waits In the outside diameter of ring moulds plate, the outside diameter of the bottom plate is identical with the outside diameter of positioning disk, on the bottom plate The corresponding position positioned at inner periphery, excircle opens up mounting hole to circumference uniform distribution respectively, and the floor level is arranged on wind On the centre of machine foundation bottom reinforcing bar, meanwhile, the ring moulds plate is vertically arranged on to the bottom reinforcement bars of blower foundation Go up and correspond in the inner circle positioned at bottom plate, make ring moulds plate center line and bottom plate center line it is corresponding to the same, by the horizontal stroke Load, vertical load are placed on horizontally on the top of ring moulds plate, and the four foundation support is corresponding under cross-arm or vertical load Side be horizontally disposed on the bottom reinforcement bars of blower foundation and with bottom reinforcement bars banding fixed, the positioning disk is placed on horizontal stroke In load, vertical load, and make the center line of the center line and ring moulds plate of the positioning disk corresponding to the same (i.e. with same center Line), each positioning seat is placed at the corresponding excircle position positioned at ring moulds plate in uniform way on the bottom plate, makes each positioning The center line of each location hole on the center line and positioning disk of stake correspond it is consistent (even if each guide pile with it is each on positioning disk Corresponding location hole is respectively provided with same center line), each base disk is mutually fixed respectively with bottom plate with fastening bolt, then, In each guide pile and mounting hole deferent in each corresponding location hole on positioning disk, the lower end section of the duct pipe is right It should be inserted into annular groove and upper end section correspondence stretching location hole.
A kind of construction method in wind driven generator base prestress anchorage cable duct (construction method in abbreviation anchor cable duct), Construction procedure is:
One), preparation of construction:
According to the model of wind-driven generator, design makes location structure, support construction, ring moulds plate, bottom plate and duct pipe;
Two), mounting ring template:
After the concrete cushion cast of blower foundation, the bottom reinforcement bars of blower foundation are bound, then on bottom reinforcement bars Mounting base makes the center of bottom plate and the center of blower foundation bed course corresponding to the same, and each installation on bottom plate is passed through with steel wire Hole, it is corresponding on bottom reinforcement bars that ring moulds are installed in the interior circular hole of bottom plate by bottom plate binding on blower foundation bottom reinforcement bars Plate;
Three), positioning disk is installed:
Cross-arm, vertical load are lain in a horizontal plane on the top of ring moulds plate, suspension hook steel wire rope or shackle being hung on partition board In hole, positioning disk is hung at cross-arm, is indulged in load, the center line for making positioning disk is corresponding with the center line of ring moulds plate consistent;
Four), support construction is installed:
It is corresponding that four foundation is flatly set to support in orthogonal four orientation of ring moulds plate, by each bottom bracing With the bottom reinforcement bars banding fixed of blower foundation, four vertical braces are mutually welded with being respectively perpendicular with corresponding cross-arm or vertical load, bottom bracing It connects, every group of two diagonal braces is mutually welded two-by-two with corresponding cross-arm, vertical load, bottom bracing across;
Five), guide pile, duct pipe are installed:
The corresponding outer circumference portion position circumference uniform distribution positioned at ring moulds plate installs each positioning seat on bottom plate, makes in each guide pile Heart line and the center line of the corresponding location hole on positioning disk mutually correspond unanimously, by each base disk respectively on blower foundation Bottom plate is mutually fixed with fastening bolt, then, each duct pipe is passed through location hole from top to bottom and is inserted into guide pile periphery In annular groove, the installation of each duct pipe is completed, then carries out the binding of blower foundation upper reinforcement and the installation of exterior sheathing, using routine Method cast blower foundation concrete, after the intensity of concrete reaches 70%, remove positioning disk and ring moulds plate, Jiang Geding Position seat, each duct pipe, cross-arm, vertical load, bottom bracing, vertical brace, diagonal brace and bottom plate are deposited in blower foundation.
The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct proposed by the invention, It is not only rational in infrastructure, it is safe and reliable, and ensure the spacing and verticality in anchor cable duct, it is reeving and later stage stretching process In the construction precision and quality in anchor cable duct to anchor cable effective protection, can be improved.
In conjunction with drawings and examples to a kind of wind driven generator base prestress anchorage cable duct proposed by the invention Positioning device is described further.
Description of the drawings
Fig. 1 is that a kind of main view of the positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention is shown It is intended to.
Fig. 2 is that a kind of vertical view of the positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention is shown It is intended to.
Fig. 3 is the positioning in a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention The schematic top plan view of seat.
Fig. 4 is the positioning in a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention The schematic front view of seat.
Fig. 5 is the part in a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention 11:The installation schematic front view of duct pipe.
Fig. 6 is the part 3 in a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention: The scheme of installation of partition board, (being A-A sectional views in Fig. 2).
Fig. 7 is after a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention is installed Schematic front view.
Fig. 8 is a kind of part 19 of the positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention: The schematic top plan view of bottom plate.
In Fig. 1-Fig. 8:
1st, positioning disk 2, location hole 3, partition board 4, cross-arm 5, vertical load 6, vertical brace 7, diagonal brace 8, bottom bracing 9, fastening spiral shell Bolt 10, ring moulds plate 11, duct pipe 12, guide pile 13, fixed bolt hole 14, base disk 15, annular groove 16, hook on hole 17th, Internal baffle 18, outer baffle 19, bottom plate 20, mounting hole
Specific embodiment
It can be seen that from Fig. 1-Fig. 8:A kind of positioning device (abbreviation anchor in wind driven generator base prestress anchorage cable duct The positioning device of Suo Kongdao), the bottom reinforcement bars including blower foundation, it is characterized in that:The positioning device in the anchor cable duct further includes Location structure, support construction, ring moulds plate 10, bottom plate 19 and duct pipe 11, wherein:The location structure includes positioning disk 1, interior Baffle 17, outer baffle 18, location hole 2, partition board 3 and positioning seat, the positioning disk 1 are circular ring shape, and the inner circle of the positioning disk 1 is straight It can be 8m that diameter, which can be 7m, outside diameter, along the inner circle periphery of the positioning disk 1 be welded it is vertical on the Internal baffle 17 put, along institute The circumferential periphery of positioning disk 1 stated be welded it is vertical on the outer baffle 18 put, on the positioning disk 1 between the inside and outside baffle Location hole 2 is opened up to circumference uniform distribution, can open up 40 to circumference uniform distribution on the positioning disk 1 between the inside and outside baffle Location hole 2, the diameter of the location hole 2 can be 11cm, corresponding between the inside and outside baffle to be located at location hole adjacent two-by-two Between position on be welded respectively the partition board 3 of one piece of semicircular arc, and opened up respectively on four pieces of partition boards 3 mutually in 90 ° of angles Hook on hole 16;
The positioning seat include base disk 14 and guide pile 12, the base disk 14 be circular ring shape steel plate, the pedestal 14 available thickness of disk is that the steel plate of 1.50cm is cut, and the interior circular diameter of the base disk 14 can be 9cm, the base disk 14 it is outer Circular diameter can be 16cm, and be welded the guide pile 12 put on vertically along the inner circle periphery of the base disk 14, the guide pile 12 be the pipe with head cover, and it can be 20cm that the overall diameter of the guide pile 12, which can be 9cm, length, in the base disk 14 The corresponding peripheral part positioned at guide pile 12 opens up annular groove 15 on upper surface, and the overall diameter of the annular groove 15 is more than duct pipe 11 Overall diameter, it can be 0.5cm that the width of the annular groove 15, which can be 0.5cm, depth, corresponding on the base disk 14 to be located at annular groove 15 outside left opens up four fixed bolt holes 13 arranged in square.
The support construction includes cross-arm 4, vertical load 5, vertical brace 6, diagonal brace 7 and bottom bracing 8, wherein:The vertical load 5 be in The front and rear straight-bar to setting, the cross-arm 4 are the straight-bar to setting in left and right, are in cross by the cross-arm 4 and vertical load 5 Ground is integrally welded, and the cross-arm 4,5 equal available slot steel of vertical load are made, the cross-arm 4, vertical load 5 length can be 12m, institute The bottom bracing 8 stated is four straight-bars, the bottom bracing 8 in crisscross arrangement and with cross-arm 4, about 5 corresponding, bottom bracings of vertical load 8 available slot steel are made, and the length of the bottom bracing 8 can be 5m, by the cross-arm 4, vertical load 5 in upper and bottom bracing 8 in lower ground cloth It puts, the corresponding vertical brace 6 that is welded between the cross-arm 4 or the outer end section of vertical load 5 and the outer end section of bottom bracing 8 is located in described The corresponding diagonal brace 7 (totally four groups, every group two of the diagonal brace 7) intersected that is welded between the cross-arm 4 of the same side or vertical load 5 and bottom bracing 8, should Vertical brace 6, diagonal brace 7 can be used the round steel of a diameter of 2cm to be made, and the duct pipe 11 is more than guide pile 12 for interior diameter The pipe of overall diameter, the duct pipe 11 can use overall diameter × interior diameter × length be 10cm × 9cm × 40cm pvc pipe make and Into;
The ring moulds plate 10 is the cylindrical tube made with welded steel plate, diameter, the height root of the ring moulds plate 10 It is determined according to the type of wind-driven generator, the outside diameter of the ring moulds plate 10 is less than or equal to the interior circular diameter of positioning disk 1, should 10 available thickness of ring moulds plate is that the welded steel plate of 2cm forms;
The bottom plate 19 is circular ring shape plate, and the interior circular diameter of the bottom plate 19 is greater than or equal to the outer straight of ring moulds plate 10 Diameter, the outside diameter of the bottom plate 19 is identical with the outside diameter of positioning disk 1, corresponding on the bottom plate 19 to be located at inner circle All, excircle position opens up to circumference uniform distribution mounting hole 20 respectively, and the bottom plate 19 is horizontally set on blower foundation On the centre of bottom reinforcement bars, meanwhile, the ring moulds plate 10 is vertically arranged on the bottom reinforcement bars of blower foundation simultaneously It is corresponding in the inner circle of bottom plate 19, make the center line of ring moulds plate 10 and bottom plate 19 center line it is corresponding to the same (be same Center line), the ring moulds plate 10 is vertically arranged on the bottom reinforcement bars of blower foundation, by the cross-arm 4, vertical load 5 It is placed on horizontally on the top of ring moulds plate 10, the four foundation support 8 is corresponded to the lower section positioned at cross-arm 4 or vertical load 5 Be horizontally disposed on the bottom reinforcement bars of blower foundation and with bottom reinforcement bars banding fixed, the positioning disk 1 is placed on horizontal stroke In load 4, vertical load 5, and make the center line of the center line and ring moulds plate 10 of the positioning disk 1 corresponding to the same (i.e. with same A center line), it is corresponding on the bottom plate 19 to place each positioning seat in uniform way in outer circumference portion circle of position week positioned at ring moulds plate 10, The center line of each guide pile 12 is made to be corresponded with the center line of each location hole 2 on positioning disk 1 consistent (even if each fixed Position stake 12 be respectively provided with same center line with each corresponding location hole 2 on positioning disk 1), by each base disk 14 respectively with Bottom plate 19 is fixed with 9 phase of fastening bolt, then, each guide pile 12 in each corresponding location hole 2 on positioning disk 1 Mounting hole deferent 11, the lower end section of the duct pipe 11, which corresponds to, to be inserted into annular groove 15 and upper end section correspondence stretching location hole 2.
Embodiment
In the construction of golden phoenix 2.0MW-HH100m units prefabricated mixing pylon wind-driven generator, the present invention has been used The construction method in a kind of wind driven generator base prestress anchorage cable duct proposed, construction procedure are:
One), preparation of construction:
According to the model of wind-driven generator, design makes location structure, support construction, ring moulds plate 10, bottom plate 19 and duct Pipe 11;
Two), mounting ring template:
After the concrete cushion cast of blower foundation, the bottom reinforcement bars of blower foundation are bound, then on bottom reinforcement bars Mounting base 19 makes the center of bottom plate 19 and the center of blower foundation bed course corresponding to the same, and steel wire is passed through on bottom plate 19 Mounting hole 20 binds bottom plate 19 at the middle part of blower foundation bottom reinforcement bars, the mounting ring template 10 in the endoporus of bottom plate 19, will Ring moulds plate 10 is placed on the bottom reinforcement bars of blower foundation;
Three), positioning disk is installed:
Cross-arm 4, vertical load 5 are lain in a horizontal plane on the top of ring moulds plate 10, steel wire rope or shackle are hung on partition board 3 In hook on hole 16, positioning disk 1 is hung at cross-arm 4, is indulged in load 5, makes the center line of positioning disk 1 and the center line pair of ring moulds plate 10 It should be consistent;
Four), support construction is installed:
It is corresponding that four foundation is flatly set to support 8 in orthogonal four orientation of ring moulds plate 10, by each bottom bracing 8 with The bottom reinforcement bars banding fixed of blower foundation, by four vertical braces 6 be respectively perpendicular with corresponding cross-arm 4 or vertical load 5,8 phase of bottom bracing Welding welds every group of two diagonal braces 7 with corresponding cross-arm 4, vertical load 5,8 phase of bottom bracing across two-by-two;
Five), guide pile 12, duct pipe 11 are installed;
Each positioning seat is corresponded to and is mounted on bottom plate 19 in uniform way positioned at the outer circumference portion circle of position week of ring moulds plate 10, it is each fixed to make The center line of position stake 12 mutually corresponds unanimously with the center line of the corresponding location hole 2 on positioning disk 1, and each base disk 14 is distinguished It is fixed with the bottom plate 19 on blower foundation with 9 phase of fastening bolt, then, each duct pipe 11 is passed through into location hole 2 from top to bottom And be inserted into the annular groove 15 on 12 periphery of guide pile, the installation of each duct pipe 11 is completed, then carry out blower foundation upper reinforcement Binding and the installation of exterior sheathing using the concrete of conventional method cast blower foundation, treat that the intensity of concrete reaches 70% Afterwards, positioning disk 1 and ring moulds plate 10 are removed, by each positioning seat, duct pipe 11, cross-arm 4, vertical load 5, bottom bracing 8, vertical brace 6,7 and of diagonal brace Bottom plate 19 is deposited in blower foundation.

Claims (9)

1. a kind of positioning device in wind driven generator base prestress anchorage cable duct, the bottom reinforcement bars including blower foundation are special Sign is:The positioning device in the anchor cable duct further includes location structure, support construction, ring moulds plate (10) and duct pipe (11), wherein: The location structure includes positioning disk (1), Internal baffle (17), outer baffle (18), location hole (2), partition board (3) and positioning again Seat, the positioning disk (1) are circular ring shape, and be welded the Internal baffle put on vertically along the inner circle periphery of the positioning disk (1) (17), along the circumferential periphery of the positioning disk (1) be welded it is vertical on the outer baffle (18) put, the inside and outside baffle it Between positioning disk (1) on circumference uniform distribution open up location hole (2), between the inside and outside baffle it is corresponding be located at it is adjacent two-by-two Location hole between position on be welded respectively the partition board (3) of one piece of semicircular arc, and mutually in four pieces of partition boards of 90 ° of angles (3) hook on hole (16) is opened up on respectively;
The positioning seat includes base disk (14) and guide pile (12), and the base disk (14) is circular ring shape steel plate, along institute The inner circle periphery of base disk (14) stated be welded it is vertical on the guide pile (12) put, the guide pile (12) is with head cover Pipe, the corresponding peripheral part positioned at guide pile (12) opens up annular groove (15), institute on the upper surface of the base disk (14) The overall diameter of annular groove (15) stated is more than the overall diameter of duct pipe (11), and the width of the annular groove (15) is 0.5cm, depth is 0.5cm, the corresponding outside left positioned at annular groove (15) opens up arranged in square four on the base disk (14) Fixed bolt hole (13);
The support construction includes cross-arm (4), vertical load (5), vertical brace (6), diagonal brace (7) and bottom bracing (8), wherein:Described is vertical It is in the front and rear straight-bar to setting to carry on a shoulder pole (5), and the cross-arm (4) is the straight-bar to setting in left and right, by the cross-arm (4) with Vertical load (5) is four straight-bars in crisscross integrally welded, described bottom bracing (8), and the bottom bracing (8) is in crisscross cloth It puts and corresponding up and down with cross-arm (4), vertical load (5), by the cross-arm (4), vertical load (5) in upper and bottom bracing (8) in lower ground cloth It puts, the corresponding vertical brace that is welded (6) between the cross-arm (4) or the outer end section of vertical load (5) and the outer end section of bottom bracing (8), in institute The corresponding diagonal brace (7) intersected that is welded between the cross-arm (4) positioned at the same side or vertical load (5) and bottom bracing (8) stated, the diagonal brace (7) Totally four groups, every group two, duct pipe (11) is more than the pipe of the overall diameter of guide pile (12) for interior diameter;
The ring moulds plate (10) is the cylindrical tube made with welded steel plate, diameter, the height root of the ring moulds plate (10) It is determined according to the type of wind-driven generator, the outside diameter of the ring moulds plate (10) is straight less than or equal to the inner circle of positioning disk (1) Diameter, the ring moulds plate (10) are formed with the welded steel plate that thickness is 2cm, and the bottom plate (19) is circular ring shape plate, the bottom plate (1) interior circular diameter is greater than or equal to the outside diameter of ring moulds plate (10), the outside diameter and positioning disk of the bottom plate (19) (1) outside diameter is identical, is corresponded on the bottom plate (19) positioned at the position of inner periphery, excircle with distinguishing circumference uniform distribution Mounting hole (20) is opened up, on the centre of bottom reinforcement bars that the bottom plate (19) is horizontally set on blower foundation, meanwhile, The ring moulds plate (10) is vertically arranged on the bottom reinforcement bars of blower foundation and is corresponded in the inner circle of bottom plate (19), It is same center line to make the center line of ring moulds plate (10) and the center line of bottom plate (19), by the cross-arm (4), vertical load (5) It is placed on horizontally on the top of ring moulds plate (10), the four foundation support (8) is corresponded to positioned at cross-arm (4) or vertical load (5) be arranged on the bottom reinforcement bars of blower foundation to lower horizontal and with bottom reinforcement bars banding fixed, by the positioning disk (1) it is placed on cross-arm (4), indulges in load (5), and make the center line phase of the center line and ring moulds plate (10) of the positioning disk (1) It is corresponding consistent, i.e., it is corresponding positioned at the excircle position of ring moulds plate (10) on the bottom plate (19) with same center line Each positioning seat is placed to circumference uniform distribution, the center line and each location hole (2) on positioning disk (1) for making each guide pile (12) Center line correspond it is consistent, even if each guide pile (12) is respectively provided with each corresponding location hole (2) on positioning disk (1) Same center line), each base disk (14) is mutually fixed respectively with bottom plate (19) with fastening bolt (9), then, each described Guide pile (12) and mounting hole deferent (11) in each corresponding location hole (2) on positioning disk (1), the duct pipe (11) Lower end section it is corresponding be inserted into annular groove (15), and upper end section corresponds to and stretches out location hole (2).
2. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist In a diameter of 7m of inner circle, the outside diameter 8m of the positioning disk (1).
3. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist In opening up to circumference uniform distribution 40 location holes (2) on the positioning disk (1) between the inside and outside baffle, the location hole (2) A diameter of 11cm.
4. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist It is cut in the base disk (14) with the steel plate that thickness is 1.50cm, a diameter of 9cm of inner circle of the base disk (14), outer circle are straight Diameter is 16cm.
5. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist In the overall diameter of the guide pile (12) be 9cm, length 20cm.
6. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist It is made in the cross-arm (4), vertical load (5), bottom bracing 8 with channel steel, the cross-arm (4), the vertical length for carrying on a shoulder pole (5) are 12m, the bottom The length for supportting (8) is 5m.
7. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist It is made in the vertical brace (6), diagonal brace (7) with the round steel of a diameter of 2cm.
8. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist It is made in duct pipe (11) with the pvc pipe that overall diameter × interior diameter × length is 10cm × 9cm × 40cm.
9. a kind of construction method in wind driven generator base prestress anchorage cable duct, construction procedure are:
One), preparation of construction:
According to the model of wind-driven generator, design makes location structure, support construction, ring moulds plate (10), bottom plate (19) and duct It manages (11);
Two), mounting ring template:
After the concrete cushion cast of blower foundation, the bottom reinforcement bars of blower foundation are bound, are then installed on bottom reinforcement bars Bottom plate (19) makes the center of bottom plate (19) and the center of blower foundation bed course corresponding to the same, and steel wire is passed through on bottom plate (19) Mounting hole (20), by bottom plate (19) binding on blower foundation bottom reinforcement bars, the mounting ring template in the endoporus of bottom plate (1) (10), ring moulds plate (10) is placed on the bottom reinforcement bars of blower foundation;
Three), positioning disk is installed:
Cross-arm (4), vertical load (5) are lain in a horizontal plane on the top of ring moulds plate (10), steel wire rope or shackle are hung on partition board (3) On hook on hole (16) in, positioning disk (1) is hung at cross-arm (4), on vertical load (5), makes the center line and ring moulds of positioning disk (1) The center line of plate (10) corresponds to consistent;
Four), support construction is installed:
It is corresponding that four foundation is flatly set to support 8 in orthogonal four orientation of ring moulds plate (10), by each bottom bracing (8) with The bottom reinforcement bars banding fixed of blower foundation, by four vertical braces (6) be respectively perpendicular with corresponding cross-arm (4) or vertical load (5), bottom Support (8) is mutually welded, and every group of two diagonal braces (7) are mutually welded two-by-two with corresponding cross-arm (4), vertical load (5), bottom bracing (8) across;
Five), guide pile, duct pipe are installed;
Each positioning seat is corresponded to and is mounted on bottom plate (19) in uniform way positioned at the outer circumference portion circle of position week of ring moulds plate (10), it is each fixed to make The center line of position stake (12) mutually corresponds unanimously with the center line of the corresponding location hole (2) on positioning disk (1), by each base disk (14) it is mutually fixed with fastening bolt (9) with the bottom plate (19) on blower foundation respectively, then, by each duct pipe (11) from top to bottom Ground passes through location hole (2) and is inserted into the annular groove (15) on guide pile (12) periphery, completes the installation of each duct pipe (11), then into The binding of sector-style machine basis upper reinforcement and the installation of exterior sheathing using the concrete of conventional method cast blower foundation, are treated After the intensity of concrete reaches 70%, positioning disk (1) and ring moulds plate (10) are removed, by each positioning seat, duct pipe (11), cross-arm (4), load (5), bottom bracing (8), vertical brace (6) diagonal brace (7) and bottom plate (19) are indulged.
CN201810195127.1A 2018-03-09 2018-03-09 The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct Active CN108265743B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810195127.1A CN108265743B (en) 2018-03-09 2018-03-09 The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810195127.1A CN108265743B (en) 2018-03-09 2018-03-09 The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct

Publications (2)

Publication Number Publication Date
CN108265743A true CN108265743A (en) 2018-07-10
CN108265743B CN108265743B (en) 2019-10-08

Family

ID=62774882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810195127.1A Active CN108265743B (en) 2018-03-09 2018-03-09 The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct

Country Status (1)

Country Link
CN (1) CN108265743B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155546A (en) * 2019-12-25 2020-05-15 湖北瑞宏新能源设备有限公司 Prestressed anchor bolt fan foundation reinforcing device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060120809A1 (en) * 2002-05-28 2006-06-08 James Ingram Method and crane for installing, maintaining and decommissioning wind turbines
US8505265B2 (en) * 2010-05-24 2013-08-13 Kv Structures Power line tower alignment method
CN204343319U (en) * 2014-12-10 2015-05-20 中国十七冶集团有限公司 Cableway pipe patten pre-embedded anchoring bolts jig
CN204475363U (en) * 2014-12-15 2015-07-15 中国十七冶集团有限公司 A kind of major diameter pre-embedded bolt fixing device for installing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060120809A1 (en) * 2002-05-28 2006-06-08 James Ingram Method and crane for installing, maintaining and decommissioning wind turbines
US8505265B2 (en) * 2010-05-24 2013-08-13 Kv Structures Power line tower alignment method
CN204343319U (en) * 2014-12-10 2015-05-20 中国十七冶集团有限公司 Cableway pipe patten pre-embedded anchoring bolts jig
CN204475363U (en) * 2014-12-15 2015-07-15 中国十七冶集团有限公司 A kind of major diameter pre-embedded bolt fixing device for installing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155546A (en) * 2019-12-25 2020-05-15 湖北瑞宏新能源设备有限公司 Prestressed anchor bolt fan foundation reinforcing device

Also Published As

Publication number Publication date
CN108265743B (en) 2019-10-08

Similar Documents

Publication Publication Date Title
CN110306524A (en) The foundation reinforcing structure and method of the Heavy Equipment-hoisting of the unclosed building of proximity
CN106586811B (en) Lifting equipment for supporting patient with burn and lifting turn-over method for concrete tower
CN108755736A (en) A kind of precast prestressed board-like generation power foundation of wind power
CN109706918A (en) A kind of lifting restricted clearance steel reinforcement cage aperture molding machine and its construction method
CN108678752A (en) Shaft equipment rapid installation process
JP2018100589A (en) Basic assembly steel bar construction method
CN207714314U (en) A kind of pile foundation construction supporting construction in soft soil foundation
CN102146729B (en) Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof
CN108265743B (en) The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct
CN207293909U (en) A kind of precast beam reinforced bar skeleton hanging apparatus
CN109024649A (en) Bottom plate multilayer Large-size rebar installs system and construction method
JP6369870B2 (en) Reinforcing bar assembly equipment
CN208563968U (en) A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus
CN108131042B (en) Concurrent, production method, construction tool and construction method
CN105401585B (en) Utilize the structure and its construction method of foundation ditch support system support tower crane
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN109137990A (en) A kind of prefabricated cushion cap of land delay-pour joint sectional type and its production and installation method
CN110541429B (en) Energy-consuming bolted connection method for connecting prefabricated concrete columns to foundations
JP2012154081A (en) Reinforcement method of hollow columnar object and reinforcing bar expansion device for hollow columnar object
CN210918762U (en) Reinforced concrete protective airtight door leaf
CN211735395U (en) Pile stabilizing device for pile cutting construction
CN107700869A (en) A kind of cast-in-place supporting construction of conical shell formula water tower
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN209384226U (en) A kind of Manual hole pile digging device in shifting sand layers
CN211646486U (en) Post-cast strip regularization formwork system