CN108265743A - A kind of positioning device and its construction method in wind driven generator base prestress anchorage cable duct - Google Patents
A kind of positioning device and its construction method in wind driven generator base prestress anchorage cable duct Download PDFInfo
- Publication number
- CN108265743A CN108265743A CN201810195127.1A CN201810195127A CN108265743A CN 108265743 A CN108265743 A CN 108265743A CN 201810195127 A CN201810195127 A CN 201810195127A CN 108265743 A CN108265743 A CN 108265743A
- Authority
- CN
- China
- Prior art keywords
- plate
- positioning
- arm
- disk
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/50—Anchored foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Wind Motors (AREA)
Abstract
The present invention is a kind of positioning device and its construction method in wind driven generator base prestress anchorage cable duct, belong to wind-driven generator construction auxiliary device and its construction method, it is characterized in that the positioning device in the anchor cable duct further includes location structure, support construction, ring moulds plate, bottom plate and duct pipe, the location structure includes positioning disk, it is interior, outer baffle, location hole and positioning seat, location hole is opened up on positioning disk, be welded guide pile on base disk, by cross-arm, vertical load, vertical brace, diagonal brace and bottom bracing group are welded into support construction, it will be horizontal, vertical load is placed on the upper of ring moulds plate, positioning disk is placed on horizontal stroke, in vertical load, each base disk is placed in bottom plate, the providing holes deferent between each guide pile and each location hole, a kind of construction method in anchor cable duct, its construction procedure is:One), preparation of construction, two), mounting ring template, three), installation positioning disk, four), installation support construction, five), installation guide pile, duct pipe;It is rational in infrastructure, improve construction precision and quality.
Description
Technical field
The invention belongs to wind-driven generator construction auxiliary device and its construction method, more particularly, to a kind of wind-driven generator base
The positioning device and its construction method of plinth prestress anchorage cable.
Background technology
Prestress anchorage cable wind driven generator base (hereinafter referred to as blower foundation) is a kind of novel blower foundation, using pre-
Stress anchor cable links into an integrated entity cast-in-place blower foundation and prefabricated concrete bottom section pylon, then carries out tensioning and fixes, in advance
Stress anchor cable is reeved form after being, i.e., after the concrete casting complete of blower foundation, several anchor cables are passed through on blower foundation
The prestress anchorage cable duct reserved on reserved prestress anchorage cable duct and prefabricated concrete bottom section pylon, after gradation tensioning
An entirety is formed, therefore, when blower foundation is constructed, the verticality in prestress anchorage cable duct, the precision of spacing are directly related to
Whether can smoothly reeve and the installation accuracy of blower foundation and top precast concrete tower, because this kind of blower foundation form is new
Type blower foundation, domestic construction is less at present, through patent consulting, does not find to record the comparison money about the positioning in anchor cable duct
Material.
Invention content
Positioning device and its construction the purpose of the present invention is to propose to a kind of wind driven generator base prestress anchorage cable duct
Method, it is not only rational in infrastructure, it is safe and reliable, and ensure the spacing and verticality in anchor cable duct, it is reeving and the later stage
To anchor cable effective protection, the construction precision and quality in anchor cable duct can be improved during drawing.
The object of the present invention is achieved like this:A kind of positioning device in wind driven generator base prestress anchorage cable duct
(positioning device in abbreviation anchor cable duct), the bottom reinforcement bars including blower foundation, it is characterized in that:The positioning device in the anchor cable duct
Location structure, support construction, ring moulds plate, bottom plate and duct pipe are further included, wherein:The location structure includes positioning disk, interior
Baffle, outer baffle, location hole, partition board and positioning seat, the positioning disk are circular ring shape, and the interior circular diameter of the positioning disk can be
7m, outside diameter can be 8m, and be welded the Internal baffle put on vertically along the inner circle periphery of the positioning disk, along the positioning disk
Circumferential periphery be welded it is vertical on the outer baffle put, open up to circumference uniform distribution on the positioning disk between the inside and outside baffle
Location hole can open up to circumference uniform distribution 40 location holes on the positioning disk between the inside and outside baffle, the location hole
Diameter can be 11cm, be welded respectively on the corresponding position being located between location hole adjacent two-by-two between the inside and outside baffle
The partition board of one piece of semicircular arc is filled, and hook on hole is opened up respectively on four pieces of partition boards mutually in 90 ° of angles;
The positioning seat includes base disk and guide pile, and the base disk is circular ring shape steel plate, which can be used
Thickness is that the steel plate of 1.50cm is cut, and the interior circular diameter of the base disk can be 9cm, and the outside diameter of the base disk can be
16cm, be welded the guide pile put on vertically along the inner circle periphery of the base disk, and the guide pile is the circle with head cover
Pipe, it can be 20cm that the overall diameter of the guide pile, which can be 9cm, length, on the upper surface of the base disk it is corresponding be located at position
The peripheral part of stake opens up annular groove, and the overall diameter of the annular groove is more than the overall diameter of duct pipe, and the width of the annular groove can be
0.5cm, depth can be 0.5cm, and the corresponding outside left positioned at annular groove opens up arranged in square on the base disk
Four fixed bolt holes;
The support construction includes cross-arm, vertical load, vertical brace, diagonal brace and bottom bracing, wherein:The vertical load be in it is front and rear to
The straight-bar of setting, the cross-arm are the straight-bar to setting in left and right, are in crisscross to be welded by the cross-arm and vertical load
One, the cross-arm, the vertical equal available slot steel of load are made, and the cross-arm, the vertical length carried on a shoulder pole can be 12m, and the bottom bracing is four
Root straight-bar, the bottom bracing make in crisscross arrangement and corresponding up and down with cross-arm, vertical load, the bottom bracing available slot steel and
Length into, the bottom bracing can be 5m, by the cross-arm, vertical load upper and bottom bracing lower is arranged, in the cross-arm or vertical
The corresponding vertical brace that is welded between the outer end section of load and the outer end section of bottom bracing, described positioned at the cross-arm of the same side or vertical load and bottom bracing
Between the corresponding intersection that is welded diagonal brace (totally four groups, every group two of the diagonal brace), the circle of a diameter of 2cm can be used in the vertical brace, diagonal brace
Steel is made, the duct pipe for interior diameter be more than guide pile overall diameter pipe, the duct pipe can use overall diameter ×
Interior diameter × length is that the pvc pipe of 10cm × 9cm × 40cm is made;
The ring moulds plate is the cylindrical tube made with welded steel plate, the diameter of the ring moulds plate, highly according to wind
The type of power generator determines that the ring moulds plate available thickness is that the welded steel plate of 2cm forms, the outside diameter of the ring moulds plate
Less than or equal to the interior circular diameter of positioning disk, the bottom plate is circular ring shape plate, and the interior circular diameter of the bottom plate is more than or waits
In the outside diameter of ring moulds plate, the outside diameter of the bottom plate is identical with the outside diameter of positioning disk, on the bottom plate
The corresponding position positioned at inner periphery, excircle opens up mounting hole to circumference uniform distribution respectively, and the floor level is arranged on wind
On the centre of machine foundation bottom reinforcing bar, meanwhile, the ring moulds plate is vertically arranged on to the bottom reinforcement bars of blower foundation
Go up and correspond in the inner circle positioned at bottom plate, make ring moulds plate center line and bottom plate center line it is corresponding to the same, by the horizontal stroke
Load, vertical load are placed on horizontally on the top of ring moulds plate, and the four foundation support is corresponding under cross-arm or vertical load
Side be horizontally disposed on the bottom reinforcement bars of blower foundation and with bottom reinforcement bars banding fixed, the positioning disk is placed on horizontal stroke
In load, vertical load, and make the center line of the center line and ring moulds plate of the positioning disk corresponding to the same (i.e. with same center
Line), each positioning seat is placed at the corresponding excircle position positioned at ring moulds plate in uniform way on the bottom plate, makes each positioning
The center line of each location hole on the center line and positioning disk of stake correspond it is consistent (even if each guide pile with it is each on positioning disk
Corresponding location hole is respectively provided with same center line), each base disk is mutually fixed respectively with bottom plate with fastening bolt, then,
In each guide pile and mounting hole deferent in each corresponding location hole on positioning disk, the lower end section of the duct pipe is right
It should be inserted into annular groove and upper end section correspondence stretching location hole.
A kind of construction method in wind driven generator base prestress anchorage cable duct (construction method in abbreviation anchor cable duct),
Construction procedure is:
One), preparation of construction:
According to the model of wind-driven generator, design makes location structure, support construction, ring moulds plate, bottom plate and duct pipe;
Two), mounting ring template:
After the concrete cushion cast of blower foundation, the bottom reinforcement bars of blower foundation are bound, then on bottom reinforcement bars
Mounting base makes the center of bottom plate and the center of blower foundation bed course corresponding to the same, and each installation on bottom plate is passed through with steel wire
Hole, it is corresponding on bottom reinforcement bars that ring moulds are installed in the interior circular hole of bottom plate by bottom plate binding on blower foundation bottom reinforcement bars
Plate;
Three), positioning disk is installed:
Cross-arm, vertical load are lain in a horizontal plane on the top of ring moulds plate, suspension hook steel wire rope or shackle being hung on partition board
In hole, positioning disk is hung at cross-arm, is indulged in load, the center line for making positioning disk is corresponding with the center line of ring moulds plate consistent;
Four), support construction is installed:
It is corresponding that four foundation is flatly set to support in orthogonal four orientation of ring moulds plate, by each bottom bracing
With the bottom reinforcement bars banding fixed of blower foundation, four vertical braces are mutually welded with being respectively perpendicular with corresponding cross-arm or vertical load, bottom bracing
It connects, every group of two diagonal braces is mutually welded two-by-two with corresponding cross-arm, vertical load, bottom bracing across;
Five), guide pile, duct pipe are installed:
The corresponding outer circumference portion position circumference uniform distribution positioned at ring moulds plate installs each positioning seat on bottom plate, makes in each guide pile
Heart line and the center line of the corresponding location hole on positioning disk mutually correspond unanimously, by each base disk respectively on blower foundation
Bottom plate is mutually fixed with fastening bolt, then, each duct pipe is passed through location hole from top to bottom and is inserted into guide pile periphery
In annular groove, the installation of each duct pipe is completed, then carries out the binding of blower foundation upper reinforcement and the installation of exterior sheathing, using routine
Method cast blower foundation concrete, after the intensity of concrete reaches 70%, remove positioning disk and ring moulds plate, Jiang Geding
Position seat, each duct pipe, cross-arm, vertical load, bottom bracing, vertical brace, diagonal brace and bottom plate are deposited in blower foundation.
The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct proposed by the invention,
It is not only rational in infrastructure, it is safe and reliable, and ensure the spacing and verticality in anchor cable duct, it is reeving and later stage stretching process
In the construction precision and quality in anchor cable duct to anchor cable effective protection, can be improved.
In conjunction with drawings and examples to a kind of wind driven generator base prestress anchorage cable duct proposed by the invention
Positioning device is described further.
Description of the drawings
Fig. 1 is that a kind of main view of the positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention is shown
It is intended to.
Fig. 2 is that a kind of vertical view of the positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention is shown
It is intended to.
Fig. 3 is the positioning in a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention
The schematic top plan view of seat.
Fig. 4 is the positioning in a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention
The schematic front view of seat.
Fig. 5 is the part in a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention
11:The installation schematic front view of duct pipe.
Fig. 6 is the part 3 in a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention:
The scheme of installation of partition board, (being A-A sectional views in Fig. 2).
Fig. 7 is after a kind of positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention is installed
Schematic front view.
Fig. 8 is a kind of part 19 of the positioning device in wind driven generator base prestress anchorage cable duct proposed by the invention:
The schematic top plan view of bottom plate.
In Fig. 1-Fig. 8:
1st, positioning disk 2, location hole 3, partition board 4, cross-arm 5, vertical load 6, vertical brace 7, diagonal brace 8, bottom bracing 9, fastening spiral shell
Bolt 10, ring moulds plate 11, duct pipe 12, guide pile 13, fixed bolt hole 14, base disk 15, annular groove 16, hook on hole
17th, Internal baffle 18, outer baffle 19, bottom plate 20, mounting hole
Specific embodiment
It can be seen that from Fig. 1-Fig. 8:A kind of positioning device (abbreviation anchor in wind driven generator base prestress anchorage cable duct
The positioning device of Suo Kongdao), the bottom reinforcement bars including blower foundation, it is characterized in that:The positioning device in the anchor cable duct further includes
Location structure, support construction, ring moulds plate 10, bottom plate 19 and duct pipe 11, wherein:The location structure includes positioning disk 1, interior
Baffle 17, outer baffle 18, location hole 2, partition board 3 and positioning seat, the positioning disk 1 are circular ring shape, and the inner circle of the positioning disk 1 is straight
It can be 8m that diameter, which can be 7m, outside diameter, along the inner circle periphery of the positioning disk 1 be welded it is vertical on the Internal baffle 17 put, along institute
The circumferential periphery of positioning disk 1 stated be welded it is vertical on the outer baffle 18 put, on the positioning disk 1 between the inside and outside baffle
Location hole 2 is opened up to circumference uniform distribution, can open up 40 to circumference uniform distribution on the positioning disk 1 between the inside and outside baffle
Location hole 2, the diameter of the location hole 2 can be 11cm, corresponding between the inside and outside baffle to be located at location hole adjacent two-by-two
Between position on be welded respectively the partition board 3 of one piece of semicircular arc, and opened up respectively on four pieces of partition boards 3 mutually in 90 ° of angles
Hook on hole 16;
The positioning seat include base disk 14 and guide pile 12, the base disk 14 be circular ring shape steel plate, the pedestal
14 available thickness of disk is that the steel plate of 1.50cm is cut, and the interior circular diameter of the base disk 14 can be 9cm, the base disk 14 it is outer
Circular diameter can be 16cm, and be welded the guide pile 12 put on vertically along the inner circle periphery of the base disk 14, the guide pile
12 be the pipe with head cover, and it can be 20cm that the overall diameter of the guide pile 12, which can be 9cm, length, in the base disk 14
The corresponding peripheral part positioned at guide pile 12 opens up annular groove 15 on upper surface, and the overall diameter of the annular groove 15 is more than duct pipe 11
Overall diameter, it can be 0.5cm that the width of the annular groove 15, which can be 0.5cm, depth, corresponding on the base disk 14 to be located at annular groove
15 outside left opens up four fixed bolt holes 13 arranged in square.
The support construction includes cross-arm 4, vertical load 5, vertical brace 6, diagonal brace 7 and bottom bracing 8, wherein:The vertical load 5 be in
The front and rear straight-bar to setting, the cross-arm 4 are the straight-bar to setting in left and right, are in cross by the cross-arm 4 and vertical load 5
Ground is integrally welded, and the cross-arm 4,5 equal available slot steel of vertical load are made, the cross-arm 4, vertical load 5 length can be 12m, institute
The bottom bracing 8 stated is four straight-bars, the bottom bracing 8 in crisscross arrangement and with cross-arm 4, about 5 corresponding, bottom bracings of vertical load
8 available slot steel are made, and the length of the bottom bracing 8 can be 5m, by the cross-arm 4, vertical load 5 in upper and bottom bracing 8 in lower ground cloth
It puts, the corresponding vertical brace 6 that is welded between the cross-arm 4 or the outer end section of vertical load 5 and the outer end section of bottom bracing 8 is located in described
The corresponding diagonal brace 7 (totally four groups, every group two of the diagonal brace 7) intersected that is welded between the cross-arm 4 of the same side or vertical load 5 and bottom bracing 8, should
Vertical brace 6, diagonal brace 7 can be used the round steel of a diameter of 2cm to be made, and the duct pipe 11 is more than guide pile 12 for interior diameter
The pipe of overall diameter, the duct pipe 11 can use overall diameter × interior diameter × length be 10cm × 9cm × 40cm pvc pipe make and
Into;
The ring moulds plate 10 is the cylindrical tube made with welded steel plate, diameter, the height root of the ring moulds plate 10
It is determined according to the type of wind-driven generator, the outside diameter of the ring moulds plate 10 is less than or equal to the interior circular diameter of positioning disk 1, should
10 available thickness of ring moulds plate is that the welded steel plate of 2cm forms;
The bottom plate 19 is circular ring shape plate, and the interior circular diameter of the bottom plate 19 is greater than or equal to the outer straight of ring moulds plate 10
Diameter, the outside diameter of the bottom plate 19 is identical with the outside diameter of positioning disk 1, corresponding on the bottom plate 19 to be located at inner circle
All, excircle position opens up to circumference uniform distribution mounting hole 20 respectively, and the bottom plate 19 is horizontally set on blower foundation
On the centre of bottom reinforcement bars, meanwhile, the ring moulds plate 10 is vertically arranged on the bottom reinforcement bars of blower foundation simultaneously
It is corresponding in the inner circle of bottom plate 19, make the center line of ring moulds plate 10 and bottom plate 19 center line it is corresponding to the same (be same
Center line), the ring moulds plate 10 is vertically arranged on the bottom reinforcement bars of blower foundation, by the cross-arm 4, vertical load 5
It is placed on horizontally on the top of ring moulds plate 10, the four foundation support 8 is corresponded to the lower section positioned at cross-arm 4 or vertical load 5
Be horizontally disposed on the bottom reinforcement bars of blower foundation and with bottom reinforcement bars banding fixed, the positioning disk 1 is placed on horizontal stroke
In load 4, vertical load 5, and make the center line of the center line and ring moulds plate 10 of the positioning disk 1 corresponding to the same (i.e. with same
A center line), it is corresponding on the bottom plate 19 to place each positioning seat in uniform way in outer circumference portion circle of position week positioned at ring moulds plate 10,
The center line of each guide pile 12 is made to be corresponded with the center line of each location hole 2 on positioning disk 1 consistent (even if each fixed
Position stake 12 be respectively provided with same center line with each corresponding location hole 2 on positioning disk 1), by each base disk 14 respectively with
Bottom plate 19 is fixed with 9 phase of fastening bolt, then, each guide pile 12 in each corresponding location hole 2 on positioning disk 1
Mounting hole deferent 11, the lower end section of the duct pipe 11, which corresponds to, to be inserted into annular groove 15 and upper end section correspondence stretching location hole 2.
Embodiment
In the construction of golden phoenix 2.0MW-HH100m units prefabricated mixing pylon wind-driven generator, the present invention has been used
The construction method in a kind of wind driven generator base prestress anchorage cable duct proposed, construction procedure are:
One), preparation of construction:
According to the model of wind-driven generator, design makes location structure, support construction, ring moulds plate 10, bottom plate 19 and duct
Pipe 11;
Two), mounting ring template:
After the concrete cushion cast of blower foundation, the bottom reinforcement bars of blower foundation are bound, then on bottom reinforcement bars
Mounting base 19 makes the center of bottom plate 19 and the center of blower foundation bed course corresponding to the same, and steel wire is passed through on bottom plate 19
Mounting hole 20 binds bottom plate 19 at the middle part of blower foundation bottom reinforcement bars, the mounting ring template 10 in the endoporus of bottom plate 19, will
Ring moulds plate 10 is placed on the bottom reinforcement bars of blower foundation;
Three), positioning disk is installed:
Cross-arm 4, vertical load 5 are lain in a horizontal plane on the top of ring moulds plate 10, steel wire rope or shackle are hung on partition board 3
In hook on hole 16, positioning disk 1 is hung at cross-arm 4, is indulged in load 5, makes the center line of positioning disk 1 and the center line pair of ring moulds plate 10
It should be consistent;
Four), support construction is installed:
It is corresponding that four foundation is flatly set to support 8 in orthogonal four orientation of ring moulds plate 10, by each bottom bracing 8 with
The bottom reinforcement bars banding fixed of blower foundation, by four vertical braces 6 be respectively perpendicular with corresponding cross-arm 4 or vertical load 5,8 phase of bottom bracing
Welding welds every group of two diagonal braces 7 with corresponding cross-arm 4, vertical load 5,8 phase of bottom bracing across two-by-two;
Five), guide pile 12, duct pipe 11 are installed;
Each positioning seat is corresponded to and is mounted on bottom plate 19 in uniform way positioned at the outer circumference portion circle of position week of ring moulds plate 10, it is each fixed to make
The center line of position stake 12 mutually corresponds unanimously with the center line of the corresponding location hole 2 on positioning disk 1, and each base disk 14 is distinguished
It is fixed with the bottom plate 19 on blower foundation with 9 phase of fastening bolt, then, each duct pipe 11 is passed through into location hole 2 from top to bottom
And be inserted into the annular groove 15 on 12 periphery of guide pile, the installation of each duct pipe 11 is completed, then carry out blower foundation upper reinforcement
Binding and the installation of exterior sheathing using the concrete of conventional method cast blower foundation, treat that the intensity of concrete reaches 70%
Afterwards, positioning disk 1 and ring moulds plate 10 are removed, by each positioning seat, duct pipe 11, cross-arm 4, vertical load 5, bottom bracing 8, vertical brace 6,7 and of diagonal brace
Bottom plate 19 is deposited in blower foundation.
Claims (9)
1. a kind of positioning device in wind driven generator base prestress anchorage cable duct, the bottom reinforcement bars including blower foundation are special
Sign is:The positioning device in the anchor cable duct further includes location structure, support construction, ring moulds plate (10) and duct pipe (11), wherein:
The location structure includes positioning disk (1), Internal baffle (17), outer baffle (18), location hole (2), partition board (3) and positioning again
Seat, the positioning disk (1) are circular ring shape, and be welded the Internal baffle put on vertically along the inner circle periphery of the positioning disk (1)
(17), along the circumferential periphery of the positioning disk (1) be welded it is vertical on the outer baffle (18) put, the inside and outside baffle it
Between positioning disk (1) on circumference uniform distribution open up location hole (2), between the inside and outside baffle it is corresponding be located at it is adjacent two-by-two
Location hole between position on be welded respectively the partition board (3) of one piece of semicircular arc, and mutually in four pieces of partition boards of 90 ° of angles
(3) hook on hole (16) is opened up on respectively;
The positioning seat includes base disk (14) and guide pile (12), and the base disk (14) is circular ring shape steel plate, along institute
The inner circle periphery of base disk (14) stated be welded it is vertical on the guide pile (12) put, the guide pile (12) is with head cover
Pipe, the corresponding peripheral part positioned at guide pile (12) opens up annular groove (15), institute on the upper surface of the base disk (14)
The overall diameter of annular groove (15) stated is more than the overall diameter of duct pipe (11), and the width of the annular groove (15) is 0.5cm, depth is
0.5cm, the corresponding outside left positioned at annular groove (15) opens up arranged in square four on the base disk (14)
Fixed bolt hole (13);
The support construction includes cross-arm (4), vertical load (5), vertical brace (6), diagonal brace (7) and bottom bracing (8), wherein:Described is vertical
It is in the front and rear straight-bar to setting to carry on a shoulder pole (5), and the cross-arm (4) is the straight-bar to setting in left and right, by the cross-arm (4) with
Vertical load (5) is four straight-bars in crisscross integrally welded, described bottom bracing (8), and the bottom bracing (8) is in crisscross cloth
It puts and corresponding up and down with cross-arm (4), vertical load (5), by the cross-arm (4), vertical load (5) in upper and bottom bracing (8) in lower ground cloth
It puts, the corresponding vertical brace that is welded (6) between the cross-arm (4) or the outer end section of vertical load (5) and the outer end section of bottom bracing (8), in institute
The corresponding diagonal brace (7) intersected that is welded between the cross-arm (4) positioned at the same side or vertical load (5) and bottom bracing (8) stated, the diagonal brace (7)
Totally four groups, every group two, duct pipe (11) is more than the pipe of the overall diameter of guide pile (12) for interior diameter;
The ring moulds plate (10) is the cylindrical tube made with welded steel plate, diameter, the height root of the ring moulds plate (10)
It is determined according to the type of wind-driven generator, the outside diameter of the ring moulds plate (10) is straight less than or equal to the inner circle of positioning disk (1)
Diameter, the ring moulds plate (10) are formed with the welded steel plate that thickness is 2cm, and the bottom plate (19) is circular ring shape plate, the bottom plate
(1) interior circular diameter is greater than or equal to the outside diameter of ring moulds plate (10), the outside diameter and positioning disk of the bottom plate (19)
(1) outside diameter is identical, is corresponded on the bottom plate (19) positioned at the position of inner periphery, excircle with distinguishing circumference uniform distribution
Mounting hole (20) is opened up, on the centre of bottom reinforcement bars that the bottom plate (19) is horizontally set on blower foundation, meanwhile,
The ring moulds plate (10) is vertically arranged on the bottom reinforcement bars of blower foundation and is corresponded in the inner circle of bottom plate (19),
It is same center line to make the center line of ring moulds plate (10) and the center line of bottom plate (19), by the cross-arm (4), vertical load (5)
It is placed on horizontally on the top of ring moulds plate (10), the four foundation support (8) is corresponded to positioned at cross-arm (4) or vertical load
(5) be arranged on the bottom reinforcement bars of blower foundation to lower horizontal and with bottom reinforcement bars banding fixed, by the positioning disk
(1) it is placed on cross-arm (4), indulges in load (5), and make the center line phase of the center line and ring moulds plate (10) of the positioning disk (1)
It is corresponding consistent, i.e., it is corresponding positioned at the excircle position of ring moulds plate (10) on the bottom plate (19) with same center line
Each positioning seat is placed to circumference uniform distribution, the center line and each location hole (2) on positioning disk (1) for making each guide pile (12)
Center line correspond it is consistent, even if each guide pile (12) is respectively provided with each corresponding location hole (2) on positioning disk (1)
Same center line), each base disk (14) is mutually fixed respectively with bottom plate (19) with fastening bolt (9), then, each described
Guide pile (12) and mounting hole deferent (11) in each corresponding location hole (2) on positioning disk (1), the duct pipe (11)
Lower end section it is corresponding be inserted into annular groove (15), and upper end section corresponds to and stretches out location hole (2).
2. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist
In a diameter of 7m of inner circle, the outside diameter 8m of the positioning disk (1).
3. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist
In opening up to circumference uniform distribution 40 location holes (2) on the positioning disk (1) between the inside and outside baffle, the location hole (2)
A diameter of 11cm.
4. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist
It is cut in the base disk (14) with the steel plate that thickness is 1.50cm, a diameter of 9cm of inner circle of the base disk (14), outer circle are straight
Diameter is 16cm.
5. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist
In the overall diameter of the guide pile (12) be 9cm, length 20cm.
6. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist
It is made in the cross-arm (4), vertical load (5), bottom bracing 8 with channel steel, the cross-arm (4), the vertical length for carrying on a shoulder pole (5) are 12m, the bottom
The length for supportting (8) is 5m.
7. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist
It is made in the vertical brace (6), diagonal brace (7) with the round steel of a diameter of 2cm.
8. a kind of positioning device in wind driven generator base prestress anchorage cable duct according to claim 1, feature exist
It is made in duct pipe (11) with the pvc pipe that overall diameter × interior diameter × length is 10cm × 9cm × 40cm.
9. a kind of construction method in wind driven generator base prestress anchorage cable duct, construction procedure are:
One), preparation of construction:
According to the model of wind-driven generator, design makes location structure, support construction, ring moulds plate (10), bottom plate (19) and duct
It manages (11);
Two), mounting ring template:
After the concrete cushion cast of blower foundation, the bottom reinforcement bars of blower foundation are bound, are then installed on bottom reinforcement bars
Bottom plate (19) makes the center of bottom plate (19) and the center of blower foundation bed course corresponding to the same, and steel wire is passed through on bottom plate (19)
Mounting hole (20), by bottom plate (19) binding on blower foundation bottom reinforcement bars, the mounting ring template in the endoporus of bottom plate (1)
(10), ring moulds plate (10) is placed on the bottom reinforcement bars of blower foundation;
Three), positioning disk is installed:
Cross-arm (4), vertical load (5) are lain in a horizontal plane on the top of ring moulds plate (10), steel wire rope or shackle are hung on partition board (3)
On hook on hole (16) in, positioning disk (1) is hung at cross-arm (4), on vertical load (5), makes the center line and ring moulds of positioning disk (1)
The center line of plate (10) corresponds to consistent;
Four), support construction is installed:
It is corresponding that four foundation is flatly set to support 8 in orthogonal four orientation of ring moulds plate (10), by each bottom bracing (8) with
The bottom reinforcement bars banding fixed of blower foundation, by four vertical braces (6) be respectively perpendicular with corresponding cross-arm (4) or vertical load (5), bottom
Support (8) is mutually welded, and every group of two diagonal braces (7) are mutually welded two-by-two with corresponding cross-arm (4), vertical load (5), bottom bracing (8) across;
Five), guide pile, duct pipe are installed;
Each positioning seat is corresponded to and is mounted on bottom plate (19) in uniform way positioned at the outer circumference portion circle of position week of ring moulds plate (10), it is each fixed to make
The center line of position stake (12) mutually corresponds unanimously with the center line of the corresponding location hole (2) on positioning disk (1), by each base disk
(14) it is mutually fixed with fastening bolt (9) with the bottom plate (19) on blower foundation respectively, then, by each duct pipe (11) from top to bottom
Ground passes through location hole (2) and is inserted into the annular groove (15) on guide pile (12) periphery, completes the installation of each duct pipe (11), then into
The binding of sector-style machine basis upper reinforcement and the installation of exterior sheathing using the concrete of conventional method cast blower foundation, are treated
After the intensity of concrete reaches 70%, positioning disk (1) and ring moulds plate (10) are removed, by each positioning seat, duct pipe (11), cross-arm
(4), load (5), bottom bracing (8), vertical brace (6) diagonal brace (7) and bottom plate (19) are indulged.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810195127.1A CN108265743B (en) | 2018-03-09 | 2018-03-09 | The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810195127.1A CN108265743B (en) | 2018-03-09 | 2018-03-09 | The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108265743A true CN108265743A (en) | 2018-07-10 |
| CN108265743B CN108265743B (en) | 2019-10-08 |
Family
ID=62774882
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810195127.1A Active CN108265743B (en) | 2018-03-09 | 2018-03-09 | The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108265743B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111155546A (en) * | 2019-12-25 | 2020-05-15 | 湖北瑞宏新能源设备有限公司 | Prestressed anchor bolt fan foundation reinforcing device |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060120809A1 (en) * | 2002-05-28 | 2006-06-08 | James Ingram | Method and crane for installing, maintaining and decommissioning wind turbines |
| US8505265B2 (en) * | 2010-05-24 | 2013-08-13 | Kv Structures | Power line tower alignment method |
| CN204343319U (en) * | 2014-12-10 | 2015-05-20 | 中国十七冶集团有限公司 | Cableway pipe patten pre-embedded anchoring bolts jig |
| CN204475363U (en) * | 2014-12-15 | 2015-07-15 | 中国十七冶集团有限公司 | A kind of major diameter pre-embedded bolt fixing device for installing |
-
2018
- 2018-03-09 CN CN201810195127.1A patent/CN108265743B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060120809A1 (en) * | 2002-05-28 | 2006-06-08 | James Ingram | Method and crane for installing, maintaining and decommissioning wind turbines |
| US8505265B2 (en) * | 2010-05-24 | 2013-08-13 | Kv Structures | Power line tower alignment method |
| CN204343319U (en) * | 2014-12-10 | 2015-05-20 | 中国十七冶集团有限公司 | Cableway pipe patten pre-embedded anchoring bolts jig |
| CN204475363U (en) * | 2014-12-15 | 2015-07-15 | 中国十七冶集团有限公司 | A kind of major diameter pre-embedded bolt fixing device for installing |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111155546A (en) * | 2019-12-25 | 2020-05-15 | 湖北瑞宏新能源设备有限公司 | Prestressed anchor bolt fan foundation reinforcing device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108265743B (en) | 2019-10-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110306524A (en) | The foundation reinforcing structure and method of the Heavy Equipment-hoisting of the unclosed building of proximity | |
| CN106586811B (en) | Lifting equipment for supporting patient with burn and lifting turn-over method for concrete tower | |
| CN108755736A (en) | A kind of precast prestressed board-like generation power foundation of wind power | |
| CN109706918A (en) | A kind of lifting restricted clearance steel reinforcement cage aperture molding machine and its construction method | |
| CN108678752A (en) | Shaft equipment rapid installation process | |
| JP2018100589A (en) | Basic assembly steel bar construction method | |
| CN207714314U (en) | A kind of pile foundation construction supporting construction in soft soil foundation | |
| CN102146729B (en) | Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof | |
| CN108265743B (en) | The positioning device and its construction method in a kind of wind driven generator base prestress anchorage cable duct | |
| CN207293909U (en) | A kind of precast beam reinforced bar skeleton hanging apparatus | |
| CN109024649A (en) | Bottom plate multilayer Large-size rebar installs system and construction method | |
| JP6369870B2 (en) | Reinforcing bar assembly equipment | |
| CN208563968U (en) | A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus | |
| CN108131042B (en) | Concurrent, production method, construction tool and construction method | |
| CN105401585B (en) | Utilize the structure and its construction method of foundation ditch support system support tower crane | |
| CN206070404U (en) | Oblique formwork support structure at the section haunch of box culvert top | |
| CN109137990A (en) | A kind of prefabricated cushion cap of land delay-pour joint sectional type and its production and installation method | |
| CN110541429B (en) | Energy-consuming bolted connection method for connecting prefabricated concrete columns to foundations | |
| JP2012154081A (en) | Reinforcement method of hollow columnar object and reinforcing bar expansion device for hollow columnar object | |
| CN210918762U (en) | Reinforced concrete protective airtight door leaf | |
| CN211735395U (en) | Pile stabilizing device for pile cutting construction | |
| CN107700869A (en) | A kind of cast-in-place supporting construction of conical shell formula water tower | |
| CN211621558U (en) | Bored concrete pile steel reinforcement cage elevation control mounting structure | |
| CN209384226U (en) | A kind of Manual hole pile digging device in shifting sand layers | |
| CN211646486U (en) | Post-cast strip regularization formwork system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |