CN108756274A - A kind of construction evens equipment out before being laid with cement with room - Google Patents
A kind of construction evens equipment out before being laid with cement with room Download PDFInfo
- Publication number
- CN108756274A CN108756274A CN201810481568.8A CN201810481568A CN108756274A CN 108756274 A CN108756274 A CN 108756274A CN 201810481568 A CN201810481568 A CN 201810481568A CN 108756274 A CN108756274 A CN 108756274A
- Authority
- CN
- China
- Prior art keywords
- block
- spring
- mounting blocks
- guide rod
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004568 cement Substances 0.000 title claims abstract description 49
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 208000028804 PERCHING syndrome Diseases 0.000 claims abstract description 38
- 238000003825 pressing Methods 0.000 claims description 64
- 244000309464 bull Species 0.000 claims description 22
- 239000007787 solid Substances 0.000 description 9
- 238000009434 installation Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000002352 surface water Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/006—Arrangements for removing of previously fixed floor coverings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The present invention relates to even out before equipment more particularly to a kind of construction are laid with cement with room to even equipment out before a kind of room laying cement.It the cement block being stained on ground is rooted out automatically, automatically collects the cement block after rooting out the object of the present invention is to provide a kind of, will insert automatically before the construction that ground recess cement block flattens is laid with cement with room and even equipment out.Technical solution is:A kind of construction evens equipment out before being laid with cement with room, includes mounting blocks, wheel, mounting base, motor, all gear, the first sliding rail, the first sliding block, link block, the first spring, wedge block, the second sliding rail, second sliding block etc.;The bottom of mounting blocks is equipped with wheel, and the lower right side of mounting blocks is provided with mounting groove, mounting base is connected on the mounting blocks of mounting groove bottom right, motor is equipped in mounting base.The present invention is by motor constantly along inverse alternate rotation, and can allowing perching knife, constantly the cement block being stained on ground is rooted out in side-to-side movement.
Description
Technical field
The present invention relates to even equipment more particularly to a kind of construction room laying water before a kind of room laying cement out
Even equipment before mud out.
Background technology
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also
It says it is various lines on design drawing, in specified place, becomes process in kind.It includes basic engineering construction, master
Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries
" construction site ", is also named building site.
In construction, need just to start after carrying out wall and roof to be laid with cement to ground, on such ground
It will be stained with more silt and cement, so user needs first before being laid with cement to ground by the silt and water on ground
Mud shovel removes, and manually roots out these things not only it will take a lot of manpower and time, nor when good control is rooted out
The depth, so occurring evening equipment out before many construction are laid with cement with room currently on the market.
When ground is stained with a large amount of cement blocks, user generally can directly manually be rooted out cement with perching knife;It is shoveled in user
After knife roots out cement block, user can generally collect cement block in collection frame;When finding that room floors have recess, user
Collected cement block can be inserted ground recess;Cement block is being filled out after the recess of ground, user can generally be incited somebody to action with pressing plate
Cement block flattens.
Therefore there is an urgent need for research and develop it is a kind of the cement block being stained on ground is rooted out automatically, will root out automatically after cement block collection
Get up, will insert automatically before the construction that ground recess cement block flattens is laid with cement with room and even equipment out.
Invention content
It needs user manually to root out the cement block that ground is stained with to overcome, need user manually by the cement after rooting out
Block collects, needs user that collected cement block is inserted ground recess manually, user hand is needed to employ pressing plate pressing
In the recess of ground the shortcomings that cement block, the cement block being stained on ground is rooted out automatically, certainly the object of the present invention is to provide a kind of
It is dynamic that cement block after rooting out is collected, the construction room laying water that ground recess cement block flattens will be inserted automatically
Even equipment before mud out.
Technical solution is:A kind of construction evens equipment out before being laid with cement with room, includes mounting blocks, wheel, peace
Fill seat, motor, all gear, the first sliding rail, the first sliding block, link block, the first spring, wedge block, the second sliding rail, the second sliding block,
Perching knife, the first rack, third sliding rail, third sliding block, the first L-shaped connecting rod, roller, first bearing seat, the first bull stick and pushing hands,
The bottom of mounting blocks is equipped with wheel, and the lower right side of mounting blocks is provided with mounting groove, connects on the mounting blocks of mounting groove bottom right
It is connected to mounting base, motor is installed in mounting base, all gear is connected on the output shaft of motor, the right side of mounting blocks is equipped with first
Sliding rail, slidingtype is connected with the first sliding block on the first sliding rail, and the lower right side of the first sliding rail is equipped with link block, the top of link block
It is connected with the first spring between the bottom of the first sliding block, wedge block is connected on the right side of the first sliding block, the bottom of wedge block is set
There is the second sliding rail, slidingtype is connected with the second sliding block on the second sliding rail, and the bottom of the second sliding block is connected with perching knife, the left side of perching knife
It is connected with the first rack, the left part of the first rack is located in mounting groove, and the first rack coordinates with all gear, is set at the top of mounting blocks
There is a third sliding rail, slidingtype is connected with third sliding block on third sliding rail, and the first L-shaped connecting rod is connected at the top of third sliding block,
The bottom end of first L-shaped connecting rod is connected with roller, is contacted at the top of roller and wedge block, the left part connection of the first L-shaped connecting rod
There is first bearing seat, the first bull stick is connected at the top of first bearing seat, the left upper portion of mounting blocks is connected with pushing hands.
Preferably, further including having the first guide sleeve, the first guide rod, the second L-shaped connecting rod, scoop, third connecting rod, second
Guide sleeve, the second guide rod, push plate, the first connecting plate, second spring, fixed pulley, spill fixture block, bracing wire and kelly install trench bottom
It is connected with the first guide sleeve on mounting blocks, the first guide sleeve inner sliding type is connected with the first guide rod, and the lower right side of the first guide rod connects
It is connected to the second L-shaped connecting rod, the top of the second L-shaped connecting rod is connected to the bottom left of wedge block, and the bottom of the first guide rod connects
It is connected to scoop, the left wall top of scoop is provided with a word hole, and the bottom left of mounting blocks is equipped with third connecting rod, third connecting rod position
In the left of the first guide rod, the bottom of third connecting rod is connected with the second guide sleeve, and the second guide sleeve inner sliding type is connected with second and leads
Bar, the second guide rod pass through a word hole, are connected with push plate on the right side of the second guide rod, push plate is located in scoop, under the left side of mounting blocks
Portion is equipped with the first connecting plate, and the lower part of the first connecting plate is provided with through-hole, the right side of the left lower of the second guide rod and the first connecting plate
Second spring is connected between side lower part, second spring is in compressive state, and the left lower of the first connecting plate, which is connected with, determines cunning
It takes turns, is connected with spill fixture block on the left of mounting blocks, spill fixture block is located at the lower section of pushing hands, and the left upper portion of the second guide rod is connected with
Bracing wire, is drawstring through through-hole, and bracing wire bypasses fixed pulley, is drawstring through spill fixture block, bracing wire top is connected with kelly, and kelly is stuck in
At the top of spill fixture block.
Preferably, further include thering is third spring, the second connecting plate and third connecting plate, the lower part of push plate to be provided with groove,
Third spring is connected in the push plate of groove top, third spring is compressed, and the end of third spring is connected with the second connecting plate,
The bottom of second connecting plate is connected with third connecting plate.
Preferably, further including having third guide sleeve, the second rack, the first pressing plate, the 4th spring, second bearing seat, second
Shaft, sector gear, belt pulley, flat belt and strut, the right part on front side of the second L-shaped connecting rod lower wall are connected with third guide sleeve,
Third guide sleeve inner sliding type is connected with the second rack, and the bottom of the second rack is connected with the first pressing plate, the top of the first pressing plate with
The 4th spring is connected between the bottom of second L-shaped connecting rod, the 4th spring is located at the right of the second rack, the wheel of forward right side
Right side is equipped with strut, and the front side right part of strut is equipped with second bearing seat, in second bearing seat interference be connected with the second shaft, the
The front of two shafts is connected with sector gear, and sector gear is meshed with the second rack, the front end of the second shaft and all gear
Front side is respectively connected with belt pulley, and flat belt is connected between two belt pulleys.
Preferably, further include having the 4th guide sleeve, the 4th guide rod, the second pressing plate and the 5th spring, the left and right of the first pressing plate
Two are respectively connected with the 4th guide sleeve, and slidingtype is connected with the 4th guide rod in the 4th guide sleeve of the left and right sides, and the of the left and right sides
Four guide rod bottoms are equipped with the second pressing plate, connect between the left and right sides of the first pressing plate bottom and the left and right sides of the second pressing plate bottom
It is connected to the 5th spring.
When user needs using this equipment, this equipment is shifted onto in room by pushing hands first, then hold the first bull stick
It moves downward, the first bull stick drives the first L-shaped connecting rod to move downward by first bearing seat, and the first L-shaped connecting rod drives rolling
Son moves downward, and then wedge block is made to move downward, and wedge block is moved downward by the first sliding block on the first sliding rail, the first bullet
Spring is compressed, and wedge block drives lower device to move downward, and the first rack is moved downwardly to be engaged with all gear, and perching knife is transported downwards
When moving to ground to appropriate location, when the first bull stick is just moved downward to the left side of mounting blocks, user is again by the first bull stick
180 degree is rotated, and then fixes the position of the first L-shaped connecting rod, subsequent user controls motor and rotates clockwise again, and motor passes through defeated
Shaft drives all gear to rotate clockwise, and all gear drives the first rack to move right, and the first rack pushes perching knife to move right,
Perching knife is moved right by the second sliding block on the second sliding rail, and perching knife evens the cement block on ground out, when the second sliding block to the right
When moving to the right side of the second sliding rail, user controls motor and rotates counterclockwise again, and motor drives all gear inverse time by output shaft
Needle rotates, and all gear drives the first rack to move downward, and the first rack pushes perching knife to move downward, and perching knife is existed by the second sliding block
It is moved downward on second sliding rail, motor is constantly controlled by user along inverse alternate rotation, and then perching knife is made constantly to shovel to the right
Except surface water clod closes motor, and rotate counterclockwise the first bull stick 180 degree when user need not use this equipment, first
Spring sets back, and the first sliding block is pushed to move upwards, and the first sliding block drive wedge block and thereon device are on the first sliding rail
Move up reset.
Because further include have the first guide sleeve, the first guide rod, the second L-shaped connecting rod, scoop, third connecting rod, the second guide sleeve,
Second guide rod, push plate, the first connecting plate, second spring, fixed pulley, spill fixture block, bracing wire and kelly install trench bottom mounting blocks
On be connected with the first guide sleeve, the first guide sleeve inner sliding type is connected with the first guide rod, and the lower right side of the first guide rod is connected with
The top of two L-shaped connecting rods, the second L-shaped connecting rod is connected to the bottom left of wedge block, and the bottom of the first guide rod is connected with shovel
The left wall top of son, scoop is provided with a word hole, and the bottom left of mounting blocks is equipped with third connecting rod, and third connecting rod is located at first
The left of guide rod, the bottom of third connecting rod are connected with the second guide sleeve, and the second guide sleeve inner sliding type is connected with the second guide rod, and second
Guide rod passes through a word hole, is connected with push plate on the right side of the second guide rod, and push plate is located in scoop, and the left lowers of mounting blocks is equipped with the
One connecting plate, the lower part of the first connecting plate are provided with through-hole, the lower right side of the left lower of the second guide rod and the first connecting plate it
Between be connected with second spring, second spring is in compressive state, and the left lower of the first connecting plate is connected with fixed pulley, mounting blocks
Left side be connected with spill fixture block, spill fixture block is located at the lower section of pushing hands, and the left upper portion of the second guide rod is connected with bracing wire, bracing wire
Across through-hole, bracing wire bypasses fixed pulley, is drawstring through spill fixture block, bracing wire top is connected with kelly, and kelly is stuck in spill fixture block
Top can drive the first guide rod to move downward, the first guide rod so when wedge block moves downward by the second L-shaped connecting rod
Drive scoop move downward, scoop with mounting blocks move and move, and then by perching knife shovel under solids collect, when with
Family finds ground when having recess, can be by pushing mounting blocks that scoop is pushed into ground recess, then by kelly from spill fixture block
Upper taking-up, bracing wire are relaxed, and second spring sets back, and push the second guide rod move right, the second guide rod drive push plate to
Right movement, push plate shifts the solids in scoop onto ground recess, and then ground recess is filled and led up, and after ground is filled and led up, uses
Family again puts back to kelly on spill fixture block, and bracing wire is tightened up, and then the second guide rod is driven to move downward, and the second guide rod drives push plate
It moving downward, second spring is compressed, and can not only be collected the solids on ground in this way, but also can fill and lead up ground,
When wedge block moves up reset, scoop can also reset therewith.
Because further including having third spring, the second connecting plate and third connecting plate, the lower part of push plate is provided with groove, groove top
Third spring is connected in the push plate in portion, third spring is compressed, and the end of third spring is connected with the second connecting plate, and second connects
The bottom of fishplate bar is connected with third connecting plate, so when scoop moves downward, third spring gradually sets back, and then pushes
Second connecting plate and third connecting plate move downward, and in this way when push plate moves right, third connecting plate can be close to always scoop
Gleanings in scoop so can all be released, prevent having gleanings residual in scoop by interior bottom.
Because further include have third guide sleeve, the second rack, the first pressing plate, the 4th spring, second bearing seat, the second shaft,
Sector gear, belt pulley, flat belt and strut, the right part on front side of the second L-shaped connecting rod lower wall are connected with third guide sleeve, and third is led
Set inner sliding type is connected with the second rack, and the bottom of the second rack is connected with the first pressing plate, the top of the first pressing plate and the second L-shaped
The 4th spring is connected between the bottom of connecting rod, the 4th spring is located at the right of the second rack, is set on the right side of the wheel of forward right side
Have strut, the front side right part of strut that second bearing seat is installed, in second bearing seat interference be connected with the second shaft, the second shaft
Front be connected with sector gear, sector gear is meshed with the second rack, and the front end of the second shaft and the front side of all gear are equal
It is connected with belt pulley, flat belt is connected between two belt pulleys, so when all gear rotates counterclockwise, upside can be driven
Belt pulley rotates counterclockwise, and the belt pulley of upside drives the belt pulley of downside to rotate counterclockwise by flat belt, and then drives fan
Shape gear rotates counterclockwise, and sector gear drives the second rack to move downward, and second the first pressing plate of rack drives moves downward, the
The ground recess that one pressing plate will be filled with solids flattens, and when all gear rotates clockwise, can drive the belt pulley up time of upside
Needle rotates, and the belt pulley of upside drives the belt pulley of downside to rotate clockwise by flat belt, and then drives sector gear up time
Needle rotates, and sector gear band carry-over bar moves upwards, and second the first pressing plate of rack drives moves upwards, in the effect of the 4th spring
Under, the first pressing plate moves up and down more steady, by all gear constantly along inverse alternate rotation, and then keeps the first pressing plate continuous
Ground moves up and down, and the ground that finally will be filled with solids flattens.
Because further including having the 4th guide sleeve, the 4th guide rod, the second pressing plate and the 5th spring, the left and right two of the first pressing plate is
It is connected with the 4th guide sleeve, slidingtype is connected with the 4th guide rod, the 4th guide rod of the left and right sides in the 4th guide sleeve of the left and right sides
Bottom is equipped with the second pressing plate, and the is respectively connected between the left and right sides of the first pressing plate bottom and the left and right sides of the second pressing plate bottom
Five springs can drive the second pressing plate to move downward so when the first pressing plate moves downward by the 4th guide rod of the left and right sides,
Under the 5th spring effect of the left and right sides, the second pressing plate can be swung up and down with the fluctuating on ground, not only can be prevented
First pressing plate knocked by ground it is bad, can also avoid the second rack damage.
The present invention, constantly along inverse alternate rotation, can allow perching knife constantly side-to-side movement that will be glued on ground by motor
Some cement blocks are rooted out;Automatically the cement block after rooting out can be collected by scoop;Pass through the second guide rod and push plate
Side-to-side movement, can by collected cement block insert ground recess;Pass through the fortune up and down of the second rack and the first pressing plate
It is dynamic, the cement block of ground recess can be flattened.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the dimensional structure diagram of spill fixture block of the present invention.
Fig. 4 is the main structure diagram of push plate of the present invention.
Fig. 5 is the third main structure diagram of the present invention.
Fig. 6 is the main structure diagram of the first pressing plate of the invention.
The meaning of reference numeral in figure:1 mounting blocks, 2 wheels, 3 mounting grooves, 4 mounting bases, 5 motors, 6 all gears,
7 first sliding rails, 8 first sliding blocks, 9 link blocks, 10 first springs, 11 wedge blocks, 12 second sliding rails, 13 second sliding blocks,
14 perching knives, 15 first racks, 16 third sliding rails, 17 third sliding blocks, 18 first L-shaped connecting rods, 19 rollers, 20 first
Bearing block, 21 first bull sticks, 22 pushing hands, 23 first guide sleeves, 24 first guide rods, 25 second L-shaped connecting rods, 26 scoops,
27 1 word holes, 28 third connecting rods, 29 second guide sleeves, 30 second guide rods, 31 push plates, 32 first connecting plates, 33 is logical
Hole, 34 second springs, 35 fixed pulleys, 36 spill fixture blocks, 37 bracing wires, 38 kellies, 39 grooves, 40 third springs, 41
Second connecting plate, 42 third connecting plates, 43 third guide sleeves, 44 second racks, 45 first pressing plates, 46 the 4th springs, 47
Second bearing seat, 48 second shafts, 49 sector gears, 50 belt pulleys, 51 flat belts, 52 struts, 53 the 4th guide sleeves, 54
4th guide rod, 55 the 5th springs, 56 second pressing plates.
Specific implementation mode
With reference to specific embodiment, the invention will be further described, in the illustrative examples and explanation of the invention
For explaining the present invention, but it is not as a limitation of the invention.
Embodiment 1
A kind of construction evens equipment out before being laid with cement with room, includes mounting blocks 1, wheel 2, installation as shown in figures 1 to 6
Seat 4, motor 5, all gear 6, the first sliding rail 7, the first sliding block 8, link block 9, the first spring 10, wedge block 11, the second sliding rail 12,
Second sliding block 13, perching knife 14, the first rack 15, third sliding rail 16, third sliding block 17, the first L-shaped connecting rod 18, roller 19,
The bottom of one bearing block 20, the first bull stick 21 and pushing hands 22, mounting blocks 1 is equipped with wheel 2, and the lower right side of mounting blocks 1 is provided with
Mounting groove 3 is connected with mounting base 4 on the mounting blocks 1 of 3 bottom right of mounting groove, motor 5 is equipped in mounting base 4, motor 5
All gear 6 is connected on output shaft, the right side of mounting blocks 1 is equipped with the first sliding rail 7, and slidingtype is connected with first on the first sliding rail 7
The lower right side of sliding block 8, the first sliding rail 7 is equipped with link block 9, is connected between the top of link block 9 and the bottom of the first sliding block 8
The right side of first spring 10, the first sliding block 8 is connected with wedge block 11, and the bottom of wedge block 11 is equipped with the second sliding rail 12, and second slides
Slidingtype is connected with the second sliding block 13 on rail 12, and the bottom of the second sliding block 13 is connected with perching knife 14, and the left side of perching knife 14 is connected with
The left part of first rack 15, the first rack 15 is located in mounting groove 3, and the first rack 15 coordinates with all gear 6, the top of mounting blocks 1
Portion is equipped with third sliding rail 16, and slidingtype is connected with third sliding block 17 on third sliding rail 16, and the top of third sliding block 17 is connected with the
The bottom end of one L-shaped connecting rod 18, the first L-shaped connecting rod 18 is connected with roller 19, and roller 19 is contacted with the top of wedge block 11, the
The left part of one L-shaped connecting rod 18 is connected with first bearing seat 20, and the top of first bearing seat 20 is connected with the first bull stick 21, installation
The left upper portion of block 1 is connected with pushing hands 22.
Embodiment 2
A kind of construction evens equipment out before being laid with cement with room, includes mounting blocks 1, wheel 2, installation as shown in figures 1 to 6
Seat 4, motor 5, all gear 6, the first sliding rail 7, the first sliding block 8, link block 9, the first spring 10, wedge block 11, the second sliding rail 12,
Second sliding block 13, perching knife 14, the first rack 15, third sliding rail 16, third sliding block 17, the first L-shaped connecting rod 18, roller 19,
The bottom of one bearing block 20, the first bull stick 21 and pushing hands 22, mounting blocks 1 is equipped with wheel 2, and the lower right side of mounting blocks 1 is provided with
Mounting groove 3 is connected with mounting base 4 on the mounting blocks 1 of 3 bottom right of mounting groove, motor 5 is equipped in mounting base 4, motor 5
All gear 6 is connected on output shaft, the right side of mounting blocks 1 is equipped with the first sliding rail 7, and slidingtype is connected with first on the first sliding rail 7
The lower right side of sliding block 8, the first sliding rail 7 is equipped with link block 9, is connected between the top of link block 9 and the bottom of the first sliding block 8
The right side of first spring 10, the first sliding block 8 is connected with wedge block 11, and the bottom of wedge block 11 is equipped with the second sliding rail 12, and second slides
Slidingtype is connected with the second sliding block 13 on rail 12, and the bottom of the second sliding block 13 is connected with perching knife 14, and the left side of perching knife 14 is connected with
The left part of first rack 15, the first rack 15 is located in mounting groove 3, and the first rack 15 coordinates with all gear 6, the top of mounting blocks 1
Portion is equipped with third sliding rail 16, and slidingtype is connected with third sliding block 17 on third sliding rail 16, and the top of third sliding block 17 is connected with the
The bottom end of one L-shaped connecting rod 18, the first L-shaped connecting rod 18 is connected with roller 19, and roller 19 is contacted with the top of wedge block 11, the
The left part of one L-shaped connecting rod 18 is connected with first bearing seat 20, and the top of first bearing seat 20 is connected with the first bull stick 21, installation
The left upper portion of block 1 is connected with pushing hands 22.
Further include having the first guide sleeve 23, the first guide rod 24, the second L-shaped connecting rod 25, scoop 26, third connecting rod 28,
Two guide sleeves 29, the second guide rod 30, push plate 31, the first connecting plate 32, second spring 34, fixed pulley 35, spill fixture block 36, bracing wire 37
With kelly 38, the first guide sleeve 23 is connected on 3 bottom mounting blocks 1 of mounting groove, 23 inner sliding type of the first guide sleeve is connected with first
The lower right side of guide rod 24, the first guide rod 24 is connected with the second L-shaped connecting rod 25, and the top of the second L-shaped connecting rod 25 is connected to
The bottom of the bottom left of wedge block 11, the first guide rod 24 is connected with scoop 26, and the left wall top of scoop 26 is provided with a word hole 27,
The bottom left of mounting blocks 1 is equipped with third connecting rod 28, and third connecting rod 28 is located at the left of the first guide rod 24, third connecting rod
28 bottom is connected with the second guide sleeve 29, and 29 inner sliding type of the second guide sleeve is connected with the second guide rod 30, and the second guide rod 30 passes through one
The right side in word hole 27, the second guide rod 30 is connected with push plate 31, and push plate 31 is located in scoop 26, and the left lower of mounting blocks 1 is equipped with
The lower part of first connecting plate 32, the first connecting plate 32 is provided with through-hole 33, the left lower of the second guide rod 30 and the first connecting plate 32
Lower right side between be connected with second spring 34, second spring 34 is in compressive state, the left lower of the first connecting plate 32
It is connected with fixed pulley 35, the left sides of mounting blocks 1 is connected with spill fixture block 36, and spill fixture block 36 is located at the lower section of pushing hands 22, and second
The left upper portion of guide rod 30 is connected with bracing wire 37, and bracing wire 37 passes through through-hole 33, bracing wire 37 to bypass fixed pulley 35, and bracing wire 37 passes through recessed
Shape fixture block 36,37 top of bracing wire are connected with kelly 38, and kelly 38 is stuck in 36 top of spill fixture block.
Embodiment 3
A kind of construction evens equipment out before being laid with cement with room, includes mounting blocks 1, wheel 2, installation as shown in figures 1 to 6
Seat 4, motor 5, all gear 6, the first sliding rail 7, the first sliding block 8, link block 9, the first spring 10, wedge block 11, the second sliding rail 12,
Second sliding block 13, perching knife 14, the first rack 15, third sliding rail 16, third sliding block 17, the first L-shaped connecting rod 18, roller 19,
The bottom of one bearing block 20, the first bull stick 21 and pushing hands 22, mounting blocks 1 is equipped with wheel 2, and the lower right side of mounting blocks 1 is provided with
Mounting groove 3 is connected with mounting base 4 on the mounting blocks 1 of 3 bottom right of mounting groove, motor 5 is equipped in mounting base 4, motor 5
All gear 6 is connected on output shaft, the right side of mounting blocks 1 is equipped with the first sliding rail 7, and slidingtype is connected with first on the first sliding rail 7
The lower right side of sliding block 8, the first sliding rail 7 is equipped with link block 9, is connected between the top of link block 9 and the bottom of the first sliding block 8
The right side of first spring 10, the first sliding block 8 is connected with wedge block 11, and the bottom of wedge block 11 is equipped with the second sliding rail 12, and second slides
Slidingtype is connected with the second sliding block 13 on rail 12, and the bottom of the second sliding block 13 is connected with perching knife 14, and the left side of perching knife 14 is connected with
The left part of first rack 15, the first rack 15 is located in mounting groove 3, and the first rack 15 coordinates with all gear 6, the top of mounting blocks 1
Portion is equipped with third sliding rail 16, and slidingtype is connected with third sliding block 17 on third sliding rail 16, and the top of third sliding block 17 is connected with the
The bottom end of one L-shaped connecting rod 18, the first L-shaped connecting rod 18 is connected with roller 19, and roller 19 is contacted with the top of wedge block 11, the
The left part of one L-shaped connecting rod 18 is connected with first bearing seat 20, and the top of first bearing seat 20 is connected with the first bull stick 21, installation
The left upper portion of block 1 is connected with pushing hands 22.
Further include having the first guide sleeve 23, the first guide rod 24, the second L-shaped connecting rod 25, scoop 26, third connecting rod 28,
Two guide sleeves 29, the second guide rod 30, push plate 31, the first connecting plate 32, second spring 34, fixed pulley 35, spill fixture block 36, bracing wire 37
With kelly 38, the first guide sleeve 23 is connected on 3 bottom mounting blocks 1 of mounting groove, 23 inner sliding type of the first guide sleeve is connected with first
The lower right side of guide rod 24, the first guide rod 24 is connected with the second L-shaped connecting rod 25, and the top of the second L-shaped connecting rod 25 is connected to
The bottom of the bottom left of wedge block 11, the first guide rod 24 is connected with scoop 26, and the left wall top of scoop 26 is provided with a word hole 27,
The bottom left of mounting blocks 1 is equipped with third connecting rod 28, and third connecting rod 28 is located at the left of the first guide rod 24, third connecting rod
28 bottom is connected with the second guide sleeve 29, and 29 inner sliding type of the second guide sleeve is connected with the second guide rod 30, and the second guide rod 30 passes through one
The right side in word hole 27, the second guide rod 30 is connected with push plate 31, and push plate 31 is located in scoop 26, and the left lower of mounting blocks 1 is equipped with
The lower part of first connecting plate 32, the first connecting plate 32 is provided with through-hole 33, the left lower of the second guide rod 30 and the first connecting plate 32
Lower right side between be connected with second spring 34, second spring 34 is in compressive state, the left lower of the first connecting plate 32
It is connected with fixed pulley 35, the left sides of mounting blocks 1 is connected with spill fixture block 36, and spill fixture block 36 is located at the lower section of pushing hands 22, and second
The left upper portion of guide rod 30 is connected with bracing wire 37, and bracing wire 37 passes through through-hole 33, bracing wire 37 to bypass fixed pulley 35, and bracing wire 37 passes through recessed
Shape fixture block 36,37 top of bracing wire are connected with kelly 38, and kelly 38 is stuck in 36 top of spill fixture block.
Further include thering is third spring 40, the second connecting plate 41 and third connecting plate 42, the lower part of push plate 31 to be provided with groove 39,
It is connected with third spring 40 in the push plate 31 at 39 top of groove, third spring 40 is compressed, and the end of third spring 40 is connected with
The bottom of second connecting plate 41, the second connecting plate 41 is connected with third connecting plate 42.
Embodiment 4
A kind of construction evens equipment out before being laid with cement with room, includes mounting blocks 1, wheel 2, installation as shown in figures 1 to 6
Seat 4, motor 5, all gear 6, the first sliding rail 7, the first sliding block 8, link block 9, the first spring 10, wedge block 11, the second sliding rail 12,
Second sliding block 13, perching knife 14, the first rack 15, third sliding rail 16, third sliding block 17, the first L-shaped connecting rod 18, roller 19,
The bottom of one bearing block 20, the first bull stick 21 and pushing hands 22, mounting blocks 1 is equipped with wheel 2, and the lower right side of mounting blocks 1 is provided with
Mounting groove 3 is connected with mounting base 4 on the mounting blocks 1 of 3 bottom right of mounting groove, motor 5 is equipped in mounting base 4, motor 5
All gear 6 is connected on output shaft, the right side of mounting blocks 1 is equipped with the first sliding rail 7, and slidingtype is connected with first on the first sliding rail 7
The lower right side of sliding block 8, the first sliding rail 7 is equipped with link block 9, is connected between the top of link block 9 and the bottom of the first sliding block 8
The right side of first spring 10, the first sliding block 8 is connected with wedge block 11, and the bottom of wedge block 11 is equipped with the second sliding rail 12, and second slides
Slidingtype is connected with the second sliding block 13 on rail 12, and the bottom of the second sliding block 13 is connected with perching knife 14, and the left side of perching knife 14 is connected with
The left part of first rack 15, the first rack 15 is located in mounting groove 3, and the first rack 15 coordinates with all gear 6, the top of mounting blocks 1
Portion is equipped with third sliding rail 16, and slidingtype is connected with third sliding block 17 on third sliding rail 16, and the top of third sliding block 17 is connected with the
The bottom end of one L-shaped connecting rod 18, the first L-shaped connecting rod 18 is connected with roller 19, and roller 19 is contacted with the top of wedge block 11, the
The left part of one L-shaped connecting rod 18 is connected with first bearing seat 20, and the top of first bearing seat 20 is connected with the first bull stick 21, installation
The left upper portion of block 1 is connected with pushing hands 22.
Further include having the first guide sleeve 23, the first guide rod 24, the second L-shaped connecting rod 25, scoop 26, third connecting rod 28,
Two guide sleeves 29, the second guide rod 30, push plate 31, the first connecting plate 32, second spring 34, fixed pulley 35, spill fixture block 36, bracing wire 37
With kelly 38, the first guide sleeve 23 is connected on 3 bottom mounting blocks 1 of mounting groove, 23 inner sliding type of the first guide sleeve is connected with first
The lower right side of guide rod 24, the first guide rod 24 is connected with the second L-shaped connecting rod 25, and the top of the second L-shaped connecting rod 25 is connected to
The bottom of the bottom left of wedge block 11, the first guide rod 24 is connected with scoop 26, and the left wall top of scoop 26 is provided with a word hole 27,
The bottom left of mounting blocks 1 is equipped with third connecting rod 28, and third connecting rod 28 is located at the left of the first guide rod 24, third connecting rod
28 bottom is connected with the second guide sleeve 29, and 29 inner sliding type of the second guide sleeve is connected with the second guide rod 30, and the second guide rod 30 passes through one
The right side in word hole 27, the second guide rod 30 is connected with push plate 31, and push plate 31 is located in scoop 26, and the left lower of mounting blocks 1 is equipped with
The lower part of first connecting plate 32, the first connecting plate 32 is provided with through-hole 33, the left lower of the second guide rod 30 and the first connecting plate 32
Lower right side between be connected with second spring 34, second spring 34 is in compressive state, the left lower of the first connecting plate 32
It is connected with fixed pulley 35, the left sides of mounting blocks 1 is connected with spill fixture block 36, and spill fixture block 36 is located at the lower section of pushing hands 22, and second
The left upper portion of guide rod 30 is connected with bracing wire 37, and bracing wire 37 passes through through-hole 33, bracing wire 37 to bypass fixed pulley 35, and bracing wire 37 passes through recessed
Shape fixture block 36,37 top of bracing wire are connected with kelly 38, and kelly 38 is stuck in 36 top of spill fixture block.
Further include thering is third spring 40, the second connecting plate 41 and third connecting plate 42, the lower part of push plate 31 to be provided with groove 39,
It is connected with third spring 40 in the push plate 31 at 39 top of groove, third spring 40 is compressed, and the end of third spring 40 is connected with
The bottom of second connecting plate 41, the second connecting plate 41 is connected with third connecting plate 42.
Further include having third guide sleeve 43, the second rack 44, the first pressing plate 45, the 4th spring 46, second bearing seat 47, second
Shaft 48, sector gear 49, belt pulley 50, flat belt 51 and strut 52, the right part connection on front side of 25 lower wall of the second L-shaped connecting rod
There are third guide sleeve 43,43 inner sliding type of third guide sleeve to be connected with the second rack 44, the bottom of the second rack 44 is connected with the first pressure
Plate 45 is connected with the 4th spring 46, the 4th 46, spring between the top of first pressing plate 45 and the bottom of the second L-shaped connecting rod 25
In the right of the second rack 44,2 right side of wheel of forward right side is equipped with strut 52, and the front side right part of strut 52 is equipped with second bearing
Seat 47, in second bearing seat 47 interference be connected with the second shaft 48, the front of the second shaft 48 is connected with sector gear 49, fan-shaped
Gear 49 is meshed with the second rack 44, and the front end of the second shaft 48 and the front side of all gear 6 are respectively connected with belt pulley 50, two
Flat belt 51 is connected between belt pulley 50.
Further include having the 4th guide sleeve 53, the 4th guide rod 54, the second pressing plate 56 and the 5th spring 55, the left and right of the first pressing plate 45
Two are respectively connected with the 4th guide sleeve 53, and slidingtype is connected with the 4th guide rod 54, left and right two in the 4th guide sleeve 53 of the left and right sides
54 bottom of the 4th guide rod of side is equipped with the second pressing plate 56, a left side for the left and right sides and 56 bottom of the second pressing plate of 45 bottom of the first pressing plate
The 5th spring 55 is respectively connected between right both sides.
When user needs using this equipment, this equipment is shifted onto in room by pushing hands 22 first, then hold first turn
Bar 21 moves downward, and the first bull stick 21 drives the first L-shaped connecting rod 18 to move downward by first bearing seat 20, and the first L-shaped connects
Extension bar 18 drives roller 19 to move downward, and then wedge block 11 is made to move downward, and wedge block 11 is slided by the first sliding block 8 first
It is moved downward on rail 7, the first spring 10 is compressed, and wedge block 11 drives lower device to move downward, and the first rack 15 is transported downwards
It moves to all gear 6 and engages, when perching knife 14 is moved downwardly to ground to appropriate location, when the first bull stick 21 just moves downward
To the left side of mounting blocks 1, the first bull stick 21 is rotated 180 degree by user again, and then fixes the position of the first L-shaped connecting rod 18, with
User controls motor 5 and rotates clockwise again afterwards, and motor 5 drives all gear 6 to rotate clockwise by output shaft, and all gear 6 drives
First rack 15 moves right, and the first rack 15 pushes perching knife 14 to move right, and perching knife 14 is slided by the second sliding block 13 second
It is moved right on rail 12, perching knife 14 evens the cement block on ground out, when the second sliding block 13 is moved right to the second sliding rail 12
When right side, user controls motor 5 and rotates counterclockwise again, and motor 5 drives all gear 6 to rotate counterclockwise by output shaft, all gear 6
The first rack 15 is driven to move downward, the first rack 15 pushes perching knife 14 to move downward, and perching knife 14 is by the second sliding block 13 the
It is moved downward on two sliding rails 12, motor 5 is constantly controlled by user along inverse alternate rotation, and then make perching knife 14 constantly to the right
Surface water clod is rooted out, when user need not use this equipment, closes motor 5, and rotate counterclockwise the first bull stick 21180
Degree, the first spring 10 set back, and the first sliding block 8 is pushed to move upwards, and the first sliding block 8 drives wedge block 11 and thereon device
Reset is moved up on the first sliding rail 7.
Because further including having the first guide sleeve 23, the first guide rod 24, the second L-shaped connecting rod 25, scoop 26, third connecting rod
28, the second guide sleeve 29, the second guide rod 30, push plate 31, the first connecting plate 32, second spring 34, fixed pulley 35, spill fixture block 36,
Bracing wire 37 and kelly 38 are connected with the first guide sleeve 23, the connection of 23 inner sliding type of the first guide sleeve on 3 bottom mounting blocks 1 of mounting groove
There are the first guide rod 24, the lower right side of the first guide rod 24 to be connected with the second L-shaped connecting rod 25, the top of the second L-shaped connecting rod 25
It is connected to the bottom left of wedge block 11, the bottom of the first guide rod 24 is connected with scoop 26, and the left wall top of scoop 26 is provided with one
The bottom left in word hole 27, mounting blocks 1 is equipped with third connecting rod 28, and third connecting rod 28 is located at the left of the first guide rod 24, the
The bottom of three connecting rods 28 is connected with the second guide sleeve 29, and 29 inner sliding type of the second guide sleeve is connected with the second guide rod 30, the second guide rod
30 pass through a word hole 27, the right side of the second guide rod 30 to be connected with push plate 31, and push plate 31 is located in scoop 26, the left side of mounting blocks 1
Lower part is equipped with the first connecting plate 32, and the lower part of the first connecting plate 32 is provided with through-hole 33, the left lower and first of the second guide rod 30
Second spring 34 is connected between the lower right side of connecting plate 32, second spring 34 is in compressive state, the first connecting plate 32
Left lower is connected with fixed pulley 35, and the left side of mounting blocks 1 is connected with spill fixture block 36, and spill fixture block 36 is located under pushing hands 22
The left upper portion of side, the second guide rod 30 is connected with bracing wire 37, and bracing wire 37 passes through through-hole 33, bracing wire 37 to bypass fixed pulley 35, bracing wire
37 pass through spill fixture block 36,37 top of bracing wire to be connected with kelly 38, and kelly 38 is stuck in 36 top of spill fixture block, so working as wedge block
11 when moving downward, and the first guide rod 24 can be driven to move downward by the second L-shaped connecting rod 25, the first guide rod 24 drives scoop 26
It moves downward, scoop 26 is moved as mounting blocks 1 move, and then the solids under the shovel of perching knife 14 is collected, and works as user
It, can be by pushing mounting blocks 1 that scoop 26 is pushed into ground recess, then by kelly 38 from spill card it was found that when there is recess on ground
It is taken out on block 36, bracing wire 37 is relaxed, and second spring 34 sets back, and the second guide rod 30 is pushed to move right, the second guide rod
30 drive push plates 31 move right, and push plate 31 shifts the solids in scoop 26 onto ground recess, and then ground recess is filled and led up,
After ground is filled and led up, user again puts back to kelly 38 on spill fixture block 36, and bracing wire 37 is tightened up, and then drives the second guide rod 30
It moves downward, the second guide rod 30 drives push plate 31 to move downward, and second spring 34 is compressed, so both can be by having consolidated on ground
Body object collects, and can fill and lead up ground, and when wedge block 11 moves up reset, scoop 26 can also reset therewith.
Because further including having third spring 40, the second connecting plate 41 and third connecting plate 42, the lower part of push plate 31 is provided with recessed
Slot 39 is connected with third spring 40 in the push plate 31 at the top of groove 39, and third spring 40 is compressed, and the end of third spring 40 connects
It is connected to the second connecting plate 41, the bottom of the second connecting plate 41 is connected with third connecting plate 42, so when scoop 26 moves downward,
Third spring 40 gradually sets back, and then the second connecting plate 41 and third connecting plate 42 is pushed to move downward, and works as push plate in this way
31 when moving right, and third connecting plate 42 can be close to always bottom in scoop 26, so can be complete by the gleanings in scoop 26
Portion releases, and prevents having gleanings residual in scoop 26.
Because further include have third guide sleeve 43, the second rack 44, the first pressing plate 45, the 4th spring 46, second bearing seat 47,
Second shaft 48, sector gear 49, belt pulley 50, flat belt 51 and strut 52, the right part on front side of 25 lower wall of the second L-shaped connecting rod
It is connected with third guide sleeve 43,43 inner sliding type of third guide sleeve is connected with the second rack 44, and the bottom of the second rack 44 is connected with
One pressing plate 45 is connected with the 4th spring 46, the 4th spring between the top of first pressing plate 45 and the bottom of the second L-shaped connecting rod 25
46 are located at the right of the second rack 44, and 2 right side of wheel of forward right side is equipped with strut 52, and the front side right part of strut 52 is equipped with second
Bearing block 47, in second bearing seat 47 interference be connected with the second shaft 48, the front of the second shaft 48 is connected with sector gear 49,
Sector gear 49 is meshed with the second rack 44, and the front end of the second shaft 48 and the front side of all gear 6 are respectively connected with belt pulley 50,
It is connected with flat belt 51 between two belt pulleys 50, so when all gear 6 rotates counterclockwise, the belt pulley 50 of upside can be driven
It rotates counterclockwise, the belt pulley 50 of upside drives the belt pulley 50 of downside to rotate counterclockwise by flat belt 51, and then drives fan
Shape gear 49 rotates counterclockwise, and sector gear 49 drives the second rack 44 to move downward, and the second rack 44 drives the first pressing plate 45
It moves downward, the ground recess that the first pressing plate 45 will be filled with solids flattens, and when all gear 6 rotates clockwise, can drive
The belt pulley 50 of side rotates clockwise, and the belt pulley 50 of upside drives the belt pulley 50 of downside to turn clockwise by flat belt 51
It is dynamic, and then sector gear 49 is driven to rotate clockwise, sector gear 49 is moved upwards with carry-over bar, and the second rack 44 drives first
Pressing plate 45 moves upwards, and under the action of the 4th spring 46, the first pressing plate 45 moves up and down more steady, passes through all gear 6
Constantly along inverse alternate rotation, and then the first pressing plate 45 is made constantly to move up and down, the ground that finally will be filled with solids flattens.
Because further including having the 4th guide sleeve 53, the 4th guide rod 54, the second pressing plate 56 and the 5th spring 55, the first pressing plate 45
Left and right two is respectively connected with the 4th guide sleeve 53, and slidingtype is connected with the 4th guide rod 54 in the 4th guide sleeve 53 of the left and right sides, left
54 bottom of the 4th guide rod of right both sides is equipped with the second pressing plate 56, the left and right sides and 56 bottom of the second pressing plate of 45 bottom of the first pressing plate
The left and right sides between be respectively connected with the 5th spring 55, so when the first pressing plate 45 moves downward, the left and right sides can be passed through
4th guide rod 54 drives the second pressing plate 56 to move downward, and under the 5th spring 55 effect of the left and right sides, the second pressing plate 56 can be with
It is swung up and down with the fluctuating on ground, not only can prevent the first pressing plate 45 from being knocked by ground bad, the second rack can also be avoided
44 damages.
Although the disclosure, art technology has shown and described with reference to the certain exemplary embodiments of the disclosure
Personnel it should be understood that in the case of the spirit and scope of the present disclosure limited without departing substantially from the following claims and their equivalents,
A variety of changes in form and details can be carried out to the disclosure.Therefore, the scope of the present disclosure should not necessarily be limited by above-described embodiment,
But should be not only determined by appended claims, also it is defined by the equivalent of appended claims.
Claims (5)
1. a kind of construction evens equipment out before being laid with cement with room, which is characterized in that include mounting blocks(1), wheel
(2), mounting base(4), motor(5), all gear(6), the first sliding rail(7), the first sliding block(8), link block(9), the first spring
(10), wedge block(11), the second sliding rail(12), the second sliding block(13), perching knife(14), the first rack(15), third sliding rail(16),
Third sliding block(17), the first L-shaped connecting rod(18), roller(19), first bearing seat(20), the first bull stick(21)And pushing hands
(22), mounting blocks(1)Bottom wheel is installed(2), mounting blocks(1)Lower right side be provided with mounting groove(3), mounting groove(3)
The mounting blocks of bottom right(1)On be connected with mounting base(4), mounting base(4)On motor is installed(5), motor(5)Output shaft
On be connected with all gear(6), mounting blocks(1)Right side be equipped with the first sliding rail(7), the first sliding rail(7)Upper slidingtype is connected with
One sliding block(8), the first sliding rail(7)Lower right side be equipped with link block(9), link block(9)Top and the first sliding block(8)Bottom
The first spring is connected between portion(10), the first sliding block(8)Right side be connected with wedge block(11), wedge block(11)Bottom set
There is the second sliding rail(12), the second sliding rail(12)Upper slidingtype is connected with the second sliding block(13), the second sliding block(13)Bottom connection
There is perching knife(14), perching knife(14)Left side be connected with the first rack(15), the first rack(15)Left part be located at mounting groove(3)
It is interior, the first rack(15)With all gear(6)Cooperation, mounting blocks(1)Top be equipped with third sliding rail(16), third sliding rail(16)On
Slidingtype is connected with third sliding block(17), third sliding block(17)Top be connected with the first L-shaped connecting rod(18), the first L-shaped company
Extension bar(18)Bottom end be connected with roller(19), roller(19)With wedge block(11)Top contact, the first L-shaped connecting rod(18)
Left part be connected with first bearing seat(20), first bearing seat(20)Top be connected with the first bull stick(21), mounting blocks(1)'s
Left upper portion is connected with pushing hands(22).
2. a kind of construction according to claim 1 evens equipment out before being laid with cement with room, which is characterized in that also wrap
The first guide sleeve is included(23), the first guide rod(24), the second L-shaped connecting rod(25), scoop(26), third connecting rod(28), second
Guide sleeve(29), the second guide rod(30), push plate(31), the first connecting plate(32), second spring(34), fixed pulley(35), spill card
Block(36), bracing wire(37)And kelly(38), mounting groove(3)Bottom mounting blocks(1)On be connected with the first guide sleeve(23), first leads
Set(23)Inner sliding type is connected with the first guide rod(24), the first guide rod(24)Lower right side be connected with the second L-shaped connecting rod
(25), the second L-shaped connecting rod(25)Top be connected to wedge block(11)Bottom left, the first guide rod(24)Bottom connection
There is scoop(26), scoop(26)Left wall top be provided with a word hole(27), mounting blocks(1)Bottom left be equipped with third connecting rod
(28), third connecting rod(28)Positioned at the first guide rod(24)Left, third connecting rod(28)Bottom be connected with the second guide sleeve
(29), the second guide sleeve(29)Inner sliding type is connected with the second guide rod(30), the second guide rod(30)Across a word hole(27), second leads
Bar(30)Right side be connected with push plate(31), push plate(31)Positioned at scoop(26)It is interior, mounting blocks(1)Left lower be equipped with first
Connecting plate(32), the first connecting plate(32)Lower part be provided with through-hole(33), the second guide rod(30)Left lower connect with first
Plate(32)Lower right side between be connected with second spring(34), second spring(34)In compressive state, the first connecting plate
(32)Left lower be connected with fixed pulley(35), mounting blocks(1)Left side be connected with spill fixture block(36), spill fixture block(36)
Positioned at pushing hands(22)Lower section, the second guide rod(30)Left upper portion be connected with bracing wire(37), bracing wire(37)Across through-hole(33),
Bracing wire(37)Around fixed pulley(35), bracing wire(37)Across spill fixture block(36), bracing wire(37)Top is connected with kelly(38), card
Bar(38)It is stuck in spill fixture block(36)Top.
3. a kind of construction according to claim 2 evens equipment out before being laid with cement with room, which is characterized in that also wrap
Third spring is included(40), the second connecting plate(41)With third connecting plate(42), push plate(31)Lower part be provided with groove(39), recessed
Slot(39)The push plate at top(31)On be connected with third spring(40), third spring(40)It is compressed, third spring(40)End
End is connected with the second connecting plate(41), the second connecting plate(41)Bottom be connected with third connecting plate(42).
4. a kind of construction according to claim 3 evens equipment out before being laid with cement with room, which is characterized in that also wrap
Third guide sleeve is included(43), the second rack(44), the first pressing plate(45), the 4th spring(46), second bearing seat(47), second turn
Axis(48), sector gear(49), belt pulley(50), flat belt(51)And strut(52), the second L-shaped connecting rod(25)On front side of lower wall
Right part be connected with third guide sleeve(43), third guide sleeve(43)Inner sliding type is connected with the second rack(44), the second rack(44)
Bottom be connected with the first pressing plate(45), the first pressing plate(45)Top and the second L-shaped connecting rod(25)Bottom between connect
There is the 4th spring(46), the 4th spring(46)Positioned at the second rack(44)Right, the wheel of forward right side(2)Right side is equipped with strut
(52), strut(52)Front side right part second bearing seat is installed(47), second bearing seat(47)Interior interference is connected with second turn
Axis(48), the second shaft(48)Front be connected with sector gear(49), sector gear(49)With the second rack(44)It is meshed,
Second shaft(48)Front end and all gear(6)Front side be respectively connected with belt pulley(50), two belt pulleys(50)Between connect
There is flat belt(51).
5. a kind of construction according to claim 4 evens equipment out before being laid with cement with room, which is characterized in that also wrap
The 4th guide sleeve is included(53), the 4th guide rod(54), the second pressing plate(56)With the 5th spring(55), the first pressing plate(45)Left and right two
Portion is respectively connected with the 4th guide sleeve(53), the 4th guide sleeve of the left and right sides(53)Interior equal slidingtype is connected with the 4th guide rod(54), left
4th guide rod of right both sides(54)Bottom is equipped with the second pressing plate(56), the first pressing plate(45)The left and right sides of bottom and the second pressing plate
(56)The 5th spring is respectively connected between the left and right sides of bottom(55).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810481568.8A CN108756274B (en) | 2018-05-18 | 2018-05-18 | Building construction is with shoveling equipment before room lays cement |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810481568.8A CN108756274B (en) | 2018-05-18 | 2018-05-18 | Building construction is with shoveling equipment before room lays cement |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108756274A true CN108756274A (en) | 2018-11-06 |
| CN108756274B CN108756274B (en) | 2020-08-11 |
Family
ID=64008470
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810481568.8A Expired - Fee Related CN108756274B (en) | 2018-05-18 | 2018-05-18 | Building construction is with shoveling equipment before room lays cement |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108756274B (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110984514A (en) * | 2019-12-03 | 2020-04-10 | 孔祥法 | A floor pre-cleaning device for ground troweling |
| CN111376377A (en) * | 2020-04-15 | 2020-07-07 | 林昆臻 | Ancient building green tile brick carving reduces gap device fast |
| CN111778824A (en) * | 2020-08-14 | 2020-10-16 | 潘家俊 | Cement cleaning device |
| CN112663443A (en) * | 2021-01-13 | 2021-04-16 | 尹英 | But grout cyclic utilization's cobblestone pavement device |
| CN112726333A (en) * | 2020-12-25 | 2021-04-30 | 浙江吉祥建设集团有限公司 | But quick equipment of laying of building cement thick liquid based on recovery type |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6467377B1 (en) * | 2001-01-22 | 2002-10-22 | Sven E. Kersting | Pneumatic stripping machine |
| CN205558290U (en) * | 2016-04-28 | 2016-09-07 | 嘉善誉亨木业有限责任公司 | Building templates thoughtlessly congeals soil spade and removes device |
| CN207228662U (en) * | 2017-11-21 | 2018-04-13 | 张新明 | A kind of building decoration is put with adjustable shovel wall leather jacket |
-
2018
- 2018-05-18 CN CN201810481568.8A patent/CN108756274B/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6467377B1 (en) * | 2001-01-22 | 2002-10-22 | Sven E. Kersting | Pneumatic stripping machine |
| CN205558290U (en) * | 2016-04-28 | 2016-09-07 | 嘉善誉亨木业有限责任公司 | Building templates thoughtlessly congeals soil spade and removes device |
| CN207228662U (en) * | 2017-11-21 | 2018-04-13 | 张新明 | A kind of building decoration is put with adjustable shovel wall leather jacket |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110984514A (en) * | 2019-12-03 | 2020-04-10 | 孔祥法 | A floor pre-cleaning device for ground troweling |
| CN111376377A (en) * | 2020-04-15 | 2020-07-07 | 林昆臻 | Ancient building green tile brick carving reduces gap device fast |
| CN111778824A (en) * | 2020-08-14 | 2020-10-16 | 潘家俊 | Cement cleaning device |
| CN111778824B (en) * | 2020-08-14 | 2022-03-01 | 安徽海川市政建设有限公司 | Cement cleaning device |
| CN112726333A (en) * | 2020-12-25 | 2021-04-30 | 浙江吉祥建设集团有限公司 | But quick equipment of laying of building cement thick liquid based on recovery type |
| CN112663443A (en) * | 2021-01-13 | 2021-04-16 | 尹英 | But grout cyclic utilization's cobblestone pavement device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108756274B (en) | 2020-08-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108756274A (en) | A kind of construction evens equipment out before being laid with cement with room | |
| CN210216807U (en) | Plant wall of green building | |
| CN106223593B (en) | Automatic paving machine | |
| CN112901853A (en) | Running water supply pipeline laying device and operation method thereof | |
| CN115885625A (en) | Pit digging device for landscaping and use method thereof | |
| CN109952841B (en) | Potato planting machine | |
| CN203821789U (en) | Dust-free plaster planning machine | |
| CN207553186U (en) | A kind of bottom of pond silt cleaning device | |
| CN107173115A (en) | Planting greenhouse | |
| CN220977887U (en) | Construction equipment is laid to hydraulic engineering river course bank protection | |
| CN114097360A (en) | Irrigation-free pit digging device and pit digging method | |
| CN211490792U (en) | Former ground environmental protection grinding device before epoxy terrace construction | |
| CN113702091A (en) | Soil sampling device for soil remediation | |
| CN116391472B (en) | A supplementary irrigation device for desalinating salt water in saline-alkali land | |
| CN112889616A (en) | Garden seedling planting device and planting method | |
| CN206016206U (en) | Automatic paving machine | |
| CN115474523B (en) | Desert ecological restoration robot and operation method thereof | |
| CN108343103B (en) | Foundation device digs for building | |
| CN214034608U (en) | Fitment wall body hand truck that plasters | |
| CN2602587Y (en) | Vehicle-carried automatical tree-transplanting device | |
| CN114451084B (en) | Earth surface landfill processing apparatus is restoreed to biological carpet in tombarthite mining area | |
| CN204850503U (en) | Automatic machine of building a wall | |
| CN206923258U (en) | A kind of digging apparatus for rhizoma Gastrodiae | |
| CN208370261U (en) | A kind of hand-pushed drum type pineapple picking machine | |
| CN213626533U (en) | Floor tile joint filling device for building construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20200717 Address after: 443100 Jinjiang East Road (front of Hujin garden), Yiling District, Yichang City, Hubei Province Applicant after: YICHANG HUICHENG CONSTRUCTION ENGINEERING Co.,Ltd. Address before: 211100 Nanjing city fourth construction engineering company, No. 998 Qingting East Road, Jiangning District, Nanjing, Jiangsu Applicant before: Qin Rulong |
|
| TA01 | Transfer of patent application right | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200811 Termination date: 20210518 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |