CN109062767A - The management method and device monitored in cloud computing system - Google Patents
The management method and device monitored in cloud computing system Download PDFInfo
- Publication number
- CN109062767A CN109062767A CN201810893569.3A CN201810893569A CN109062767A CN 109062767 A CN109062767 A CN 109062767A CN 201810893569 A CN201810893569 A CN 201810893569A CN 109062767 A CN109062767 A CN 109062767A
- Authority
- CN
- China
- Prior art keywords
- equipment
- data
- data monitoring
- strategy
- computing system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3003—Monitoring arrangements specially adapted to the computing system or computing system component being monitored
- G06F11/3006—Monitoring arrangements specially adapted to the computing system or computing system component being monitored where the computing system is distributed, e.g. networked systems, clusters, multiprocessor systems
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3051—Monitoring arrangements for monitoring the configuration of the computing system or of the computing system component, e.g. monitoring the presence of processing resources, peripherals, I/O links, software programs
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3065—Monitoring arrangements determined by the means or processing involved in reporting the monitored data
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3089—Monitoring arrangements determined by the means or processing involved in sensing the monitored data, e.g. interfaces, connectors, sensors, probes, agents
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computing Systems (AREA)
- Mathematical Physics (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The invention discloses the management method monitored in a kind of cloud computing system and devices.The described method includes: the type information of resource in cloud computing system is arranged;According to the type information of resource, corresponding data monitoring strategy is configured for each resource type;It is the corresponding data monitoring strategy of the device configuration according to the corresponding resource type of the function of the equipment in the cloud computing system;The equipment completion strategy is being detected with postponing, according to the data monitoring strategy of each resource type, from the monitoring data of equipment acquisition cloud computing system.
Description
Technical field
The present invention relates to field of information processing, the management method and device that are monitored in espespecially a kind of cloud computing system.
Background technique
Be continuously increased with the development of science and technology with intellectual management demand, national defence, industry, social undertakings etc. all according to
Computer is ask to carry out digital management, back-end data processing, scientific algorithm and teaching.In the process of modernization development,
As modern mainstream equipment Development is more accurate, facility environment becomes increasingly complex, and proposes more to the data monitoring of working stock
High requirement.Previous maintenance is all a very scabrous realistic problem, needs to arrange specific people and completes monitoring, due to people
The mode of work monitoring is very easy to ignore the abnormal conditions of appearance, therefore urgent need carries out data acquisition monitoring system
R and D.
With the fast lifting of client and business scale, how to realize to system and business be monitored alarm it is more next
It is more important, wherein it is even more important how to realize that the dynamic of acquisition and its configuration of data updates.One side acquisition terminal equipment is more,
It need to realize the management of efficient stable;Another side requires the customization of acquisition data configuration flexibly, realizes the customization demand of data acquisition,
The storage of saving system, network overhead.
There is configuration and fix, update not flexible, maintainable poor, acquisition data redundancy in traditional supervisory control and data acquisition system,
It causes to cannot achieve hot update at present.Therefore traditional supervisory control and data acquisition system cannot fully meet the need of existing application
It asks.
Summary of the invention
In order to solve the above-mentioned technical problems, the present invention provides the management method monitored in a kind of cloud computing system and dresses
It sets, realizes that the heat of monitoring management strategy updates.
In order to reach the object of the invention, the present invention provides the management methods monitored in a kind of cloud computing system, comprising:
The type information of resource in cloud computing system is set;
According to the type information of resource, corresponding data monitoring strategy is configured for each resource type;
It is the corresponding number of the device configuration according to the corresponding resource type of the function of the equipment in the cloud computing system
According to monitoring strategies;
Detecting that the equipment completes strategy with postponing, according to the data monitoring strategy of each resource type, from described
The monitoring data of equipment acquisition cloud computing system.
Wherein, the method also has a characteristic that described corresponding according to the function of the equipment in the cloud computing system
Resource type, be the corresponding data monitoring strategy of the device configuration after, the method also includes:
Receive the new data monitoring strategy uploaded;
New data monitoring strategy is compared with the data monitoring strategy recorded, the policy data updated;
For the policy data of update described in the device configuration in the cloud computing system.
Wherein, the method also has a characteristic that described corresponding according to the function of the equipment in the cloud computing system
Resource type, be the corresponding data monitoring strategy of the device configuration, comprising:
Whether detect in the cloud computing system has new equipment online;
If having detected that new equipment is online, it is determined that the resource type in the resource allocation information of the equipment;
According to determining resource type, obtain and the matched data monitoring strategy of the resource type;
For the data monitoring strategy got described in the new online device configuration.
Wherein, the method also has a characteristic that the type information according to resource, configures for each resource type
Corresponding data monitoring strategy, comprising:
The corresponding acquisition item of each resource type according to the pre-stored data selects the corresponding target acquisition of each resource type
?;
Item is acquired according to the target, generates the data monitoring strategy of each resource type.
Wherein, the method also has a characteristic that the data monitoring strategy according to each resource type, from described
After equipment obtains the monitoring data of cloud computing system, the method also includes:
According to the monitoring data of the equipment, adjusts and sample item and/or sampling pipe in the data monitoring strategy of the equipment
Reason strategy, the data monitoring strategy after being adjusted;
For data monitoring adjusted strategy described in the device configuration.
A kind of managing device monitored in cloud computing system, comprising:
Setup module, for the type information of resource in cloud computing system to be arranged;
First configuration module configures corresponding data monitoring for the type information according to resource for each resource type
Strategy;
Second configuration module, for the corresponding resource type of function according to the equipment in the cloud computing system, for institute
State the corresponding data monitoring strategy of device configuration;
Module is obtained, for detecting the equipment completion strategy with postponing, according to the data prison of each resource type
Control strategy, the monitoring data of cloud computing system is obtained from the equipment.
Wherein, described device also has a characteristic that described device further include:
Receiving module, for connecing after for the corresponding data monitoring strategy of device configuration in the cloud computing system
Receive the new data monitoring strategy uploaded;
Contrast module obtains more for comparing new data monitoring strategy with the data monitoring strategy recorded
New policy data;
Third configuration module, for the policy data for update described in the device configuration in the cloud computing system.
Wherein, described device also has a characteristic that second configuration module includes:
Whether detection unit has new equipment online for detecting in the cloud computing system;
Determination unit, if for having detected that new equipment is online, it is determined that in the resource allocation information of the equipment
Resource type;
Acquiring unit, for obtaining and the matched data monitoring strategy of the resource type according to determining resource type;
Configuration unit, for the data monitoring strategy to be got described in the new online device configuration.
Wherein, described device also has a characteristic that first configuration module includes:
Selecting unit is used for the corresponding acquisition item of each resource type according to the pre-stored data, selects each resource type
Corresponding target acquires item;
Generation unit generates the data monitoring strategy of each resource type for acquiring item according to the target.
Wherein, described device also has a characteristic that described device further include:
Adjust module, for from the equipment obtain cloud computing system monitoring data after, according to the prison of the equipment
Data are controlled, adjusts and samples item and/or sampling management strategy in the data monitoring strategy of the equipment, the data prison after being adjusted
Control strategy;
4th configuration module, for being data monitoring strategy adjusted described in the device configuration.
Corresponding data monitoring plan is arranged with the type information of resource in cloud computing system in embodiment provided by the invention
It slightly, is the corresponding data of the device configuration further according to the corresponding resource type of function of the equipment in the cloud computing system
Monitoring strategies, and the equipment completion strategy is being detected with postponing, according to the data monitoring strategy of each resource type, from institute
State equipment obtain cloud computing system monitoring data, compared with prior art, data monitoring strategy provided by the invention be as a means of
It is configured based on Source Type, overcomes the prior art and closed with the close coupling with equipment of individual equipment customization monitoring strategies
System realizes the purpose that the heat of monitoring strategies updates.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification
It obtains it is clear that understand through the implementation of the invention.The objectives and other advantages of the invention can be by specification, right
Specifically noted structure is achieved and obtained in claim and attached drawing.
Detailed description of the invention
Attached drawing is used to provide to further understand technical solution of the present invention, and constitutes part of specification, with this
The embodiment of application technical solution for explaining the present invention together, does not constitute the limitation to technical solution of the present invention.
Fig. 1 is the flow chart of the management method monitored in cloud computing system provided by the invention;
Fig. 2 is the structure chart of the managing device monitored in cloud computing system provided by the invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention
Embodiment be described in detail.It should be noted that in the absence of conflict, in the embodiment and embodiment in the application
Feature can mutual any combination.
Step shown in the flowchart of the accompanying drawings can be in a computer system such as a set of computer executable instructions
It executes.Also, although logical order is shown in flow charts, and it in some cases, can be to be different from herein suitable
Sequence executes shown or described step.
Fig. 1 is the flow chart of the management method monitored in cloud computing system provided by the invention.Method shown in Fig. 1 includes:
The type information of resource in step 101, setting cloud computing system;
Wherein, the type information of the resource is host, virtual machine, operating system and storage system etc.;
Step 102, the type information according to resource configure corresponding data monitoring strategy for each resource type;
Wherein, since the corresponding major function of each resource type is different, so the data monitoring of each resource
The emphasis that item is sampled in strategy is just different, and therefore, the sampling item according to the setting of the function of the resource type is just different, and citing comes
Say, by taking storage system as an example, due to storage system function be information storage tube reason, then sample ratio is in the great majority in item be
The sampling of the information of storage resource;The function of virtual machine is information processing, then sampling ratio is in the great majority in item is processor
With the sampling item of memory;
Step 103, the corresponding resource type of function according to the equipment in the cloud computing system are the device configuration
Corresponding data monitoring strategy;
Wherein, which can be corresponding with the type of the resource in step 101, carries out the configuration of data monitoring strategy;
Step 104 is detecting the equipment completion strategy with postponing, according to the data monitoring plan of each resource type
Slightly, the monitoring data of cloud computing system is obtained from the equipment.
Corresponding data monitoring is arranged with the type information of resource in cloud computing system in embodiment of the method provided by the invention
Strategy is the corresponding number of the device configuration further according to the corresponding resource type of function of the equipment in the cloud computing system
According to monitoring strategies, and detecting that the equipment completes strategy with postponing, according to the data monitoring strategy of each resource type, from
The equipment obtains the monitoring data of cloud computing system, compared with prior art, data monitoring strategy provided by the invention be with
It is configured based on resource type, overcomes the prior art and closed with the close coupling with equipment of individual equipment customization monitoring strategies
System realizes the purpose that the heat of monitoring strategies updates.
Embodiment of the method provided by the invention is described further below:
The present invention, which realizes, configures flexible acquisition tasks, and wherein acquisition tasks carry out personal settings by resource, acquisition item.
Wherein, resource can be host, virtual machine, operating system and storage system etc.;Acquisition item be CPU usage, memory usage,
System load and system process number etc.;Sampling management strategy is acquisition switch, collection period, acquisition and acquisition parameter etc..
The present invention realizes the templating of acquisition tasks configuration.It can be achieved according to resource types to customize acquisition tasks list conduct
Template, any such resource or the corresponding template of packet associated to realize batch setting acquisition tasks, and utilize database
Store acquisition tasks.On the one hand convenient that acquisition tasks are flexibly modified;On the other hand it is provided to provide data collection station service
The data source that task obtains.
In an embodiment of the method provided by the invention, the function pair according to the equipment in the cloud computing system
The resource type answered, be the corresponding data monitoring strategy of the device configuration after, the method also includes:
Receive the new data monitoring strategy uploaded;
New data monitoring strategy is compared with the data monitoring strategy recorded, the policy data updated;
For the policy data of update described in the device configuration in the cloud computing system.
Specifically, to realize that the management that heat updates is supervised after receiving new data monitoring strategy with the data recorded
Control strategy compares, and obtains corresponding more new data, and carry out online updating to equipment according to the more new data, avoids and set
The standby operation restarted.
For example, acquisition terminal be distributed in the resource of acquisition data in need, have that data volume is big, operation is multiple
It is miscellaneous, must avoid influence resource on other service.When being acquired using the strategy modification data for task, the acquisition terminal seeervice cycle
Property according to place resource type and resource name from acquisition tasks list is pulled from the background, then with existing acquisition tasks list pair
Than realization changes operation to the additions and deletions of acquisition tasks.This strategy avoids operate on a large scale to acquisition terminal service, avoid weight
Open acquisition service.
In an embodiment of the method provided by the invention, the function pair according to the equipment in the cloud computing system
The resource type answered is the corresponding data monitoring strategy of the device configuration, comprising:
Whether detect in the cloud computing system has new equipment online;
If having detected that new equipment is online, it is determined that the resource type in the resource allocation information of the equipment;
According to determining resource type, obtain and the matched data monitoring strategy of the resource type;
For the data monitoring strategy got described in the new online device configuration.
Specifically, participating in carrying out setting for data monitoring strategy without user for online equipment new in cloud computing system
It sets, it is only necessary to search the resource type with the function match of the equipment, auto-configuration data monitoring strategies.
For example, after the completion of detecting new virtual machine creating, it is first determined the resource type of the virtual machine, then obtain
The data monitoring strategy is sent to the virtual machine that new creation is completed, number can be completed by the corresponding data monitoring strategy of virtual machine
According to the configuration of monitoring strategies.
In an embodiment of the method provided by the invention, the type information according to resource is each resource type
Configure corresponding data monitoring strategy, comprising:
The corresponding acquisition item of each resource type according to the pre-stored data selects the corresponding target acquisition of each resource type
?;
Item is acquired according to the target, generates the data monitoring strategy of each resource type.
Specifically, the importance information that item is sampled in the resource type need to be considered when generating data monitoring strategy, for
The high monitored object of importance information will configure more sampling items, for example, for the sampling item of virtual machine, in importance
In rank, the rank of processor is higher than the rank of hard disk, then the number of the sampling item of processor will be more than the sampling item of hard disk
Number;And within the storage system, in importance information, the rank of processor will be lower than the rank of hard disk, then processor
The number for sampling item will be more than the number of the sampling item of hard disk.
By above equipment, the characteristic for resource may be implemented, more accurately acquired, and can be in batches to multiple
Equipment is configured.
In an embodiment of the method provided by the invention, the data monitoring strategy according to each resource type, from
After the equipment obtains the monitoring data of cloud computing system, the method also includes:
According to the monitoring data of the equipment, adjusts and sample item and/or sampling pipe in the data monitoring strategy of the equipment
Reason strategy, the data monitoring strategy after being adjusted;
For data monitoring adjusted strategy described in the device configuration.
Specifically, by the parsing to monitoring data, it can be found that the performance of potential risk, potential more accurately to identify
Risk, the data monitoring plan that the management strategy of sampling item and/or sampling item can be adjusted, and be updated for device configuration
Slightly.
Need to illustrate when, be configuration data of device monitoring strategies, equipment can be notified from pre-set store path
Download configuration file, and the executable text of the configuration file is run, configuration of the policy data in equipment is completed, can also be incited somebody to action
Data monitoring strategy is sent to equipment, and notice equipment completes configuration, the final configuration for realizing data monitoring strategy after being parsed.
In conclusion the monitoring data collection that one of monitoring alarm platform provided by the invention is updated based on configuration heat
Extensive acquisition terminal may be implemented in method, realizes that acquisition tasks configuration is flexible, heat updates, maintainable feature, makes stabilization
Reliably, flexible data acquisition service is customized, the utilization rate of system resource is improved, reduces monitoring system maintenance cost.
It is described further below with application example provided by the invention:
Application example of the present invention provides a kind of monitoring data collection method updated based on configuration heat, and specific implementation process is such as
Under:
(1) acquisition tasks management system adds the acquisition tasks of all kinds of resources, and acquisition tasks include acquisition switch, acquisition week
Phase, acquisition, acquisition parameter etc., and be added in database;
(2) data acquisition service is disposed in all kinds of resources and configure the data source of acquisition tasks;Data acquisition service is drawn
It takes and starts acquisition tasks.
(3) user can modify the acquisition tasks attribute of any resource or any group of resource by acquisition tasks management system,
And it updates into database.
(4) data acquisition service periodically pulls task and determines whether there is update, executes corresponding additions and deletions if any updating
Change wiping operation.
The method that application example of the present invention provides, the supervisory control and data acquisition system updated based on configuration heat solve traditional system
Existing configure of system fixes, updates not flexible, maintainable poor, acquisition data redundancy, cannot achieve the problem of heat updates, realization
Extensive acquisition terminal realizes that configuration is flexible, heat updates, maintainable feature, makes reliable and stable, the flexible data of customization and adopts
Collection service, improves the utilization rate of system resource, reduces monitoring system maintenance cost.
Fig. 2 is the structure chart of the managing device monitored in cloud computing system provided by the invention.Fig. 2 shown device includes:
Setup module 201, for the type information of resource in cloud computing system to be arranged;
First configuration module 202 configures corresponding data prison for the type information according to resource for each resource type
Control strategy;
Second configuration module 203 is for the corresponding resource type of function according to the equipment in the cloud computing system
The corresponding data monitoring strategy of the device configuration;
Module 204 is obtained, for detecting the equipment completion strategy with postponing, according to the data of each resource type
Monitoring strategies obtain the monitoring data of cloud computing system from the equipment.
In an Installation practice provided by the invention, described device further include:
Receiving module, for connecing after for the corresponding data monitoring strategy of device configuration in the cloud computing system
Receive the new data monitoring strategy uploaded;
Contrast module obtains more for comparing new data monitoring strategy with the data monitoring strategy recorded
New policy data;
Third configuration module, for the policy data for update described in the device configuration in the cloud computing system.
In an Installation practice provided by the invention, second configuration module includes:
Whether detection unit has new equipment online for detecting in the cloud computing system;
Determination unit, if for having detected that new equipment is online, it is determined that in the resource allocation information of the equipment
Resource type;
Acquiring unit, for obtaining and the matched data monitoring strategy of the resource type according to determining resource type;
Configuration unit, for the data monitoring strategy to be got described in the new online device configuration.
In an Installation practice provided by the invention, first configuration module includes:
Selecting unit is used for the corresponding acquisition item of each resource type according to the pre-stored data, selects each resource type
Corresponding target acquires item;
Generation unit generates the data monitoring strategy of each resource type for acquiring item according to the target.
In an Installation practice provided by the invention, described device further include:
Adjust module, for from the equipment obtain cloud computing system monitoring data after, according to the prison of the equipment
Data are controlled, adjusts and samples item and/or sampling management strategy in the data monitoring strategy of the equipment, the data prison after being adjusted
Control strategy;
4th configuration module, for being data monitoring strategy adjusted described in the device configuration.
Corresponding data monitoring is arranged with the type information of resource in cloud computing system in Installation practice provided by the invention
Strategy is the corresponding number of the device configuration further according to the corresponding resource type of function of the equipment in the cloud computing system
According to monitoring strategies, and detecting that the equipment completes strategy with postponing, according to the data monitoring strategy of each resource type, from
The equipment obtains the monitoring data of cloud computing system, compared with prior art, data monitoring strategy provided by the invention be with
It is configured based on resource type, overcomes the prior art and closed with the close coupling with equipment of individual equipment customization monitoring strategies
System realizes the purpose that the heat of monitoring strategies updates.
Those of ordinary skill in the art will appreciate that computer journey can be used in all or part of the steps of above-described embodiment
Sequence process realizes that the computer program can be stored in a computer readable storage medium, the computer program exists
(such as system, unit, device) executes on corresponding hardware platform, when being executed, include the steps that embodiment of the method it
One or combinations thereof.
Optionally, integrated circuit can be used also to realize in all or part of the steps of above-described embodiment, these steps can
To be fabricated to integrated circuit modules one by one respectively, or make multiple modules or steps in them to single integrated electricity
Road module is realized.In this way, the present invention is not limited to any specific hardware and softwares to combine.
Each device/functional module/functional unit in above-described embodiment, which can be adopted, is realized with general computing device realization, it
Can be concentrated on a single computing device, can also be distributed over a network of multiple computing devices.
Each device/functional module/functional unit in above-described embodiment realized in the form of software function module and as
Independent product when selling or using, can store in a computer readable storage medium.Computer mentioned above
Read/write memory medium can be read-only memory, disk or CD etc..
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be subject to protection scope described in claim.
Claims (10)
1. the management method monitored in a kind of cloud computing system characterized by comprising
The type information of resource in cloud computing system is set;
According to the type information of resource, corresponding data monitoring strategy is configured for each resource type;
It is the corresponding data prison of the device configuration according to the corresponding resource type of the function of the equipment in the cloud computing system
Control strategy;
The equipment completion strategy is being detected with postponing, according to the data monitoring strategy of each resource type, from the equipment
Obtain the monitoring data of cloud computing system.
2. the method according to claim 1, wherein the function according to the equipment in the cloud computing system
Corresponding resource type, be the corresponding data monitoring strategy of the device configuration after, the method also includes:
Receive the new data monitoring strategy uploaded;
New data monitoring strategy is compared with the data monitoring strategy recorded, the policy data updated;
For the policy data of update described in the device configuration in the cloud computing system.
3. method according to claim 1 or 2, which is characterized in that the equipment according in the cloud computing system
The corresponding resource type of function is the corresponding data monitoring strategy of the device configuration, comprising:
Whether detect in the cloud computing system has new equipment online;
If having detected that new equipment is online, it is determined that the resource type in the resource allocation information of the equipment;
According to determining resource type, obtain and the matched data monitoring strategy of the resource type;
For the data monitoring strategy got described in the new online device configuration.
4. the method according to claim 1, wherein the type information according to resource, is each resources-type
Type configures corresponding data monitoring strategy, comprising:
The corresponding acquisition item of each resource type according to the pre-stored data selects the corresponding target acquisition item of each resource type;
Item is acquired according to the target, generates the data monitoring strategy of each resource type.
5. the method according to claim 1, wherein the data monitoring strategy according to each resource type,
After the monitoring data that the equipment obtains cloud computing system, the method also includes:
According to the monitoring data of the equipment, adjusts and sample item and/or sampling management plan in the data monitoring strategy of the equipment
Slightly, the data monitoring strategy after being adjusted;
For data monitoring adjusted strategy described in the device configuration.
6. the managing device monitored in a kind of cloud computing system characterized by comprising
Setup module, for the type information of resource in cloud computing system to be arranged;
First configuration module configures corresponding data monitoring strategy for the type information according to resource for each resource type;
Second configuration module is set for the corresponding resource type of function according to the equipment in the cloud computing system to be described
It is standby to configure corresponding data monitoring strategy;
Module is obtained, for detecting the equipment completion strategy with postponing, according to the data monitoring plan of each resource type
Slightly, the monitoring data of cloud computing system is obtained from the equipment.
7. device according to claim 6, which is characterized in that described device further include:
Receiving module, for after for the corresponding data monitoring strategy of device configuration in the cloud computing system, in reception
The new data monitoring strategy passed;
Contrast module is updated for comparing new data monitoring strategy with the data monitoring strategy recorded
Policy data;
Third configuration module, for the policy data for update described in the device configuration in the cloud computing system.
8. device according to claim 6 or 7, which is characterized in that second configuration module includes:
Whether detection unit has new equipment online for detecting in the cloud computing system;
Determination unit, if for having detected that new equipment is online, it is determined that the resource in the resource allocation information of the equipment
Type;
Acquiring unit, for obtaining and the matched data monitoring strategy of the resource type according to determining resource type;
Configuration unit, for the data monitoring strategy to be got described in the new online device configuration.
9. device according to claim 6, which is characterized in that first configuration module includes:
Selecting unit is used for the corresponding acquisition item of each resource type according to the pre-stored data, selects each resource type corresponding
Target acquire item;
Generation unit generates the data monitoring strategy of each resource type for acquiring item according to the target.
10. device according to claim 6, which is characterized in that described device further include:
Adjust module, for from the equipment obtain cloud computing system monitoring data after, according to the monitoring number of the equipment
According to adjusting and sample item and/or sampling management strategy, the data monitoring plan after being adjusted in the data monitoring strategy of the equipment
Slightly;
4th configuration module, for being data monitoring strategy adjusted described in the device configuration.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810893569.3A CN109062767A (en) | 2018-08-08 | 2018-08-08 | The management method and device monitored in cloud computing system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810893569.3A CN109062767A (en) | 2018-08-08 | 2018-08-08 | The management method and device monitored in cloud computing system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109062767A true CN109062767A (en) | 2018-12-21 |
Family
ID=64678753
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810893569.3A Pending CN109062767A (en) | 2018-08-08 | 2018-08-08 | The management method and device monitored in cloud computing system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109062767A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111694634A (en) * | 2020-04-14 | 2020-09-22 | 新华三信息技术有限公司 | Monitoring method and monitoring device for virtual machine |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100153769A1 (en) * | 2004-06-30 | 2010-06-17 | Jose Renato Santos | Method and apparatus for enhanced design of multi-tier systems |
| CN104486406A (en) * | 2014-12-15 | 2015-04-01 | 浪潮电子信息产业股份有限公司 | Layered resource monitoring method based on cloud data center |
| CN106453544A (en) * | 2016-09-30 | 2017-02-22 | 郑州云海信息技术有限公司 | Cloud environment, and monitoring method and system thereof |
| CN107733712A (en) * | 2017-10-18 | 2018-02-23 | 郑州云海信息技术有限公司 | The monitoring method and device of Service Source in cloud computing system |
-
2018
- 2018-08-08 CN CN201810893569.3A patent/CN109062767A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100153769A1 (en) * | 2004-06-30 | 2010-06-17 | Jose Renato Santos | Method and apparatus for enhanced design of multi-tier systems |
| CN104486406A (en) * | 2014-12-15 | 2015-04-01 | 浪潮电子信息产业股份有限公司 | Layered resource monitoring method based on cloud data center |
| CN106453544A (en) * | 2016-09-30 | 2017-02-22 | 郑州云海信息技术有限公司 | Cloud environment, and monitoring method and system thereof |
| CN107733712A (en) * | 2017-10-18 | 2018-02-23 | 郑州云海信息技术有限公司 | The monitoring method and device of Service Source in cloud computing system |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111694634A (en) * | 2020-04-14 | 2020-09-22 | 新华三信息技术有限公司 | Monitoring method and monitoring device for virtual machine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106933204A (en) | Distributed industrial performance monitoring and analysis | |
| US10353762B2 (en) | Hierarchical fault determination in an application performance management system | |
| CN108984370A (en) | A kind of method and apparatus of determining monitoring threshold value | |
| CN111190888A (en) | Method and device for managing graph database cluster | |
| US9652368B2 (en) | Using linked data to determine package quality | |
| CN112835604B (en) | System gray version release management method, system, equipment and medium | |
| CN110019539A (en) | A kind of method and apparatus that the data of data warehouse are synchronous | |
| US12411486B2 (en) | Asset health identification from multi-modality data analysis | |
| CN111383100A (en) | Risk model-based full life cycle management and control method and device | |
| CN115310954B (en) | IT service operation maintenance method and system | |
| CN109814957B (en) | Label adding method and device for IOS (input/output system) | |
| CN109240905A (en) | Method for testing software and system | |
| CN119676278A (en) | One-stop multi-source data acquisition and monitoring systems and equipment for industrial use | |
| JP2024544646A (en) | Dynamic system workload placement in cloud infrastructure - Patents.com | |
| CN110580216B (en) | Application lifting method and device | |
| CN119862091A (en) | Full life cycle management method and system for aerospace engineering data algorithm model | |
| CN113704058A (en) | Business model monitoring method and device and electronic equipment | |
| CN116931974A (en) | Intelligent installation system and method for edge service | |
| JP2021506010A (en) | Methods and systems for tracking application activity data from remote devices and generating modified behavioral data structures for remote devices | |
| CN109725913A (en) | The method and apparatus that data update | |
| CN112579402A (en) | Method and device for positioning faults of application system | |
| US20230259377A1 (en) | User input predictive action system and method for user interfaces | |
| CN109062767A (en) | The management method and device monitored in cloud computing system | |
| CN109254899A (en) | A kind of server monitoring method and device | |
| CN114390093B (en) | Virtual gateway simulation system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |