CN109403367A CN201811491522.0A CN201811491522A CN109403367A CN 109403367 A CN109403367 A CN 109403367A CN 201811491522 A CN201811491522 A CN 201811491522A CN 109403367 A CN109403367 A CN 109403367A
Authority
CN
China
Prior art keywords
bottom plate
column
plate
shear key
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811491522.0A
Other languages
Chinese (zh)
Other versions
CN109403367B (en
Inventor
刘洋
郑俊杰
曹文昭
崔博
谢明星
徐光彬
沈强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
Original Assignee
Huazhong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology filed Critical Huazhong University of Science and Technology
Priority to CN201811491522.0A priority Critical patent/CN109403367B/en
Publication of CN109403367A publication Critical patent/CN109403367A/en
Application granted granted Critical
Publication of CN109403367B publication Critical patent/CN109403367B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Housings And Mounting Of Transformers (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention belongs to box type transformer substation base fields, disclose a kind of assembled case change basis and component on site construction method.It includes bottom plate, upright post base, column, junction steel plate, connection bolt etc. that the assembled case, which becomes basis, pass through the design of six kinds of modularization bottom plates, when needing to adapt to various sizes of box-type substation, can be realized after only need to modular bottom plate being increased or being removed the extension of form.When needing case becoming basis displacement, foundation soil need to only be dug out, cut away case change and case becomes the welding position on basis, then case is become into basis overall pulling down, next engineering can be put into and used.The present invention have many advantages, such as structurally reasonable, force path is clear, assembly is simple, short time limit, low cost, it is reusable, suitable for the box-type substation of various specifications, small to environmental perturbation.

Description

A kind of assembled case change basis and its component on site construction method
Technical field
The invention belongs to box type transformer substation base fields, become basis and its scene more particularly, to a kind of assembled case Construction method.
Background technique
Currently, building overwhelming majority when box type transformer substation base all uses cast-type construction method, the case of cast-type becomes base Plinth haves the shortcomings that following:
1) long in time limit, cast-type case becomes basis and needs live assembling reinforcement, live formwork, poured in place concrete, later period Demoulding etc., it is long in time limit;
2) costly, from ground excavation, assembling reinforcement, production mold, concreting, concrete curing, form removable It just needs to spend more expense;
3) effect on environment is big, and case becomes basis and often builds in city, and the excavation of foundation soil unavoidably will affect city Environment influences city image, and the construction period that cast-type case becomes basis generally requires one month or more time, for city Environment is affected, and influences normally to go on a journey.
Invention at present for the box basis of assembled is seldom, and existing assembled case change basic constructional design is unreasonable, Structure force path is inappropriate, and globality and stability are all poor, and pours after assembled case becomes in the assembly of basis and used Concrete, causing assembled case to become basis cannot reuse, is long in time limit, is costly etc., these unfavorable factors all limit Assembled case becomes the application and popularization on basis.
Summary of the invention
Aiming at the above defects or improvement requirements of the prior art, the present invention provides a kind of assembled casees to become basis and scene Construction method passes through structure and the arrangement side to such as six kinds of key component basic bottom plates, upright post base, column and junction steel plate The design of formula, obtaining a kind of structurally reasonable, force path, clearly assembled case becomes basis, has short time limit, at low cost, just In manual assembly, advantage reusable, environmental perturbation is small.
To achieve the above object, according to one aspect of the present invention, a kind of assembled case change basis is provided, including under The supreme bottom plate set gradually, upright post base, column and junction steel plate, in which:
Bottom plate is poured by armored concrete, is embedded with the bolt for connecting upright post base, the side of bottom plate thereon It is additionally provided with the shear key of the evagination for resisting lateral shear and is slightly larger than the shear key groove of shear key with size;Shear key is recessed Slot is used to that concave-convex connection to be collectively formed with the shear key on other bottom plates, resists the transverse shearing force that top upright post base transmits;
Bottom plate is divided into six kinds of basic prefabricated panels according to shear key, shear key groove, the position of bolt and arrangement difference, Formation base array is as follows: being the first bottom plate on four corners;First row middle position is the second bottom plate, third column middle position Third bottom plate;Secondary series both ends are respectively the 4th bottom plate, the 5th bottom plate, and middle position is the 6th bottom plate;Wherein, the first bottom plate, Second bottom plate, third base plate size are consistent, and cross section is square, but the shear key of bottom panel side and shear key groove are set It sets and the position of bolt that plate face is pre-buried is different;4th bottom plate, the 5th bottom plate, the 6th bottom plate cross section be rectangle, it is horizontal It is equal to width and be set as five kinds of different specifications, become basis to be suitable for the case of full-scale range, and the 4th bottom plate, the 5th Bottom plate, the longitudinal width of the 6th bottom plate are equal with the longitudinal width of the first bottom plate;
First bottom plate, the second bottom plate are equipped with upright post base, column and junction steel plate on third bottom plate;4th bottom plate, Five bottom plates, the 6th bottom plate are used to extend the spacing between two columns with a line.
Further, the Longitudinal Extension of base array by installed additional between the first bottom plate and the second bottom plate the second bottom plate, It installs third bottom plate additional between the first bottom plate and third bottom plate, and installs the 6th additional between the 4th bottom plate and/or the 5th bottom plate Bottom plate is realized;
The extending transversely of base array passes through installation same specification or different size between the first bottom plate and the 4th bottom plate The 4th bottom plate, the 5th bottom plate of same specification or different size is installed additional between the first bottom plate and the 5th bottom plate, at the second bottom Between plate and the 6th bottom plate install additional same specification perhaps the 6th bottom plate of different size or between first bottom plate of same a line more The 4th bottom plate of different size and the 5th bottom plate of dimension are changed, replaces dimension between the second bottom plate and third bottom plate The 6th bottom plate realize.
It further, further include junction steel plate;Junction steel plate is divided into the first junction steel plate, the second junction steel plate, and third connects Steel plate is connect, first junction steel plate is for connecting four pieces of bottom plates, and second junction steel plate is for connecting adjacent two pieces of bottom plates Between connection, the third junction steel plate for adjacent two pieces of bottom plates side connect;
First~the 6th bottom plate is embedded with the first bolt upward, and the side of the first~the 5th bottom plate is embedded with laterally The second bolt, the middle part of first~third bottom plate is also embedded with the third bolt for connecting upright post base;Multiple first spiral shells Bolt is respectively intended to cooperate with the first junction steel plate and connects the upper surface of adjacent four pieces of bottom plates, the second junction steel plate of cooperation connection adjacent two The upper surface of block bottom plate, the side that the second bolt is used to that third junction steel plate to be cooperated to connect adjacent two pieces of bottom plates.
Further, three edges of the first plate upper surface are embedded with the first bolt, which corresponds to the Two sides of one bottom plate, wherein a side opens up shear key groove, shear key is arranged in another side;First bottom plate is certainly It is equipped with one second bolt close to shear key at the relative side of body shear key groove, and it is close at the opposite side of itself shear key Shear key groove also is provided with one second bolt;
Four edges of the second plate upper surface are embedded with the first bolt, and two relative sides of the second bottom plate are used for It is docked with two the first bottom plates, is respectively equipped with a shear key and a shear key groove;Second bottom plate is located at base array edge Pre-buried two the second bolts on side, the side that the second bottom plate is docked with the 6th bottom plate are equipped with a shear key groove;
Four edges of third plate upper surface are embedded with the first bolt, and two relative sides of third bottom plate are used for It is docked with two the first bottom plates, is respectively equipped with a shear key and a shear key groove;Third bottom plate is located at base array edge Pre-buried two the second bolts on side, the side that third bottom plate is docked with the 6th bottom plate are equipped with a shear key;
4th~the 6th bottom plate is equipped with corresponding be used for and adjacent each bottom plate according to from the present position in base array The shear key and shear key groove being connected to each other.
Further, the 4th bottom plate, the 5th bottom plate, the 6th bottom plate transverse width be disposed as 30cm, 50cm, 70cm, Five kinds of different specifications of 90cm, 110cm
Further, upright post base shape is truncated rectangular pyramids, and four sides of upright post base are provided with bolt hole, for the Three bolts are fastened with merging with nut, to be connected and fixed with corresponding bottom plate;The 4th bolt is embedded on the top surface of upright post base To be connect with column.
The bottom end of column is equipped with the column bottom steel plate for cooperating the 4th bolt to connect column with upright post base;Column Top be embedded with for case become connection column at the top of steel plate;Column bottom steel plate thickness is not less than 15mm, column top Steel plate thickness is not less than 10mm.
Further, column bottom steel plate is indulged with column together with reinforcement welding curved in muscle bottom, steel plate at the top of column It is indulged with column together with reinforcement welding curved in top rib portion, then formwork casting concrete constitutes column.
Further, six kinds of bottom plates, upright post base, column are equipped with the pull ring for carrying.
Further, bottom plate, upright post base, column are prefabricated reinforced concrete member, are led to by the reinforcing bar bound It crosses mold one-time-concreting and forms and conserve and reach predetermined strength.
To achieve the goals above, it is another aspect of this invention to provide that providing a kind of scene on assembled case change basis Construction method includes the following steps:
S1: surveying setting-out excavates foundation soil, is excavated to specified absolute altitude;
S2: previously prepared reinforced concrete floor is carried to designated position and is spliced;
S3: the bottom plate spliced is attached using junction steel plate, and is fastened using nut;
S4: previously prepared reinforced concrete footing is carried on the reserved bolt hole of bottom plate and is assembled, and is used Nut is fastened;
S5: previously prepared column is carried on the reserved bolt hole of upright post base assembles again, and use nut It is fastened;
S6: covering the electric wire for accessing box-type substation with PVC pipeline, and carries out and underground electric nest of tubes at incoming line Interface processing, prevents underground water from leaking;
S7: box-type substation is placed on column, and does grounding, installs the electric wire of access box-type substation, Finally backfill foundation soil.
In general, the above technical scheme conceived by the present invention compared with prior art, can obtain following beneficial to effect Fruit.
1, the present invention can greatly shorten the construction time of box type transformer substation base by the assembly to less assembly parts, reduce Influence when urban construction pre-fabricated electric cables active well to environment reduces project cost.
2, the present invention passes through the design of six kinds of general modules of bottom plate, it is only necessary to being collocated with each other using just between general module The present invention can be made to be suitable for the box-type substation of nearly all specification, greatly expand the scope of application of the invention.
3, present invention assembly is simple, and entire assembled case becomes basis and related only to be bolted and shear key, shear key The physical connection of groove, connection type is simple, easy to disassemble, short time limit, is conducive to the popularization that assembled case becomes basis.
4, the present invention is broken the whole up into parts the big component of script by modularization idea, and single quality of concrete members can be big It is big to mitigate, so not needed when construction using machinery, it is only necessary to which manual handling assembly connection can complete entire case and become base The construction of plinth.Due to not needing large-scale construction equipment, cast in situs and maintenance are not needed especially, is greatly expanded assembled Case becomes the scope of application on basis, so that present invention can be widely used to the box-type substation construction of remote districts and meet an urgent need box The construction of substation.
5, assembled case of the invention becomes basis and may be reused, and case change can be cut away after an engineering construction Then assembled case change basis is disassembled into basic prefabricated section, then transported next by the connection on basis and form substation It is continued to use in engineering, greatly reduces the wasting of resources.
6, force path of the present invention is clear, reasonable in design, and the dead load of box-type substation is passed to upright post base by column, Load is passed to bottom plate again by upright post base, and load is finally passed to foundation soil by bottom plate, in this way can will be upper since base areas is big The transmitting downwards of the evenly dispersed ground of the load that portion is transmitted, not only can make foundation soil settling amount small, assembled case can also be made to become Under differential settlement, entire foundation settlement is uniform.
Detailed description of the invention
Fig. 1 is the three-dimensional axonometric schematic diagram that assembled case of the invention becomes basis;
Fig. 2 is six pieces of bottom plate relative positions and assembly method top view of the invention;
Fig. 3 is bottom plate pull ring location map when the present invention is put according to position shown in Fig. 2;
(a) of Fig. 4~(f) is successively six kinds of basic bottom plates and each bolt embedded part distribution map of the invention;
(a), (b) of Fig. 5 is two side views of the first bottom plate of the invention;
(a) of Fig. 6~(c) is the three-view diagram of upright post base of the invention;
(a) of Fig. 7~(c) is the three-view diagram of column of the invention;
(a) of Fig. 8~(c) is the top view of three kinds of junction steel plates of the invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below Not constituting a conflict with each other can be combined with each other.
As shown in Figure 1, a kind of assembled case provided in an embodiment of the present invention becomes basis comprising set gradually from bottom to up Column 3, upright post base 2, bottom plate 1, junction steel plate 4, wherein bottom plate 1 as dispersion upper load raft plate, by reinforced concrete Soil pours.Its insole board 1 shares six kinds of basic Prefabricated blocks, by this modular extension, can make this hair The bright box-type substation suitable for nearly all specification.Bolt company is carried out by junction steel plate 4 after the modules splicing of bottom plate 1 It connects, wherein the thickness of junction steel plate 4 is not less than 15mm, and 9 size of bolt hole opened on junction steel plate 4 is pre-buried slightly larger than on bottom plate Bolt 5, to install.The corresponding position of pedestal and bottom plate of upright post base 2 is provided with bolt hole, directly by upright post base when assembly It is transported to designated position, blending bolt is fastened.After upright post base installs, then column is transported on upright post base and spiral shell The corresponding position of keyhole, blending bolt are fastened.The column being again lifted into box-type substation after assembling above column Top steel plate, and scene is welded to connect, and finally carries out ground earthen backfill again.
As shown in Figure 1, Figure 2 and Figure 3, bottom plate 1 shares 6 kinds of basic modules, is equipped in each module for tentatively spelling The shear key 6 and shear key groove 7 connect, wherein the first bottom plate 1-1, the second bottom plate 1-2, the third cross section bottom plate 1-3 be pros Shape, the first bottom plate 1-1, the second bottom plate 1-2, third bottom plate 1-3 side length be 1000mm, poured by armored concrete and It is not less than 200mm at the thickness of, bottom plate, is not more than 300mm, it is the first bottom plate 1-1, the second bottom plate 1-2, pre- on third bottom plate 1-3 Be embedded with the first bolt 5-1, the second bolt 5-2 connected with side for backplate surface and with 2 corresponding position of upright post base Third bolt 5-3.In addition, being additionally provided with the drawing for manual handling on the first bottom plate 1-1, the second bottom plate 1-2, third bottom plate 1-3 Bottom plate 1 is carried to bottom of foundation ditch designated position by pull ring 8 and carries out preliminary assembly by ring 8, worker;4th bottom plate 1-4, the 5th bottom Plate 1-5, the 6th cross section bottom plate 1-6 are rectangle, are poured by armored concrete, and the thickness of bottom plate is not less than 200mm, no Greater than 300mm, long side and the first bottom plate 1-1, the second bottom plate 1-2, the side length of third bottom plate 1-3 are equal, short side setting Five kinds of specifications of 300mm, 500mm, 700mm, 900mm, 1100mm, by between the first bottom plate 1-1 and 1-4 install additional same specification or 4th bottom plate 1-4 of person's different size installs the 5th bottom of same specification or different size additional between the first bottom plate 1-1 and 1-5 Plate 1-5 installs same specification perhaps the 6th bottom plate 1-6 of different size or same at two additional between the second bottom plate 1-2 and 1-6 The 4th bottom plate 1-4, the 5th bottom plate 1-5 that different size is replaced between the first capable bottom plate 1-1, in the second bottom plate 1-2, third bottom The mode that the 6th bottom plate 1-6 of different size is replaced between plate 1-3 carrys out the lateral distance between adjusting post, to adapt to all rule The width of the box-type substation of lattice.By in the first bottom plate 1-1 and the second bottom plate 1-2, the first bottom plate 1-1 and third bottom plate 1-3 Between install additional one piece or muti-piece the second bottom plate 1-2 and third bottom plate 1-3 come regulating box become basis longitudinal length, to adapt to There is the length of the box-type substation of specification.By the combination collocation of this six kinds of basic modules, can produce be suitble to it is nearly all The assembling type base of the box-type substation of specification.
As shown in Figures 4 and 5, the centre on the bottom plate of six kinds of basic modules is embedded with corresponding with 2 position of upright post base Third bolt 5-3, the height of bolt exposure bottom plate plate face are 100mm, and the diameter of bolt is not less than 20mm, and upright post base 2 passes through Bolt hole is attached with bottom plate 1, is fastened after connection by nut, and Fig. 5 is the three-view diagram of the first bottom plate 1-1, wherein resisting It cuts key 6 and shear key groove 7 is arranged at position among the side of bottom plate, the height of shear key 6 is 100mm, planar dimension For 800mm × 150mm, the height of shear key groove is 110mm, and planar dimension is 960mm × 160mm, other bottom plates resist Cut the distributing position of key 6 and shear key groove 7 as shown in figure 4, carry out bottom plate it is tentatively assembled when, the shear key 6 of every piece of bottom plate Be inserted into shear key groove 7, when bottom plate is by upper load, shear key 6 and shear key groove 7 with the use of can be with So that bottom plate is resisted the effect of transverse shearing force, and reinforce the integraty of bottom plate, after the completion of the preliminary assembly of bottom plate, by the first junction steel plate 4-1, the second junction steel plate 4-2, third junction steel plate 4-3 carry out further connection to enhance the globality and shearing resistance energy of bottom plate Power.
As shown in fig. 6, portion's third bolt 5-3 opposite position is provided with bolt hole 9 to upright post base 2 in the soleplate, and it is arranged By the pull ring 8 for manual handling, 2 upper surface of upright post base having a size of 300mm × 300mm, lower surface having a size of 800mm × 800mm, the height of upright post base 2 are 250mm, and the with 3 bolt hole of column, 9 opposite position is embedded at the top of upright post base 2 Four bolt 5-4, the 4th bolt 5-4 are higher by 2 top surface 100mm of upright post base, and the diameter of the 4th bolt 5-4 is not less than 20mm, worker It is fastened after upright post base 2 is transported on pedestal with nut, to complete the connection of upright post base and bottom plate.
As shown in fig. 7, the bottom of column 3 is equipped with column bottom steel plate 10, bottom steel plate 10 is indulged curved in muscle bottom for column 3 End welds to obtain with steel plate, and top is equipped with steel plate 11 at the top of column, and steel plate 11 is that column 3 indulges curved in top rib portion and steel at the top of column Plate welds to obtain, and is equipped with bolt hole 9 with 2 upper surface pre-embedded bolt opposite position of upright post base on column bottom steel plate 10, leads to The pull ring 8 crossed on column 3 carries out the mode of manual handling and column 3 is transported to 2 opposite position of upright post base, and with nut into Row fastening.
As shown in figure 8, junction steel plate 4 divides the first junction steel plate 4-1 for connecting bottom board surface, the second junction steel plate 4-2 And the third junction steel plate 4-3 of connecting bottom board side, wherein the first junction steel plate 4-1 planar dimension is 250mm × 250mm, Thickness is not less than 20mm, and the second junction steel plate 4-2 planar dimension is 250mm × 120mm, and thickness is not less than 20mm, third connection Steel plate 4-3 planar dimension is 250mm × 100mm, and thickness is not less than 20mm and is pressed after the completion of the preliminary assembly of bottom plate with junction steel plate It is attached according to position shown in FIG. 1, to enhance the globality of bottom plate and resist transverse shearing force.
Assembled case of the invention becomes basis and specifically carries out site operation using following steps:
S1: be prepared before construction: surveying setting-out carries out foundation soil to be excavated to predetermined absolute altitude, and foundation soil is tamped, One layer of sand bedding course is stamped, and is flattened;
S2: bottom plate needed for project is carried to bottom of foundation ditch, and carries out preliminary assembly to bottom plate according to project drawing;
S3: after assembled, then with junction steel plate steel plate connection is carried out to bottom plate in corresponding position, and is carried out tightly with nut Gu;
S4: being transported to position corresponding with bottom plate for upright post base, upright post base be inserted into the designated position of bottom plate, and It is fastened using nut column pedestal;
S5: column is transported to position corresponding with column bottom plate, column is inserted into upright post base designated position, is used in combination Nut column is fastened;
S6: box-type substation is maneuvered on column, and is welded at the scene to steel plate at the top of box-type substation and column It connects in succession;
S7: entangling the cable into box-type substation with pvc pipe, and carries out fastening, waterproof and the cable of cable line outlet Into at box-type substation fastening and water-proofing treatment, after the completion by foundation soil be backfilled to former base hole position, complete one with this Case becomes whole constructions on basis;
When needing case becoming basic shift position, assembled case need to only be become to basis and disassemble and be carried to specified ground Point is installed according to above-mentioned steps again.
The present invention gives full play to that fabricated construction short time limit, low cost, environmental perturbation be small, reusable, construction is simple (being not necessarily to mechanized construction), advantage structurally reasonable, power transmission is clear, can be applicable on a large scale.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (10)

1. a kind of assembled case becomes basis, which is characterized in that including bottom plate (1), the upright post base set gradually from bottom to up (2), column (3) and junction steel plate (4), in which:
Bottom plate (1) is poured by armored concrete, is embedded with the bolt (5) for connecting upright post base (2), bottom plate thereon (1) side is additionally provided with the shear key (6) of the evagination for resisting lateral shear and is slightly larger than the shearing resistance of shear key (6) with size Key groove (7);Shear key groove (7) is used to be collectively formed concave-convex connection with the shear key (6) on other bottom plates (1), in resistance The transverse shearing force that portion's upright post base (2) transmits;
Bottom plate (1) is divided into six kinds substantially in advance according to shear key (6), shear key groove (7), the position of bolt (5) and arrangement difference Bottom plate processed, formation base array are as follows: being on four corners the first bottom plate (1-1);First row middle position is the second bottom plate (1- 2), third column middle position is third bottom plate (1-3);Secondary series both ends are respectively the 4th bottom plate (1-4), the 5th bottom plate (1-5), Middle position is the 6th bottom plate (1-6);Wherein, the first bottom plate (1-1), the second bottom plate (1-2), third bottom plate (1-3) size one Cause, cross section is square, but the shear key (6) and shear key groove (7) of bottom panel side setting and plate face it is pre-buried The position of bolt (5) is different;4th bottom plate (1-4), the 5th bottom plate (1-5), the 6th bottom plate (1-6) cross section be rectangle, Transverse width is equal and is set as five kinds of different specifications, becomes basic to be suitable for the case of full-scale range, and the 4th bottom plate (1- 4), the 5th bottom plate (1-5), the longitudinal width of the 6th bottom plate (1-6) are equal with the side length of the first bottom plate (1-1);
First bottom plate (1-1), the second bottom plate (1-2) are connected with upright post base (2), upright post base (2) on third bottom plate (1-3) On be connected with column (3);4th bottom plate (1-4), the 5th bottom plate (1-5), the 6th bottom plate (1-6) are for extending two with a line Spacing between column (3).
2. assembled case as described in claim 1 becomes basis, which is characterized in that the Longitudinal Extension of base array passes through first Install the second bottom plate (1-2) between bottom plate (1-1) and the second bottom plate (1-2) additional, in the first bottom plate (1-1) and third bottom plate (1-3) Between install additional third bottom plate (1-3), and between the 4th bottom plate (1-4) and/or the 5th bottom plate (1-5) install additional the 6th bottom plate (1-6) is realized;
Base array it is extending transversely by installing same specification or not additional between the first bottom plate (1-1) and the 4th bottom plate (1-4) 4th bottom plate (1-4) of same specification installs same specification or different rule additional between the first bottom plate (1-1) and the 5th bottom plate (1-5) 5th bottom plate (1-5) of lattice installs same specification or different size additional between the second bottom plate (1-2) and the 6th bottom plate (1-6) 6th bottom plate (1-6), or between first bottom plate (1-1) of same a line replace different size the 4th bottom plate (1-4) and phase The 5th bottom plate (1-5) for answering specification replaces the 6th bottom of dimension between the second bottom plate (1-2) and third bottom plate (1-3) Plate (1-6) Lai Shixian.
3. assembled case as claimed in claim 1 or 2 becomes basis, which is characterized in that further include junction steel plate (4);Connect steel Plate (4) is divided into the first junction steel plate (4-1), the second junction steel plate (4-2), third junction steel plate (4-3), the first connection steel Plate (4-1) is for connecting four pieces of bottom plates (1), and second junction steel plate (4-2) is for connecting between adjacent two pieces of bottom plates (1) Connection, side of the third junction steel plate (4-3) for adjacent two pieces of bottom plates (1) connect;
First~the 6th bottom plate is embedded with the first bolt (5-1) upward, and the side of the first~the 5th bottom plate is embedded with side To the second bolt (5-2), the middle part of first~third bottom plate is also embedded with the third bolt for connecting upright post base (2) (5-3);Multiple first bolts (5-1) be respectively intended to cooperate with the first junction steel plate (4-1) connect adjacent four pieces of bottom plates upper surface, The second junction steel plate (4-2) is cooperated to connect the upper surface of adjacent two pieces of bottom plates, the second bolt (5-2) is for cooperating third to connect steel Plate (4-3) connects the side of adjacent two pieces of bottom plates (1).
4. assembled case as claimed in claim 3 becomes basis, which is characterized in that three sides of the upper surface the first bottom plate (1-1) The first bolt (5-1) is embedded at angle, which corresponds to two sides of the first bottom plate (1-1), wherein a side It opens up shear key groove (7), shear key (6) are arranged in another side;First bottom plate (1-1) is in side where shear key groove (7) The opposite side on side is equipped with one second bolt (5-2) close to shear key (6), and in the opposite side of side where shear key (6) close to shearing resistance Key groove (7) also is provided with one second bolt (5-2);
Four edges of the upper surface the second bottom plate (1-2) are embedded with the first bolt (5-1), and two of the second bottom plate (1-2) Relative side is respectively equipped with a shear key (6) and a shear key groove (7) for docking with two the first bottom plates (1);Second bottom Plate (1-2) is located at pre-buried two the second bolts (5-2) on the side at base array edge, the second bottom plate (1-2) and the 6th bottom plate The side of (1-6) docking is equipped with a shear key groove (7);
Four edges of the upper surface third bottom plate (1-3) are embedded with the first bolt (5-1), and two of third bottom plate (1-3) Relative side is respectively equipped with a shear key (6) and a shear key groove (7) for docking with two the first bottom plates (1);Third bottom Plate (1-3) is located at pre-buried two the second bolts (5-2) on the side at base array edge, third bottom plate (1-3) and the 6th bottom plate The side of (1-6) docking is equipped with a shear key (6);
4th~the 6th bottom plate is equipped with corresponding for mutual with adjacent each bottom plate according to from the present position in base array The shear key (6) and shear key groove (7) of docking.
5. assembled case as described in Claims 1 to 4 any one becomes basis, which is characterized in that the 4th bottom plate (1-4), the Five bottom plates (1-5), the 6th bottom plate (1-6) transverse width be disposed as five kinds of differences of 30cm, 50cm, 70cm, 90cm, 110cm Specification.
6. assembled case as claimed in any one of claims 1 to 5, wherein becomes basis, which is characterized in that upright post base (2) shape is Four sides of truncated rectangular pyramids, upright post base (2) are provided with bolt hole (9), for tight with nut with merging with third bolt (5-3) Gu to be connected and fixed with corresponding bottom plate;The 4th bolt (5-4) is embedded on the top surface of upright post base (2) to connect with column (3) It connects;
The bottom end of column (3) is equipped with the column bottom for cooperating the 4th bolt (5-4) to connect column (3) and upright post base (2) Portion's steel plate (10);Steel plate (11) at the top of the column for becoming connection with case is embedded at the top of column (3);Column bottom steel plate (10) thickness is not less than 15mm, and steel plate (11) thickness is not less than 10mm at the top of column.
7. assembled case as claimed in claim 6 becomes basis, which is characterized in that column bottom steel plate (10) and column (3) are vertical Curved reinforcement welding together, indulge reinforcement welding curved in top rib portion and exist at the top of column by steel plate (11) and column (3) in muscle bottom Together, then formwork casting concrete constitutes column (3).
8. the assembled case as described in claim 1~7 any one becomes basis, which is characterized in that six kinds of bottom plates, upright post bases (2), column (3) is equipped with the pull ring (8) for carrying.
9. the assembled case as described in claim 1~8 any one becomes basis, which is characterized in that bottom plate (1), upright post base (2), column (3) is prefabricated reinforced concrete member, is formed and is conserved by mold one-time-concreting by the reinforcing bar bound Reach predetermined strength.
10. the component on site construction method that a kind of assembled case becomes basis, which comprises the steps of:
S1: surveying setting-out excavates foundation soil, is excavated to specified absolute altitude;
S2: previously prepared reinforced concrete floor (1) is carried to designated position and is spliced;
S3: the bottom plate (1) spliced is attached using junction steel plate (4), and is fastened using nut;
S4: previously prepared reinforced concrete footing (2) being carried on bottom plate (1) reserved bolt hole (9) and is assembled, and It is fastened using nut;
S5: previously prepared column (3) is carried on upright post base (2) reserved bolt hole (9) assembles again, and used Nut is fastened;
S6: covering the electric wire for accessing box-type substation with PVC pipeline, and the interface with underground electric nest of tubes is carried out at incoming line Processing, prevents underground water from leaking;
S7: box-type substation being placed on column (3), and does grounding, installs the electric wire of access box-type substation, most After backfill foundation soil.
CN201811491522.0A 2018-12-07 2018-12-07 Assembled box transformer foundation and field construction method thereof Active CN109403367B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811491522.0A CN109403367B (en) 2018-12-07 2018-12-07 Assembled box transformer foundation and field construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811491522.0A CN109403367B (en) 2018-12-07 2018-12-07 Assembled box transformer foundation and field construction method thereof

Publications (2)

Publication Number Publication Date
CN109403367A true CN109403367A (en) 2019-03-01
CN109403367B CN109403367B (en) 2024-04-05

Family

ID=65457614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811491522.0A Active CN109403367B (en) 2018-12-07 2018-12-07 Assembled box transformer foundation and field construction method thereof

Country Status (1)

Country Link
CN (1) CN109403367B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989413A (en) * 2019-04-18 2019-07-09 中国建筑西北设计研究院有限公司 The spliced basis of power station equipment
CN111042189A (en) * 2019-12-27 2020-04-21 广东南控电力有限公司 Photovoltaic power plant's modularization base
CN111173025A (en) * 2019-12-11 2020-05-19 华中科技大学 Assembled transformer substation GIS equipment foundation and construction method thereof
CN112221672A (en) * 2020-09-24 2021-01-15 南京钜力智能制造技术研究院有限公司 Intelligent environment-friendly box type mobile crushing station and construction method thereof
CN114455052A (en) * 2022-03-09 2022-05-10 中国船舶重工集团公司第七0三研究所 Marine main unit whole frame divides enhancement of reconnection design to assist board structure
CN116356875A (en) * 2023-04-13 2023-06-30 徐州建机工程机械有限公司 Steel structure foundation block, assembled fixed foundation and installation method
CN117211202A (en) * 2023-10-30 2023-12-12 中铁二院工程集团有限责任公司 Assembled platform structure and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225312A (en) * 2013-04-22 2013-07-31 陈国龙 Prefabricated assembled foundation of tower mast structure
KR20170004586A (en) * 2015-07-03 2017-01-11 우광티엔씨(주) Hybrid underground pit structures and its construction method
CN106480900A (en) * 2016-11-28 2017-03-08 无锡市莱达热工工程有限公司 Factory Building upright post basic
CN106759420A (en) * 2016-12-21 2017-05-31 上海电力设计院有限公司 Prefabricated assembled transformer substation foundation structure
CN107100188A (en) * 2017-05-24 2017-08-29 北京浮士华国际工程顾问有限公司 A kind of assembling frame basis and its construction method for steelwork tower truss
CN108049501A (en) * 2018-01-19 2018-05-18 华侨大学 Prefabricated assembled concrete-filled steel square tubular column foot node and construction method can be repaired
CN207987958U (en) * 2018-02-13 2018-10-19 四平电力设计有限公司 A kind of pedestal of the tablet formula power equipment assembly foundation structure
CN209353364U (en) * 2018-12-07 2019-09-06 华中科技大学 A prefabricated box-type substation foundation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225312A (en) * 2013-04-22 2013-07-31 陈国龙 Prefabricated assembled foundation of tower mast structure
KR20170004586A (en) * 2015-07-03 2017-01-11 우광티엔씨(주) Hybrid underground pit structures and its construction method
CN106480900A (en) * 2016-11-28 2017-03-08 无锡市莱达热工工程有限公司 Factory Building upright post basic
CN106759420A (en) * 2016-12-21 2017-05-31 上海电力设计院有限公司 Prefabricated assembled transformer substation foundation structure
CN107100188A (en) * 2017-05-24 2017-08-29 北京浮士华国际工程顾问有限公司 A kind of assembling frame basis and its construction method for steelwork tower truss
CN108049501A (en) * 2018-01-19 2018-05-18 华侨大学 Prefabricated assembled concrete-filled steel square tubular column foot node and construction method can be repaired
CN207987958U (en) * 2018-02-13 2018-10-19 四平电力设计有限公司 A kind of pedestal of the tablet formula power equipment assembly foundation structure
CN209353364U (en) * 2018-12-07 2019-09-06 华中科技大学 A prefabricated box-type substation foundation

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989413A (en) * 2019-04-18 2019-07-09 中国建筑西北设计研究院有限公司 The spliced basis of power station equipment
CN111173025A (en) * 2019-12-11 2020-05-19 华中科技大学 Assembled transformer substation GIS equipment foundation and construction method thereof
CN111042189A (en) * 2019-12-27 2020-04-21 广东南控电力有限公司 Photovoltaic power plant's modularization base
CN112221672A (en) * 2020-09-24 2021-01-15 南京钜力智能制造技术研究院有限公司 Intelligent environment-friendly box type mobile crushing station and construction method thereof
CN112221672B (en) * 2020-09-24 2022-04-19 南京钜力智能制造技术研究院有限公司 Intelligent environment-friendly box type mobile crushing station and construction method thereof
CN114455052A (en) * 2022-03-09 2022-05-10 中国船舶重工集团公司第七0三研究所 Marine main unit whole frame divides enhancement of reconnection design to assist board structure
CN116356875A (en) * 2023-04-13 2023-06-30 徐州建机工程机械有限公司 Steel structure foundation block, assembled fixed foundation and installation method
CN117211202A (en) * 2023-10-30 2023-12-12 中铁二院工程集团有限责任公司 Assembled platform structure and construction method thereof

Also Published As

Publication number Publication date
CN109403367B (en) 2024-04-05

Similar Documents

Publication Publication Date Title
CN109403367A (en) A kind of assembled case change basis and its component on site construction method
CN106013954B (en) A kind of construction method of combination enclosing
US8161698B2 (en) Foundation for monopole wind turbine tower
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN207348091U (en) A kind of assembled pipe gallery
CN104466869A (en) Reinforced concrete assembly type cable duct and manufacturing method
WO2013040495A1 (en) Concrete forming systems and methods
KR101414155B1 (en) Self-supported shoring structure using shelf and construction method using the relieving platform
CN205171535U (en) Prefabricated assembled foundation of transmission line
CN209854577U (en) An Assembled Thin-Walled Box-Type Channel
CN112177036A (en) Height-adjustable modular prestressed fan foundation and construction method thereof
CN209353364U (en) A prefabricated box-type substation foundation
CN212582739U (en) Prefabricated grout of concrete seals assembled inspection shaft
US20050183363A1 (en) Prefabricated tower foundation comprising equipment shelters and a method for its deployment on site
CN215715401U (en) Can dismantle soil nailing wall structure
CN106284298B (en) Constitute the diaphram wall of piping lane side wall
CN212001059U (en) Pile foundation reinforcing structure of high-voltage line tower near deep foundation pit
CN212751754U (en) Modularized prefabricated assembly type pipeline and processing mold
CN213233403U (en) Steel connecting piece of underground continuous wall and underground continuous wall
KR100740052B1 (en) Prefab Manhole for Underground Transmission
CN208501735U (en) Prefabricated piping lane
CN208857844U (en) An assembled cable working well
CN214412214U (en) Assembled cable channel
CN222541527U (en) A comprehensive trench reinforcement structure
CN222923780U (en) Tower crane foundation structure free of formwork and support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant