CN109618279A - A kind of mining area communication method, equipment and computer readable storage medium - Google Patents

A kind of mining area communication method, equipment and computer readable storage medium Download PDF

Info

Publication number
CN109618279A
CN109618279A CN201910002155.1A CN201910002155A CN109618279A CN 109618279 A CN109618279 A CN 109618279A CN 201910002155 A CN201910002155 A CN 201910002155A CN 109618279 A CN109618279 A CN 109618279A
Authority
CN
China
Prior art keywords
mining area
communication
equipment
construction
ancillary equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910002155.1A
Other languages
Chinese (zh)
Other versions
CN109618279B (en
Inventor
何学苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910002155.1A priority Critical patent/CN109618279B/en
Publication of CN109618279A publication Critical patent/CN109618279A/en
Application granted granted Critical
Publication of CN109618279B publication Critical patent/CN109618279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/025Services making use of location information using location based information parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/04Arrangements for maintaining operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/30Services specially adapted for particular environments, situations or purposes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/80Services using short range communication, e.g. near-field communication [NFC], radio-frequency identification [RFID] or low energy communication

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of mining area communication methods, equipment and computer readable storage medium, wherein, this method comprises: mining area is divided into multiple regions, corresponding communication mode is used in different regions, simultaneously, it is communicating in unsmooth region, it keeps communicating to connect by way of communication for coordination, this programme realizes communication plan in a kind of more efficiently mine, the construction personnel in mine is enabled preferably to link up and exchange outside with mine, on the one hand, avoid the generation of safety accident, on the other hand, so that the administrative staff outside mine keep real-time tracking to the progress of project under construction.

Description

A kind of mining area communication method, equipment and computer readable storage medium
Technical field
The present invention relates to mobile communication field more particularly to a kind of mining area communication methods, equipment and computer-readable storage Medium.
Background technique
In the prior art, intelligent terminal, such as smart phone, Intelligent flat etc. have communication and positioning function, but When entering in mine with construction personnel, the communication function of intelligent terminal can not due to that can not search corresponding communication network Normal use.
In addition, administrative staff can not be in progress to the project under construction in mine outside mine since the communication network in mining area is unsmooth It is followed up in real time, can not be linked up and be solved in time so as to cause the construction obstruction being likely to occur.
Therefore, in the prior art, lack a kind of technical side that instant messaging and construction progress monitoring can be carried out in mine Case.
Summary of the invention
In order to solve above-mentioned technological deficiency in the prior art, the invention proposes a kind of mining area communication method, this method Include:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include First mining area, the second mining area and third mining area, wherein the geographic location feature includes associated with geo-location parameter Communication signal parameters;
The communication signal parameters for monitoring communication equipment determine that corresponding geographical location is joined according to the communication signal parameters Number, and locating region is determined according to the geo-location parameter, wherein first signal of communication in first mining area refers to Value, the second signal of communication reference value in second mining area, the third communication signal reference value in the third mining area successively reduce;
If the communication equipment is in first mining area, associated first auxiliary is determined in first mining area Equipment, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in second mining area related Second ancillary equipment of connection, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area pre- If first construction item, wherein as described in the communication equipment monitoring first construction item the first construction speed, and in real time The construction speed is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area by second mining area, judgement is set with second auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in the third mining area related The third ancillary equipment of connection, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area pre- If second construction item, wherein as described in the communication equipment monitoring second construction item the second construction speed, and in real time Second construction speed is synchronized to the third ancillary equipment, meanwhile, described first is reported by second ancillary equipment Construction speed.
Optionally, if the communication equipment is in first mining area, determination is associated in first mining area First ancillary equipment, wherein the communication connection with first ancillary equipment is established by near-field communication, comprising:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preparation thing Item includes construction area locating for construction group locating for the communication equipment and the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group And the construction area determines first ancillary equipment.
Optionally, if the communication equipment is transferred to second mining area by first mining area, judgement and described the Whether the communication connection of one ancillary equipment disconnects, if it is not, the communication connection is then kept, if so, in second mining area Determine associated second ancillary equipment, wherein the communication connection with second ancillary equipment, packet are established by near-field communication It includes:
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, it is determined in second mining area associated Optional equipment;
Obtain and cache the link information of the optional equipment.
Optionally, if the communication equipment is transferred to second mining area by first mining area, judge described first Whether the communication connection of ancillary equipment disconnects, if it is not, the communication connection is then kept, if so, in second mining area really Fixed associated second ancillary equipment, wherein the communication connection with second ancillary equipment is established by near-field communication, is also wrapped It includes:
If the communication connection with first ancillary equipment has disconnected, associated the is determined in second mining area Two ancillary equipments, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment.
Optionally, associated third ancillary equipment is determined in the third mining area, meanwhile, in the third mining area Execute preset second construction item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, And second construction speed is synchronized to the third ancillary equipment in real time, meanwhile, institute is reported by second ancillary equipment State the first construction speed, comprising:
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by described Three ancillary equipments report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
It is applied in conjunction with the determination of the task of the construction personnel, first construction plan and second construction plan The recruitment needs of work project.
The invention also provides a kind of mining area communication equipment, which includes memory, processor and is stored in described deposit It is real when the computer program is executed by the processor on reservoir and the computer program that can run on the processor It is existing:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include First mining area, the second mining area and third mining area, wherein the geographic location feature includes associated with geo-location parameter Communication signal parameters;
The communication signal parameters for monitoring communication equipment determine that corresponding geographical location is joined according to the communication signal parameters Number, and locating region is determined according to the geo-location parameter, wherein first signal of communication in first mining area refers to Value, the second signal of communication reference value in second mining area, the third communication signal reference value in the third mining area successively reduce;
If the communication equipment is in first mining area, associated first auxiliary is determined in first mining area Equipment, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in second mining area related Second ancillary equipment of connection, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area pre- If first construction item, wherein as described in the communication equipment monitoring first construction item the first construction speed, and in real time The construction speed is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area by second mining area, judgement is set with second auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in the third mining area related The third ancillary equipment of connection, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area pre- If second construction item, wherein as described in the communication equipment monitoring second construction item the second construction speed, and in real time Second construction speed is synchronized to the third ancillary equipment, meanwhile, described first is reported by second ancillary equipment Construction speed.
Optionally, it is realized when the computer program is also executed by the processor:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preparation thing Item includes construction area locating for construction group locating for the communication equipment and the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group And the construction area determines first ancillary equipment.
Optionally, it is realized when the computer program is also executed by the processor:
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, it is determined in second mining area associated Optional equipment;
Obtain and cache the link information of the optional equipment.
Optionally, it is realized when the computer program is also executed by the processor:
If the communication connection with first ancillary equipment has disconnected, associated the is determined in second mining area Two ancillary equipments, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment;
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by described Three ancillary equipments report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
It is applied in conjunction with the determination of the task of the construction personnel, first construction plan and second construction plan The recruitment needs of work project.
The invention also provides a kind of computer readable storage medium, mining area is stored on the computer readable storage medium The step of signal procedure, mining area communication program realizes mining area communication method as described in any one of the above embodiments when being executed by processor.
Implement mining area communication method, equipment and computer readable storage medium of the invention, it is multiple by the way that mining area to be divided into Region uses corresponding communication mode in different regions, meanwhile, it is communicating in unsmooth region, is passing through communication for coordination Mode keeps communicating to connect, and this programme realizes communication plan in a kind of more efficiently mine, enables construction personnel in mine It is enough preferably to be linked up and exchanged outside with mine, on the one hand, the generation of safety accident to be avoided, on the other hand, so that outside mine Administrative staff keep real-time tracking to the progress of project under construction.
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention, And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects of the present invention, feature and advantage can It is clearer and more comprehensible, it is special below to lift specific embodiments of the present invention.
Detailed description of the invention
By reading hereafter detailed description of preferred embodiment, various other advantages and benefits skill common for this field Art personnel will become clear.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to limit of the invention System.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the flow chart of mining area communication method first embodiment of the present invention;
Fig. 2 is the flow chart of mining area communication method second embodiment of the present invention;
Fig. 3 is the flow chart of mining area communication method 3rd embodiment of the present invention;
Fig. 4 is the flow chart of mining area communication method fourth embodiment of the present invention;
Fig. 5 is the flow chart of the 5th embodiment of mining area communication method of the present invention.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.
Embodiment one
Fig. 1 is the flow chart of mining area communication method first embodiment of the present invention.A kind of mining area communication method, this method packet It includes:
S1, the mining area is divided by least three regions, three regions according to the geographic location feature in the mining area Including the first mining area, the second mining area and third mining area, wherein the geographic location feature includes related to geo-location parameter The communication signal parameters of connection;
S2, the communication signal parameters for monitoring communication equipment determine corresponding geographical position according to the communication signal parameters Parameter is set, and determines locating region according to the geo-location parameter, wherein first signal of communication in first mining area is joined Value, the second signal of communication reference value in second mining area, the third communication signal reference value in the third mining area is examined successively to drop It is low;
If S3, the communication equipment are in first mining area, associated first is determined in first mining area Ancillary equipment, wherein the communication connection with first ancillary equipment is established by near-field communication;
If S4, the communication equipment are transferred to second mining area by first mining area, judge and described first is auxiliary Help whether the communication connection of equipment disconnects, if it is not, the communication connection is then kept, if so, determining in second mining area Associated second ancillary equipment, wherein the communication connection with second ancillary equipment is established by near-field communication;
S5, associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area Preset first construction item, wherein the first construction speed of the first construction item as described in the communication equipment monitoring, and it is real When the construction speed is synchronized to second ancillary equipment;
If S6, the communication equipment are transferred to the third mining area by second mining area, judge and described second is auxiliary Help whether the communication connection of equipment disconnects, if it is not, the communication connection is then kept, if so, determining in the third mining area Associated third ancillary equipment, wherein the communication connection with the third ancillary equipment is established by near-field communication;
S7, associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area Preset second construction item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, and it is real When second construction speed is synchronized to the third ancillary equipment, meanwhile, report described by second ancillary equipment One construction speed.
Optionally, if the communication equipment is in first mining area, determination is associated in first mining area First ancillary equipment of one or more ancillary equipments as the present embodiment, wherein established and described first by near-field communication The communication connection of ancillary equipment;
Optionally, if the communication equipment is in first mining area, determination is associated in first mining area Strongest the first ancillary equipment as the present embodiment of connection signal in multiple ancillary equipments, wherein built by near-field communication The vertical communication connection with first ancillary equipment;
Optionally, associated second ancillary equipment is determined in second mining area, meanwhile, in second mining area Execute preset first construction item, wherein monitor the first of the first construction item by the camera of the communication equipment Construction speed, and the construction speed is synchronized to second ancillary equipment in real time;
Optionally, associated second ancillary equipment is determined in second mining area, meanwhile, in second mining area Execute preset first construction item, wherein the first construction item as described in the data input device typing of the communication equipment The first construction speed, and the construction speed is synchronized to second ancillary equipment in real time;
Optionally, associated second ancillary equipment is determined in second mining area, meanwhile, in second mining area Execute preset first construction item, wherein by the associated component monitoring of second ancillary equipment the first construction item The first construction speed, and the construction speed is synchronized to second ancillary equipment in real time.
The beneficial effect of the present embodiment is, by the way that mining area is divided into multiple regions, using corresponding in different regions Communication mode, meanwhile, communicating in unsmooth region, keeping communicating to connect by way of communication for coordination, this programme is realized Communication plan in a kind of more efficiently mine, enable the construction personnel in mine preferably with link up and hand over outside mine Stream, on the one hand, the generation of safety accident is avoided, on the other hand, so that the administrative staff outside mine protect the progress of project under construction Hold real-time tracking.
Embodiment two
Fig. 2 is the flow chart of mining area communication method second embodiment of the present invention.Based on the above embodiment, optionally, if institute It states communication equipment and is in first mining area, then determine associated first ancillary equipment in first mining area, wherein is logical Cross the communication connection of near-field communication foundation and first ancillary equipment, comprising:
S31, associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction is pre- Standby item includes construction area locating for construction group and the communication equipment locating for the communication equipment;
S32, first ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction Group and the construction area determine first ancillary equipment.
Optionally, construction group indicates to carry the construction group that the construction personnel of the communication equipment is assigned, wherein this The construction group of embodiment and mining area region have relevance;
Optionally, construction area indicates to carry the construction location that the construction personnel of the communication equipment is assigned, wherein this The construction location of embodiment and mining area region have relevance.
The beneficial effect of the present embodiment is, by construction group and construction area locating for communication equipment, realizes Communication plan in more effective mine enables the construction personnel in mine preferably to link up and exchange outside with mine, on the one hand, The generation of safety accident is avoided, on the other hand, so that the administrative staff outside mine keep real-time tracking to the progress of project under construction.
Embodiment three
Fig. 3 is the flow chart of mining area communication method 3rd embodiment of the present invention.Based on the above embodiment, optionally, if institute It states communication equipment and second mining area is transferred to by first mining area, then judge the communication connection with first ancillary equipment Whether disconnect, if it is not, the communication connection is then kept, if so, determining associated second auxiliary in second mining area Equipment, wherein the communication connection with second ancillary equipment is established by near-field communication, comprising:
If S41, the communication equipment are transferred to second mining area by first mining area, judge and described first is auxiliary Help whether the communication connection of equipment disconnects, if it is not, the communication connection is then kept, meanwhile, phase is determined in second mining area Associated optional equipment;
S42, acquisition and the link information for caching the optional equipment.
Optionally, if the communication equipment is transferred to second mining area by first mining area, judgement and described the Whether the communication connection of one ancillary equipment disconnects, if it is not, the communication connection is then kept, meanwhile, detect the communication connection Communication quality disconnects the communication connection if the communication quality is lower than preset threshold;
Optionally, if the communication equipment is transferred to second mining area by first mining area, judgement and described the Whether the communication connection of one ancillary equipment disconnects, if it is not, the communication connection is then kept, meanwhile, detect the communication connection Communication quality keeps the communication connection if the communication quality is higher than preset threshold;
Optionally, obtain and cache the link information of the optional equipment, wherein searched by the preset period and determined institute Optional equipment is stated, the optional equipment for selecting communication quality highest as the present embodiment.
The beneficial effect of the present embodiment is, by determining associated optional equipment in second mining area, avoids Can not establish when communicating and disconnecting realizes in a kind of more efficiently mine with other communication connections for assisting equipment, this programme Communication plan enables the construction personnel in mine preferably to link up and exchange outside with mine, on the one hand, to avoid safe thing Therefore generation, on the other hand, so that administrative staff outside mine keep real-time tracking to the progress of project under construction.
Example IV
Fig. 4 is the flow chart of mining area communication method fourth embodiment of the present invention.Based on the above embodiment, optionally, if institute It states communication equipment and second mining area is transferred to by first mining area, then judge that the communication connection of first ancillary equipment is No disconnection, if it is not, the communication connection is then kept, if so, determining that associated second auxiliary is set in second mining area It is standby, wherein the communication connection with second ancillary equipment is established by near-field communication, further includes:
If S43, having been disconnected with the communication connection of first ancillary equipment, determined in second mining area associated The second ancillary equipment, meanwhile, associated optional equipment is determined in second mining area;
S44, acquisition and the link information for caching the optional equipment.
Optionally, if having disconnected with the communication connection of first ancillary equipment, phase is determined in second mining area Associated second ancillary equipment, meanwhile, associated optional equipment is determined in second mining area, wherein selection communication matter Measure highest the second ancillary equipment as the present embodiment;
Optionally, if having disconnected with the communication connection of first ancillary equipment, phase is determined in second mining area Associated second ancillary equipment, meanwhile, associated optional equipment is determined in second mining area, wherein selection communication matter Measure the highest optional equipment as the present embodiment.
The beneficial effect of the present embodiment is, by determining associated optional equipment in second mining area, avoids Can not establish when communicating and disconnecting realizes in a kind of more efficiently mine with other communication connections for assisting equipment, this programme Communication plan enables the construction personnel in mine preferably to link up and exchange outside with mine, on the one hand, to avoid safe thing Therefore generation, on the other hand, so that administrative staff outside mine keep real-time tracking to the progress of project under construction.
Embodiment five
Fig. 5 is the flow chart of the 5th embodiment of mining area communication method of the present invention.Based on the above embodiment, optionally, in institute It states and determines associated third ancillary equipment in third mining area, meanwhile, preset second construction is executed in the third mining area Item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, and applied in real time by described second Work progress is synchronized to the third ancillary equipment, meanwhile, first construction speed is reported by second ancillary equipment, is wrapped It includes:
S71, the first construction speed reported according to determine the first construction plan of construction personnel;
S72, the second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by institute It states third ancillary equipment and reports second construction speed;
S73, the second construction speed reported according to determine the second construction plan of the construction personnel;
S74, the task in conjunction with the construction personnel, first construction plan and second construction plan are true Determine the recruitment needs of project under construction.
Optionally, the second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by The third ancillary equipment reports second construction speed, wherein second construction speed includes the communication equipment Communication connection relationship, in order to track and ensure the quality of connection of the current communication plan of communication equipment;
Optionally, in conjunction with the task of the construction personnel, first construction plan and the second construction meter Draw the recruitment needs for generating project under construction;
Optionally, the recruitment needs are issued by third ancillary equipment.
The beneficial effect of the present embodiment is, passes through point of tracking and project under construction, construction demand to construction speed Analysis, obtains relevant recruitment needs, further enriches the communication plan in mine outside mine, enhance usage experience.
Embodiment six
Based on the above embodiment, the invention also provides a kind of mining area communication equipment, which includes memory, processor And it is stored in the computer program that can be run on the memory and on the processor, the computer program is by the place Reason device is realized when executing:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include First mining area, the second mining area and third mining area, wherein the geographic location feature includes associated with geo-location parameter Communication signal parameters;
The communication signal parameters for monitoring communication equipment determine that corresponding geographical location is joined according to the communication signal parameters Number, and locating region is determined according to the geo-location parameter, wherein first signal of communication in first mining area refers to Value, the second signal of communication reference value in second mining area, the third communication signal reference value in the third mining area successively reduce;
If the communication equipment is in first mining area, associated first auxiliary is determined in first mining area Equipment, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in second mining area related Second ancillary equipment of connection, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area pre- If first construction item, wherein as described in the communication equipment monitoring first construction item the first construction speed, and in real time The construction speed is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area by second mining area, judgement is set with second auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in the third mining area related The third ancillary equipment of connection, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area pre- If second construction item, wherein as described in the communication equipment monitoring second construction item the second construction speed, and in real time Second construction speed is synchronized to the third ancillary equipment, meanwhile, described first is reported by second ancillary equipment Construction speed.
Embodiment seven
Based on the above embodiment, optionally, it is realized when the computer program is also executed by the processor:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preparation thing Item includes construction area locating for construction group locating for the communication equipment and the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group And the construction area determines first ancillary equipment.
Embodiment eight
Based on the above embodiment, optionally, it is realized when the computer program is also executed by the processor:
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary Whether standby communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, it is determined in second mining area associated Optional equipment;
Obtain and cache the link information of the optional equipment.
Embodiment nine
Based on the above embodiment, optionally, it is realized when the computer program is also executed by the processor:
If the communication connection with first ancillary equipment has disconnected, associated the is determined in second mining area Two ancillary equipments, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment;
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by described Three ancillary equipments report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
It is applied in conjunction with the determination of the task of the construction personnel, first construction plan and second construction plan The recruitment needs of work project.
Embodiment ten
Based on the above embodiment, the invention also provides a kind of computer readable storage medium, the computer-readable storages Mining area communication program is stored on medium, mining area communication program realizes mining area as described in any one of the above embodiments when being executed by processor The step of communication means.
Implement mining area communication method, equipment and computer readable storage medium of the invention, by obtaining the first mine lamp First location data;Monitor the first exercise data of first mine lamp;According to the first initial alignment parameter and described First exercise data judges whether first mine lamp is in mining area communication state;If so, according to the first mining area communication parameter The mining area communication data of first mine lamp are generated, in real time with the second mining area communication parameter to be used for the mine lamp in moving process Middle execution mining area communication operation.A kind of significantly more efficient mine lamp navigation scheme is realized, so that construction personnel is in underground work Safety be protected.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or device.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art The part contributed out can be embodied in the form of software products, which is stored in a storage medium In (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal (can be mobile phone, computer, service Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, all of these belong to the protection of the present invention.

Claims (10)

1. a kind of mining area communication method, which is characterized in that the described method includes:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include first Mining area, the second mining area and third mining area, wherein the geographic location feature includes communication associated with geo-location parameter Signal parameter;
The communication signal parameters for monitoring communication equipment, determine corresponding geo-location parameter according to the communication signal parameters, And locating region is determined according to the geo-location parameter, wherein the first signal of communication reference value in first mining area, institute The third communication signal reference value of the second signal of communication reference value, the third mining area of stating the second mining area successively reduces;
If the communication equipment is in first mining area, determine that associated first auxiliary is set in first mining area It is standby, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area, judgement and first ancillary equipment by first mining area Whether communication connection disconnects, if it is not, the communication connection is then kept, if so, determination is associated in second mining area Second ancillary equipment, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area preset First construction item, wherein the first construction speed of the first construction item as described in the communication equipment monitoring, and in real time by institute It states construction speed and is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area, judgement and second ancillary equipment by second mining area Whether communication connection disconnects, if it is not, the communication connection is then kept, if so, determination is associated in the third mining area Third ancillary equipment, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area preset Second construction item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, and in real time by institute It states the second construction speed and is synchronized to the third ancillary equipment, meanwhile, first construction is reported by second ancillary equipment Progress.
2. mining area communication method according to claim 1, which is characterized in that if the communication equipment is in first mine Area then determines associated first ancillary equipment in first mining area, wherein is established and described first by near-field communication The communication connection of ancillary equipment, comprising:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preliminary matter packet Include construction area locating for construction group and the communication equipment locating for the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group and The construction area determines first ancillary equipment.
3. mining area communication method according to claim 2, which is characterized in that if the communication equipment is by first mining area It is transferred to second mining area, then judges whether the communication connection with first ancillary equipment disconnects, if it is not, described in then keeping Communication connection, if so, determining associated second ancillary equipment in second mining area, wherein built by near-field communication The vertical communication connection with second ancillary equipment, comprising:
If the communication equipment is transferred to second mining area, judgement and first ancillary equipment by first mining area Whether communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, determination is associated standby in second mining area Optional equipment;
Obtain and cache the link information of the optional equipment.
4. mining area communication method according to claim 3, which is characterized in that if the communication equipment is by first mining area It is transferred to second mining area, then judges whether the communication connection of first ancillary equipment disconnects, if it is not, then keeping described logical Letter connection, if so, determining associated second ancillary equipment in second mining area, wherein established by near-field communication With the communication connection of second ancillary equipment, further includes:
If the communication connection with first ancillary equipment has disconnected, determine that associated second is auxiliary in second mining area Equipment is helped, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment.
5. mining area communication method according to claim 4, which is characterized in that determination is associated in the third mining area Third ancillary equipment, meanwhile, preset second construction item is executed in the third mining area, wherein by the communication equipment The second construction speed of the second construction item is monitored, and second construction speed is synchronized to the third in real time and is assisted Equipment, meanwhile, first construction speed is reported by second ancillary equipment, comprising:
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, it is auxiliary by the third when communication equipment leaves the third mining area Equipment is helped to report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
Construction item is determined in conjunction with the task of the construction personnel, first construction plan and second construction plan Purpose recruitment needs.
6. a kind of mining area communication equipment, which is characterized in that the equipment includes memory, processor and is stored in the memory Computer program that is upper and can running on the processor, the computer program are realized when being executed by the processor:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include first Mining area, the second mining area and third mining area, wherein the geographic location feature includes communication associated with geo-location parameter Signal parameter;
The communication signal parameters for monitoring communication equipment, determine corresponding geo-location parameter according to the communication signal parameters, And locating region is determined according to the geo-location parameter, wherein the first signal of communication reference value in first mining area, institute The third communication signal reference value of the second signal of communication reference value, the third mining area of stating the second mining area successively reduces;
If the communication equipment is in first mining area, determine that associated first auxiliary is set in first mining area It is standby, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area, judgement and first ancillary equipment by first mining area Whether communication connection disconnects, if it is not, the communication connection is then kept, if so, determination is associated in second mining area Second ancillary equipment, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area preset First construction item, wherein the first construction speed of the first construction item as described in the communication equipment monitoring, and in real time by institute It states construction speed and is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area, judgement and second ancillary equipment by second mining area Whether communication connection disconnects, if it is not, the communication connection is then kept, if so, determination is associated in the third mining area Third ancillary equipment, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area preset Second construction item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, and in real time by institute It states the second construction speed and is synchronized to the third ancillary equipment, meanwhile, first construction is reported by second ancillary equipment Progress.
7. mining area communication equipment according to claim 6, which is characterized in that the computer program is also by the processor It is realized when execution:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preliminary matter packet Include construction area locating for construction group and the communication equipment locating for the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group and The construction area determines first ancillary equipment.
8. mining area communication equipment according to claim 7, which is characterized in that the computer program is also by the processor It is realized when execution:
If the communication equipment is transferred to second mining area, judgement and first ancillary equipment by first mining area Whether communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, determination is associated standby in second mining area Optional equipment;
Obtain and cache the link information of the optional equipment.
9. mining area communication equipment according to claim 8, which is characterized in that the computer program is also by the processor It is realized when execution:
If the communication connection with first ancillary equipment has disconnected, determine that associated second is auxiliary in second mining area Equipment is helped, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment;
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, it is auxiliary by the third when communication equipment leaves the third mining area Equipment is helped to report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
Construction item is determined in conjunction with the task of the construction personnel, first construction plan and second construction plan Purpose recruitment needs.
10. a kind of computer readable storage medium, which is characterized in that it is logical to be stored with mining area on the computer readable storage medium Believe program, the mining area communication as described in any one of claims 1 to 5 is realized when the mining area communication program is executed by processor The step of method.
CN201910002155.1A 2019-01-02 2019-01-02 Mining area communication method, mining area communication equipment and computer readable storage medium Active CN109618279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910002155.1A CN109618279B (en) 2019-01-02 2019-01-02 Mining area communication method, mining area communication equipment and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910002155.1A CN109618279B (en) 2019-01-02 2019-01-02 Mining area communication method, mining area communication equipment and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN109618279A true CN109618279A (en) 2019-04-12
CN109618279B CN109618279B (en) 2021-08-10

Family

ID=66016515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910002155.1A Active CN109618279B (en) 2019-01-02 2019-01-02 Mining area communication method, mining area communication equipment and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN109618279B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112381368A (en) * 2020-11-02 2021-02-19 郑州富联智能工坊有限公司 Production information analysis method, computer device and system for analyzing production information

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104580453A (en) * 2014-12-30 2015-04-29 武汉华科道普轨道交通信息技术有限公司 Railway transportation safety construction information service pushing system based on positions and tasks
CN206790713U (en) * 2017-05-10 2017-12-22 上海建工集团股份有限公司 Job site personnel positioner
US9949085B2 (en) * 2016-01-12 2018-04-17 General Electric Company System for collection, analytics, and display of indoor positioning data

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104580453A (en) * 2014-12-30 2015-04-29 武汉华科道普轨道交通信息技术有限公司 Railway transportation safety construction information service pushing system based on positions and tasks
US9949085B2 (en) * 2016-01-12 2018-04-17 General Electric Company System for collection, analytics, and display of indoor positioning data
CN206790713U (en) * 2017-05-10 2017-12-22 上海建工集团股份有限公司 Job site personnel positioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112381368A (en) * 2020-11-02 2021-02-19 郑州富联智能工坊有限公司 Production information analysis method, computer device and system for analyzing production information

Also Published As

Publication number Publication date
CN109618279B (en) 2021-08-10

Similar Documents

Publication Publication Date Title
KR102205096B1 (en) Transaction risk detection method and apparatus
CN103699120B (en) Fault diagnosis system for special vehicle
CN101320073B (en) Method for determining location of phase-to-earth fault
CN107945053A (en) A kind of multiple source power distribution network data convergence analysis platform and its control method
CN105761483B (en) A kind of vehicle data processing method and equipment
CN106646130B (en) A fault location method and system for active distribution network based on current polarity comparison
CN104039585A (en) A Method And A Device For Determining Information About Efficiency Of An Inductive Charging System, Having A Primary Coil Embedded In A Road Infrastructure
CN107194542A (en) On-site emergency disposal method, system and moving emergency server
CN110286300A (en) A kind of multi branch electric power lines road Fault Locating Method, device, equipment and system
CN105844846B (en) A kind of method for safety monitoring based on Ibeacon technologies, apparatus and system
CN102624097A (en) Fault location method for intelligent distribution lines
CN109618279A (en) A kind of mining area communication method, equipment and computer readable storage medium
CN202281817U (en) Microcomputer low current grounding and line-selecting system
CN105023124A (en) Transformer station defect real time research and judge method, apparatus and system
CN109334590A (en) Pilotless automobile chassis control method, apparatus, equipment and storage medium
CN116316233A (en) Intelligent substation inspection system, method, equipment and storage medium
CN107889058A (en) Monitoring method, device and electronic equipment
CN105352523B (en) Intelligent route generation method and device
CN109116382A (en) A kind of location prediction and fast iterative algorithm and application apparatus based on artificial intelligence sensing technology
CN106067219B (en) A kind of the centralized management control system and method for charging pile
CN105635155B (en) The detection method and device of component devices state in robot terminal
CN104898022B (en) A kind of online fault location system and method for high-speed railway high pressure full cable perforation circuit
CN104933557B (en) A kind of method and system for preventing POS machine strange land from trading
CN107888394A (en) The method and device of network failure reason positioning
CN111204249A (en) Battery charging method and system based on intelligent charging pile

Legal Events

Date Code Title Description