CN109618279A - A kind of mining area communication method, equipment and computer readable storage medium - Google Patents
A kind of mining area communication method, equipment and computer readable storage medium Download PDFInfo
- Publication number
- CN109618279A CN109618279A CN201910002155.1A CN201910002155A CN109618279A CN 109618279 A CN109618279 A CN 109618279A CN 201910002155 A CN201910002155 A CN 201910002155A CN 109618279 A CN109618279 A CN 109618279A
- Authority
- CN
- China
- Prior art keywords
- mining area
- communication
- equipment
- construction
- ancillary equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004891 communication Methods 0.000 title claims abstract description 318
- 238000005065 mining Methods 0.000 title claims abstract description 261
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000003860 storage Methods 0.000 title claims abstract description 13
- 238000010276 construction Methods 0.000 claims abstract description 222
- 238000012544 monitoring process Methods 0.000 claims description 29
- 230000001360 synchronised effect Effects 0.000 claims description 18
- 238000004590 computer program Methods 0.000 claims description 15
- 230000007115 recruitment Effects 0.000 claims description 9
- 230000009286 beneficial effect Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 230000006870 function Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/02—Services making use of location information
- H04W4/025—Services making use of location information using location based information parameters
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/04—Arrangements for maintaining operational condition
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/30—Services specially adapted for particular environments, situations or purposes
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/80—Services using short range communication, e.g. near-field communication [NFC], radio-frequency identification [RFID] or low energy communication
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a kind of mining area communication methods, equipment and computer readable storage medium, wherein, this method comprises: mining area is divided into multiple regions, corresponding communication mode is used in different regions, simultaneously, it is communicating in unsmooth region, it keeps communicating to connect by way of communication for coordination, this programme realizes communication plan in a kind of more efficiently mine, the construction personnel in mine is enabled preferably to link up and exchange outside with mine, on the one hand, avoid the generation of safety accident, on the other hand, so that the administrative staff outside mine keep real-time tracking to the progress of project under construction.
Description
Technical field
The present invention relates to mobile communication field more particularly to a kind of mining area communication methods, equipment and computer-readable storage
Medium.
Background technique
In the prior art, intelligent terminal, such as smart phone, Intelligent flat etc. have communication and positioning function, but
When entering in mine with construction personnel, the communication function of intelligent terminal can not due to that can not search corresponding communication network
Normal use.
In addition, administrative staff can not be in progress to the project under construction in mine outside mine since the communication network in mining area is unsmooth
It is followed up in real time, can not be linked up and be solved in time so as to cause the construction obstruction being likely to occur.
Therefore, in the prior art, lack a kind of technical side that instant messaging and construction progress monitoring can be carried out in mine
Case.
Summary of the invention
In order to solve above-mentioned technological deficiency in the prior art, the invention proposes a kind of mining area communication method, this method
Include:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include
First mining area, the second mining area and third mining area, wherein the geographic location feature includes associated with geo-location parameter
Communication signal parameters;
The communication signal parameters for monitoring communication equipment determine that corresponding geographical location is joined according to the communication signal parameters
Number, and locating region is determined according to the geo-location parameter, wherein first signal of communication in first mining area refers to
Value, the second signal of communication reference value in second mining area, the third communication signal reference value in the third mining area successively reduce;
If the communication equipment is in first mining area, associated first auxiliary is determined in first mining area
Equipment, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in second mining area related
Second ancillary equipment of connection, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area pre-
If first construction item, wherein as described in the communication equipment monitoring first construction item the first construction speed, and in real time
The construction speed is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area by second mining area, judgement is set with second auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in the third mining area related
The third ancillary equipment of connection, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area pre-
If second construction item, wherein as described in the communication equipment monitoring second construction item the second construction speed, and in real time
Second construction speed is synchronized to the third ancillary equipment, meanwhile, described first is reported by second ancillary equipment
Construction speed.
Optionally, if the communication equipment is in first mining area, determination is associated in first mining area
First ancillary equipment, wherein the communication connection with first ancillary equipment is established by near-field communication, comprising:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preparation thing
Item includes construction area locating for construction group locating for the communication equipment and the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group
And the construction area determines first ancillary equipment.
Optionally, if the communication equipment is transferred to second mining area by first mining area, judgement and described the
Whether the communication connection of one ancillary equipment disconnects, if it is not, the communication connection is then kept, if so, in second mining area
Determine associated second ancillary equipment, wherein the communication connection with second ancillary equipment, packet are established by near-field communication
It includes:
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, it is determined in second mining area associated
Optional equipment;
Obtain and cache the link information of the optional equipment.
Optionally, if the communication equipment is transferred to second mining area by first mining area, judge described first
Whether the communication connection of ancillary equipment disconnects, if it is not, the communication connection is then kept, if so, in second mining area really
Fixed associated second ancillary equipment, wherein the communication connection with second ancillary equipment is established by near-field communication, is also wrapped
It includes:
If the communication connection with first ancillary equipment has disconnected, associated the is determined in second mining area
Two ancillary equipments, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment.
Optionally, associated third ancillary equipment is determined in the third mining area, meanwhile, in the third mining area
Execute preset second construction item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring,
And second construction speed is synchronized to the third ancillary equipment in real time, meanwhile, institute is reported by second ancillary equipment
State the first construction speed, comprising:
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by described
Three ancillary equipments report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
It is applied in conjunction with the determination of the task of the construction personnel, first construction plan and second construction plan
The recruitment needs of work project.
The invention also provides a kind of mining area communication equipment, which includes memory, processor and is stored in described deposit
It is real when the computer program is executed by the processor on reservoir and the computer program that can run on the processor
It is existing:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include
First mining area, the second mining area and third mining area, wherein the geographic location feature includes associated with geo-location parameter
Communication signal parameters;
The communication signal parameters for monitoring communication equipment determine that corresponding geographical location is joined according to the communication signal parameters
Number, and locating region is determined according to the geo-location parameter, wherein first signal of communication in first mining area refers to
Value, the second signal of communication reference value in second mining area, the third communication signal reference value in the third mining area successively reduce;
If the communication equipment is in first mining area, associated first auxiliary is determined in first mining area
Equipment, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in second mining area related
Second ancillary equipment of connection, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area pre-
If first construction item, wherein as described in the communication equipment monitoring first construction item the first construction speed, and in real time
The construction speed is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area by second mining area, judgement is set with second auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in the third mining area related
The third ancillary equipment of connection, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area pre-
If second construction item, wherein as described in the communication equipment monitoring second construction item the second construction speed, and in real time
Second construction speed is synchronized to the third ancillary equipment, meanwhile, described first is reported by second ancillary equipment
Construction speed.
Optionally, it is realized when the computer program is also executed by the processor:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preparation thing
Item includes construction area locating for construction group locating for the communication equipment and the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group
And the construction area determines first ancillary equipment.
Optionally, it is realized when the computer program is also executed by the processor:
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, it is determined in second mining area associated
Optional equipment;
Obtain and cache the link information of the optional equipment.
Optionally, it is realized when the computer program is also executed by the processor:
If the communication connection with first ancillary equipment has disconnected, associated the is determined in second mining area
Two ancillary equipments, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment;
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by described
Three ancillary equipments report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
It is applied in conjunction with the determination of the task of the construction personnel, first construction plan and second construction plan
The recruitment needs of work project.
The invention also provides a kind of computer readable storage medium, mining area is stored on the computer readable storage medium
The step of signal procedure, mining area communication program realizes mining area communication method as described in any one of the above embodiments when being executed by processor.
Implement mining area communication method, equipment and computer readable storage medium of the invention, it is multiple by the way that mining area to be divided into
Region uses corresponding communication mode in different regions, meanwhile, it is communicating in unsmooth region, is passing through communication for coordination
Mode keeps communicating to connect, and this programme realizes communication plan in a kind of more efficiently mine, enables construction personnel in mine
It is enough preferably to be linked up and exchanged outside with mine, on the one hand, the generation of safety accident to be avoided, on the other hand, so that outside mine
Administrative staff keep real-time tracking to the progress of project under construction.
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention,
And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects of the present invention, feature and advantage can
It is clearer and more comprehensible, it is special below to lift specific embodiments of the present invention.
Detailed description of the invention
By reading hereafter detailed description of preferred embodiment, various other advantages and benefits skill common for this field
Art personnel will become clear.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to limit of the invention
System.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the flow chart of mining area communication method first embodiment of the present invention;
Fig. 2 is the flow chart of mining area communication method second embodiment of the present invention;
Fig. 3 is the flow chart of mining area communication method 3rd embodiment of the present invention;
Fig. 4 is the flow chart of mining area communication method fourth embodiment of the present invention;
Fig. 5 is the flow chart of the 5th embodiment of mining area communication method of the present invention.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
It is fully disclosed to those skilled in the art.
Embodiment one
Fig. 1 is the flow chart of mining area communication method first embodiment of the present invention.A kind of mining area communication method, this method packet
It includes:
S1, the mining area is divided by least three regions, three regions according to the geographic location feature in the mining area
Including the first mining area, the second mining area and third mining area, wherein the geographic location feature includes related to geo-location parameter
The communication signal parameters of connection;
S2, the communication signal parameters for monitoring communication equipment determine corresponding geographical position according to the communication signal parameters
Parameter is set, and determines locating region according to the geo-location parameter, wherein first signal of communication in first mining area is joined
Value, the second signal of communication reference value in second mining area, the third communication signal reference value in the third mining area is examined successively to drop
It is low;
If S3, the communication equipment are in first mining area, associated first is determined in first mining area
Ancillary equipment, wherein the communication connection with first ancillary equipment is established by near-field communication;
If S4, the communication equipment are transferred to second mining area by first mining area, judge and described first is auxiliary
Help whether the communication connection of equipment disconnects, if it is not, the communication connection is then kept, if so, determining in second mining area
Associated second ancillary equipment, wherein the communication connection with second ancillary equipment is established by near-field communication;
S5, associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area
Preset first construction item, wherein the first construction speed of the first construction item as described in the communication equipment monitoring, and it is real
When the construction speed is synchronized to second ancillary equipment;
If S6, the communication equipment are transferred to the third mining area by second mining area, judge and described second is auxiliary
Help whether the communication connection of equipment disconnects, if it is not, the communication connection is then kept, if so, determining in the third mining area
Associated third ancillary equipment, wherein the communication connection with the third ancillary equipment is established by near-field communication;
S7, associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area
Preset second construction item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, and it is real
When second construction speed is synchronized to the third ancillary equipment, meanwhile, report described by second ancillary equipment
One construction speed.
Optionally, if the communication equipment is in first mining area, determination is associated in first mining area
First ancillary equipment of one or more ancillary equipments as the present embodiment, wherein established and described first by near-field communication
The communication connection of ancillary equipment;
Optionally, if the communication equipment is in first mining area, determination is associated in first mining area
Strongest the first ancillary equipment as the present embodiment of connection signal in multiple ancillary equipments, wherein built by near-field communication
The vertical communication connection with first ancillary equipment;
Optionally, associated second ancillary equipment is determined in second mining area, meanwhile, in second mining area
Execute preset first construction item, wherein monitor the first of the first construction item by the camera of the communication equipment
Construction speed, and the construction speed is synchronized to second ancillary equipment in real time;
Optionally, associated second ancillary equipment is determined in second mining area, meanwhile, in second mining area
Execute preset first construction item, wherein the first construction item as described in the data input device typing of the communication equipment
The first construction speed, and the construction speed is synchronized to second ancillary equipment in real time;
Optionally, associated second ancillary equipment is determined in second mining area, meanwhile, in second mining area
Execute preset first construction item, wherein by the associated component monitoring of second ancillary equipment the first construction item
The first construction speed, and the construction speed is synchronized to second ancillary equipment in real time.
The beneficial effect of the present embodiment is, by the way that mining area is divided into multiple regions, using corresponding in different regions
Communication mode, meanwhile, communicating in unsmooth region, keeping communicating to connect by way of communication for coordination, this programme is realized
Communication plan in a kind of more efficiently mine, enable the construction personnel in mine preferably with link up and hand over outside mine
Stream, on the one hand, the generation of safety accident is avoided, on the other hand, so that the administrative staff outside mine protect the progress of project under construction
Hold real-time tracking.
Embodiment two
Fig. 2 is the flow chart of mining area communication method second embodiment of the present invention.Based on the above embodiment, optionally, if institute
It states communication equipment and is in first mining area, then determine associated first ancillary equipment in first mining area, wherein is logical
Cross the communication connection of near-field communication foundation and first ancillary equipment, comprising:
S31, associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction is pre-
Standby item includes construction area locating for construction group and the communication equipment locating for the communication equipment;
S32, first ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction
Group and the construction area determine first ancillary equipment.
Optionally, construction group indicates to carry the construction group that the construction personnel of the communication equipment is assigned, wherein this
The construction group of embodiment and mining area region have relevance;
Optionally, construction area indicates to carry the construction location that the construction personnel of the communication equipment is assigned, wherein this
The construction location of embodiment and mining area region have relevance.
The beneficial effect of the present embodiment is, by construction group and construction area locating for communication equipment, realizes
Communication plan in more effective mine enables the construction personnel in mine preferably to link up and exchange outside with mine, on the one hand,
The generation of safety accident is avoided, on the other hand, so that the administrative staff outside mine keep real-time tracking to the progress of project under construction.
Embodiment three
Fig. 3 is the flow chart of mining area communication method 3rd embodiment of the present invention.Based on the above embodiment, optionally, if institute
It states communication equipment and second mining area is transferred to by first mining area, then judge the communication connection with first ancillary equipment
Whether disconnect, if it is not, the communication connection is then kept, if so, determining associated second auxiliary in second mining area
Equipment, wherein the communication connection with second ancillary equipment is established by near-field communication, comprising:
If S41, the communication equipment are transferred to second mining area by first mining area, judge and described first is auxiliary
Help whether the communication connection of equipment disconnects, if it is not, the communication connection is then kept, meanwhile, phase is determined in second mining area
Associated optional equipment;
S42, acquisition and the link information for caching the optional equipment.
Optionally, if the communication equipment is transferred to second mining area by first mining area, judgement and described the
Whether the communication connection of one ancillary equipment disconnects, if it is not, the communication connection is then kept, meanwhile, detect the communication connection
Communication quality disconnects the communication connection if the communication quality is lower than preset threshold;
Optionally, if the communication equipment is transferred to second mining area by first mining area, judgement and described the
Whether the communication connection of one ancillary equipment disconnects, if it is not, the communication connection is then kept, meanwhile, detect the communication connection
Communication quality keeps the communication connection if the communication quality is higher than preset threshold;
Optionally, obtain and cache the link information of the optional equipment, wherein searched by the preset period and determined institute
Optional equipment is stated, the optional equipment for selecting communication quality highest as the present embodiment.
The beneficial effect of the present embodiment is, by determining associated optional equipment in second mining area, avoids
Can not establish when communicating and disconnecting realizes in a kind of more efficiently mine with other communication connections for assisting equipment, this programme
Communication plan enables the construction personnel in mine preferably to link up and exchange outside with mine, on the one hand, to avoid safe thing
Therefore generation, on the other hand, so that administrative staff outside mine keep real-time tracking to the progress of project under construction.
Example IV
Fig. 4 is the flow chart of mining area communication method fourth embodiment of the present invention.Based on the above embodiment, optionally, if institute
It states communication equipment and second mining area is transferred to by first mining area, then judge that the communication connection of first ancillary equipment is
No disconnection, if it is not, the communication connection is then kept, if so, determining that associated second auxiliary is set in second mining area
It is standby, wherein the communication connection with second ancillary equipment is established by near-field communication, further includes:
If S43, having been disconnected with the communication connection of first ancillary equipment, determined in second mining area associated
The second ancillary equipment, meanwhile, associated optional equipment is determined in second mining area;
S44, acquisition and the link information for caching the optional equipment.
Optionally, if having disconnected with the communication connection of first ancillary equipment, phase is determined in second mining area
Associated second ancillary equipment, meanwhile, associated optional equipment is determined in second mining area, wherein selection communication matter
Measure highest the second ancillary equipment as the present embodiment;
Optionally, if having disconnected with the communication connection of first ancillary equipment, phase is determined in second mining area
Associated second ancillary equipment, meanwhile, associated optional equipment is determined in second mining area, wherein selection communication matter
Measure the highest optional equipment as the present embodiment.
The beneficial effect of the present embodiment is, by determining associated optional equipment in second mining area, avoids
Can not establish when communicating and disconnecting realizes in a kind of more efficiently mine with other communication connections for assisting equipment, this programme
Communication plan enables the construction personnel in mine preferably to link up and exchange outside with mine, on the one hand, to avoid safe thing
Therefore generation, on the other hand, so that administrative staff outside mine keep real-time tracking to the progress of project under construction.
Embodiment five
Fig. 5 is the flow chart of the 5th embodiment of mining area communication method of the present invention.Based on the above embodiment, optionally, in institute
It states and determines associated third ancillary equipment in third mining area, meanwhile, preset second construction is executed in the third mining area
Item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, and applied in real time by described second
Work progress is synchronized to the third ancillary equipment, meanwhile, first construction speed is reported by second ancillary equipment, is wrapped
It includes:
S71, the first construction speed reported according to determine the first construction plan of construction personnel;
S72, the second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by institute
It states third ancillary equipment and reports second construction speed;
S73, the second construction speed reported according to determine the second construction plan of the construction personnel;
S74, the task in conjunction with the construction personnel, first construction plan and second construction plan are true
Determine the recruitment needs of project under construction.
Optionally, the second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by
The third ancillary equipment reports second construction speed, wherein second construction speed includes the communication equipment
Communication connection relationship, in order to track and ensure the quality of connection of the current communication plan of communication equipment;
Optionally, in conjunction with the task of the construction personnel, first construction plan and the second construction meter
Draw the recruitment needs for generating project under construction;
Optionally, the recruitment needs are issued by third ancillary equipment.
The beneficial effect of the present embodiment is, passes through point of tracking and project under construction, construction demand to construction speed
Analysis, obtains relevant recruitment needs, further enriches the communication plan in mine outside mine, enhance usage experience.
Embodiment six
Based on the above embodiment, the invention also provides a kind of mining area communication equipment, which includes memory, processor
And it is stored in the computer program that can be run on the memory and on the processor, the computer program is by the place
Reason device is realized when executing:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include
First mining area, the second mining area and third mining area, wherein the geographic location feature includes associated with geo-location parameter
Communication signal parameters;
The communication signal parameters for monitoring communication equipment determine that corresponding geographical location is joined according to the communication signal parameters
Number, and locating region is determined according to the geo-location parameter, wherein first signal of communication in first mining area refers to
Value, the second signal of communication reference value in second mining area, the third communication signal reference value in the third mining area successively reduce;
If the communication equipment is in first mining area, associated first auxiliary is determined in first mining area
Equipment, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in second mining area related
Second ancillary equipment of connection, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area pre-
If first construction item, wherein as described in the communication equipment monitoring first construction item the first construction speed, and in real time
The construction speed is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area by second mining area, judgement is set with second auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, if so, determining in the third mining area related
The third ancillary equipment of connection, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area pre-
If second construction item, wherein as described in the communication equipment monitoring second construction item the second construction speed, and in real time
Second construction speed is synchronized to the third ancillary equipment, meanwhile, described first is reported by second ancillary equipment
Construction speed.
Embodiment seven
Based on the above embodiment, optionally, it is realized when the computer program is also executed by the processor:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preparation thing
Item includes construction area locating for construction group locating for the communication equipment and the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group
And the construction area determines first ancillary equipment.
Embodiment eight
Based on the above embodiment, optionally, it is realized when the computer program is also executed by the processor:
If the communication equipment is transferred to second mining area by first mining area, judgement is set with first auxiliary
Whether standby communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, it is determined in second mining area associated
Optional equipment;
Obtain and cache the link information of the optional equipment.
Embodiment nine
Based on the above embodiment, optionally, it is realized when the computer program is also executed by the processor:
If the communication connection with first ancillary equipment has disconnected, associated the is determined in second mining area
Two ancillary equipments, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment;
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, when the communication equipment leaves the third mining area, by described
Three ancillary equipments report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
It is applied in conjunction with the determination of the task of the construction personnel, first construction plan and second construction plan
The recruitment needs of work project.
Embodiment ten
Based on the above embodiment, the invention also provides a kind of computer readable storage medium, the computer-readable storages
Mining area communication program is stored on medium, mining area communication program realizes mining area as described in any one of the above embodiments when being executed by processor
The step of communication means.
Implement mining area communication method, equipment and computer readable storage medium of the invention, by obtaining the first mine lamp
First location data;Monitor the first exercise data of first mine lamp;According to the first initial alignment parameter and described
First exercise data judges whether first mine lamp is in mining area communication state;If so, according to the first mining area communication parameter
The mining area communication data of first mine lamp are generated, in real time with the second mining area communication parameter to be used for the mine lamp in moving process
Middle execution mining area communication operation.A kind of significantly more efficient mine lamp navigation scheme is realized, so that construction personnel is in underground work
Safety be protected.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or device.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in a storage medium
In (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal (can be mobile phone, computer, service
Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific
Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art
Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much
Form, all of these belong to the protection of the present invention.
Claims (10)
1. a kind of mining area communication method, which is characterized in that the described method includes:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include first
Mining area, the second mining area and third mining area, wherein the geographic location feature includes communication associated with geo-location parameter
Signal parameter;
The communication signal parameters for monitoring communication equipment, determine corresponding geo-location parameter according to the communication signal parameters,
And locating region is determined according to the geo-location parameter, wherein the first signal of communication reference value in first mining area, institute
The third communication signal reference value of the second signal of communication reference value, the third mining area of stating the second mining area successively reduces;
If the communication equipment is in first mining area, determine that associated first auxiliary is set in first mining area
It is standby, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area, judgement and first ancillary equipment by first mining area
Whether communication connection disconnects, if it is not, the communication connection is then kept, if so, determination is associated in second mining area
Second ancillary equipment, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area preset
First construction item, wherein the first construction speed of the first construction item as described in the communication equipment monitoring, and in real time by institute
It states construction speed and is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area, judgement and second ancillary equipment by second mining area
Whether communication connection disconnects, if it is not, the communication connection is then kept, if so, determination is associated in the third mining area
Third ancillary equipment, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area preset
Second construction item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, and in real time by institute
It states the second construction speed and is synchronized to the third ancillary equipment, meanwhile, first construction is reported by second ancillary equipment
Progress.
2. mining area communication method according to claim 1, which is characterized in that if the communication equipment is in first mine
Area then determines associated first ancillary equipment in first mining area, wherein is established and described first by near-field communication
The communication connection of ancillary equipment, comprising:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preliminary matter packet
Include construction area locating for construction group and the communication equipment locating for the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group and
The construction area determines first ancillary equipment.
3. mining area communication method according to claim 2, which is characterized in that if the communication equipment is by first mining area
It is transferred to second mining area, then judges whether the communication connection with first ancillary equipment disconnects, if it is not, described in then keeping
Communication connection, if so, determining associated second ancillary equipment in second mining area, wherein built by near-field communication
The vertical communication connection with second ancillary equipment, comprising:
If the communication equipment is transferred to second mining area, judgement and first ancillary equipment by first mining area
Whether communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, determination is associated standby in second mining area
Optional equipment;
Obtain and cache the link information of the optional equipment.
4. mining area communication method according to claim 3, which is characterized in that if the communication equipment is by first mining area
It is transferred to second mining area, then judges whether the communication connection of first ancillary equipment disconnects, if it is not, then keeping described logical
Letter connection, if so, determining associated second ancillary equipment in second mining area, wherein established by near-field communication
With the communication connection of second ancillary equipment, further includes:
If the communication connection with first ancillary equipment has disconnected, determine that associated second is auxiliary in second mining area
Equipment is helped, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment.
5. mining area communication method according to claim 4, which is characterized in that determination is associated in the third mining area
Third ancillary equipment, meanwhile, preset second construction item is executed in the third mining area, wherein by the communication equipment
The second construction speed of the second construction item is monitored, and second construction speed is synchronized to the third in real time and is assisted
Equipment, meanwhile, first construction speed is reported by second ancillary equipment, comprising:
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, it is auxiliary by the third when communication equipment leaves the third mining area
Equipment is helped to report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
Construction item is determined in conjunction with the task of the construction personnel, first construction plan and second construction plan
Purpose recruitment needs.
6. a kind of mining area communication equipment, which is characterized in that the equipment includes memory, processor and is stored in the memory
Computer program that is upper and can running on the processor, the computer program are realized when being executed by the processor:
The mining area is divided at least three regions according to the geographic location feature in the mining area, three regions include first
Mining area, the second mining area and third mining area, wherein the geographic location feature includes communication associated with geo-location parameter
Signal parameter;
The communication signal parameters for monitoring communication equipment, determine corresponding geo-location parameter according to the communication signal parameters,
And locating region is determined according to the geo-location parameter, wherein the first signal of communication reference value in first mining area, institute
The third communication signal reference value of the second signal of communication reference value, the third mining area of stating the second mining area successively reduces;
If the communication equipment is in first mining area, determine that associated first auxiliary is set in first mining area
It is standby, wherein the communication connection with first ancillary equipment is established by near-field communication;
If the communication equipment is transferred to second mining area, judgement and first ancillary equipment by first mining area
Whether communication connection disconnects, if it is not, the communication connection is then kept, if so, determination is associated in second mining area
Second ancillary equipment, wherein the communication connection with second ancillary equipment is established by near-field communication;
Associated second ancillary equipment is determined in second mining area, meanwhile, it is executed in second mining area preset
First construction item, wherein the first construction speed of the first construction item as described in the communication equipment monitoring, and in real time by institute
It states construction speed and is synchronized to second ancillary equipment;
If the communication equipment is transferred to the third mining area, judgement and second ancillary equipment by second mining area
Whether communication connection disconnects, if it is not, the communication connection is then kept, if so, determination is associated in the third mining area
Third ancillary equipment, wherein the communication connection with the third ancillary equipment is established by near-field communication;
Associated third ancillary equipment is determined in the third mining area, meanwhile, it is executed in the third mining area preset
Second construction item, wherein the second construction speed of the second construction item as described in the communication equipment monitoring, and in real time by institute
It states the second construction speed and is synchronized to the third ancillary equipment, meanwhile, first construction is reported by second ancillary equipment
Progress.
7. mining area communication equipment according to claim 6, which is characterized in that the computer program is also by the processor
It is realized when execution:
Associated communication equipment is determined according to the construction preliminary matter in the first mining area, wherein the construction preliminary matter packet
Include construction area locating for construction group and the communication equipment locating for the communication equipment;
First ancillary equipment is determined between the associated communication equipment, wherein in conjunction with the construction group and
The construction area determines first ancillary equipment.
8. mining area communication equipment according to claim 7, which is characterized in that the computer program is also by the processor
It is realized when execution:
If the communication equipment is transferred to second mining area, judgement and first ancillary equipment by first mining area
Whether communication connection disconnects, if it is not, the communication connection is then kept, meanwhile, determination is associated standby in second mining area
Optional equipment;
Obtain and cache the link information of the optional equipment.
9. mining area communication equipment according to claim 8, which is characterized in that the computer program is also by the processor
It is realized when execution:
If the communication connection with first ancillary equipment has disconnected, determine that associated second is auxiliary in second mining area
Equipment is helped, meanwhile, associated optional equipment is determined in second mining area;
Obtain and cache the link information of the optional equipment;
The first construction plan of construction personnel is determined according to first construction speed reported;
The second construction speed for caching the monitoring, it is auxiliary by the third when communication equipment leaves the third mining area
Equipment is helped to report second construction speed;
The second construction plan of the construction personnel is determined according to second construction speed reported;
Construction item is determined in conjunction with the task of the construction personnel, first construction plan and second construction plan
Purpose recruitment needs.
10. a kind of computer readable storage medium, which is characterized in that it is logical to be stored with mining area on the computer readable storage medium
Believe program, the mining area communication as described in any one of claims 1 to 5 is realized when the mining area communication program is executed by processor
The step of method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910002155.1A CN109618279B (en) | 2019-01-02 | 2019-01-02 | Mining area communication method, mining area communication equipment and computer readable storage medium |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910002155.1A CN109618279B (en) | 2019-01-02 | 2019-01-02 | Mining area communication method, mining area communication equipment and computer readable storage medium |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109618279A true CN109618279A (en) | 2019-04-12 |
| CN109618279B CN109618279B (en) | 2021-08-10 |
Family
ID=66016515
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910002155.1A Active CN109618279B (en) | 2019-01-02 | 2019-01-02 | Mining area communication method, mining area communication equipment and computer readable storage medium |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109618279B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112381368A (en) * | 2020-11-02 | 2021-02-19 | 郑州富联智能工坊有限公司 | Production information analysis method, computer device and system for analyzing production information |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104580453A (en) * | 2014-12-30 | 2015-04-29 | 武汉华科道普轨道交通信息技术有限公司 | Railway transportation safety construction information service pushing system based on positions and tasks |
| CN206790713U (en) * | 2017-05-10 | 2017-12-22 | 上海建工集团股份有限公司 | Job site personnel positioner |
| US9949085B2 (en) * | 2016-01-12 | 2018-04-17 | General Electric Company | System for collection, analytics, and display of indoor positioning data |
-
2019
- 2019-01-02 CN CN201910002155.1A patent/CN109618279B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104580453A (en) * | 2014-12-30 | 2015-04-29 | 武汉华科道普轨道交通信息技术有限公司 | Railway transportation safety construction information service pushing system based on positions and tasks |
| US9949085B2 (en) * | 2016-01-12 | 2018-04-17 | General Electric Company | System for collection, analytics, and display of indoor positioning data |
| CN206790713U (en) * | 2017-05-10 | 2017-12-22 | 上海建工集团股份有限公司 | Job site personnel positioner |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112381368A (en) * | 2020-11-02 | 2021-02-19 | 郑州富联智能工坊有限公司 | Production information analysis method, computer device and system for analyzing production information |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109618279B (en) | 2021-08-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102205096B1 (en) | Transaction risk detection method and apparatus | |
| CN103699120B (en) | Fault diagnosis system for special vehicle | |
| CN101320073B (en) | Method for determining location of phase-to-earth fault | |
| CN107945053A (en) | A kind of multiple source power distribution network data convergence analysis platform and its control method | |
| CN105761483B (en) | A kind of vehicle data processing method and equipment | |
| CN106646130B (en) | A fault location method and system for active distribution network based on current polarity comparison | |
| CN104039585A (en) | A Method And A Device For Determining Information About Efficiency Of An Inductive Charging System, Having A Primary Coil Embedded In A Road Infrastructure | |
| CN107194542A (en) | On-site emergency disposal method, system and moving emergency server | |
| CN110286300A (en) | A kind of multi branch electric power lines road Fault Locating Method, device, equipment and system | |
| CN105844846B (en) | A kind of method for safety monitoring based on Ibeacon technologies, apparatus and system | |
| CN102624097A (en) | Fault location method for intelligent distribution lines | |
| CN109618279A (en) | A kind of mining area communication method, equipment and computer readable storage medium | |
| CN202281817U (en) | Microcomputer low current grounding and line-selecting system | |
| CN105023124A (en) | Transformer station defect real time research and judge method, apparatus and system | |
| CN109334590A (en) | Pilotless automobile chassis control method, apparatus, equipment and storage medium | |
| CN116316233A (en) | Intelligent substation inspection system, method, equipment and storage medium | |
| CN107889058A (en) | Monitoring method, device and electronic equipment | |
| CN105352523B (en) | Intelligent route generation method and device | |
| CN109116382A (en) | A kind of location prediction and fast iterative algorithm and application apparatus based on artificial intelligence sensing technology | |
| CN106067219B (en) | A kind of the centralized management control system and method for charging pile | |
| CN105635155B (en) | The detection method and device of component devices state in robot terminal | |
| CN104898022B (en) | A kind of online fault location system and method for high-speed railway high pressure full cable perforation circuit | |
| CN104933557B (en) | A kind of method and system for preventing POS machine strange land from trading | |
| CN107888394A (en) | The method and device of network failure reason positioning | |
| CN111204249A (en) | Battery charging method and system based on intelligent charging pile |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||