CN101320259A CNA2007101722791A CN200710172279A CN101320259A CN 101320259 A CN101320259 A CN 101320259A CN A2007101722791 A CNA2007101722791 A CN A2007101722791A CN 200710172279 A CN200710172279 A CN 200710172279A CN 101320259 A CN101320259 A CN 101320259A
Authority
CN
China
Prior art keywords
life
temperature
unit
main engine
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101722791A
Other languages
Chinese (zh)
Inventor
史进渊
杨宇
邓志成
吴茜
刘平原
李立人
黄维浩
朱小平
张恒涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Power Equipment Research Institute Co Ltd
Original Assignee
Shanghai Power Equipment Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Power Equipment Research Institute Co Ltd filed Critical Shanghai Power Equipment Research Institute Co Ltd
Priority to CNA2007101722791A priority Critical patent/CN101320259A/en
Publication of CN101320259A publication Critical patent/CN101320259A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本发明涉及一种单元发电机组主机重要部件寿命管理系统,其特征在于,网页服务器分别与计算/应用服务器、数据库服务器和用户端浏览器连接,计算/应用服务器与数据库服务器连接,数据库服务器通过外部系统接口与发电机组主机数据采集系统与参数测点连接。其管理方法为:确定在线计算单元发电机组主机重要部件的瞬态寿命损耗,计算单元发电机组主机重要部件剩余低周疲劳寿命、剩余蠕变寿命、在蠕变与低周疲劳共同作用下的、在低周疲劳与扭振疲劳共同作用下的及在腐蚀与磨损共同作用下的发电机转子剩余寿命。本发明的优点是采用一套寿命管理系统,实现了单元发电机组四台主机多个重要部件的瞬态寿命损耗和剩余寿命的在线计算和监测。

Figure 200710172279

The invention relates to a life management system for important components of a unit generating set main engine, which is characterized in that the web server is respectively connected with a calculation/application server, a database server and a client browser, the calculation/application server is connected with a database server, and the database server is connected through an external The system interface is connected with the generator set host data acquisition system and parameter measurement points. The management method is: determine the transient life loss of the important parts of the main engine of the online calculation unit, calculate the remaining low-cycle fatigue life of the important parts of the main engine of the unit, the remaining creep life, Remaining life of generator rotor under combined action of low cycle fatigue and torsional vibration fatigue and under combined action of corrosion and wear. The advantage of the present invention is that a set of life management system is adopted to realize the on-line calculation and monitoring of transient life loss and remaining life of multiple important components of the four main engines of the unit generating set.

Figure 200710172279

Description

一种单元发电机组主机重要部件寿命管理方法及系统 A method and system for life management of important components of a unit generator set host

技术领域 technical field

本发明涉及一种单元发电机组主机重要部件寿命管理方法及系统,应用于单元发电机组运行和检修的设备管理,属于发电工程和发电机组技术领域。The invention relates to a method and system for life management of important components of a unit generator set, which are applied to equipment management for the operation and maintenance of a unit generator set, and belong to the technical field of power generation engineering and generator sets.

背景技术 Background technique

发电厂发电机组的四大主机是汽轮机、锅炉、发电机和变压器,重要部件包括:汽轮机的转子、汽缸与阀壳,锅炉的汽包或汽水分离器、集箱、管道、过热器与再热器管子、水冷壁与省煤器管子,发电机的转子、定子绕组绝缘,主变压器的绕组绝缘。发电机组主机重要部件造价昂贵,损坏后果严重。为了合理使用发电机组主机重要部件寿命,公开文献报道的发电机组主机重要部件寿命管理的现有技术,都是对一台发电机组的某一主机的单个重要部件进行寿命管理,用来指导运行、检修和设备管理。由于一台发电机组主机有四台主机,一台主机又有多个重要部件,这些主机重要部件需要同时进行寿命管理。采用现有技术进行寿命管理有两方面不足:第一方面的不足是一台发电机组某一主机的一个重要部件配置一套寿命管理系统,一台发电机组多台主机多个重要部件的寿命管理需要配置几十套寿命管理系统,投资高,使用与维护不方便;第二方面不足是依据发电机组的某一主机的某一重要部件的寿命管理结果来指导整台发电机组的运行操作或安排计划检修,考虑问题尚不能够全面。The four major hosts of power plant generator sets are steam turbine, boiler, generator and transformer. The important components include: rotor, cylinder and valve casing of steam turbine, steam drum or steam-water separator, header, pipeline, superheater and reheater of boiler The tubes of the generator, the water wall and the economizer tube, the rotor and stator winding insulation of the generator, and the winding insulation of the main transformer. The main components of the generator set are expensive to manufacture, and the consequences of damage are serious. In order to reasonably use the life of important components of the main engine of the generator set, the existing technologies of the life management of the important components of the main engine of the generator set reported in the open literature are all life management for a single important component of a certain main engine of a generator set, which is used to guide the operation, Maintenance and equipment management. Since a main engine of a generating set has four main engines, and one main engine has multiple important components, these important components of the main engine need to be managed at the same time. There are two deficiencies in using the existing technology for life management: the first one is that an important part of a main engine of a generator set is equipped with a life management system, and the life management of multiple important parts of a generator set with multiple main engines Dozens of life management systems need to be configured, which requires high investment and is inconvenient to use and maintain. The second problem is to guide the operation or arrangement of the entire generator set based on the life management results of an important component of a certain host of the generator set Planning maintenance, considering the problem is not yet comprehensive.

发明内容 Contents of the invention

本发明的目的是提供一种采用一套寿命管理系统实现单元发电机组四台主机重要部件寿命管理的方法及系统。The purpose of the present invention is to provide a method and system for realizing the life management of the important parts of the four main engines of the unit generator set by using a set of life management system.

为实现以上目的,本发明的技术方案是提供一种单元发电机组主机重要部件寿命管理系统,其特征在于,由寿命的计算/应用服务器及软件、数据库服务器、外部系统接口、发电机组主机数据采集系统DAS与参数测点、网页服务器和用户端浏览器组成,网页服务器分别与计算/应用服务器、数据库服务器和用户端浏览器连接,计算/应用服务器与数据库服务器连接,数据库服务器通过外部系统接口与发电机组主机数据采集系统与参数测点连接。In order to achieve the above objectives, the technical solution of the present invention is to provide a life management system for important components of the main engine of a unit generating set, which is characterized in that it consists of a life calculation/application server and software, a database server, an external system interface, and data acquisition of the main engine of the generating set The system DAS is composed of parameter measuring points, web server and client browser. The web server is respectively connected to the computing/application server, database server and client browser. The computing/application server is connected to the database server. The database server is connected to the external system interface. The generator set host data acquisition system is connected to the parameter measuring point.

所述的参数测点为:汽轮机的转速、机组功率、主汽阀前汽压、主汽阀前汽温、调节级后蒸汽温度、调节级部位高压内缸金属温度、中压主汽阀前汽压、中压主汽阀前汽温、中压内缸金属温度、中排汽压或四抽汽压、中排汽温或四抽汽温、中低压联通管温度、凝汽器真空;锅炉的主蒸汽出口流量、温度与压力,锅炉再热蒸汽出口的流量、温度与压力,锅炉给水流量、温度与压力、再热蒸汽进口流量、温度与压力,汽包或汽水分离器与集箱及管道的壁温测点值;发电机的有功功率,三相电流与电压,发电机轴系扭振信号,发电机定子绕组绝缘的工作温度。The parameter measuring points are: the speed of the steam turbine, the power of the unit, the steam pressure in front of the main steam valve, the steam temperature in front of the main steam valve, the steam temperature after the regulating stage, the metal temperature of the high pressure inner cylinder at the regulating stage, the Steam pressure, steam temperature in front of the medium pressure main steam valve, metal temperature of the medium pressure inner cylinder, medium exhaust steam pressure or four extraction steam pressure, medium exhaust steam temperature or four extraction steam temperature, medium and low pressure connecting pipe temperature, condenser vacuum; Main steam outlet flow, temperature and pressure of the boiler, boiler reheat steam outlet flow, temperature and pressure, boiler feed water flow, temperature and pressure, reheat steam inlet flow, temperature and pressure, steam drum or steam-water separator and header and pipe wall temperature measurement points; generator active power, three-phase current and voltage, generator shaft torsional vibration signal, generator stator winding insulation working temperature.

一种单元发电机组主机重要部件寿命的管理方法,其特征在于,采用C语言编写的单元发电机组主机重要部件的寿命损耗和剩余寿命的计算软件运行在计算/应用服务器上,应用于单元发电机组主机重要部件寿命管理,其方法为:第一步:存入在线监测数据A method for managing the life of important parts of a main unit generator set, characterized in that the software for calculating the life loss and remaining life of important parts of a unit generator set main unit written in C language runs on a calculation/application server and is applied to a unit generator set The life management of important components of the main engine, the method is as follows: Step 1: Store online monitoring data

通过外部系统接口,每隔Δτ=1分钟至30分钟把发电机组主机数据采集系统DAS系统在线采集的流量、压力、温度、转速、功率、壁温、电流、电压、扭振信号、工作温度等测点数据存入数据库服务器;Through the external system interface, the flow, pressure, temperature, speed, power, wall temperature, current, voltage, torsional vibration signal, working temperature, etc. collected online by the data acquisition system DAS system of the main engine of the generator set are collected every Δτ=1 minute to 30 minutes The measuring point data is stored in the database server;

第二步:输入基础数据Step 2: Enter basic data

通过检修部门用户端每隔Δm=1天至7天在用户端浏览器上通过网页服务器向数据库服务器内输入发电机组的累计运行小时数Sh、累计冷态启动次数nc、累计温态启动次数nw、累计热态启动次数nh、累计极热态启动次数nr、累计大负荷变动次数n1、累计中负荷变动次数n2、累计小负荷变动次数n3;每次计划检修结束后,检修部门在用户端浏览器上通过网页服务器向数据库服务器内输入管子的测量壁厚δ;Through the user terminal of the maintenance department, input the cumulative running hours S h , cumulative cold start times n c , and cumulative warm state Times n w , accumulative number of hot starts n h , accumulative number of extremely hot starts n r , accumulative number of large load changes n 1 , accumulative times of medium load changes n 2 , accumulative times of small load changes n 3 ; the end of each planned maintenance Finally, the maintenance department enters the measured wall thickness δ of the pipe into the database server through the web server on the client browser;

第三步:确定主机重要部件的寿命评定项目Step 3: Determine the life evaluation items of important components of the main engine

根据多年从事发电机组的寿命管理积累的经验,定义单元发电机组主机重要部件寿命评定项目表示在表1According to the experience accumulated in the life management of generator sets for many years, the life evaluation items of important components of the defined unit generator set host are shown in Table 1

[表1][Table 1]

Figure A20071017227900101
Figure A20071017227900101

第四步:在线计算单元发电机组主机重要部件的瞬态寿命损耗di和dv应用安装在计算/应用服务器上发电机组主机重要部件的寿命计算机软件,采用现有技术在线计算单元发电机组主机重要部件的瞬态低周疲劳寿命损耗di和瞬态扭振疲劳寿命损耗dvStep 4: online calculation of the transient life loss d i and d v of important parts of the generator unit main engine is applied to the computer software installed on the computing/application server for the life of the important components of the generator unit main engine, and the prior art is used to calculate the unit generator main engine online Transient low cycle fatigue life loss d i and transient torsional vibration fatigue life loss d v of important components;

第五步:提出单元发电机组优化运行建议Step 5: Put forward suggestions for optimal operation of unit generator sets

发电机组主机重要部件在线计算的低周疲劳寿命寿命损耗di和扭振疲劳寿命损耗dv分别与发电机组主机重要部件的低周疲劳寿命损耗界限值[d]和扭振疲劳寿命损耗[dv]做比较,若di≤0.8[d],发电机组主机主蒸汽温度的变化率和负荷的变化率按《发电机组主机运行规程》的规定数值操作;若dv≤[dv],机组正常运行。在di>0.8[d]情况下,按以下四中情况提出优化运行建议:若0.8[d]<di≤[d],减少发电机组主机主蒸汽温度的变化率和负荷的变化率;若[d]<di≤1.05[d],控制发电机组主机主蒸汽温度的变化率和负荷的变化率均为0;若1.05[d]<di≤1.25[d],发出警报,30分钟后跳闸停机;若di>1.25[d],发出警报,1分钟后跳闸停机;在dv>0.8[dv]情况下,发出报警;The low-cycle fatigue life loss d i and torsional vibration fatigue life loss d v calculated online for the important components of the main engine of the generator set are respectively related to the low-cycle fatigue life loss limit value [d] and the torsional vibration fatigue life loss [d v ] for comparison, if d i ≤0.8[d], the change rate of main steam temperature and load change rate of the generator set main engine shall operate according to the specified values in the "Operation Regulations for Generator Set Main Engine"; if d v ≤[d v ], The unit is operating normally. In the case of d i >0.8[d], the optimization operation suggestions are put forward according to the following four situations: If 0.8[d]<d i ≤[d], reduce the change rate of main steam temperature and load change rate of the generator set; If [d]<d i ≤1.05[d], the rate of change of the main steam temperature and the load of the generator set are controlled to be 0; if 1.05[d]<d i ≤1.25[d], an alarm will be issued, Trip and stop after 1 minute; if d i > 1.25[d], an alarm will be issued, and trip and stop will be triggered after 1 minute; in the case of d v > 0.8[d v ], an alarm will be issued;

第六步:计算单元发电机组主机重要部件剩余低周疲劳寿命yrlni检修部门用户端浏览器的技术人员通过网页服务器向计算/应用服务器发出指令,计算/应用服务器从数据库服务器中读取所需要的累计启动次数与累计负荷变动次数,利用计算/应用服务器中寿命计算软件中事先计算得出的发电机组主机重要部件的冷态启停寿命Nfc、温态启停寿命Nfw、热态启停寿命Nfh、极热态启停寿命Nfr、大负荷变动寿命Nf1、中负荷变动寿命Nf2和小负荷变动寿命Nf3以及年均低周疲劳寿命损耗速率eN,计算发电机组主机低压转子、汽包、汽水分离器、低温集箱和低温蒸汽管道的低周疲劳剩余寿命yrlni为:Step 6: Calculate the remaining low-cycle fatigue life of the important components of the main engine of the generator unit y rlni maintenance department The technicians of the client browser send instructions to the calculation/application server through the web server, and the calculation/application server reads the required information from the database server The accumulative start-up times and accumulative load change times, the cold-state start-stop life N fc , the warm-state start-stop life N fw , the hot start-stop life N fc Stop life N fh , extremely hot start-stop life N fr , large load change life N f1 , medium load change life N f2 , small load change life N f3 and annual average low-cycle fatigue life loss rate e N , to calculate the main engine of the generating set Low-cycle fatigue remaining life y rlni of low-pressure rotor, steam drum, steam-water separator, low-temperature header and low-temperature steam pipeline is:

ythe y rr lnln ii == (( DD. NiNi -- EE. NiNi )) // ee NiNi

== [[ DD. NiNi -- (( nno cc NN fcfc ++ nno ww NN fwfw ++ nno hh NN fhfh ++ nno rr NN frfr ++ nno 11 NN ff 11 ++ nno 22 NN ff 22 ++ nno 33 NN ff 33 )) &times;&times; 100100 %% ]] // ee NiNi

式中,DNi为发电机组主机重要部件的总寿命损耗的指标值,根据多年从事In the formula, D Ni is the index value of the total life loss of the important parts of the main engine of the generating set, according to the

发电机组寿命管理积累的经验,定义DNi的取值范围是DNi=75%-100%;According to the experience accumulated in life management of generator sets, the value range of D Ni is defined as D Ni =75%-100%;

第七步:计算单元发电机组主机重要部件剩余蠕变寿命yrlti Step 7: Calculating the remaining creep life y rlti of important components of the main engine of the unit generating set

检修部门用户端浏览器的技术人员通过网页服务器向计算/应用服务器发出指令,计算/应用服务器从数据库读取所需要的高温部件在各温度段的累计工作小时数τj、利用计算/应用服务器中寿命计算软件中事先计算得出的对应不同温度段组中值的蠕变寿命设计值τRj以及年均蠕变寿命损耗速率eti,计算锅炉再热器管子与过热器管子的剩余蠕变寿命yrlti为:The technicians of the client browser in the maintenance department send instructions to the calculation/application server through the web server, and the calculation/application server reads the cumulative working hours τ j of the required high-temperature components in each temperature range from the database, and uses the calculation/application server Calculate the residual creep of boiler reheater tubes and superheater tubes based on the creep life design value τ Rj and the annual average creep life loss rate e ti calculated in advance in the medium life calculation software corresponding to the median values of different temperature ranges The lifetime y rlti is:

ythe y rltirlti == (( DD. titi -- EE. titi )) // ee titi == (( DD. titi -- (( &Sigma;&Sigma; &tau;&tau; ii &tau;&tau; RjRj )) &times;&times; 100100 %% )) // ee titi

式中,Dti为发电机组主机重要部件的总蠕变寿命损耗的指标值,根据多年In the formula, D ti is the index value of the total creep life loss of the important parts of the main engine of the generating set, according to the

从事发电机组寿命管理积累的经验,定义Dti的取值范围是Dti=75%-100%;Based on the experience accumulated in life management of generator sets, the value range of D ti is defined as D ti =75%-100%;

第八步:计算单元发电机组主机重要部件在蠕变与低周疲劳共同作用下的剩余寿命采用现有技术,在线计算发电机组高温部件的累积低周疲劳寿命损耗ENi、累积蠕变寿命损耗Eti和年均寿命损耗速率eyi,发电机组的高中压转子、高压内缸、中压内缸、高压主汽阀阀壳、中压主汽阀阀壳、高温集箱、高温管道的剩余寿命yrlnti为:Step 8: Calculating the remaining life of the important components of the main engine of the generator unit under the joint action of creep and low cycle fatigue Using the existing technology, online calculation of the cumulative low-cycle fatigue life loss E Ni and cumulative creep life loss of the high-temperature components of the generator set E ti and the average annual life loss rate e yi , the remainder of high and medium pressure rotors, high pressure inner cylinders, medium pressure inner cylinders, high pressure main steam valve casings, medium pressure main steam valve casings, high temperature headers, and high temperature pipelines of generator sets Lifetime y rlnti is:

yrlnti=(D-ENi-Eti)/eyi y rlnti = (DE Ni -E ti )/e yi

式中,D为发电机组主机重要部件的总寿命损耗的指标值,根据多年从事发电机组寿命管理积累的经验,定义D=100%;In the formula, D is the index value of the total life loss of the important components of the main engine of the generator set. According to the experience accumulated in the life management of generator sets for many years, D=100% is defined;

第九步:计算单元发电机组主机重要部件在低周疲劳与扭振疲劳共同作用下的剩余寿命yrlnvi Step 9: Calculate the remaining life y rlnvi of the important components of the main engine of the unit generator set under the joint action of low cycle fatigue and torsional vibration fatigue

采用现有技术,计算发电机转子累积低周疲劳寿命损耗ENi、累积扭振疲劳寿命损耗Evi和年均寿命损耗率ezi,发电机转子的剩余寿命yrlnvi为:Using the existing technology, calculate the cumulative low-cycle fatigue life loss E Ni of the generator rotor, the cumulative torsional vibration fatigue life loss E vi and the annual average life loss rate e zi , the remaining life y rlnvi of the generator rotor is:

yrlnvi=(D-ENi-Evi)/ezi y rlnvi =(DE Ni -E vi )/e zi

第十步:计算单元发电机组主机重要部件在腐蚀与磨损共同作用下的剩余寿命yrlai Step 10: Calculating the remaining life y rlai of the important parts of the main engine of the unit generator set under the joint action of corrosion and wear

在数据库中读取管子的测量壁厚δ,利用计算/应用服务器中寿命计算软件设计的数据,包括管子原始壁厚δ0、管子原始外径D0、钢材在使用温度下的蠕变极限σc、管内压力P,锅炉水冷壁管子与省煤器管子的烟侧腐蚀与磨损作用下的剩余寿命yrlai Read the measured wall thickness δ of the pipe in the database, and use the data designed by the life calculation software in the calculation/application server, including the original wall thickness δ 0 of the pipe, the original outer diameter of the pipe D 0 , and the creep limit σ of the steel at the service temperature c . Pressure P inside the tube, remaining life y rlai under the action of smoke side corrosion and wear of boiler water wall tubes and economizer tubes

ythe y rlairlai == &delta;&delta; (( 22 &sigma;&sigma; cc -- PP )) -- PP (( DD. 00 -- 22 &delta;&delta; 00 )) vv (( 22 &sigma;&sigma; cc -- PP ))

式中,v=(δ10)/Sh1,δ1为上一次测量的壁厚,Sh1为测得δ1和δ0之间的累计运行小时数;In the formula, v=(δ 10 )/S h1 , δ 1 is the wall thickness measured last time, and Sh1 is the accumulated operating hours between δ 1 and δ 0 ;

第十一步:计算发电机组主机重要部件的剩余绝缘寿命yrlwi Step 11: Calculate the remaining insulation life y rlwi of the important components of the main engine of the generating set

在线计算绕组在各电压段的累计工作小时数τej和在各温度段的累计工作小时数τhj,利用计算/应用服务器中寿命计划软件事先确定的对应不同电压的绕组绝缘电老化寿命tej和对应不同工作温度的绕组绝缘热老化寿命thj以及年均绝缘老化寿命损耗ewi,发电机定子绕组和主变压器绕组的绝缘老化寿命yrlwi为:Calculate online the accumulative working hours τ ej of the winding in each voltage segment and the accumulative operating hours τ hj in each temperature segment, and use the winding insulation electrical aging life t ej determined in advance by the life planning software in the calculation/application server corresponding to different voltages And the winding insulation thermal aging life t hj corresponding to different working temperatures and the annual average insulation aging life loss e wi , the insulation aging life y rlwi of the generator stator winding and the main transformer winding is:

ythe y rlwirlwi == (( DD. ww -- &Sigma;&Sigma; &tau;&tau; ejej tt ejej -- &Sigma;&Sigma; &tau;&tau; hjhj tt hjhj )) // ee wiwi

式中,Dw为绕组总寿命损耗,根据多年从事发电机组寿命管理积累的经验,定义Dw=100%;In the formula, Dw is the total life loss of the winding. According to the experience accumulated in the life management of generator sets for many years, Dw = 100% is defined;

第十二步:推荐单元发电机组优化检修措施Step 12: Recommend optimal maintenance measures for unit generator sets

根据发电机组主机各重要部件的剩余寿命yrlxi(yrlni,或yrlti,或yrlnti,或yrlnvi,或yrlnai,或yrlnwi)的预测结果,推荐计划检修中发电机组主机的优化检修措施为:According to the prediction results of the remaining life y rlxi (y rlni , or y rlti , or y rlnti , or y rlnvi , or y rlnai , or y rlnwi ) of the important components of the main engine of the generating set, the optimized maintenance of the main engine of the generating set is recommended in the planned maintenance The measures are:

1.yrlxi<1.5年,建议年内安排计划检修,予以检修或更换;1. If y rlxi < 1.5 years, it is recommended to arrange planned maintenance within the year, to be repaired or replaced;

2.1.5年≤yrlxi<4.5年,建议1年后但4年内安排计划检修,予以检修或更换;2.1.5 years ≤ y rlxi < 4.5 years, it is recommended to arrange planned maintenance after 1 year but within 4 years, to be repaired or replaced;

3.4.5年≤yrlxi<8.5年,建议下一次计划检修中,对机械部件予以详细的探伤检查,对绕组绝缘进行老化鉴定试验;3.4.5 years ≤ y rlxi < 8.5 years, it is recommended that in the next planned maintenance, detailed flaw detection inspection should be carried out on mechanical parts, and aging identification test should be carried out on winding insulation;

4.yrlxi≥8.5年,建议按照电厂《发电企业设备检修导则》安排单元发电机组的计划检修周期和计划检修项目;4. y rlxi ≥ 8.5 years, it is recommended to arrange the planned maintenance cycle and planned maintenance items of the unit generator set according to the power plant's "Guidelines for Equipment Maintenance of Power Generation Enterprises";

第十三步:打印结果Step 13: Print the result

输出并打印单元发电机组主机重要部件瞬态寿命损耗di和dv在线监测结果和所提出的单元发电机组优化运行建议,以及单元发电机组主机重要部件剩余寿命yrlxi的预测结果和推荐的优化检修措施。Output and print the online monitoring results of transient life loss d i and d v of the main components of the main unit of the unit generator set and the proposed optimization operation suggestions of the unit generator set, as well as the prediction results and recommended optimization of the remaining life y rlxi of the main components of the unit generator set Maintenance measures.

本发明具有以下特点:The present invention has the following characteristics:

本发明使用以上给定的寿命管理系统和方法,根据单元发电机机组在线监测数据、运行统计数据、检修测量数据和设计数据,在线计算单元发电机组主机重要部件的瞬态寿命损耗,指导运行操作;在线计算单元发电机组主机重要部件的剩余寿命,指导设备检修。The present invention uses the life management system and method given above, and calculates the transient life loss of important components of the unit generator set online based on the unit generator unit on-line monitoring data, operation statistics data, maintenance measurement data and design data, and guides the operation ; On-line calculation of the remaining life of important components of the main engine of the unit generator set to guide equipment maintenance.

本发明的优点是在单元发电机组的使用阶段,采用一套寿命管理系统,实现了单元发电机组四台主机多个重要部件的瞬态寿命损耗和剩余寿命的在线计算和监测,依据单元机组主机重要部件的瞬态低周疲劳寿命损耗和瞬态扭振疲劳寿命损耗指导运行操作,依据单元发电机组主机重要部件的剩余寿命来安排计划检修,能够使整台单元发电机组主机重要部件的寿命处于受控状态,既可以避免不适当的运行操作与过多的损耗单元机组主机重要部件的设计寿命,又可以充分使用发电机组主机重要部件的剩余寿命,实现了采用寿命管理技术来管理单元发电机组设备,达到既降低发电机组主机重要部件寿命损耗,又合理使用发电机组重要部件剩余寿命的技术效果。The advantage of the present invention is that in the use stage of the unit generating set, a set of life management system is adopted to realize the online calculation and monitoring of the transient life loss and remaining life of multiple important components of the four main engines of the unit generating set. The transient low-cycle fatigue life loss and transient torsional vibration fatigue life loss of important components guide the operation, and the planned maintenance is arranged according to the remaining life of the important components of the main unit of the unit generator set, so that the life of the important components of the main unit of the unit generator set can be kept at The controlled state can not only avoid inappropriate operation and excessive loss of the design life of the important parts of the main unit of the unit unit, but also make full use of the remaining life of the important parts of the main unit of the generator set, and realize the use of life management technology to manage the unit generator set equipment, to achieve the technical effect of not only reducing the life loss of important components of the main engine of the generating set, but also rationally using the remaining life of the important components of the generating set.

附图说明 Description of drawings

图1为本发明所采用重要部件寿命管理系统的方框图;Fig. 1 is the block diagram of important component life management system that the present invention adopts;

图2为本发明寿命管理所采用方法的流程图;Fig. 2 is the flow chart of the method adopted in the life management of the present invention;

图3为本发明寿命管理的计算机软件框图;Fig. 3 is the computer software block diagram of life management of the present invention;

图4为发电机组主机部件剩余寿命预测结果示意图。Figure 4 is a schematic diagram of the remaining life prediction results of the main engine components of the generator set.

具体实施方式 Detailed ways

如图1所示,为汽单元发电机组主机重要部件寿命管理系统,由寿命的计算/应用服务器及软件1、数据库服务器2、外部系统接口3、发电机组主机数据采集系统DAS与参数测点4、网页服务器5和用户端浏览器6组成。网页服务器5分别与计算/应用服务器1、数据库服务器2和用户端浏览器6连接,计算/应用服务器1与数据库服务器2连接,数据库服务器2通过外部系统接口3与发电机组主机数据采集系统与参数测点4连接。As shown in Figure 1, it is the life management system for important components of the main engine of the steam unit generator set, which consists of life calculation/application server and software 1, database server 2, external system interface 3, data acquisition system DAS of the main engine of the generator set and parameter measurement points 4 , a web server 5 and a client browser 6. The web server 5 is respectively connected to the calculation/application server 1, the database server 2 and the client browser 6, the calculation/application server 1 is connected to the database server 2, and the database server 2 is connected to the data acquisition system and parameters of the generator set main engine through the external system interface 3 Measuring point 4 is connected.

如图2所示,为本发明提供方法的流程图,如图3所示,为本发明采用C语言编写的单元发电机组主机重要部件寿命管理计算机软件框图,该软件安装在单元发电机组主机重要部件寿命管理的计算/应用服务器上,适用于单元发电机组主机不同重要部件的寿命管理。As shown in Figure 2, it is a flow chart of the method provided by the present invention, and as shown in Figure 3, it is a block diagram of the life management computer software for the important parts of the unit generator set main engine written in C language for the present invention, and the software is installed on the main engine of the unit generator set On the calculation/application server of component life management, it is suitable for the life management of different important components of the main engine of the unit generator set.

以下结合附图和实施例对本发明作进一步说明。The present invention will be further described below in conjunction with drawings and embodiments.

实施例Example

对于某型号进汽温度为566℃的超临界600MW发电机组主机的高中压转子、高压内缸、低压转子,汽水分离器、过热器管子、过热器高温集箱,发电机转子、发电机定子绕组绝缘、主变压器绕组绝缘,采用图1所示的寿命管理系统、采用如图2所示的本发明提供方法的流程图和图3所示的发电机组主机重要部件寿命管理的计算机软件,计算得出以上的发电机组主机重要部件的剩余寿命的预测结果列于图4。For a certain type of supercritical 600MW generator set with an inlet steam temperature of 566°C, the high and medium pressure rotors, high pressure inner cylinders, low pressure rotors, steam-water separators, superheater pipes, superheater high-temperature headers, generator rotors, and generator stator windings Insulation, main transformer winding insulation, using the life management system shown in Figure 1, the flow chart of the method provided by the present invention as shown in Figure 2 and the computer software for life management of important parts of the main engine of the generator set shown in Figure 3, calculated The prediction results of the remaining life of the important components of the main engine of the generator set above are listed in Figure 4.

第一步:每隔Δτ=3分钟,通过外部系统接口3把该600MW汽轮机数据采集系统DAS 4的测点数据中发电机组的测点参数存入数据库服务器2,这些参数为:汽轮机的转速、机组功率、主汽阀前汽压、主汽阀前汽温、调节级后蒸汽温度、调节级部位高压内缸金属温度、中压主汽阀前汽压、中压主汽阀前汽温、中压内缸金属温度、中排汽压或四抽汽压、中排汽温或四抽汽温、中低压联通管温度、凝汽器真空;锅炉的主蒸汽出口流量、温度与压力,锅炉再热蒸汽出口的流量、温度与压力,锅炉给水流量、温度与压力、再热蒸汽进口流量、温度与压力,汽包或汽水分离器与集箱及管道的壁温测点值;发电机的有功功率,三相电流与电压,发电机轴系扭振信号,发电机定子绕组绝缘的工作温度;The first step: every Δτ=3 minutes, store the measuring point parameters of the generator set in the measuring point data of the 600MW steam turbine data acquisition system DAS 4 into the database server 2 through the external system interface 3, these parameters are: the rotating speed of the steam turbine, Unit power, steam pressure before the main steam valve, steam temperature before the main steam valve, steam temperature after the regulating stage, metal temperature of the high pressure inner cylinder at the regulating stage, steam pressure before the main steam valve of the medium pressure, steam temperature before the main steam valve of the medium pressure, Medium pressure inner tank metal temperature, middle exhaust steam pressure or four extraction steam pressure, middle exhaust steam temperature or four extraction steam temperature, medium and low pressure connecting pipe temperature, condenser vacuum; boiler main steam outlet flow, temperature and pressure, boiler The flow rate, temperature and pressure of reheat steam outlet, the flow rate, temperature and pressure of boiler feed water, the flow rate, temperature and pressure of reheat steam inlet, the wall temperature measurement point value of steam drum or steam-water separator, header and pipeline; Active power, three-phase current and voltage, generator shaft torsional vibration signal, working temperature of generator stator winding insulation;

第二步:每隔Δm=1天,输入该600MW发电机组主机累计运行小时数Sh、累计冷态启动次数nc、累计温态启动次数nw、累计热态启动次数nh、累计极热态启动次数nr、累计大负荷变动次数n1、累计中负荷变动次数n2、累计小负荷变动次数n3;每次计划检修结束后,检修部门在用户端浏览器6上通过网页服务器5向数据库服务器2内输入管子的测量壁厚δ;Step 2: Every Δm=1 day, input the accumulative operating hours S h of the main engine of the 600MW generating set, the accumulative number of cold starts n c , the accumulative number of warm starts n w , the accumulative number of hot starts n h , the accumulative pole The number of hot starts n r , the cumulative number of large load changes n 1 , the cumulative number of medium load changes n 2 , the cumulative number of small load changes n 3 ; 5. Input the measured wall thickness δ of the pipe into the database server 2;

第三步:该600MW机组主机的8个重要部件的寿命评定项目列于表2Step 3: The life evaluation items of the 8 important components of the main engine of the 600MW unit are listed in Table 2

[表2][Table 2]

Figure A20071017227900161
Figure A20071017227900161

第四步:在线读取数据库服务器2中测点数据,使用单元机组主机多个部件低周疲劳寿命管理软件,计算得出该600MW发电机组主机高中压转子、高压内缸、低压转子、汽水分离器、高温过热器集箱、发电机转子的瞬态低周疲劳寿命损耗di或瞬态扭振疲劳寿命损耗dv,存入数据库服务器。Step 4: Read the data of the measuring points in the database server 2 online, and use the low-cycle fatigue life management software for multiple components of the main engine of the unit unit to calculate the high and medium pressure rotor, high pressure inner cylinder, low pressure rotor, and steam-water separation of the main engine of the 600MW generator set. Transient low-cycle fatigue life loss d i or transient torsional vibration fatigue life loss d v of generator, high-temperature superheater header, and generator rotor are stored in the database server.

第五步:根据多年从事发电机组主机部件寿命管理技术研究工作积累的经验,定义发电机组主机部件低周疲劳寿命损耗的界限值[d]和[dv]表示在表3;Step 5: According to the experience accumulated in years of research on the life management technology of the main engine components of the generator set, define the threshold values [d] and [d v ] of the low-cycle fatigue life loss of the main engine components of the generator set, which are shown in Table 3;

[表3][table 3]

Figure A20071017227900162
Figure A20071017227900162

在该600MW发电机组的某次负荷变动过程的某一时刻这九个部件均有di=<0.8[d],优化运行建议是不需要调整汽轮机主蒸汽温度的温升率和汽轮机的升负荷速率。At a certain moment during a certain load change process of the 600MW generator set, all of these nine components have d i =<0.8[d], and the optimal operation suggestion is that there is no need to adjust the temperature rise rate of the main steam temperature of the steam turbine and the load increase of the steam turbine rate.

第六步至第十一步:对于该型号600MW机组主机,这九个部件的设计日历寿命和平均寿命损耗率列于表4,剩余寿命的在线计算结果表示在表5和图4;Steps 6 to 11: For the main engine of this type of 600MW unit, the design calendar life and average life loss rate of these nine components are listed in Table 4, and the online calculation results of the remaining life are shown in Table 5 and Figure 4;

[表4][Table 4]

Figure A20071017227900171
Figure A20071017227900171

[表5][table 5]

Figure A20071017227900172
Figure A20071017227900172

第十二步:该600MW发电机组主机使用11.5年后,主变压器绕组绝缘的剩余寿命最小为6.5年,推荐的检修处理措施为在下次计划检修周期中进行主变压器绕组绝缘老化鉴定试验,根据鉴定试验结果安排购置备件计划;其他主机重要部件的检修处理措施为按照《发电企业设备检修导则》安排单元发电机组的计划检修周期和计划检修项目。Step 12: After the main engine of the 600MW generating set has been used for 11.5 years, the remaining life of the main transformer winding insulation is at least 6.5 years. According to the test results, the spare parts purchase plan is arranged; the maintenance and treatment measures for other important components of the main engine are to arrange the planned maintenance cycle and planned maintenance items of the unit generator set in accordance with the "Guidelines for Equipment Maintenance of Power Generation Enterprises".

采用本发明提供的单元发电机组主机重要部件寿命的管理方法及系统,可以在线定量计算该600MW发电机组四台主机的九个重要部件的瞬态寿命损耗和剩余寿命,根据瞬态寿命损耗在线计算结果提出优化运行建议,根据剩余寿命预测结果安排单元发电机组主机重要部件的计划大修周期和计划大修项目,使该600MW发电机组四台主机的九个重要部件的寿命处于受控状态。根据该600MW发电机组四台主机九个部件的寿命管理结果采取运行控制措施和安排计划检修,既可确保该600MW发电机组主机这九个部件安全运行,又可以合理使用剩余寿命,实现了使用一套寿命管理系统管理该600MW发电机组四大主机九个部件寿命的技术效果。Using the management method and system for the life of important components of the main unit generator set provided by the present invention, the transient life loss and remaining life of the nine important components of the four main engines of the 600MW generating set can be quantitatively calculated online, and the online calculation is based on the transient life loss As a result, the optimization operation suggestion is put forward, and the planned overhaul cycle and planned overhaul items of the main components of the unit generator set are arranged according to the remaining life prediction results, so that the life of nine important components of the four main engines of the 600MW generating set is in a controlled state. According to the life management results of the nine components of the four main engines of the 600MW generating set, the operation control measures and planned maintenance can be taken, which can not only ensure the safe operation of the nine components of the main engine of the 600MW generating set, but also make reasonable use of the remaining life. A set of life management system manages the technical effect of the life of the nine components of the four main engines of the 600MW generating set.

Claims (3)

1.一种单元发电机组主机重要部件寿命管理系统,其特征在于,由寿命的计算/应用服务器及软件(1)、数据库服务器(2)、外部系统接口(3)、发电机组主机数据采集系统DAS与参数测点(4)、网页服务器(5)和用户端浏览器(6)组成,网页服务器(5)分别与计算/应用服务器(1)、数据库服务器(2)和用户端浏览器(6)连接,计算/应用服务器(1)与数据库服务器(2)连接,数据库服务器(2)通过外部系统接口(3)与发电机组主机数据采集系统DAS与参数测点(4)连接。1. A life management system for important components of a unit generator set main engine, characterized in that it consists of a life calculation/application server and software (1), a database server (2), an external system interface (3), and a generator set main engine data acquisition system DAS is composed of parameter measuring points (4), web server (5) and client browser (6), and web server (5) is connected with calculation/application server (1), database server (2) and client browser ( 6) Connection, the computing/application server (1) is connected to the database server (2), and the database server (2) is connected to the data acquisition system DAS of the main unit of the generating set and the parameter measuring point (4) through the external system interface (3). 2.根据权利要求1所述的一种单元发电机组主机重要部件寿命管理系统,其特征在于,所述的参数测点为:汽轮机的转速、机组功率、主汽阀前汽压、主汽阀前汽温、调节级后蒸汽温度、调节级部位高压内缸金属温度、中压主汽阀前汽压、中压主汽阀前汽温、中压内缸金属温度、中排汽压或四抽汽压、中排汽温或四抽汽温、中低压联通管温度、凝汽器真空;锅炉的主蒸汽出口流量、温度与压力,锅炉再热蒸汽出口的流量、温度与压力,锅炉给水流量、温度与压力、再热蒸汽进口流量、温度与压力,汽包或汽水分离器与集箱及管道的壁温测点值;发电机的有功功率,三相电流与电压,发电机轴系扭振信号,发电机定子绕组绝缘的工作温度。2. A life management system for key components of a unit generator set according to claim 1, wherein said parameter measuring points are: the speed of the steam turbine, the unit power, the steam pressure before the main steam valve, the main steam valve Front steam temperature, steam temperature after regulating stage, metal temperature of high pressure inner cylinder at regulating stage, steam pressure before medium pressure main steam valve, steam temperature before medium pressure main steam valve, metal temperature of medium pressure inner cylinder, middle exhaust steam pressure or four Extraction pressure, mid-exhaust steam temperature or four-extraction steam temperature, medium-low pressure connecting pipe temperature, condenser vacuum; boiler main steam outlet flow, temperature and pressure, boiler reheat steam outlet flow, temperature and pressure, boiler feed water Flow rate, temperature and pressure, reheat steam inlet flow rate, temperature and pressure, wall temperature measurement point value of steam drum or steam separator, header and pipeline; active power of generator, three-phase current and voltage, generator shafting Torsional vibration signal, working temperature of generator stator winding insulation. 3.根据权利要求1所述的一种单元发电机组主机重要部件寿命的管理方法,其特征在于,采用C语言编写的单元发电机组主机重要部件的寿命损耗和剩余寿命的计算软件运行在计算/应用服务器(1)上,应用于单元发电机组主机重要部件寿命管理,其方法为:3. A method for managing the life of important parts of a main unit generator set according to claim 1, characterized in that the calculation software for the life loss and remaining life of the important parts of a unit generator unit main unit written in C language runs in the calculation/ On the application server (1), it is applied to the life management of important components of the main engine of the unit generator set, and the method is as follows: 第一步:存入在线监测数据Step 1: Store online monitoring data 通过外部系统接口(3),每隔Δτ=1分钟至30分钟把发电机组主机数据采集系统DAS系统(4)在线采集的流量、压力、温度、转速、功率、壁温、电流、电压、扭振信号、工作温度等测点数据存入数据库服务器(2);Through the external system interface (3), the flow, pressure, temperature, speed, power, wall temperature, current, voltage, torque, and The measuring point data such as vibration signal and working temperature are stored in the database server (2); 第二步:输入基础数据Step 2: Enter basic data 通过检修部门用户端每隔Δm=1天至7天在用户端浏览器(6)上通过网页服务器(5)向数据库服务器(2)内输入发电机组的累计运行小时数Sh、累计冷态启动次数nc、累计温态启动次数nw、累计热态启动次数nh、累计极热态启动次数nr、累计大负荷变动次数n1、累计中负荷变动次数n2、累计小负荷变动次数n3;每次计划检修结束后,检修部门在用户端浏览器(6)上通过网页服务器(5)向数据库服务器(2)内输入管子的测量壁厚δ;Through the user end of the maintenance department, input the cumulative running hours S h and cumulative cold state The number of starts n c , the cumulative number of warm starts n w , the cumulative number of hot starts n h , the cumulative number of very hot starts n r , the cumulative number of large load changes n 1 , the cumulative number of medium load changes n 2 , the cumulative number of small load changes Number of times n 3 ; after each scheduled maintenance, the maintenance department enters the measured wall thickness δ of the pipe in the database server (2) through the web server (5) on the client browser (6); 第三步:确定主机重要部件的寿命评定项目Step 3: Determine the life evaluation items of important components of the main engine 根据多年从事发电机组的寿命管理积累的经验,定义单元发电机组主机重要部件寿命评定项目表示在表1According to the experience accumulated in the life management of generator sets for many years, the life evaluation items of important components of the defined unit generator set host are shown in Table 1 [表1][Table 1]
Figure A2007101722790003C1
Figure A2007101722790003C1
第四步:在线计算单元发电机组主机重要部件的瞬态寿命损耗di和dv应用安装在计算/应用服务器上发电机组主机重要部件的寿命计算机软件,采用现有技术在线计算单元发电机组主机重要部件的瞬态低周疲劳寿命损耗di和瞬态扭振疲劳寿命损耗dvStep 4: online calculation of the transient life loss d i and d v of important parts of the generator unit main engine is applied to the computer software installed on the computing/application server for the life of the important components of the generator unit main engine, and the prior art is used to calculate the unit generator main engine online Transient low cycle fatigue life loss d i and transient torsional vibration fatigue life loss d v of important components; 第五步:提出单元发电机组优化运行建议Step 5: Put forward suggestions for optimal operation of unit generator sets 发电机组主机重要部件在线计算的低周疲劳寿命寿命损耗di和扭振疲劳寿命损耗dv分别与发电机组主机重要部件的低周疲劳寿命损耗界限值[d]和扭振疲劳寿命损耗[dv]做比较,若di≤0.8[d],发电机组主机主蒸汽温度的变化率和负荷的变化率按《发电机组主机运行规程》的规定数值操作;若dv≤[dv],机组正常运行。在di>0.8[d]情况下,按以下四种情况提出优化运行建议:若0.8[d]<di≤[d],减少发电机组主机主蒸汽温度的变化率和负荷的变化率;若[d]<di≤1.05[d],控制发电机组主机主蒸汽温度的变化率和负荷的变化率均为0;若1.05[d]<di≤1.25[d],发出警报,30分钟后跳闸停机;若di>1.25[d],发出警报,1分钟后跳闸停机;在dv>0.8[dv]情况下,发出报警;The low-cycle fatigue life loss d i and torsional vibration fatigue life loss d v calculated online for the important components of the main engine of the generator set are respectively related to the low-cycle fatigue life loss limit value [d] and the torsional vibration fatigue life loss [d v ] for comparison, if d i ≤0.8[d], the rate of change of main steam temperature and load change rate of the main engine of the generator set shall operate according to the specified values in the "Operation Regulations for Main Engine of Generator Sets"; if d v ≤[d v ], The unit is operating normally. In the case of d i >0.8[d], the optimization operation suggestions are put forward according to the following four situations: if 0.8[d]<d i ≤[d], reduce the change rate of main steam temperature and load change rate of the generator set; If [d]<d i ≤1.05[d], the rate of change of the main steam temperature and the load of the generator set are controlled to be 0; if 1.05[d]<d i ≤1.25[d], an alarm will be issued, Trip and stop after 1 minute; if d i > 1.25[d], an alarm will be issued, and trip and stop will be triggered after 1 minute; in the case of d v > 0.8[d v ], an alarm will be issued; 第六步:计算单元发电机组主机重要部件剩余低周疲劳寿命yrlni Step 6: Calculating the remaining low-cycle fatigue life y rlni of the important components of the main engine of the unit generating set 检修部门用户端浏览器的技术人员通过网页服务器(5)向计算/应用服务器(1)发出指令,计算/应用服务器(1)从数据库服务器(2)中读取所需要的累计启动次数与累计负荷变动次数,利用计算/应用服务器(1)中寿命计算软件中事先计算得出的发电机组主机重要部件的冷态启停寿命Nfc、温态启停寿命Nfw、热态启停寿命Nfh、极热态启停寿命Nfr、大负荷变动寿命Nf1、中负荷变动寿命Nf2和小负荷变动寿命Nf3以及年均低周疲劳寿命损耗速率eN,计算发电机组主机低压转子、汽包、汽水分离器、低温集箱和低温蒸汽管道的低周疲劳剩余寿命yrlniThe technical staff of the client browser in the maintenance department sends instructions to the computing/application server (1) through the web server (5), and the computing/application server (1) reads the required cumulative startup times and the cumulative The number of load changes, using the cold start-stop life N fc , warm start-stop life N fw , hot start-stop life N fh , extremely hot start-stop life N fr , life of large load fluctuations N f1 , life of medium load fluctuations N f2 , life of small load fluctuations N f3 , and annual average low-cycle fatigue life loss rate e N Low cycle fatigue remaining life y rlni of steam drum, steam-water separator, low-temperature header and low-temperature steam pipeline is ythe y rr lnln ii == (( DD. NiNi -- EE. NiNi )) // ee NiNi == [[ DD. NiNi -- (( nno cc NN fcfc ++ nno ww NN fwfw ++ nno hh NN fhf ++ nno rr NN frfr ++ nno 11 NN ff 11 ++ nno 22 NN ff 22 ++ nno 33 NN ff 33 )) &times;&times; 100100 %% ]] // ee NiNi 式中,DNi为发电机组主机重要部件的总寿命损耗的指标值,根据多年从事发电机组寿命管理积累的经验,定义DNi的取值范围是DNi=75%-100%;In the formula, D Ni is the index value of the total life loss of the important parts of the main engine of the generator set. According to the experience accumulated in the life management of generator sets for many years, the value range of D Ni is defined as D Ni = 75%-100%; 第七步:计算单元发电机组主机重要部件剩余蠕变寿命yrlti Step 7: Calculating the remaining creep life y rlti of important components of the main engine of the unit generating set 检修部门用户端浏览器的技术人员通过网页服务器(5)向计算/应用服务器(1)发出指令,计算/应用服务器(1)从数据库读取所需要的高温部件在各温度段的累计工作小时数τj、利用计算/应用服务器(1)中寿命计算软件中事先计算得出的对应不同温度段组中值的蠕变寿命设计值τRj以及年均蠕变寿命损耗速率eti,计算锅炉再热器管子与过热器管子的剩余蠕变寿命yrltiThe technicians of the client browser in the maintenance department send instructions to the calculation/application server (1) through the web server (5), and the calculation/application server (1) reads the cumulative working hours of the required high-temperature components in each temperature range from the database τ j , using the creep life design value τ Rj calculated in advance in the life calculation software in the calculation/application server (1) corresponding to the median value of different temperature range groups and the annual average creep life loss rate e ti to calculate the boiler The remaining creep life y rlti of the reheater tube and the superheater tube is ythe y rltirlti == (( DD. titi -- EE. titi )) // ee titi == (( DD. titi -- (( &Sigma;&Sigma; &tau;&tau; jj &tau;&tau; RjRj )) &times;&times; 100100 %% )) // ee titi 式中,Dti为发电机组主机重要部件的总蠕变寿命损耗的指标值,根据多年从事发电机组寿命管理积累的经验,定义Dti的取值范围是Dti=75%-100%;In the formula, D ti is the index value of the total creep life loss of the important parts of the main engine of the generator set. According to the experience accumulated in the life management of generator sets for many years, the value range of D ti is defined as D ti =75%-100%; 第八步:计算单元发电机组主机重要部件在蠕变与低周疲劳共同作用下的剩余寿命Step 8: Calculate the remaining life of the important components of the main engine of the unit generator set under the joint action of creep and low cycle fatigue 采用现有技术,在线计算发电机组高温部件的累积低周疲劳寿命损耗ENi、累积蠕变寿命损耗Eti和年均寿命损耗速率eyi,发电机组的高中压转子、高压内缸、中压内缸、高压主汽阀阀壳、中压主汽阀阀壳、高温集箱、高温管道的剩余寿命yrlntiUsing the existing technology, the cumulative low-cycle fatigue life loss E Ni , the cumulative creep life loss E ti and the annual average life loss rate e yi of the high-temperature components of the generator set are calculated online. The remaining service life y rlnti of inner cylinder, high-pressure main steam valve casing, medium-pressure main steam valve casing, high-temperature header and high-temperature pipeline is yrlnti=(D-ENi-Eti)/eyi y rlnti = (DE Ni -E ti )/e yi 式中,D为发电机组主机重要部件的总寿命损耗的指标值,根据多年从事发电机组寿命管理积累的经验,定义D=100%;In the formula, D is the index value of the total life loss of the important components of the main engine of the generator set. According to the experience accumulated in the life management of generator sets for many years, D=100% is defined; 第九步:计算单元发电机组主机重要部件在低周疲劳与扭振疲劳共同作用下的剩余寿命yrlnvi Step 9: Calculate the remaining life y rlnvi of the important components of the main engine of the unit generator set under the joint action of low cycle fatigue and torsional vibration fatigue 采用现有技术,计算发电机转子累积低周疲劳寿命损耗ENi、累积扭振疲劳寿命损耗Evi和年均寿命损耗率ezi,发电机转子的剩余寿命yrlnviUsing the existing technology, calculate the cumulative low-cycle fatigue life loss E Ni of the generator rotor, the cumulative torsional vibration fatigue life loss E vi and the annual average life loss rate e zi , the remaining life of the generator rotor y rlnvi is yrlnvi=(D-ENi-Evi)/ezi y rlnvi =(DE Ni -E vi )/e zi 第十步:计算单元发电机组主机重要部件在腐蚀与磨损共同作用下的剩余寿命yrlai Step 10: Calculating the remaining life y rlai of the important parts of the main engine of the unit generator set under the joint action of corrosion and wear 在数据库中读取管子的测量壁厚δ,利用计算/应用服务器(1)中寿命计算软件设计的数据,包括管子原始壁厚δ0、管子原始外径D0、钢材在使用温度下的蠕变极限σc、管内压力P,锅炉水冷壁管子与省煤器管子的烟侧腐蚀与磨损作用下的剩余寿命yrlai为:Read the measured wall thickness δ of the pipe in the database, and use the data designed by the life calculation software in the calculation/application server (1), including the original wall thickness δ 0 of the pipe, the original outer diameter of the pipe D 0 , the creep of the steel at the service temperature Variable limit σ c , pipe internal pressure P, remaining life y rlai under the action of smoke side corrosion and wear of boiler water wall pipes and economizer pipes is: ythe y rlairlai == &delta;&delta; (( 22 &sigma;&sigma; cc -- PP )) -- PP (( DD. 00 -- 22 &delta;&delta; 00 )) vv (( 22 &sigma;&sigma; cc -- PP )) 式中,v=(δ10)/Sh1,δ1为上一次测量的壁厚,Sh1为测得δ1和δ0之间的累计运行小时数;In the formula, v=(δ 10 )/S h1 , δ 1 is the wall thickness measured last time, and Sh1 is the accumulated operating hours between δ 1 and δ 0 ; 第十一步:计算发电机组主机重要部件的剩余绝缘寿命yrlwi Step 11: Calculate the remaining insulation life y rlwi of the important components of the main engine of the generating set 在线计算绕组在各电压段的累计工作小时数τej和在各温度段的累计工作小时数τhj,利用计算/应用服务器(1)中寿命计划软件事先确定的对应不同电压的绕组绝缘电老化寿命tej和对应不同工作温度的绕组绝缘热老化寿命thj以及年均绝缘老化寿命损耗ewi,发电机定子绕组和主变压器绕组的绝缘老化寿命yrlwi为:Calculate online the accumulative operating hours τ ej of the winding in each voltage segment and the accumulative operating hours τ hj in each temperature segment, using the electrical aging of the winding insulation corresponding to different voltages determined in advance by the life planning software in the calculation/application server (1) The lifetime t ej and the thermal aging lifetime t hj of the winding insulation corresponding to different operating temperatures and the annual average insulation aging lifetime loss ewi , the insulation aging lifetime y rlwi of the generator stator winding and the main transformer winding are: ythe y rlwirlwi == (( DD. ww -- &Sigma;&Sigma; &tau;&tau; ejej tt ejej -- &Sigma;&Sigma; &tau;&tau; hjhj tt hjhj )) // ee wiwi 式中,Dw为绕组总寿命损耗,根据多年从事发电机组寿命管理积累的经验,定义Dw=100%;In the formula, Dw is the total life loss of the winding. According to the experience accumulated in the life management of generator sets for many years, Dw = 100% is defined; 第十二步:推荐单元发电机组优化检修措施Step 12: Recommend optimal maintenance measures for unit generator sets 根据发电机组主机各重要部件的剩余寿命yrlxi(yrlni,或yrlti,或yrlnti,或yrlnvi,或yrlnai,或yrlnwi)的预测结果,推荐计划检修中发电机组主机的优化检修措施为:According to the prediction results of the remaining life y rlxi (y rlni , or y rlti , or y rlnti , or y rlnvi , or y rlnai , or y rlnwi ) of the important components of the main engine of the generating set, the optimized maintenance of the main engine of the generating set is recommended in the planned maintenance The measures are: 1.yrlxi<1.5年,建议年内安排计划检修,予以检修或更换;1. If y rlxi < 1.5 years, it is recommended to arrange planned maintenance within the year, to be repaired or replaced; 2.1.5年≤yrlxi<4.5年,建议1年后但4年内安排计划检修,予以检修或更换;2.1.5 years ≤ y rlxi < 4.5 years, it is recommended to arrange planned maintenance after 1 year but within 4 years, to be repaired or replaced; 3.4.5年≤yrlxi<8.5年,建议下一次计划检修中,对机械部件予以详细的探伤检查,对绕组绝缘进行老化鉴定试验;3.4.5 years ≤ y rlxi < 8.5 years, it is recommended that in the next planned maintenance, detailed flaw detection inspection should be carried out on mechanical parts, and aging identification test should be carried out on winding insulation; 4.yrlxi≥8.5年,建议按照电厂《发电企业设备检修导则》安排单元发电机组的计划检修周期和计划检修项目;4. y rlxi ≥ 8.5 years, it is recommended to arrange the planned maintenance cycle and planned maintenance items of the unit generator set according to the power plant's "Guidelines for Equipment Maintenance of Power Generation Enterprises"; 第十三步:打印结果Step 13: Print the result 输出并打印单元发电机组主机重要部件瞬态寿命损耗di和dv在线监测结果和所提出的单元发电机组优化运行建议,以及单元发电机组主机重要部件剩余寿命yrlxi的预测结果和推荐的优化检修措施。Output and print the online monitoring results of transient life loss d i and d v of the main components of the main unit of the unit generator set and the proposed optimization operation suggestions of the unit generator set, as well as the prediction results and recommended optimization of the remaining life y rlxi of the main components of the unit generator set Maintenance measures.
CNA2007101722791A 2007-12-14 2007-12-14 A method and system for life management of important components of a unit generator set host Pending CN101320259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101722791A CN101320259A (en) 2007-12-14 2007-12-14 A method and system for life management of important components of a unit generator set host

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101722791A CN101320259A (en) 2007-12-14 2007-12-14 A method and system for life management of important components of a unit generator set host

Publications (1)

Publication Number Publication Date
CN101320259A true CN101320259A (en) 2008-12-10

Family

ID=40180346

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101722791A Pending CN101320259A (en) 2007-12-14 2007-12-14 A method and system for life management of important components of a unit generator set host

Country Status (1)

Country Link
CN (1) CN101320259A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763580A (en) * 2009-09-17 2010-06-30 宁波北电源兴电力工程有限公司 Equipment state overhaul management module for EAM system of power plant
CN101561676B (en) * 2009-04-30 2011-07-06 上海发电设备成套设计研究院 On-line monitoring and control device and method for remaining life of thermal power generation unit components
CN102251859A (en) * 2010-05-17 2011-11-23 通用电气公司 System and method for enhancement of power generation facilities
CN101825273B (en) * 2010-01-28 2012-05-30 上海发电设备成套设计研究院 On-line monitoring device and method for remaining calendar life of high-temperature pressure-bearing parts outside the furnace
CN104023078A (en) * 2014-06-18 2014-09-03 北京四方继保自动化股份有限公司 Torsional vibration remote application system based on cloud computing
USD713825S1 (en) 2012-05-09 2014-09-23 S.P.M. Flow Control, Inc. Electronic device holder
CN104578114A (en) * 2015-01-14 2015-04-29 国网宁夏电力公司电力科学研究院 Generator tripping time remaining estimation method, pre-warning method and monitoring protection device
CN104616095A (en) * 2014-12-25 2015-05-13 哈尔滨汽轮机厂有限责任公司 Turbine control engineering dynamic project control and monitoring system
USD750516S1 (en) 2014-09-26 2016-03-01 S.P.M. Flow Control, Inc. Electronic device holder
CN105631091A (en) * 2015-12-13 2016-06-01 中国航空工业集团公司西安飞机设计研究所 Aircraft equipment durability design method and aircraft equipment durability design system
US9417160B2 (en) 2012-05-25 2016-08-16 S.P.M. Flow Control, Inc. Apparatus and methods for evaluating systems associated with wellheads
CN106092190A (en) * 2016-06-02 2016-11-09 国家电网公司 Pump-storage generator stable sexual state deterioration method for early warning and system
CN107272635A (en) * 2017-05-31 2017-10-20 贵州乌江水电开发有限责任公司 Judgment method of basic state of hydropower centralized control unit
US9915128B2 (en) 2010-04-30 2018-03-13 S.P.M. Flow Control, Inc. Machines, systems, computer-implemented methods, and computer program products to test and certify oil and gas equipment
CN107844873A (en) * 2016-08-26 2018-03-27 国家电网公司 One introduces a collection net coordinates performance whole-life cycle fee system and its management method
US9940492B2 (en) 2014-07-30 2018-04-10 S.P.M. Flow Control, Inc. Band with RFID chip holder and identifying component
US10102471B2 (en) 2015-08-14 2018-10-16 S.P.M. Flow Control, Inc. Carrier and band assembly for identifying and managing a component of a system associated with a wellhead
CN109253870A (en) * 2018-08-21 2019-01-22 嘉兴新嘉爱斯热电有限公司 The assessment device and method in biomass fuel boiler heat-exchange tube service life
CN112200451A (en) * 2020-10-09 2021-01-08 华润电力技术研究院有限公司 Maintenance period calculation method and maintenance period calculation device for air preheater
CN113051800A (en) * 2021-03-31 2021-06-29 宁夏京能宁东发电有限责任公司 Steam turbine rotor life assessment and maintenance indicating system
CN114006475A (en) * 2021-11-01 2022-02-01 西安热工研究院有限公司 An intelligent management system for digital medium-voltage switchgear in power plants

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101561676B (en) * 2009-04-30 2011-07-06 上海发电设备成套设计研究院 On-line monitoring and control device and method for remaining life of thermal power generation unit components
CN101763580A (en) * 2009-09-17 2010-06-30 宁波北电源兴电力工程有限公司 Equipment state overhaul management module for EAM system of power plant
CN101825273B (en) * 2010-01-28 2012-05-30 上海发电设备成套设计研究院 On-line monitoring device and method for remaining calendar life of high-temperature pressure-bearing parts outside the furnace
US9915128B2 (en) 2010-04-30 2018-03-13 S.P.M. Flow Control, Inc. Machines, systems, computer-implemented methods, and computer program products to test and certify oil and gas equipment
US10196878B2 (en) 2010-04-30 2019-02-05 S.P.M. Flow Control, Inc. Machines, systems, computer-implemented methods, and computer program products to test and certify oil and gas equipment
CN102251859A (en) * 2010-05-17 2011-11-23 通用电气公司 System and method for enhancement of power generation facilities
CN102251859B (en) * 2010-05-17 2014-04-02 通用电气公司 System and method for enhancement of power generation facilities
USD713825S1 (en) 2012-05-09 2014-09-23 S.P.M. Flow Control, Inc. Electronic device holder
USD774495S1 (en) 2012-05-09 2016-12-20 S.P.M. Flow Control, Inc. Electronic device holder
US10760402B2 (en) 2012-05-25 2020-09-01 S.P.M. Flow Control, Inc. Apparatus and methods for evaluating systems associated with wellheads
US10018031B2 (en) 2012-05-25 2018-07-10 S.P.M. Flow Control, Inc. Apparatus and methods for evaluating systems associated with wellheads
US9417160B2 (en) 2012-05-25 2016-08-16 S.P.M. Flow Control, Inc. Apparatus and methods for evaluating systems associated with wellheads
CN104023078B (en) * 2014-06-18 2017-06-23 北京四方继保自动化股份有限公司 A kind of torsional oscillation remote application system based on cloud computing
CN104023078A (en) * 2014-06-18 2014-09-03 北京四方继保自动化股份有限公司 Torsional vibration remote application system based on cloud computing
US10339347B2 (en) 2014-07-30 2019-07-02 S.P.M. Flow Control, Inc. Band with RFID chip holder and identifying components
US9940492B2 (en) 2014-07-30 2018-04-10 S.P.M. Flow Control, Inc. Band with RFID chip holder and identifying component
USD750516S1 (en) 2014-09-26 2016-03-01 S.P.M. Flow Control, Inc. Electronic device holder
CN104616095A (en) * 2014-12-25 2015-05-13 哈尔滨汽轮机厂有限责任公司 Turbine control engineering dynamic project control and monitoring system
CN104578114B (en) * 2015-01-14 2017-02-22 国网宁夏电力公司电力科学研究院 Generator tripping time remaining estimation method, pre-warning method and monitoring protection device
CN104578114A (en) * 2015-01-14 2015-04-29 国网宁夏电力公司电力科学研究院 Generator tripping time remaining estimation method, pre-warning method and monitoring protection device
US10102471B2 (en) 2015-08-14 2018-10-16 S.P.M. Flow Control, Inc. Carrier and band assembly for identifying and managing a component of a system associated with a wellhead
CN105631091A (en) * 2015-12-13 2016-06-01 中国航空工业集团公司西安飞机设计研究所 Aircraft equipment durability design method and aircraft equipment durability design system
CN106092190B (en) * 2016-06-02 2019-03-29 国家电网公司 Pump-storage generator operation stability state deteriorates method for early warning and system
CN106092190A (en) * 2016-06-02 2016-11-09 国家电网公司 Pump-storage generator stable sexual state deterioration method for early warning and system
CN107844873A (en) * 2016-08-26 2018-03-27 国家电网公司 One introduces a collection net coordinates performance whole-life cycle fee system and its management method
CN107272635A (en) * 2017-05-31 2017-10-20 贵州乌江水电开发有限责任公司 Judgment method of basic state of hydropower centralized control unit
CN109253870A (en) * 2018-08-21 2019-01-22 嘉兴新嘉爱斯热电有限公司 The assessment device and method in biomass fuel boiler heat-exchange tube service life
CN109253870B (en) * 2018-08-21 2019-09-06 嘉兴新嘉爱斯热电有限公司 The assessment device and method in biomass fuel boiler heat-exchange tube service life
CN112200451A (en) * 2020-10-09 2021-01-08 华润电力技术研究院有限公司 Maintenance period calculation method and maintenance period calculation device for air preheater
CN112200451B (en) * 2020-10-09 2024-05-14 深圳市出新知识产权管理有限公司 Maintenance period calculation method and maintenance period calculation device for air preheater
CN113051800A (en) * 2021-03-31 2021-06-29 宁夏京能宁东发电有限责任公司 Steam turbine rotor life assessment and maintenance indicating system
CN114006475A (en) * 2021-11-01 2022-02-01 西安热工研究院有限公司 An intelligent management system for digital medium-voltage switchgear in power plants

Similar Documents

Publication Publication Date Title
CN101320259A (en) A method and system for life management of important components of a unit generator set host
CN101320253A (en) Method and system for on-line life management of main components of multiple generating sets at factory level
CN101561676B (en) On-line monitoring and control device and method for remaining life of thermal power generation unit components
Benato et al. Combined cycle power plants: A comparison between two different dynamic models to evaluate transient behaviour and residual life
CN101038248B (en) Predicting method and system for steam turbine high temperature component creep life
CN103605329B (en) Components of thermoelectric generator set accumulation low-cycle fatigue life loss method for supervising
CN105781632B (en) The monitoring of components of steam turbine calendar entire life in the case where low-cycle fatigue and creep are acted on
CN101561669B (en) Device for online monitoring and controlling low cycle fatigue life consumption of components of steam turbine and method
CN102506408B (en) Control device and method for on-line monitoring of safety risk of four pipelines outside furnace of boiler of power station
CN107543733A (en) A kind of condenser duty on-line monitoring system and measuring method
CN1908974A (en) Online evaluation of calendar lifespan of steam turbine high-temperature durable parts and prediction method
CN105527113A (en) Nuclear power station thermal energy efficiency monitoring and diagnosing system and method
CN106092594A (en) A kind of strong robustness gas turbine gas path component performance diagnogtics method of anti-sensor fault
Dominiczak et al. Online prediction of temperature and stress in steam turbine components using neural networks
CN102505970A (en) Device and method for monitoring crack propagation life of turbine rotor
CN115618592A (en) Gas circuit fault diagnosis method, system, equipment and terminal of a gas turbine in a power plant
Stoppato et al. Assessment of stresses and residual life of plant components in view of life-time extension of power plants
CN101561677A (en) Device for online monitoring and controlling residual service life of durable components of steam turbine and method
CN101178796B (en) A method and system for online management of calendar life of important durable parts of multiple steam turbines
CN102213115B (en) On-line monitoring and control device and method for safety risk of steam turbine moving blades
CN101178795B (en) A low-cycle fatigue life management system and management method for key components of a single steam turbine
Zaleta-Aguilar et al. A Reconciliation Method Based on a Module Simulator-An Approach to the Diagnosis of Energy System Malfunctions
CN102644912B (en) On-line monitoring and control device and method for safety risk of power plant boiler heat exchange tube
Li et al. Research on anomaly detection of steam power system based on the coupling of thermoeconomics and autoencoder
CN101825273B (en) On-line monitoring device and method for remaining calendar life of high-temperature pressure-bearing parts outside the furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20081210