[go: up one dir, main page]

CN102168453B - Building bracket for construction - Google Patents

Building bracket for construction Download PDF

Info

Publication number
CN102168453B
CN102168453B CN201110080550A CN201110080550A CN102168453B CN 102168453 B CN102168453 B CN 102168453B CN 201110080550 A CN201110080550 A CN 201110080550A CN 201110080550 A CN201110080550 A CN 201110080550A CN 102168453 B CN102168453 B CN 102168453B
Authority
CN
China
Prior art keywords
slide bar
sleeve pipe
construction
lower chord
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110080550A
Other languages
Chinese (zh)
Other versions
CN102168453A (en
Inventor
李伟涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110080550A priority Critical patent/CN102168453B/en
Publication of CN102168453A publication Critical patent/CN102168453A/en
Application granted granted Critical
Publication of CN102168453B publication Critical patent/CN102168453B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The invention relates to the technical field of buildings, in particular to a building bracket for construction. The building bracket for construction mainly comprises sliding rods and a casing, wherein the sliding rods are positioned in the casing; and one end of each sliding rod is provided with a fixed point while the other end of the sliding rod is inserted into the casing. The building bracket for construction, provided by the invention, has the advantages of simplicity and convenience for connection, assembly and disassembly, safety, reliability, easiness for adjustment, no easy loss of parts due to capability of being directly connected with a building mold frame, repeated use and material saving.

Description

Construction is with the building support
Technical field
The present invention relates to technical field of buildings, be specifically related to construction with the building support.
Background technology
In building construction process, no matter be to build building, workshop, or build road, bridge, all be unable to do without the building support.Need build the support that some are used for casting reinforced concrete, water rubber at the construction field (site), the support that uses at present is to be mostly lazy board, steel pipe support.The lazy board poor safety performance.The steel tube fastener support is formed by connecting steel pipe in length and breadth, can reclaim repeatedly and use.But because the length of steel pipe is lack of standardization, the installation site of fastener is fixing,, adjust the length that expends time in, also need sometimes steel pipe is cut off, can satisfy the requirement of support width so installation rate is slow.And fastener causes unnecessary loss installing and losing easily during striking.Its shortcoming is that its length can not be adjusted, and uses inconvenience, poor safety performance.After pouring, all can not construct below striking is preceding, cause an engineering construction time long.
Summary of the invention
The purpose of this invention is to provide a kind of practicality simple for structure, connect easy, as can to use, save material repeatedly construction with the building support.
Construction mainly is made up of slide bar, sleeve pipe with the building support, and an end of slide bar connects fixture, and the other end of slide bar inserts in the sleeve pipe.
Preferably, the cross section of sleeve pipe and slide bar is a rectangle.
Preferably, the cross section of sleeve pipe and slide bar is circular.
Preferably, the two ends of sleeve pipe are inserted with a slide bar respectively.
Preferably, the sleeve pipe two ends connect the two ends of lower chord, and two tie points are in same plane, and the lower chord median rise is in the arc-shaped, and the two ends of web member are splicing sleeve mid point and lower chord mid point respectively.
Preferably, in the both sides of web member the diagonal web member more than 1 is set, the two ends of diagonal web member are sleeve pipe and lower chord respectively.
The invention has the beneficial effects as follows: the present invention connects easy each other, safe and reliable, adjustment easily, applicability is strong, installation and removal are easy, can directly be connected with building form frame, part is difficult for losing, and can use the saving material repeatedly.
Description of drawings
Fig. 1 is a structural profile sketch map of the present invention.
1 lower chord, 2 web members, 3 slide bar B, 4 slide bar A, 5 fixed point A, 6 fixed point B, 7 diagonal web members, 8 sleeve pipes.
The specific embodiment
Construction is with the building support, and the two ends of sleeve pipe 8 are inserted with slide bar A4 and slide bar B3 respectively, and the end of slide bar A4 and slide bar B3 inserts in the sleeve pipe 8, and the other end of slide bar A4 and slide bar B3 is connected fixture A5 and fixture B6 respectively.
Sleeve pipe 8 two ends connect the two ends of lower chord 1; Two tie points are in same plane, and lower chord 1 median rise is in the arc-shaped, and the two ends of web member 2 are splicing sleeve 8 mid points and lower chord 1 mid point respectively; In the both sides of web member 26 diagonal web members 7 are set respectively, the two ends of diagonal web member 7 are sleeve pipe 8 and lower chord 1 respectively.
Should be noted that at last: above embodiment is only in order to technical scheme of the present invention to be described but not to its restriction; Although with reference to preferred embodiment the present invention has been carried out detailed explanation, the those of ordinary skill in affiliated field is to be understood that: still can specific embodiments of the invention make amendment or the part technical characterictic is equal to replacement; And not breaking away from the spirit of technical scheme of the present invention, it all should be encompassed in the middle of the technical scheme scope that the present invention asks for protection.

Claims (4)

1. construction is characterized in that with the building support, mainly is made up of slide bar, sleeve pipe; One end of slide bar connects fixture, and the other end of slide bar inserts in the sleeve pipe, and the two ends of sleeve pipe are inserted with a slide bar respectively; The sleeve pipe two ends connect the two ends of lower chord; Two tie points are in same plane, and the lower chord median rise is in the arc-shaped, and the two ends of web member are splicing sleeve mid point and lower chord mid point respectively.
2. the building support is used in said construction according to claim 1, it is characterized in that the cross section of sleeve pipe and slide bar is a rectangle.
3. the building support is used in said construction according to claim 1, it is characterized in that, the cross section of sleeve pipe and slide bar is circular.
4. the building support is used in said construction according to claim 1, it is characterized in that, in the both sides of web member the diagonal web member more than 1 is set, and the two ends of diagonal web member link sleeve pipe and lower chord respectively.
CN201110080550A 2011-04-01 2011-04-01 Building bracket for construction Expired - Fee Related CN102168453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110080550A CN102168453B (en) 2011-04-01 2011-04-01 Building bracket for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110080550A CN102168453B (en) 2011-04-01 2011-04-01 Building bracket for construction

Publications (2)

Publication Number Publication Date
CN102168453A CN102168453A (en) 2011-08-31
CN102168453B true CN102168453B (en) 2012-09-05

Family

ID=44489757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110080550A Expired - Fee Related CN102168453B (en) 2011-04-01 2011-04-01 Building bracket for construction

Country Status (1)

Country Link
CN (1) CN102168453B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201152014Y (en) * 2007-12-28 2008-11-19 浙江昆仑建设集团股份有限公司 Scaffolding connector
CN101318071A (en) * 2007-06-04 2008-12-10 徐志春 Sliding plate capable of relative motion
CN201206336Y (en) * 2008-05-20 2009-03-11 竹鹰企业有限公司 Support frame structure for drop-prevention net
CN101677699A (en) * 2007-03-14 2010-03-24 奥丁·基瓦鲁 adjustable length member

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5439309A (en) * 1993-04-20 1995-08-08 Raz; Danny Joint coupling
CN2519836Y (en) * 2002-01-10 2002-11-06 赵艳 Telescopic rod of scaffold
US7992353B2 (en) * 2008-12-10 2011-08-09 Athan Stephan P Space frame hub joint

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101677699A (en) * 2007-03-14 2010-03-24 奥丁·基瓦鲁 adjustable length member
CN101318071A (en) * 2007-06-04 2008-12-10 徐志春 Sliding plate capable of relative motion
CN201152014Y (en) * 2007-12-28 2008-11-19 浙江昆仑建设集团股份有限公司 Scaffolding connector
CN201206336Y (en) * 2008-05-20 2009-03-11 竹鹰企业有限公司 Support frame structure for drop-prevention net

Also Published As

Publication number Publication date
CN102168453A (en) 2011-08-31

Similar Documents

Publication Publication Date Title
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN207063181U (en) A kind of diagonal brace of precast facade template and demoulding dual-purpose built-in fitting
CN108166374A (en) A kind of safety and stability type Recumbent tie-rod arch form bridge and its construction technology
CN103334541A (en) Steel rib-steel pipe concrete combination column
CN104314589B (en) Longitudinal waterstop mounting method on tunnel side wall basis
CN202430994U (en) Template limiting clamp
CN102168453B (en) Building bracket for construction
CN202369931U (en) Arch ring bracket
CN202064619U (en) Building support for construction
CN204282551U (en) A kind of rubber fastening band installation and positioning structure
CN204252543U (en) For culvert, foot bridge abutment body construction the U-shaped card of positive and negative silk to drawing push rod
CN204551172U (en) A kind of prefabricated road surface of assembled steel reinforced concrete hollow
CN209539376U (en) A kind of positioning device for tunnel-liner steel side sealing belt construction
CN201151866Y (en) Arch beam type overbridge
CN209227765U (en) Concrete-filled steel tube joint connection structure
CN202990407U (en) Quick-release scaffold
CN103046757B (en) Method of transforming stiffness pillar cross type steel ribs into stiffness steel tube type steel ribs and transition section thereof
CN204609352U (en) Vertical turn terraced adjustable wall attaching parts
CN204753353U (en) Novel a portable emergent bridge for road construction
CN103711083B (en) A kind of double-deck comb shape template system and mounting method
CN104343236A (en) Fastening clamp for web side formwork of stiffened concrete beam
CN203755167U (en) Assistant mounting device of V-shaped steel pipe frame of tower bridge
CN204174936U (en) A kind of template support structure of outer wall of basement
CN207392235U (en) Construction template of circular pipe culvert in urban underground comprehensive pipe gallery
CN215369874U (en) Tunnel secondary lining steel bar positioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20150401