CN102278090A - Method and control system for stopping leakage of reservoir fracture in drilling - Google Patents

Method and control system for stopping leakage of reservoir fracture in drilling Download PDF

Info

Publication number
CN102278090A
CN102278090A CN2011102345366A CN201110234536A CN102278090A CN 102278090 A CN102278090 A CN 102278090A CN 2011102345366 A CN2011102345366 A CN 2011102345366A CN 201110234536 A CN201110234536 A CN 201110234536A CN 102278090 A CN102278090 A CN 102278090A
Authority
CN
China
Prior art keywords
loss circulation
pore
size
drilling fluid
circulation material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102345366A
Other languages
Chinese (zh)
Inventor
武恒志
王世泽
兰林
孙勇
夏海英
潘宝风
林永茂
吴建忠
牛静
陈智晖
杨丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Southwest Oil and Gas Co
Original Assignee
China Petroleum and Chemical Corp
Sinopec Southwest Oil and Gas Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Southwest Oil and Gas Co filed Critical China Petroleum and Chemical Corp
Priority to CN2011102345366A priority Critical patent/CN102278090A/en
Publication of CN102278090A publication Critical patent/CN102278090A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Sealing Material Composition (AREA)
  • Porous Artificial Stone Or Porous Ceramic Products (AREA)

Abstract

The invention discloses a method and a control system for stopping the leakage of a reservoir fracture in drilling. The method comprises the following steps of: (1) collecting geological, drilling, drilling fluid and leakage parameters to compute the width of the reservoir fracture; (2) selecting a leakage stopping material with a corresponding particle size according t the width of the reservoir fracture; and (3) computing a pore size formed by the leakage stopping material selected by the step (2), selecting a next-stage leakage stopping material with a particle size corresponding to the pore size, sealing the pore size formed by an upper-stage leakage stopping material by using the next-stage leakage stopping material, computing the pore sizes formed by the leakage stopping materials of each stage by the operations stage by stage, and selecting sealing materials with the corresponding particle sizes to form a multistage leakage stopping drilling fluid composition of sealing pores formed by the leakage stopping materials with larger particle sizes by using the leakage stopping materials with smaller particle sizes to seal the reservoir fracture. The control system comprises a reservoir fracture width computing module adopting an interactive user interface, a leakage stopping drilling fluid composition generation module, a data recording and storage module and a composition design display module. The method and the system have the characteristics of convenience, practicability, timeliness and the like.

Description

Bore the blocking method and the control system of meeting the reservoir crack
Technical field
The present invention relates to a kind of blocking method of meeting the reservoir crack that bores, reach the leak stopping control system, it is used for aided drilling liquid engineer and calculates reservoir crack width and design plugging drilling fluid prescription, can be in the situ of drilling well real-time operation, and promptness is strong.
Background technology
The intrinsic fracture of reservoir is the important seepage channel of oil-gas mining, when running into the crack in the drilling well, leakage phenomena usually takes place, and this just needs drilling fluid to carry out leak stopping.At present, the blocking method that adopts in the oil-gas mining is, according to leaking fast big or small rough estimate crack width and designing the plugging drilling fluid prescription according to experience.There are following 3 main deficiencies in this method: 1. crack width is estimated, the engineer does not also know definite parameter, thereby causes difficulty for follow-up leak stopping design for scheme, and this is because the accurate prediction of crack width is the basis of follow-up leak stopping solution formulation; 2. rule of thumb definite plugging drilling fluid prescription can't be known the size distribution of material in the definite plugging drilling fluid, and this is because rational size distribution is the key of leak stopping success, thereby often repeatedly leak stopping could be successful to cause the scene; From crack width estimate the plugging drilling fluid Formula Design, rely on engineer individual's subjective experience fully, poor practicability.Above-mentioned 3 main deficiencies cause plugging operations once to determine, often need carry out repeatedly in the mode of test repeatedly could be successful, seriously restricted the smooth exploitation of oil gas well.And the leak stopping repeatedly of this test formula needs a large amount of plugging drilling fluids, has increased the cost of oil-gas mining, even more serious is to cause a large amount of plugging drilling fluids and leak stopping slurry to invade the reservoir deep, be difficult to the row of returning, loss oil and gas flow passage causes the injury that can't retrieve to reservoir.
In sum, accurately calculate the matter of great urgency that reservoir crack width and design plugging drilling fluid prescription have become current oil-gas mining.
Summary of the invention
One of purpose of the present invention is: at above-mentioned the deficiencies in the prior art, provide a kind of simple, convenient and practical, blocking method that brill that promptness is strong is met the reservoir crack.
Two of purpose of the present invention is: at above-mentioned the deficiencies in the prior art, provide a kind of automation, even intelligentized brill is met the leak stopping control system in reservoir crack.
One of purpose of the present invention adopts following technical proposals to realize: a kind of blocking method of meeting the reservoir crack that bores comprises the following steps:
(1) collects geologic parameter, drilling parameter, drilling liquid parameter and leakage parameter, obtain the width in reservoir crack by these calculation of parameter;
(2) select the loss circulation material of corresponding particle diameter according to the reservoir crack width;
(3), select the next stage loss circulation material with the corresponding particle diameter of this pore-size, with the pore-size of next stage loss circulation material shutoff upper level loss circulation material formation by calculating the pore-size that step (2) loss circulation material forms; According to preceding method, calculate the pore-size that each grade loss circulation material forms step by step, and select the plugging material of corresponding particle diameter, form multistage plugging drilling fluid prescription with this, with the shutoff of reservoir crack with the big particle diameter loss circulation material of small particle diameter loss circulation material shutoff hole.
The width in reservoir crack draws by following computation model in the step (1):
Figure 2011102345366100002DEST_PATH_IMAGE001
In the formula:
Figure 2011102345366100002DEST_PATH_IMAGE002
Be crack width;
Figure 2011102345366100002DEST_PATH_IMAGE003
Be formation porosity; r EqBe the well equivalent redius; △
Figure 2011102345366100002DEST_PATH_IMAGE004
Be the drilling well positive differential pressure;
Figure 2011102345366100002DEST_PATH_IMAGE005
Plastic viscosity for drilling fluid;
Figure 2011102345366100002DEST_PATH_IMAGE006
Be the total compression coefficient; v CumBe the accumulation wastage; T is the leakage time; C is a constant, gets 1.3956.
The average pore size that loss circulation material forms in the step (3) draws by the computation model of one of the following:
1. Coberly formula,
Figure 2011102345366100002DEST_PATH_IMAGE007
Figure 2011102345366100002DEST_PATH_IMAGE008
In the formula: D PoreBe effective pore throat size, unit is μ m; D 50Be average packed particle size, unit is μ m; Φ is for piling up degree of porosity.
Two of purpose of the present invention adopts following technical proposals to realize: a kind of leak stopping control system of meeting the reservoir crack of boring comprises reservoir crack width computing module, plugging drilling fluid prescription generation module, the data record memory module of interactive user interface and shows the prescription design module; Wherein:
Reservoir crack width computing module:, calculate the width in reservoir crack based on the computation model analysis-by-synthesis of system according to the geologic parameter of collecting, drilling parameter, drilling liquid parameter and leakage parameter information;
Plugging drilling fluid prescription generation module: the width value to the output of reservoir crack width computing module is analyzed, and selects the plugging drilling fluid prescription of corresponding particle diameter in the data record memory module according to analysis result;
Data record memory module: title and the average packed particle size of being responsible for the various loss circulation materials of record, and calculate the particle packing degree of porosity and the average pore size of various loss circulation materials based on the computation model analysis-by-synthesis of system, accumulation degree of porosity and average pore size according to various loss circulation materials, various loss circulation materials are divided into a plurality of different ranks, the pore-size that makes the formation of each grade loss circulation material forms multistage plugging drilling fluid prescription with the big particle diameter loss circulation material of small particle diameter loss circulation material shutoff pore-size by the shutoff of next stage loss circulation material with this; And these information record is stored in database;
Show the prescription design module: the prescription that the responsible loss circulation materials at different levels that show that plugging drilling fluid prescription generation module generates are formed.
Computation model in the described reservoir crack width computing module is as follows:
Figure 2011102345366100002DEST_PATH_IMAGE009
In the formula:
Figure 447447DEST_PATH_IMAGE002
Be crack width; Be formation porosity; r EqBe the well equivalent redius; △
Figure 894794DEST_PATH_IMAGE004
Be the drilling well positive differential pressure;
Figure 691849DEST_PATH_IMAGE005
Plastic viscosity for drilling fluid; Be the total compression coefficient; v CumBe the accumulation wastage; T is the leakage time; C is a constant, gets 1.3956.
Computation model in the described data record memory module is an one of the following:
1. Coberly formula,
Figure 2011102345366100002DEST_PATH_IMAGE010
Figure 2011102345366100002DEST_PATH_IMAGE011
In the formula: D PoreBe effective pore throat size, unit is μ m; D 50Be average packed particle size, unit is μ m; Φ is for piling up degree of porosity.
The invention has the beneficial effects as follows:
Method of the present invention, be that this leakage parameter that " is harmful to " phenomenon and provides is converted into " useful " data of calculating the down-hole crack width with leakage, in conjunction with geologic parameter, science data such as drilling parameter and drilling liquid parameter, disposablely just can accurately calculate the reservoir crack width, integrated application particle packing theory, particle bridge formation theory and loss circulation material particle size distribution data are developed the plugging drilling fluid prescription of mutual compatibility, effective shutoff is carried out in the reservoir crack, it is reasonable to the demand of plugging drilling fluid prescription, there is not waste, injury to the reservoir crack is little, has simple, characteristics such as convenient and practical and promptness is strong;
Control system of the present invention, be to adopt computer programming language that blocking method of the present invention is written as special-purpose software, finish the integrated work that calculates the design of plugging drilling fluid prescription from the leakage crack width, thereby realize the computerization of plugging drilling fluid prescription design, automation, even it is intelligent, adjust the plugging drilling fluid prescription that corresponding proportioning comes grade reasonable in design to distribute by different crack widths intuitively, aided drilling liquid engineer formulates rational leak stopping scheme, effectively instruct field operation, significantly improve operating efficiency, leak stopping in time reduces leakage, thereby reduces loss.
Description of drawings
Fig. 1 is a kind of FB(flow block) of the present invention.
Fig. 2 is a kind of structured flowchart of control system of the present invention.
Fig. 3 is that the present invention shows that the prescription design module demonstrates the template figure of plugging drilling fluid commonly used.
The specific embodiment
Embodiment 1
Referring to Fig. 1: a kind of blocking method of meeting the reservoir crack that bores comprises the following order step:
(1). collect geologic parameter 3, drilling parameter 4, drilling liquid parameter 5 and leakage parameter 6, wherein, geologic parameter 3 comprises degree of porosity and fracture dip, drilling parameter 4 comprises bore hole hole diameter, drill footage and pressure reduction, drilling liquid parameter 5 comprises plastic viscosity and compression coefficient, leakage parameter 6 comprises wastage and leakage time, these parameters is applied in the following computation model, by calculating leakage (reservoir) crack width 1; Computation model is specific as follows,
Figure 2011102345366100002DEST_PATH_IMAGE012
In the formula:
Figure 37959DEST_PATH_IMAGE002
Be crack width;
Figure 235591DEST_PATH_IMAGE003
Be formation porosity;
r EqBe the well equivalent redius;
Be the drilling well positive differential pressure;
Figure 299679DEST_PATH_IMAGE005
Plastic viscosity for drilling fluid;
Figure 948966DEST_PATH_IMAGE006
Be the total compression coefficient;
v CumBe the accumulation wastage;
T is the leakage time;
C is a constant, gets 1.3956.
(2). according to the leakage crack width 1 that step (1) draws, selection is a loss circulation material with the plugging drilling fluid 2(of the corresponding particle diameter of this width).
(3). calculate the pore-size 8 that the selected loss circulation material of step (2) forms by the particle packing theory, select the next stage loss circulation material of the known size distribution 9 corresponding then, with the pore-size of next stage loss circulation material shutoff upper level loss circulation material formation with this pore-size; And according to preceding method, calculate the pore-size that each grade loss circulation material forms step by step, select next stage plugging material with the corresponding particle diameter of this grade pore-size, form multistage plugging drilling fluid prescription with this with the big particle diameter loss circulation material of small particle diameter loss circulation material shutoff hole, as plugging operations 7, with leakage (reservoir) crack shutoff, reduce leakage; The average pore size that loss circulation material in this step forms draws by following computation model:
1. Coberly formula,
Figure 2011102345366100002DEST_PATH_IMAGE013
Or
Figure 2011102345366100002DEST_PATH_IMAGE014
In the formula: D PoreBe effective pore throat size, unit is μ m;
D 50Be average packed particle size, unit is μ m;
Φ is for piling up degree of porosity.
Embodiment 2
Referring to Fig. 2: a kind of leak stopping control system of meeting the reservoir crack of boring comprises reservoir crack width computing module 10, plugging drilling fluid prescription generation module 11, the data record memory module 12 of interactive user interface and shows prescription design module 13.Wherein:
Reservoir crack width computing module 10:, calculate the width in reservoir crack based on the computation model analysis-by-synthesis of system according to the geologic parameter of collecting, drilling parameter, drilling liquid parameter and leakage parameter information; Aforesaid geologic parameter comprises degree of porosity and fracture dip, and drilling parameter comprises bore hole hole diameter, drill footage and pressure reduction, and drilling liquid parameter comprises plastic viscosity and compression coefficient, and the leakage parameter comprises wastage and leakage time.
The aforementioned calculation model is specific as follows:
Figure 2011102345366100002DEST_PATH_IMAGE015
In the formula:
Figure 440253DEST_PATH_IMAGE002
Be crack width;
Be formation porosity;
r EqBe the well equivalent redius;
Be the drilling well positive differential pressure;
Figure 599205DEST_PATH_IMAGE005
Plastic viscosity for drilling fluid;
Be the total compression coefficient;
v CumBe the accumulation wastage;
T is the leakage time;
C is a constant, gets 1.3956.
Plugging drilling fluid prescription generation module 11: the width value to 10 outputs of reservoir crack width computing module is analyzed, and selects plugging drilling fluid prescription with the corresponding particle diameter of width value according to analysis result in data record memory module 12.
Data record memory module 12: title and the average packed particle size of being responsible for the various loss circulation materials of record, and calculate the particle packing degree of porosity and the average pore size of various loss circulation materials based on the computation model analysis-by-synthesis of system, accumulation degree of porosity and average pore size according to various loss circulation materials, various loss circulation materials are divided into a plurality of different ranks, the pore-size that makes the formation of each grade loss circulation material forms multistage plugging drilling fluid prescription with the big particle diameter loss circulation material of small particle diameter loss circulation material shutoff pore-size by the shutoff of next stage loss circulation material with this; And these information record is stored in database.
Computation model in the above-mentioned data record memory module 12 is specific as follows:
1. Coberly formula,
Figure 2011102345366100002DEST_PATH_IMAGE016
Or
Figure 2011102345366100002DEST_PATH_IMAGE017
In the formula: D PoreBe effective pore throat size, unit is μ m;
D 50Be average packed particle size, unit is μ m;
Φ is for piling up degree of porosity.
Show the prescription design module: the prescription that the responsible loss circulation materials at different levels that show that plugging drilling fluid prescription generation module 11 generates are formed, this design module will be filled a prescription with the form demonstration of template figure, make things convenient for the loss circulation material of engineer's match query directly perceived.
Referring to Fig. 3: with control system of the present invention some loss circulation materials commonly used have been carried out gathering and calculated, and with in these data record storages and the database, for future use.Below just the invention will be further described in conjunction with gathering these loss circulation material data commonly used that calculate.
Adopt computation model Blake-Kozeny formula, i.e. D Pore=D 50Φ/(3(1-Φ)), be that walnut shell, SRD5, SRD3, SRD2 and FRD-2 calculate to loss circulation material title/code name; Adopt computation model Coberly formula, i.e. D Pore=D 50/ 6.5, be RSD80, FRD-1, DTR, SD1, LF-2, FLC-1, LF-1 and CaCO to loss circulation material title/code name 3Calculate, computed information specifically is shown in Table 1.
The loss circulation material commonly used that table 1 calculates is piled up pore-size
Figure 2011102345366100002DEST_PATH_IMAGE018
Annotate: upward each loss circulation material is granular material in the table.
Loss circulation material according to table 1 is piled up pore-size, by the principle that the next stage loss circulation material must mate upper level loss circulation material hole, obtains drilling fluid composition design template figure shown in Figure 3.After calculating the reservoir crack width, the first order loss circulation material of elder generation's match query crack width on drilling fluid composition design template figure, find out the particle diameter particle corresponding with crack width, but find out the next stage particle that this grade particles of corresponding shutoff forms pore-size by this grade arrow indication then, by that analogy, and according to the best plugging drilling fluid prescription that must dosage plugging drilling fluid (seeing Table 2) obtain that is stored in the database.
Table 2 must the dosage plugging drilling fluid
Figure 2011102345366100002DEST_PATH_IMAGE019

Claims (6)

1. one kind is bored the blocking method of meeting the reservoir crack, comprises the following steps:
(1). collect geologic parameter, drilling parameter, drilling liquid parameter and leakage parameter, obtain the width in reservoir crack by these calculation of parameter;
(2). select the loss circulation material of corresponding particle diameter according to the reservoir crack width;
(3). by calculating the pore-size that step (2) loss circulation material forms, select the next stage loss circulation material with the corresponding particle diameter of this pore-size, with the pore-size of next stage loss circulation material shutoff upper level loss circulation material formation; According to preceding method, calculate the pore-size that each grade loss circulation material forms step by step, and select the plugging material of corresponding particle diameter, form multistage plugging drilling fluid prescription with this, with the shutoff of reservoir crack with the big particle diameter loss circulation material of small particle diameter loss circulation material shutoff hole.
2. meet the blocking method in reservoir crack according to the described brill of claim 1, it is characterized in that the width in reservoir crack draws by following computation model in the step (1):
Figure 337266DEST_PATH_IMAGE001
In the formula:
Figure 757883DEST_PATH_IMAGE002
Be crack width;
Figure 918868DEST_PATH_IMAGE003
Be formation porosity; r EqBe the well equivalent redius; △
Figure 970001DEST_PATH_IMAGE004
Be the drilling well positive differential pressure;
Figure 82182DEST_PATH_IMAGE005
Plastic viscosity for drilling fluid; Be the total compression coefficient; v CumBe the accumulation wastage; T is the leakage time; C is a constant, gets 1.3956.
3. meet the blocking method in reservoir crack according to the described brill of claim 1, it is characterized in that the average pore size that loss circulation material forms in the step (3) draws by the computation model of one of the following:
1. Coberly formula,
Figure 305670DEST_PATH_IMAGE007
In the formula: D PoreBe effective pore throat size, unit is μ m; D 50Be average packed particle size, unit is μ m; Φ is for piling up degree of porosity.
4. one kind is bored the leak stopping control system of meeting the reservoir crack, it is characterized in that, comprises reservoir crack width computing module, plugging drilling fluid prescription generation module, the data record memory module of interactive user interface and shows the prescription design module; Wherein:
Reservoir crack width computing module:, calculate the width in reservoir crack based on the computation model analysis-by-synthesis of system according to the geologic parameter of collecting, drilling parameter, drilling liquid parameter and leakage parameter information;
Plugging drilling fluid prescription generation module: the width value to the output of reservoir crack width computing module is analyzed, and selects the plugging drilling fluid prescription of corresponding particle diameter in the data record memory module according to analysis result;
Data record memory module: title and the average packed particle size of being responsible for the various loss circulation materials of record, and calculate the particle packing degree of porosity and the average pore size of various loss circulation materials based on the computation model analysis-by-synthesis of system, accumulation degree of porosity and average pore size according to various loss circulation materials, various loss circulation materials are divided into a plurality of different ranks, the pore-size that makes the formation of each grade loss circulation material forms multistage plugging drilling fluid prescription with the big particle diameter loss circulation material of small particle diameter loss circulation material shutoff pore-size by the shutoff of next stage loss circulation material with this; And these information record is stored in database;
Show the prescription design module: the prescription that the responsible loss circulation materials at different levels that show that plugging drilling fluid prescription generation module generates are formed.
5. meet the leak stopping control system in reservoir crack according to the described brill of claim 4, it is characterized in that the computation model in the described reservoir crack width computing module is as follows:
Figure 690963DEST_PATH_IMAGE009
In the formula:
Figure 656645DEST_PATH_IMAGE002
Be crack width; Be formation porosity; r EqBe the well equivalent redius; △ Be the drilling well positive differential pressure;
Figure 52357DEST_PATH_IMAGE005
Plastic viscosity for drilling fluid;
Figure 618468DEST_PATH_IMAGE006
Be the total compression coefficient; v CumBe the accumulation wastage; T is the leakage time; C is a constant, gets 1.3956.
6. meet the leak stopping control system in reservoir crack according to the described brill of claim 4, it is characterized in that the computation model in the described data record memory module is an one of the following:
1. Coberly formula,
Figure 608552DEST_PATH_IMAGE010
Figure 969126DEST_PATH_IMAGE011
In the formula: D PoreBe effective pore throat size, unit is μ m; D 50Be average packed particle size, unit is μ m; Φ is for piling up degree of porosity.
CN2011102345366A 2011-08-16 2011-08-16 Method and control system for stopping leakage of reservoir fracture in drilling Pending CN102278090A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102345366A CN102278090A (en) 2011-08-16 2011-08-16 Method and control system for stopping leakage of reservoir fracture in drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102345366A CN102278090A (en) 2011-08-16 2011-08-16 Method and control system for stopping leakage of reservoir fracture in drilling

Publications (1)

Publication Number Publication Date
CN102278090A true CN102278090A (en) 2011-12-14

Family

ID=45103779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102345366A Pending CN102278090A (en) 2011-08-16 2011-08-16 Method and control system for stopping leakage of reservoir fracture in drilling

Country Status (1)

Country Link
CN (1) CN102278090A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015945A (en) * 2012-12-07 2013-04-03 中国石油集团川庆钻探工程有限公司 Process for improving pressure bearing capacity of stratum
CN104153738A (en) * 2013-05-14 2014-11-19 四川海沃石油工程技术有限公司 Blocking controlling and leaking stopping tool assembly and leaking stopping method applied to drilling engineering
CN104949899A (en) * 2015-05-19 2015-09-30 重庆科技学院 Method for measuring effective viscosity of oil displacing polymer in porous medium
CN108868687A (en) * 2017-05-15 2018-11-23 中国石油化工股份有限公司 A kind of method of leak-proof leak-stopping
CN110017118A (en) * 2018-01-08 2019-07-16 中国石油化工股份有限公司 A kind of leak-proof leak-stopping system
CN110069878A (en) * 2019-04-29 2019-07-30 西南石油大学 A kind of drilling completion plugging material Quantitative scoring preferred method
CN110396399A (en) * 2019-06-18 2019-11-01 中国石油天然气股份有限公司 Plugging material and plugging method for large-leakage casing damage section of oil-water well
CN110764541A (en) * 2018-07-26 2020-02-07 中国石油天然气股份有限公司 Method and device for determining particle composition of drilling fluid
CN110763826A (en) * 2018-07-25 2020-02-07 中国石油天然气股份有限公司 Drilling fluid detection equipment
CN111472752A (en) * 2020-05-27 2020-07-31 西南石油大学 A method for estimating lost circulation fracture width while drilling using logging data
CN111734399A (en) * 2020-04-01 2020-10-02 四川维泰科创石油设备制造有限公司 Intelligent leakage blocking method and system in drilling process
CN111767626A (en) * 2019-03-28 2020-10-13 中国石油天然气股份有限公司 A method and apparatus for establishing a crack strength body
CN111793482A (en) * 2020-07-02 2020-10-20 长江大学 Plugging slurry for program plugging and method for plugging drilling loss of oil and gas well
CN111985147A (en) * 2019-05-23 2020-11-24 中国石油天然气股份有限公司 Design method and device of drilling fluid inhibition formula, storage medium and electronic device
CN113051305A (en) * 2019-12-27 2021-06-29 中国石油化工股份有限公司 Method for optimizing particle size of plugging material and electronic equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1928319A (en) * 2005-10-17 2007-03-14 长庆石油勘探局 Filling and leakage blocking process for cracking leak gravel
US20100181073A1 (en) * 2007-07-26 2010-07-22 Dupriest Fred E Method For Controlling Loss of Drilling Fluid

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1928319A (en) * 2005-10-17 2007-03-14 长庆石油勘探局 Filling and leakage blocking process for cracking leak gravel
US20100181073A1 (en) * 2007-07-26 2010-07-22 Dupriest Fred E Method For Controlling Loss of Drilling Fluid

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
OYENEYIN, M.B.等: "Factors to Consider in the Effective Management and Control of Fines Migration in High Permeability Sands", 《SPE PAPER NO.30112》 *
兰林等: "川西须家河组裂缝性储层保护堵漏技术研究", 《钻井液与完井液》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015945A (en) * 2012-12-07 2013-04-03 中国石油集团川庆钻探工程有限公司 Process for improving pressure bearing capacity of stratum
CN103015945B (en) * 2012-12-07 2015-07-08 中国石油集团川庆钻探工程有限公司 Process for improving pressure bearing capacity of stratum
CN104153738A (en) * 2013-05-14 2014-11-19 四川海沃石油工程技术有限公司 Blocking controlling and leaking stopping tool assembly and leaking stopping method applied to drilling engineering
CN104949899A (en) * 2015-05-19 2015-09-30 重庆科技学院 Method for measuring effective viscosity of oil displacing polymer in porous medium
CN104949899B (en) * 2015-05-19 2017-09-08 重庆科技学院 A kind of assay method of Polymer Used For Oil Displacement effective viscosity in porous media
CN108868687A (en) * 2017-05-15 2018-11-23 中国石油化工股份有限公司 A kind of method of leak-proof leak-stopping
CN108868687B (en) * 2017-05-15 2020-08-11 中国石油化工股份有限公司 Leakage-proof and plugging method
CN110017118A (en) * 2018-01-08 2019-07-16 中国石油化工股份有限公司 A kind of leak-proof leak-stopping system
CN110763826A (en) * 2018-07-25 2020-02-07 中国石油天然气股份有限公司 Drilling fluid detection equipment
CN110764541A (en) * 2018-07-26 2020-02-07 中国石油天然气股份有限公司 Method and device for determining particle composition of drilling fluid
CN110764541B (en) * 2018-07-26 2023-04-07 中国石油天然气股份有限公司 Method and device for determining particle composition of drilling fluid
CN111767626A (en) * 2019-03-28 2020-10-13 中国石油天然气股份有限公司 A method and apparatus for establishing a crack strength body
CN110069878A (en) * 2019-04-29 2019-07-30 西南石油大学 A kind of drilling completion plugging material Quantitative scoring preferred method
CN111985147A (en) * 2019-05-23 2020-11-24 中国石油天然气股份有限公司 Design method and device of drilling fluid inhibition formula, storage medium and electronic device
CN110396399A (en) * 2019-06-18 2019-11-01 中国石油天然气股份有限公司 Plugging material and plugging method for large-leakage casing damage section of oil-water well
CN113051305A (en) * 2019-12-27 2021-06-29 中国石油化工股份有限公司 Method for optimizing particle size of plugging material and electronic equipment
CN111734399A (en) * 2020-04-01 2020-10-02 四川维泰科创石油设备制造有限公司 Intelligent leakage blocking method and system in drilling process
CN111472752A (en) * 2020-05-27 2020-07-31 西南石油大学 A method for estimating lost circulation fracture width while drilling using logging data
CN111793482A (en) * 2020-07-02 2020-10-20 长江大学 Plugging slurry for program plugging and method for plugging drilling loss of oil and gas well
CN111793482B (en) * 2020-07-02 2022-11-08 长江大学 Plugging slurry for program plugging and method for plugging drilling loss of oil and gas well

Similar Documents

Publication Publication Date Title
CN102278090A (en) Method and control system for stopping leakage of reservoir fracture in drilling
CA2708142C (en) Systems and methods for utilizing cell based flow simulation results to calculate streamline trajectories
EP2100218A2 (en) Modeling and management of reservoir systems with material balance groups
Jackson et al. Investigation of liquid loading in tight gas horizontal wells with a transient multiphase flow simulator
CN110593863A (en) Identification method and identification system of water-consuming zone in high water-cut reservoir
CN104699954A (en) Calibration method for oil recovery rate of karst-fissure-cavity carbonatite reservoir
Okwen et al. Effect of well orientation (vertical vs. horizontal) and well length on the injection of CO2 in deep saline aquifers
US20240344451A1 (en) Approximating spatial and temporal saturation and pressure of a carbon dioxide injection into an aquifer
CN115538996A (en) A three-stage visual classification evaluation method for CO2 flooding and geological storage
Bezerra et al. Optimization methodology of artificial lift rates for Brazilian offshore field
Pathak et al. Solving the challenges of short and long-term production forecasting and uncertainty using a fully-coupled implicit integrated production modelling system
Fadairo et al. An improved predictive tool for liquid loading in a gas well
Fairuzov et al. Stability maps for continuous gas-lift wells: A new approach to solving an old problem
Sagen et al. A dynamic model for simulation of integrated reservoir, well and pipeline system
van der Meer et al. Calculating subsurface CO2 storage capacities
CN106285647A (en) Tracer Technique quantitative assessment sea oil reservoir waterflooding development effect method
CN115544796A (en) Dynamic evaluation method and device for gas injection blind well effect based on pressure drop curve
Elias et al. New Inflow Performance Relationship for solution-gas drive oil reservoirs
Pathak et al. Solving the challenges of a complex integrated production system in camisea field using novel modeling techniques
Wallace et al. A reservoir simulation model with platform production/injection constraints for development planning of volatile oil reservoirs
Varavva et al. Creating the Integrated Model for Conceptual Engineering of Reservoir Management and Field Facilities Construction–Experience of Tazovskoe Oil and Gas-Condensate Field.
Sergeev et al. Experimental Research of Simultaneous Water and Gas Injection Technology into Injection Wells using Mixing Devices
Romualdo et al. Bullheading optimization study of the PMCD technique
Hakiki et al. An Analytical Model for Multilayer Well Production Evaluation to Overcome Cross-Flow Problem
Xiao et al. Design and demonstration of creating underground gas storage in a fractured oil depleted carbonate reservoir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111214