[go: up one dir, main page]

CN103161439A - Horizontal segment updip well group - Google Patents

Horizontal segment updip well group Download PDF

Info

Publication number
CN103161439A
CN103161439A CN2011104069996A CN201110406999A CN103161439A CN 103161439 A CN103161439 A CN 103161439A CN 2011104069996 A CN2011104069996 A CN 2011104069996A CN 201110406999 A CN201110406999 A CN 201110406999A CN 103161439 A CN103161439 A CN 103161439A
Authority
CN
China
Prior art keywords
well
horizontal
updip
horizontal segment
wells
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104069996A
Other languages
Chinese (zh)
Inventor
卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011104069996A priority Critical patent/CN103161439A/en
Publication of CN103161439A publication Critical patent/CN103161439A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a well drilling method of a horizontal segment updip well group of well bore sections in well drilling of petroleum, natural gas, coalbed methane, shale gas and oil sand. The horizontal segment updip well group comprises a vertical well and N horizontal wells (N=1, 2, 3 ...), wherein the vertical well is drilled in the center of the horizontal segment updip well group, and the bottom of the vertical well is communicated with the tail ends of the horizontal segments of other wells. The horizontal wells are characterized in that the horizontal segments are inclined upwards, the design method can achieve that reservoir stratums are distributed gently or inclined towards the direction of a drilling machine, and the horizontal wells and large displacement wells are drilled on structures having quite unstable top stratums. Besides, during oil extraction production, oil gas flows upwards, and the problems that water production, sand production, water blocking and sand blocking prematurely occur in horizontal segment updip horizontal wells are resolved.

Description

Horizontal segment updip well group
Technical field
The present invention relates to the boring method of the casing program horizontal segment updip well group in a kind of oil, natural gas, coal bed gas, shale gas, oil-sand drilling well.
Technical background
In oil, natural gas, coal bed gas, shale gas, oil-sand Drilling Design, often run into reservoir distribution mild or to the rig direction tilt (reduction), the unsettled situation in stratum at its top, for example, the top of adjacent reservoir have easily collapse, the water layer of easily expansion, high pressure or low pressure, under these circumstances, be infeasible substantially at the top of reservoir horizontal well drilling and extended reach well.Although the casing program method for designing of conventional " horizontal segment updip horizontal well " can be alleviated or solve the impact of this Geological Defects, get out the well section of growing at oily reservoir, but making gas stream at first to flow to oblique below, this well just can reach ground, in the situation that water or sand are arranged in well, this type of flow of oil gas certainly will promote water and sand flows earthward together, thereby, cause too early water outlet and the problem of shaking out, reduced oil and gas production and productivity effect.
In addition, the front portion of " horizontal segment updip horizontal well " is lower, and the water that density is larger, sand make gas channel become narrow or/and piece is fallen on the stratum is tending towards resulting in blockage in this well section deposition, and when serious, well blocks fully.For such obstruction, the production of hydrocarbons of just having to stop is carried out the drifting operation.
Summary of the invention
The object of the invention is to propose a kind of solve reservoir distribution mild or to the rig direction tilt, the unsettled structure in stratum at its top, the casing program method for designing of existing horizontal well and extended reach well can not satisfy the novel well bore Section Design method of the needs of drilling engineering and petroleum production engineering simultaneously.
The present invention realizes like this; Centre drill a bite straight well of horizontal well group, its bottom is connected with the horizontal segment end of other many mouthfuls of wells, net horizontal section is inclined upwardly, the angle buildup interval of horizontal well and extended reach well extends to the good ground below reservoir and/or reservoir, 1 mouthful of straight well+N mouth horizontal segment updip horizontal well (N=1,2,3 ...).Straight well can utilize exploratory well or the development evaluation well completed to serve as, like this with regard to make much can not horizontal well drilling and the structure of extended reach well come true; Solve the problem that horizontal segment updip well forces gas stream to flow to oblique below, like this, more be conducive to the natural flow of oil gas, thereby improved oil-gas mining speed and final coefficient of mining.
In actual applications, not only save fund, also verified accurate location and the characteristic of reservoir.Straight well has the characteristics that can reserve the sand setting pocket, like this, has just solved " horizontal segment updip horizontal well " and has crossed early leaving, shakes out and the problem such as obstruction.
In addition because the casing program characteristics of the design's method be first get into reservoir bottom, the high-order bit to reservoir creeps into again, in this course, the situation of oil reservoir has had clearly understanding, like this, need to bore the trouble of leading eye when just having saved horizontal well drilling.
Description of drawings
Concrete structure drawings and Examples of the present invention provide.
Figure-1 horizontal segment updip well group schematic diagram.
Legend:
1, well head, 2, straight well, 3, horizontal well #1,4, horizontal well #N, 5, well, 6, inclination section, 7, (updip) horizontal segment, 8, horizontal segment end end, 9, ponding and sand, 10, the sand setting pocket
The specific embodiment
The first step: according to development plan and the surface state in oil field, make relative well head 1 position of straight well 2 and other N mouth " horizontal segment updip horizontal well " 3,4.
Second step: bore the larger straight well 2 of a bite diameter in the central authorities of horizontal well group, well 5 its degree of depth are deeper than 30 meters-50 meters of reservoir bottoms, and purpose is for the accurate degree of depth of drilling oil reservoir, reserves enough sand setting pockets 10.
The 3rd step: bore N mouth " horizontal segment updip horizontal well " 3,4 in the distance that distance straight well 2 is suitable, this horizontal well has inclination section 6, and (updip) horizontal segment 7, forms ponding and sand 9 in its bottom.
The 4th step: utilize modern drilling technology, the end 8 of horizontal segment will be connected with the topmost reservoir of straight well 2.

Claims (3)

1. the boring method of horizontal segment updip well group, centre drill a bite straight well of horizontal well group, its bottom is connected with the horizontal segment end of other many mouthfuls of wells.
2. horizontal segment updip well group as claimed in claim 1, net horizontal section is inclined upwardly, and the angle buildup interval of horizontal well and extended reach well extends to the good ground below reservoir or reservoir.
3. horizontal segment updip well group as claimed in claim 1, straight well can utilize exploratory well or the development evaluation well completed to serve as.
CN2011104069996A 2011-12-09 2011-12-09 Horizontal segment updip well group Pending CN103161439A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104069996A CN103161439A (en) 2011-12-09 2011-12-09 Horizontal segment updip well group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104069996A CN103161439A (en) 2011-12-09 2011-12-09 Horizontal segment updip well group

Publications (1)

Publication Number Publication Date
CN103161439A true CN103161439A (en) 2013-06-19

Family

ID=48584934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104069996A Pending CN103161439A (en) 2011-12-09 2011-12-09 Horizontal segment updip well group

Country Status (1)

Country Link
CN (1) CN103161439A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234667A (en) * 2014-07-18 2014-12-24 张传文 Brine channel, and system and excavation method thereof
CN108894765A (en) * 2018-08-24 2018-11-27 广州海洋地质调查局 The major-minor well construction and its method of deep water shallow layer gas hydrate exploitation
CN110043229A (en) * 2019-04-02 2019-07-23 广州海洋地质调查局 A kind of more well group connection convergence recovery methods of Gas Hydrate In Sea Areas

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5029641A (en) * 1987-12-17 1991-07-09 Standard Alaska Production Company Inverted wellbore completion
US5402851A (en) * 1993-05-03 1995-04-04 Baiton; Nick Horizontal drilling method for hydrocarbon recovery
CN1247930A (en) * 1998-05-27 2000-03-22 特克马克国际发展公司 Multiple effluent method for producing petroleum from tar sand
US6679322B1 (en) * 1998-11-20 2004-01-20 Cdx Gas, Llc Method and system for accessing subterranean deposits from the surface
CN1659359A (en) * 2001-10-19 2005-08-24 Cdx天然气有限公司 Method and system for dewatering of coal seams
CN1727636A (en) * 1998-11-20 2006-02-01 Cdx天然气有限公司 Method and system for accessing subterranean deposits from the surface

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5029641A (en) * 1987-12-17 1991-07-09 Standard Alaska Production Company Inverted wellbore completion
US5402851A (en) * 1993-05-03 1995-04-04 Baiton; Nick Horizontal drilling method for hydrocarbon recovery
CN1247930A (en) * 1998-05-27 2000-03-22 特克马克国际发展公司 Multiple effluent method for producing petroleum from tar sand
US6679322B1 (en) * 1998-11-20 2004-01-20 Cdx Gas, Llc Method and system for accessing subterranean deposits from the surface
CN1727636A (en) * 1998-11-20 2006-02-01 Cdx天然气有限公司 Method and system for accessing subterranean deposits from the surface
CN1659359A (en) * 2001-10-19 2005-08-24 Cdx天然气有限公司 Method and system for dewatering of coal seams

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234667A (en) * 2014-07-18 2014-12-24 张传文 Brine channel, and system and excavation method thereof
CN108894765A (en) * 2018-08-24 2018-11-27 广州海洋地质调查局 The major-minor well construction and its method of deep water shallow layer gas hydrate exploitation
CN110043229A (en) * 2019-04-02 2019-07-23 广州海洋地质调查局 A kind of more well group connection convergence recovery methods of Gas Hydrate In Sea Areas

Similar Documents

Publication Publication Date Title
CN107387034B (en) Extraction method of horizontal coal bed gas well completed by non-well-cementing casing
CN103867180B (en) A kind of coal bed gas horizontal well method for controlling trajectory
PL200785B1 (en) Method and system for enhanced access to a subterranean zone
CN102392678A (en) Gas drainage method combining surface and underground fracturing and permeability improvement
CN102392677A (en) Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN102031950A (en) Hole-forming process method for comb gas extraction borehole in coal seam roof
CN102852490A (en) High gas suction and discharge process method for complex well
CN104790918B (en) Method for mining coal bed gas from cluster well and horizontal well combined ground under complex terrain condition
CN102518464A (en) Method for extracting gas at corner on recovery working face in coal mine
CN101233293A (en) Cavity well system
CN103174403A (en) Gravity and steam flooding combined mining method for thick-layer interlayer-containing common heavy oil reservoir
CN106979001A (en) Thick-layer glutenite horizontal well solid seam net fracturing optimizing method
CN108756884A (en) Coal mine tight roof full face ground shifts to an earlier date outburst elimination method
CN103603643A (en) Coal bed gas U-shaped well staged fracturing exploitation technology
CN102226412B (en) Underground dark mining drilling well gas extraction method
CN203335054U (en) Multi-branch horizontal well system suitable for coalbed methane of syncline structure
CN113605874A (en) Method for extracting coal bed gas of broken soft coal bed top and bottom double-layer horizontal well
CN114439428A (en) Enhanced extraction method for coal bed gas horizontal well under through goaf group
CN103161439A (en) Horizontal segment updip well group
CN113513360A (en) A gas drainage method for fully mechanized caving mining of single thick coal seam in goaf
CN111058891B (en) Method for replacing and extracting coal seam gas in underground and aboveground modes
CN103422813B (en) Individual well eye multi-lateral horizontal well system for coal bed gas and boring method
CN105351000A (en) Goaf roof high-position directional borehole gas extraction technology
US20110315379A1 (en) Producing hydrocarbon material from a layer of oil sand
CN104343424A (en) Coalbed-methane horizontal-well PE (poly ethylene) screen pipe well completion application process method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Wei Guo

Document name: the First Notification of an Office Action

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130619