[go: up one dir, main page]

CN103208757B - Insulated conductor supporter - Google Patents

Insulated conductor supporter Download PDF

Info

Publication number
CN103208757B
CN103208757B CN201310107009.8A CN201310107009A CN103208757B CN 103208757 B CN103208757 B CN 103208757B CN 201310107009 A CN201310107009 A CN 201310107009A CN 103208757 B CN103208757 B CN 103208757B
Authority
CN
China
Prior art keywords
insulated conductor
wire
end points
cable clamp
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310107009.8A
Other languages
Chinese (zh)
Other versions
CN103208757A (en
Inventor
周新民
沈裕祥
孙健刚
丁丁
瞿卫东
周永华
陆忠心
杨勇
袁伟东
李金祥
宋洪涛
刘涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Electric Power Co
State Grid Corp of China SGCC
Original Assignee
Shanghai Municipal Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co, State Grid Corp of China SGCC filed Critical Shanghai Municipal Electric Power Co
Priority to CN201310107009.8A priority Critical patent/CN103208757B/en
Publication of CN103208757A publication Critical patent/CN103208757A/en
Application granted granted Critical
Publication of CN103208757B publication Critical patent/CN103208757B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明涉及一种绝缘导线架线器,能够被固定在架空线杆的横担上,通过在底座弯曲部分两端的支撑柱上设置的U型支撑座在剥皮过程中承载导线的重量,并利用底座弯曲部分的半径及端点支撑柱的长度来满足在导线上使用剥线器时的旋转半径要求。还能够进一步使用带梅花螺栓的线缆夹具将导线一端紧固,以避免导线随剥线器转动;并且,通过设置U型夹板和弹簧压板,能够方便快速地将该架线器连接至横担上,节约时间。本发明的制作成本低,能够有效减轻杆上作业劳动量,加快施工进度和施工效率,提高剥皮合格率。

The invention relates to an insulated conductor liner, which can be fixed on the cross arm of an overhead line pole, and the weight of the conductor can be carried by the U-shaped support seat arranged on the support columns at both ends of the curved part of the base during the stripping process, and the use of The radius of the curved portion of the base and the length of the end support post are designed to meet the radius of rotation requirements when using the stripper on the wire. It is also possible to further use a cable clamp with torx bolts to fasten one end of the wire to prevent the wire from rotating with the wire stripper; and, by setting a U-shaped clamp and a spring pressure plate, the wire tensioner can be easily and quickly connected to the cross arm to save time. The invention has low production cost, can effectively reduce the labor load on the pole, accelerate the construction progress and efficiency, and improve the qualified rate of peeling.

Description

绝缘导线架线器Insulated Wire Rack

技术领域 technical field

本发明涉及电力架空线领域,特别涉及一种绝缘导线架线器。 The invention relates to the field of electric power overhead wires, in particular to an insulated wire wire hanger.

背景技术 Background technique

近年来架空线路绝缘化改造正逐渐普及,架空线路多采用PSL-12/4防雷绝缘子。在进行绝缘化改造放线作业时,为了能够将绝缘导线固定在防雷绝缘子上,必须对绝缘导线进行剥皮处理。 In recent years, the insulation transformation of overhead lines is gradually becoming popular, and PSL-12/4 lightning protection insulators are mostly used in overhead lines. When performing insulation transformation and setting out operations, in order to fix the insulated wires on the lightning protection insulator, the insulated wires must be stripped.

然而,目前在进行新架线路或线路绝缘化改造时,作业人员在杆上对绝缘导线剥皮处理时,往往需要用肩膀抗住导线,使得导线的重量全部压在作业人员身上,这样不仅加重作业人员的劳累程度,而且由于风的吹动及杆上作业人员自身的不平衡等因素,造成难以对剥皮位置准确定位,降低了施工效率和质量;同时抗在肩膀上剥线增加了损伤导线的几率,降低了剥线合格率。经过测算,现有绝缘导线剥皮处理的过程,耗费时间5分钟,肩膀承受导线重量平均在35KG,剥皮合格率只有95%,因此费时费力、易有误差。 However, at present, when carrying out new wiring or line insulation transformation, when the operator strips the insulated wire on the pole, it is often necessary to hold the wire with his shoulders, so that the weight of the wire is all pressed on the operator, which not only aggravates the work Due to factors such as the blowing of the wind and the unbalance of the operator on the pole, it is difficult to accurately locate the stripping position, which reduces the construction efficiency and quality; at the same time, the resistance to stripping the wire on the shoulder increases the chance of damaging the wire. probability, reducing the qualified rate of stripping. According to calculations, the existing insulated conductor stripping process takes 5 minutes, the average weight of the conductor on the shoulder is 35KG, and the stripping pass rate is only 95%, so it is time-consuming, laborious and prone to errors.

发明内容 Contents of the invention

为了解决上述问题,本发明的目的在于提出一种绝缘导线架线器,在进行绝缘导线剥皮处理时,用于代替作业人员的肩膀来承载导线重量,以节约绝缘导线剥皮时所用的时间,并大大提高剥皮时导线的稳定性。 In order to solve the above problems, the object of the present invention is to provide an insulated wire wire hanger, which is used to replace the shoulders of the operator to carry the weight of the wire when performing the insulated wire stripping process, so as to save the time used when the insulated wire is stripped, and Greatly improves the stability of the wire when stripping.

为了达到目的,本发明的第一个技术方案是提供一种绝缘导线架线器,在对绝缘导线进行剥皮时用以对绝缘导线进行固定,所述架线器包含配合连接的以下部件: In order to achieve the purpose, the first technical solution of the present invention is to provide an insulated wire wire erector, which is used to fix the insulated wire when stripping the insulated wire. The wire erector includes the following parts that are mated and connected:

一个底座,其进一步包含一体成型的弯曲的主体和分别位于该主体两端的水平连接面; A base, which further includes an integrally formed curved main body and horizontal connecting surfaces respectively located at two ends of the main body;

两个端点支撑柱,分别固定连接在底座的两个所述水平连接面上; The two end support columns are respectively fixedly connected to the two horizontal connection surfaces of the base;

两个端点支撑座,分别固定连接在两个所述端点支撑柱的顶部;绝缘导线能够架设在两个所述端点支撑座上相对开设的U型缺口中进行剥皮作业; The two terminal support bases are respectively fixedly connected to the tops of the two terminal support columns; the insulated wires can be erected in the U-shaped gaps opened oppositely on the two terminal support bases for peeling operation;

至少一个支点固定柱,设置在所述底座主体的底部外侧,用以将所述架线器固定连接在架空线杆的横担上。 At least one fulcrum fixing column is arranged outside the bottom of the base main body, and is used for fixedly connecting the wire hanger to the cross arm of the overhead line pole.

所述底座主体的半径值与所述端点支撑柱的长度的和值,与剥线器在绝缘导线上进行旋转剥皮时的旋转半径相匹配。 The sum of the radius value of the base body and the length of the end support column matches the rotation radius of the wire stripper when it rotates and strips the insulated wire.

优选的,所述底座是一个电缆抱箍。 Preferably, the base is a cable hoop.

两个所述端点支撑柱分别是具有第一长度的螺丝,所述支点固定柱是具有第二长度的螺丝,第一长度与第二长度不同。 The two end support posts are respectively screws with a first length, and the fulcrum fixing posts are screws with a second length, and the first length is different from the second length.

本发明的另一个技术方案是提供一种绝缘导线架线器,在对绝缘导线进行剥皮时用以对绝缘导线进行固定,所述架线器包含配合连接的以下部件: Another technical solution of the present invention is to provide an insulated wire wire hanger, which is used to fix the insulated wire when stripping the insulated wire. The wire hanger includes the following parts that are mated and connected:

一个底座,其进一步包含一体成型的弯曲的主体和分别位于该主体两端的水平连接面; A base, which further includes an integrally formed curved main body and horizontal connecting surfaces respectively located at two ends of the main body;

两个端点支撑柱,分别固定连接在底座的两个所述水平连接面上; The two end support columns are respectively fixedly connected to the two horizontal connecting surfaces of the base;

一个线缆夹具,固定连接在其中一个所述端点支撑柱的水平连接面上,等待剥皮的绝缘导线的一端能够由该线缆夹具紧固; A cable clamp, fixedly connected to the horizontal connection surface of one of the terminal support columns, one end of the insulated conductor waiting to be stripped can be fastened by the cable clamp;

一个端点支撑座,固定连接在另一个所述端点支撑柱的水平连接面上,所述绝缘导线的另一端能够架设在所述端点支撑座上的U型缺口中。 One terminal support seat is fixedly connected to the horizontal connection surface of the other terminal support column, and the other end of the insulated wire can be bridged in the U-shaped notch on the terminal support seat.

所述架线器还进一步包含: The wire hanger further includes:

U型夹板,设置在所述底座主体的底部外侧,用以将所述架线器嵌入连接到架空线杆的横担上; U-shaped splint, arranged outside the bottom of the base body, used to embed the wire hanger on the cross arm connected to the overhead line pole;

弹簧压板,嵌设在所述U型夹板上水平布置的开口中,用以将U型夹板与横担进行紧固。 The spring pressing plate is embedded in the opening horizontally arranged on the U-shaped splint, and is used for fastening the U-shaped splint and the cross arm.

所述底座主体的半径值与所述端点支撑柱的长度的和值,与剥线器在绝缘导线上进行旋转剥皮时的旋转半径相匹配。 The sum of the radius value of the base body and the length of the end support column matches the rotation radius of the wire stripper when it rotates and strips the insulated wire.

优选的,所述底座是一个铝合金的电缆抱箍。 Preferably, the base is an aluminum alloy cable hoop.

两个所述端点支撑柱是两个空心铝柱,其顶部各自设置有法兰盘,用以分别连接所述端点支撑座和所述线缆夹具。 The two end support columns are two hollow aluminum columns, each of which is provided with a flange on the top, for respectively connecting the end support seat and the cable clamp.

所述线缆夹具分为两个部分,这两个部分的接触面之间留有空隙;所述线缆夹具上还进一步设置有梅花螺栓,用以将所述线缆夹具的两个部分锁紧,进而将穿入在所述空隙内的绝缘导线进行紧固。 The cable clamp is divided into two parts, and there is a gap between the contact surfaces of the two parts; the cable clamp is further provided with a torx bolt, which is used to lock the two parts of the cable clamp Tight, and then fasten the insulated wire that penetrates into the gap.

综上所述,本发明所述绝缘导线架线器的基本结构,能够被固定在架空线杆的横担上,通过在底座弯曲部分的两端支撑柱上所设置的U型支撑座在剥皮过程中承载导线的重量,并利用底座弯曲部分的半径及端点支撑柱的长度来满足在导线上使用剥线器时的旋转半径要求。而在改进的结构中,能够进一步使用带梅花螺栓的线缆夹具将导线一端紧固,以避免导线随剥线器转动;并且,通过设置U型夹板和弹簧压板,能够方便快速地将该架线器连接至横担上,节约时间。 To sum up, the basic structure of the insulated conductor wire hanger of the present invention can be fixed on the cross arm of the overhead line pole, and the U-shaped support seat provided on the support columns at both ends of the curved part of the base can be used for stripping The weight of the wire is carried during the process, and the radius of the curved part of the base and the length of the end support column are used to meet the requirements of the radius of rotation when using the wire stripper on the wire. In the improved structure, a cable clamp with torx bolts can be further used to fasten one end of the wire to prevent the wire from rotating with the wire stripper; and, by setting a U-shaped splint and a spring pressure plate, the rack can be easily and quickly The wire guide is connected to the crossarm, saving time.

因此,与现有技术相比,本发明的优点在于: Therefore, compared with prior art, the advantage of the present invention is:

1)利用该架线器能够在进行导线剥皮操作时,代替作业人员的肩膀来承载导线重量,使得原先作业人员肩膀承受的重量从35KG降低为0KG。2)能够将导线剥皮的时间从5分钟降低为2分钟。3)在剥皮时能够有效防止导线由于风、导线自重等因素令导线滑动、扭动而导致对线芯损伤的影响,使用本发明后导线能够在绝对稳定的状态下进行剥皮,从而极大地降低损伤线芯的可能性,将剥皮合格率从95%提升为100%。 1) Using this wire erector can replace the shoulders of the operator to bear the weight of the wire during the wire stripping operation, so that the weight on the shoulders of the original operator is reduced from 35KG to 0KG. 2) Ability to reduce wire stripping time from 5 minutes to 2 minutes. 3) When peeling, it can effectively prevent the wire core from being damaged by sliding and twisting due to factors such as wind and wire weight. After using the invention, the wire can be peeled in an absolutely stable state, thereby greatly reducing The possibility of damaging the core increases the stripping pass rate from 95% to 100%.

另外,本发明所述架线器的制作材料都是架空线路上的常用材料,牢固耐用,仅需要一次性投入,且制作成本低;本发明能够减轻杆上作业劳动量,大大降低劳动强度,加快施工进度和施工效率,而工人节省下来的时间可以投入其他生产工作,增加效益。 In addition, the manufacturing materials of the wire-setter described in the present invention are commonly used materials on overhead lines, are firm and durable, only need a one-time investment, and have low manufacturing cost; The construction progress and construction efficiency are accelerated, and the time saved by workers can be invested in other production work to increase efficiency.

附图说明 Description of drawings

图1是本发明所述绝缘导线架线器在第一实施例中的结构示意图; Fig. 1 is a schematic structural view of the first embodiment of the insulated conductor wire hanger of the present invention;

图2是本发明所述绝缘导线架线器在第二实施例中的结构示意图。 Fig. 2 is a schematic structural view of the second embodiment of the insulated conductor wire hanger of the present invention.

具体实施方式 detailed description

以下根据附图1和2介绍本发明的多个具体实施方式。 A number of specific embodiments of the present invention will be described below based on the accompanying drawings 1 and 2 .

如图1所示,本发明在第一实施例中提供的绝缘导线架线器,包含一个弓形(或弧形等类似形状)的底座10,在底座10两端分别设置的两个端点支撑柱20,在这两个端点支撑柱20顶部对应设置的两个U型的端点支撑座30,以及在所述底座10的底部中间穿过并朝着弓形外侧设置的支点固定柱40。通过该支点固定柱40将整个绝缘导线架线器可靠地固定连接在架空线杆的横担上。 As shown in Figure 1, the insulated conductor wire hanger provided in the first embodiment of the present invention includes a bow-shaped (or arc-shaped or similar shape) base 10, and two end point support columns respectively provided at both ends of the base 10 20 , two U-shaped end support seats 30 correspondingly arranged on top of the two end support columns 20 , and a fulcrum fixing column 40 passing through the middle of the bottom of the base 10 and arranged toward the outside of the arc. Through the fulcrum fixing column 40, the entire insulated conductor wire hanger is reliably fixed and connected to the cross arm of the overhead line pole.

制成所述绝缘导线架线器中各个部件的材料,可以是架空线杆上常用的,但必须结实耐用,能有较长的使用寿命;重量应当适中,既能够承载绝缘导线(以下或简称为导线)的重量,又可以便于杆上作业人员上下架空线杆时携带。 The materials used to make the various parts of the insulated conductor liner can be commonly used on overhead poles, but they must be durable and have a long service life; the weight should be moderate, and can carry insulated conductors (hereinafter referred to as It is the weight of the wire), and it can be easily carried by the operator on the pole when going up and down the overhead pole.

其中,所述底座10中弓形的主体,与该主体两个端点位置上的水平连接面,应当是通过一次成型制成的。当有导线被架设在两个U型的端点支撑座30上时,导线与该主体的弓形内侧应当仍然留有足够的间隙距离,以确保能够在导线上使用剥皮器进行旋转剥皮。 Wherein, the bow-shaped main body of the base 10 and the horizontal connection surfaces at the two end points of the main body should be formed through one-time molding. When a wire is erected on the two U-shaped end support seats 30, there should still be enough clearance distance between the wire and the arcuate inner side of the main body, so as to ensure that a stripper can be used on the wire to perform rotary stripping.

固定安装在主体两端水平连接面上的所述端点支撑柱20,能够有效增加旋转半径,以适应剥线器剥皮时对于转动空间的需要。因此,需要对所述底座10主体的弯曲程度(表现为主体的半径),以及两个端点支撑柱20的长度进行设计,以满足使用剥线器时的旋转半径要求。 The end support columns 20 fixedly installed on the horizontal connection surfaces at both ends of the main body can effectively increase the radius of rotation to meet the need for rotation space when the wire stripper strips. Therefore, it is necessary to design the bending degree of the main body of the base 10 (expressed as the radius of the main body) and the lengths of the two end support columns 20 to meet the requirement of the rotation radius when using the wire stripper.

在一个优选的实施结构中,可以将一个铝合金的电缆抱箍作为上述的底座10使用,两个端点支撑柱20用第一种长度的螺丝(第一螺丝、第二螺丝)构成,所述支点固定柱40则用另一种长度的螺丝(第三螺丝)来构成。 In a preferred implementation structure, an aluminum alloy cable hoop can be used as the above-mentioned base 10, and the two end support columns 20 are formed by screws of a first type of length (first screws, second screws), the The fulcrum fixing column 40 is formed by another length of screw (the third screw).

进一步优选的参数示例如下,即,考虑到对导线剥皮位置的准确定位并保证剥皮长度符合标准,使用直径为205mm(图1中示出为半径102.5mm)的抱箍,可供剥皮的导线长度为155mm。并且,由于剥皮作业时,是通过旋转剥皮器来实现绝缘导线的剥皮,这就要求剥皮器的旋转半径必须大于剥皮器的半径,即大于100mm,而穿过抱箍两端的第一螺丝、第二螺丝的长度就基本决定了剥皮器的旋转半径,例如可以使用长度为110mm的螺丝。作为支点固定柱40使用的第三螺丝则可以使用长度为50mm的螺丝。另外,设置有相应数量的螺帽,与这些螺丝配合使用实行固定连接,螺帽的直径可以为16mm。 Examples of further preferred parameters are as follows, that is, considering the accurate positioning of the wire stripping position and ensuring that the stripping length meets the standard, using a hoop with a diameter of 205mm (shown as a radius of 102.5mm in Figure 1), the length of the wire available for stripping is 155mm. Moreover, since the peeling operation is to realize the peeling of the insulated wire by rotating the stripper, this requires that the radius of rotation of the stripper must be greater than the radius of the stripper, that is, greater than 100mm, and the first screw and the second screw that pass through both ends of the hoop The length of the second screw basically determines the rotation radius of the peeler, for example, a screw with a length of 110mm can be used. The third screw used as the fulcrum fixing column 40 can use a screw with a length of 50 mm. In addition, a corresponding number of nuts are provided, which are used in conjunction with these screws to implement fixed connection, and the diameter of the nuts can be 16 mm.

如图2所示,本发明在第二实施例中提供的绝缘导线架线器,也包含一个弓形(或弧形等类似形状)的底座10,和在底座10两端分别设置的两个端点支撑柱20。与上述实施例中不同的是,本实施例中其中一个端点支撑柱20顶部设置有U型的端点支撑座30,另一个端点支撑柱20顶部则设置为线缆夹具50。另外,本实施例中还在底座10的底部中间朝着弓形外侧设置有U型夹板41和弹簧压板42。 As shown in Figure 2, the insulated conductor threader provided in the second embodiment of the present invention also includes a bow-shaped (or arc-shaped or similar shape) base 10, and two endpoints respectively provided at both ends of the base 10 Support column 20. Different from the above-mentioned embodiments, in this embodiment, a U-shaped end support seat 30 is arranged on the top of one of the end support columns 20 , and a cable clamp 50 is arranged on the top of the other end support column 20 . In addition, in this embodiment, a U-shaped splint 41 and a spring pressing plate 42 are also provided in the middle of the bottom of the base 10 toward the outer side of the arc.

其中,所述底座10和端点支撑柱20的大致结构、材料、参数等都可以参见第一实施例中的描述。例如优选使用一种铝合金的抱箍作为底座10。优选的,可以设置两个空心铝柱作为端点支撑柱20,固定连接在底座10两端的水平连接面上;并且,在每个端点支撑柱20的顶部还设置有法兰盘21,用于分别固定连接本实施例中所述U型的端点支撑座30和所述线缆夹具50。 Wherein, the general structure, materials, parameters, etc. of the base 10 and the end support column 20 can refer to the description in the first embodiment. For example, an aluminum alloy clamp is preferably used as the base 10 . Preferably, two hollow aluminum columns can be set as the terminal support columns 20, which are fixedly connected to the horizontal connection surfaces at both ends of the base 10; and, a flange 21 is also provided on the top of each terminal support column 20 for respectively The U-shaped terminal support base 30 and the cable clamp 50 in this embodiment are fixedly connected.

所述线缆夹具50分为两个部分(例如是上下两个部分,或者是左右两个部分等等),这两个部分的接触面之间留有空隙,绝缘导线的一端能够穿入到线缆夹具50的该空隙内,并且使得该导线的另一端能够架设在U型的端点支撑座30上。优选的,端点支撑座30的U型缺口与线缆夹具50的空隙是在同一水平位置上相对布置的。在所述线缆夹具50上还进一步设置有梅花螺栓51,通过拧紧梅花螺栓51,令其产生足够的摩擦力,能够将两个部分快速锁紧,从而使其中的导线处于绝对的稳定和紧固状态,因此,在进行剥皮作业时,导线将不会随着剥线器的转动而转动。当然,本发明并不限定在其他的实施结构(图中未示出)中,将导线的两端都使用线缆夹具进行紧固。 The cable clamp 50 is divided into two parts (for example, upper and lower parts, or left and right parts, etc.), there is a gap between the contact surfaces of these two parts, and one end of the insulated wire can penetrate into the The gap of the cable clamp 50 allows the other end of the wire to be mounted on the U-shaped terminal support 30 . Preferably, the U-shaped notch of the terminal support seat 30 and the gap of the cable clamp 50 are arranged opposite to each other at the same horizontal position. Torx bolts 51 are further arranged on the cable clamp 50. By tightening the torx bolts 51, enough friction can be generated to quickly lock the two parts, so that the wires therein are absolutely stable and tight. solid state, so that the wire will not rotate with the rotation of the stripper during the stripping operation. Of course, the present invention is not limited to other implementation structures (not shown in the figure), where both ends of the wire are fastened with cable clamps.

另外,为了能够将整个绝缘导线架线器方便快捷地固定安装到横担上,以节约操作时间,本实施例中特别设置了所述的U型夹板41。该U型夹板41的开口是水平布置的,在开口中间嵌有所述的弹簧压板42。则,能够将U型夹板41嵌入横担,并通过弹簧压板42夹紧,达到对绝缘导线架线器的固定作用。 In addition, the U-shaped splint 41 is specially provided in this embodiment in order to conveniently and quickly fix and install the entire insulated conductor wire hanger on the cross arm to save operation time. The opening of the U-shaped clamping plate 41 is arranged horizontally, and the above-mentioned spring pressing plate 42 is embedded in the middle of the opening. Then, the U-shaped splint 41 can be embedded into the cross arm, and clamped by the spring pressing plate 42, so as to achieve the fixing effect on the insulated wire liner.

尽管本发明的内容已经通过上述优选实施例作了详细介绍,但应当认识到上述的描述不应被认为是对本发明的限制。在本领域技术人员阅读了上述内容后,对于本发明的多种修改和替代都将是显而易见的。因此,本发明的保护范围应由所附的权利要求来限定。 Although the content of the present invention has been described in detail through the above preferred embodiments, it should be understood that the above description should not be considered as limiting the present invention. Various modifications and alterations to the present invention will become apparent to those skilled in the art upon reading the above disclosure. Therefore, the protection scope of the present invention should be defined by the appended claims.

Claims (5)

1. an insulated conductor supporter, when carrying out peeling to insulated conductor in order to be fixed insulated conductor, is characterized in that, described supporter comprise be connected with lower component:
A base (10), its horizontal connecting surface comprising integrated bending main body further and lay respectively at these main body two ends;
Two end points support columns (20), are fixedly connected on two described horizontal connecting surfaces of base (10) respectively;
A cable clamp (50), is fixedly connected on the horizontal connecting surface of end points support column (20) described in one of them, waits for that one end of the insulated conductor of peeling can be fastening by this cable clamp (50);
An end points supporting seat (30), is fixedly connected on the horizontal connecting surface of end points support column (20) described in another, and the other end of described insulated conductor can be erected in the U-shaped breach on described end points supporting seat (30);
U-shaped clamping plate (41), are arranged on the bottom outside of described base (10) main body, are connected on the cross-arm of overhead line poles in order to described supporter to be embedded;
Spring bearer plate (42), is embedded in the opening of the upper horizontal arrangement of described U-shaped clamping plate (41), in order to be undertaken fastening by U-shaped clamping plate (41) and cross-arm;
Described cable clamp (50) is divided into two parts, leaves space between the contact-making surface of these two parts, makes insulated conductor penetrate in described space; The U-shaped breach of described end points supporting seat (30) and the space of cable clamp (50) are positioned opposite on same level position.
2. insulated conductor supporter as claimed in claim 1, is characterized in that,
The radius value of described base (10) main body and the length of described end points support column (20) and be worth, radius of turn when carrying out rotary peeling with wire stripper on insulated conductor matches.
3. insulated conductor supporter as claimed in claim 1, is characterized in that,
Described base (10) is the cable anchor ear of an aluminium alloy.
4. insulated conductor supporter as claimed in claim 1, is characterized in that,
Two described end points support columns (20) are two hollow aluminum posts, and its top is provided with ring flange (21) separately, in order to connect described end points supporting seat (30) and described cable clamp (50) respectively.
5. insulated conductor supporter as claimed in claim 1, is characterized in that,
Described cable clamp (50) is also provided with plum blossom bolt (51) further, in order to two of described cable clamp (50) parts are locked, and then the insulated conductor penetrated in described space is carried out fastening.
CN201310107009.8A 2013-03-29 2013-03-29 Insulated conductor supporter Active CN103208757B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310107009.8A CN103208757B (en) 2013-03-29 2013-03-29 Insulated conductor supporter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310107009.8A CN103208757B (en) 2013-03-29 2013-03-29 Insulated conductor supporter

Publications (2)

Publication Number Publication Date
CN103208757A CN103208757A (en) 2013-07-17
CN103208757B true CN103208757B (en) 2016-04-27

Family

ID=48755892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310107009.8A Active CN103208757B (en) 2013-03-29 2013-03-29 Insulated conductor supporter

Country Status (1)

Country Link
CN (1) CN103208757B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104682273A (en) * 2013-12-02 2015-06-03 哈尔滨智木科技有限公司 Wire stripper
CN104037675A (en) * 2014-06-12 2014-09-10 国家电网公司 Tower operation insulation wire outer insulation layer stripping support
CN105610091B (en) * 2016-02-26 2017-06-09 国网山东省电力公司章丘市供电公司 A kind of stringing support meanss
CN106531427A (en) * 2016-12-02 2017-03-22 聊城市光明电力服务有限责任公司 Lower lead assembly platform

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201188519Y (en) * 2008-04-29 2009-01-28 济南供电公司 Special support for maintaining 10KV overhead line
CN203193185U (en) * 2013-03-29 2013-09-11 国家电网公司 Insulated Wire Rack

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008278602A (en) * 2007-04-26 2008-11-13 Chugoku Electric Power Co Inc:The Method for steel tower reconstruction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201188519Y (en) * 2008-04-29 2009-01-28 济南供电公司 Special support for maintaining 10KV overhead line
CN203193185U (en) * 2013-03-29 2013-09-11 国家电网公司 Insulated Wire Rack

Also Published As

Publication number Publication date
CN103208757A (en) 2013-07-17

Similar Documents

Publication Publication Date Title
CN103208757B (en) Insulated conductor supporter
CN107706871A (en) Overhead distribution
CN102842870A (en) Novel insulating lead wire fixing bracket
CN203541929U (en) Adjustable hoop welding tool
CN105514877A (en) Cross arm clamp for insulator replacement of steel pipe pole of common-tower double-circuit lines
CN104991093A (en) Cable test splicing fitting
CN203193185U (en) Insulated Wire Rack
US9117574B2 (en) Adjustable double insulator cover for electrical distribution systems
CN204516510U (en) an insulator
CN207052381U (en) A kind of insulator being used in electric line
CN111554459A (en) Insulating power line double-tight lightning protection insulator with electroscopic grounding ring
CN111477418A (en) Fast assembly insulator
CN203193199U (en) Auxiliary wire setter for stripping insulated wires
CN204905757U (en) Tightly, take out stitches and use coaster
CN104810119B (en) A kind of insulator
CN204333778U (en) Replacing the 110kV tension single-string insulator back-up protection jig
CN206640269U (en) The conductor grip being fixed on insulator
CN218633723U (en) A transformer rectifier conductor fixing hardware
CN206619447U (en) A kind of butterfly ceramic insulator being easily installed
CN209250178U (en) An anti-off wire clip with live function
CN209496670U (en) Portable Post Insulator Wire Fixing Clip
CN205389093U (en) Fastener for bunched cable
CN204720262U (en) A kind of line insulator
CN104393428B (en) A kind of split conductor wire clamp gold utensil and a wire clamp thereof
CN204516511U (en) A kind of insulator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant