[go: up one dir, main page]

CN103306289B - Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof - Google Patents

Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof Download PDF

Info

Publication number
CN103306289B
CN103306289B CN201310273491.2A CN201310273491A CN103306289B CN 103306289 B CN103306289 B CN 103306289B CN 201310273491 A CN201310273491 A CN 201310273491A CN 103306289 B CN103306289 B CN 103306289B
Authority
CN
China
Prior art keywords
anchor
pile
slope protection
concrete
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310273491.2A
Other languages
Chinese (zh)
Other versions
CN103306289A (en
Inventor
孙海友
王钰
张立国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201310273491.2A priority Critical patent/CN103306289B/en
Publication of CN103306289A publication Critical patent/CN103306289A/en
Application granted granted Critical
Publication of CN103306289B publication Critical patent/CN103306289B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to the field of adjacent subsurface structure foundation pits construction, particularly to a foundation pit piled anchor dado concrete anchor cable top beam structure and a construction method thereof. The foundation pit piled anchor dado concrete anchor cable top beam structure is characterized by comprising slope protection piles, top beams, anchor cables and coupling beams and is an integral reinforced concrete structure comprising two rows of slope protection piles, wherein the two rows of slope protection piles arranged at intervals are arranged on two the side walls of two foundation pits respectively; a pre-stressed anchor is arranged between every two adjacent slope protection piles; waist rails used for reinforcement are arranged between the two rows of slope protection piles; pile heads at the top of each row of slope protection piles are connected together through the top beams made of reinforced concretes; the top beams on the slope protection piles in the foundation pits are connected through the coupling beams; the anchor cables are arranged in the coupling beams; the two ends of the anchor cables are connected with the top beams through base plates and anchorage devices. Compared with the prior art, the foundation pit piled anchor dado concrete anchor cable top beam structure has the following advantages: as the two rows of slope protection piles form a steady and firm slope protection system through the anchor cables, the safety of a soil body between two structures is ensured, the construction working plane and transport corridor are increased, the excavated volume and backfill volume are reduced, the construction period is greatly shortened, and the cost is reduced.

Description

Pit pile anchor breast wall concrete anchor cable hat girder construction and construction method thereof
Technical field
The present invention relates to adjacent underground structure foundation pit construction field, particularly relate to a kind of pit pile anchor breast wall concrete anchor cable hat girder construction and construction method thereof.
Background technology
At present in the civil engineering of underground structure, time between adjacent 20 ~ 30 meters of two underground structures, need to process the earthwork between two underground structure foundation ditches, wherein a kind of method is all excavated by soil between structure, complete Deng Underground Construction, backfilled, its defect is the reduction of operation side again, adds amount of excavation and vertical transport cost.
Another kind method adopts pile anchor breast wall structure, inter-pile soil between lagging pile does some roads prestressing force shank, together with by horizontal waist rail prestressing force shank being anchored at slope protection pile, its defect is: when part is as vehicle transport and placing of material ground between using structure, be difficult to ensure side slope safety, area between structure cannot be effectively utilized.
Summary of the invention
The object of this invention is to provide a kind of pit pile anchor breast wall concrete anchor cable hat girder construction and construction method thereof, do not excavate the earthwork between two underground structures, and the safety ensureing as placing of material place and vehicle transport passage, increase operation side and transport of materials facility, reduce the earthwork and dig freight volume and construction sequence, shorten the construction period.
For achieving the above object, the present invention adopts following technical scheme to realize:
Pit pile anchor breast wall concrete anchor cable hat girder construction, comprise slope protection pile, Guan Liang, anchor cable and coupling beam, this is the integral reinforced concrete structure formed by two row's slope protection pile, the spaced slope protection pile of a row is respectively provided with at the adjacent wall of two foundation ditches, prestressed anchor is provided with between the stake of adjacent slope protection pile, the waist rail reinforced is provided with between the stake of often arranging slope protection pile, the pile crown often arranging slope protection pile top is linked into an integrated entity by the Guan Liang of steel concrete, Guan Liang in two foundation pit slope protection stakes is connected by coupling beam, anchor cable is established in coupling beam, anchor cable two ends are connected with Guan Liang by backing plate beam ground tackle of coming of age, reinforced mesh is distributed with between slope protection pile.
Be provided with in described reinforced mesh by the cross-coupled horizontal bar of rinforcement bar and vertical muscle.
Described prestressed anchor is the one in prestress wire, solid anchor pole, hollow expansion type rock bolt or hollow grouting anchor.
Described slope protection pile is reinforced concrete revetment pile, immersed tube bored slope protection pile, the one stirred in slope protection pile, borehole slope protection pile or mechanical hole building slope protection pile.
Described waist rail can be steel wale, also can be reinforced concrete waist rail.
The construction method of described pit pile anchor breast wall concrete anchor cable hat girder construction, its Specific construction step is:
1) at predetermined two foundation pit side-wall inner sides, respective interval construction one row concrete revetment pile;
2) after slope protection pile intensity reaches 75% requirement, dig out the earthwork of slope protection pile pile crown part in time, 100 ~ 150mm to coupling beam elevation of bottom is dug in the earthwork;
3) water C10 concrete cushion, abolish pile crown concrete;
4) hat beam center line is ejected, i.e. slope protection pile center line;
5) reinforcing bar of fabrication and installation Guan Liang;
6) pre-buried anchor cable steel sleeve, backing plate and PVC sleeve pipe;
7) model sheetinstallat is reinforced, cast Guan Liang and coupling beam concrete maintenance;
8) after hat beam strength reaches 80%, install hat beam anchor cable and start pit earthwork excavation, excavation is to the position of lagging pile anchor pole;
9) between slope protection pile, carry out prestressed anchor punching construction, smear sliding agent, and put PVC sleeve pipe for one section that before cast, prestressed anchor is run through waist rail, then carry out prestressed anchor, mortar depositing construction, slip casting is to sleeve pipe place;
10) cleaning of the inter-pile soil body at prestressed anchor position is rejected clean, the inter-pile soil body of the pile body of both sides slope protection pile and rejecting is cleaned out;
11) by beyond prestressed anchor grouting port to stake one section be coated with sliding agent, by cover have the prestressed anchor two ends of sleeve pipe to be inserted in anchor slab, within the scope of the inner side 100mm of anchor slab permanent position joint face outside slope protection pile;
12) assembling reinforcement mesh sheet outside anchor slab, fixing spilled water hole, sprayed mortar;
13) waist rail is installed, ground tackle between stake is installed, stretch-draw prestressing force anchor pole;
14), after completing waist rail, next step foundation ditch digging can be carried out.
Described hat beam minimum dimension is 1.2m × 0.7m, and hat beam concrete strength is not less than C30.
In described step 5), pile crown reinforcing bar stretches into Guan Liang and is no less than 650mm.
Described step 6) stream line steel sleeve diameter is 90 ~ 100mm, and be plain concrete between two hat beams, pre-buried PVC plastic pipe runs through coupling beam.
Compared with prior art, the invention has the beneficial effects as follows: 1) adopt hat beam anchor cable structure effectively to be reinforced by soil between two underground structures, firm bank protection system is formed by between two row's slope protection pile, ensure that soil body safety between structure, is cheap, safe and reliable, the simple and convenient easy hat beam construction technology of a kind of disposal cost.2) between two Adjacent Pits, the soil body can be used for operation side heap putting material and transport channel, decreases excavation of foundation pit amount and backfill amount, substantially reduces the construction period, simplify construction sequence, reduce cost, accelerate programming.
Accompanying drawing explanation
Fig. 1 is the plan view from above of the embodiment of the present invention;
Fig. 2 is along A-A line sectional view in Fig. 1;
Fig. 3 is along B-B line sectional view in Fig. 2;
Fig. 4 is the structural representation of reinforced mesh in the embodiment of the present invention;
Fig. 5 is prestressed anchor anchor structure schematic diagram between slope protection pile of the present invention;
Fig. 6 is the position relationship structural representation of reinforced mesh and anchor slab in the embodiment of the present invention;
Fig. 7 is the axial sectional view of Fig. 6;
Fig. 8 is Guan Liang in the embodiment of the present invention, slope protection pile and waist rail position elevational schematic view.
In figure: 1-is preced with beam 2-slope protection pile 3-coupling beam 4-backing plate 5-hat beam ground tackle 6-anchor cable 7-PVC sleeve pipe 8-support 9-prestressed anchor 10-anchor slab 11-rinforcement bar 12-horizontal bar 13-and indulges ground tackle 15-stake reinforcing bar 16-steel sleeve 17-waist rail between muscle 14-stake
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention one step is illustrated:
See Fig. 1, Fig. 2, Fig. 3, it is pit pile anchor breast wall concrete anchor cable of the present invention hat girder construction embodiment plan view from above, comprise hat beam 1, slope protection pile 2, anchor cable 6 and coupling beam 3, this is the integral reinforced concrete structure formed by two row's slope protection pile, the spaced slope protection pile 2 of a row is respectively provided with at two foundation pit side-walls, prestressed anchor 9 is provided with between the stake of adjacent slope protection pile 2, often arrange slope protection pile 2 stake between be provided with reinforce waist rail 17, the pile crown often arranging slope protection pile 2 top is linked into an integrated entity by the hat beam 1 of steel concrete, hat beam 1 in two foundation pit slope protection stakes is connected by coupling beam 3, anchor cable 6 is established in coupling beam 3, anchor cable 6 two ends by backing plate 4 come of age beam ground tackle 5 with hat beam 1 be connected, reinforced mesh is distributed with between slope protection pile 2.
See Fig. 4, be provided with by the cross-coupled horizontal bar of rinforcement bar 11 12 and vertical muscle 13 in reinforced mesh, vertical muscle 13 welds with stake reinforcing bar 15.
In embodiment, prestressed anchor is the one in prestress wire, solid anchor pole, hollow expansion type rock bolt or hollow grouting anchor.Slope protection pile is reinforced concrete revetment pile, immersed tube bored slope protection pile, the one stirred in slope protection pile, borehole slope protection pile or mechanical hole building slope protection pile.Waist rail 17 can be steel wale, also can be reinforced concrete waist rail.
The construction method of pit pile anchor breast wall concrete anchor cable hat girder construction of the present invention, its Specific construction step is:
1) correspondence position inside predetermined two foundation pit side-walls, respective interval construction one row concrete revetment pile 2;
2) after slope protection pile 2 intensity reaches 75% requirement, dig out the earthwork of slope protection pile 2 pile crown part in time, 100 ~ 150mm to coupling beam 3 elevation of bottom is dug in the earthwork;
3) water C10 concrete cushion, abolish pile crown concrete;
4) eject the center line of hat beam 1, i.e. slope protection pile center line, eject coupling beam center line;
5) see Fig. 5, the reinforcing bar of fabrication and installation hat beam 1, stake reinforcing bar 15 is extended down in hat beam 1;
6) the PVC sleeve pipe 7 in the steel sleeve 16 of pre-buried anchor cable 6, backing plate 4 and coupling beam, establish PVC sleeve pipe 7 in steel sleeve 16, steel sleeve 16 is carried on a shoulder pole on support 8, and the bottom surface of support 8 bottom surface and coupling beam 3 is contour;
7) model sheetinstallat is reinforced, cast hat beam 1 and coupling beam 3 concrete maintenance;
8) after hat beam 1 intensity reaches 80%, install anchor cable 6 and start pit earthwork excavation, excavation is to the position of anchor pole 9;
9) between slope protection pile 2, carry out prestressed anchor 9 to punch construction, pour into a mould and front a section of prestressed anchor 9 being run through waist rail 17 is smeared sliding agent, then prestressed anchor pole 9, mortar depositing construction, slip casting is to anchor slab 10 place;
10) cleaning of the inter-pile soil body at prestressed anchor 9 position is rejected clean, the inter-pile soil body of the pile body of both sides slope protection pile 2 and rejecting is cleaned out;
11) see Fig. 6, by beyond prestressed anchor 9 grouting port to stake one section be coated with sliding agent, by cover have prestressed anchor 9 two ends of sleeve pipe to be inserted in anchor slab 10, within the scope of the inner side 100mm of anchor slab 10 permanent position joint face outside slope protection pile;
12) see Fig. 7, the horizontal bar 12 of assembling reinforcement mesh sheet and vertical muscle 13 outside anchor slab 10, fixing spilled water hole, sprayed mortar, between stake, ground tackle 14 is positioned at the end of prestressed anchor 9;
13) see Fig. 8, install waist rail 17, install ground tackle between stake, stretch-draw prestressing force anchor pole, waist rail 17 is used for reinforcing the slope protection pile 2 below hat beam 1;
14), after completing waist rail, next step foundation ditch digging can be carried out.

Claims (4)

1. the construction method of a pit pile anchor breast wall concrete anchor cable hat girder construction, described pit pile anchor breast wall concrete anchor cable hat girder construction, comprise slope protection pile, Guan Liang, anchor cable and coupling beam, this is the integral reinforced concrete structure formed by two row's slope protection pile, the spaced slope protection pile of a row is respectively provided with at the adjacent wall of two foundation ditches, prestressed anchor is provided with between the stake of adjacent slope protection pile, the waist rail reinforced is provided with between the stake of often arranging slope protection pile, the pile crown often arranging slope protection pile top is linked into an integrated entity by the Guan Liang of steel concrete, Guan Liang in two foundation pit slope protection stakes is connected by coupling beam, anchor cable is established in coupling beam, anchor cable two ends are connected with Guan Liang by backing plate beam ground tackle of coming of age, reinforced mesh is distributed with between slope protection pile, it is characterized in that, the construction method of described pit pile anchor breast wall concrete anchor cable hat girder construction, Specific construction step is as follows:
1) at predetermined two foundation pit side-wall inner sides, respective interval construction one row concrete revetment pile;
2) after slope protection pile intensity reaches 75% requirement, dig out the earthwork of slope protection pile pile crown part in time, 100 ~ 150mm to coupling beam elevation of bottom is dug in the earthwork;
3) water C10 concrete cushion, abolish pile crown concrete;
4) hat beam center line is ejected, i.e. slope protection pile center line;
5) reinforcing bar of fabrication and installation Guan Liang;
6) pre-buried anchor cable steel sleeve, backing plate and PVC sleeve pipe;
7) model sheetinstallat is reinforced, cast Guan Liang and coupling beam concrete maintenance;
8) after hat beam strength reaches 80%, install hat beam anchor cable and start pit earthwork excavation, excavation is to the position of lagging pile anchor pole;
9) between slope protection pile, carry out prestressed anchor punching construction, smear sliding agent, and put PVC sleeve pipe for one section that before cast, prestressed anchor is run through waist rail, then carry out prestressed anchor, mortar depositing construction, slip casting is to sleeve pipe place;
10) cleaning of the inter-pile soil body at prestressed anchor position is rejected clean, the inter-pile soil body of the pile body of both sides slope protection pile and rejecting is cleaned out;
11) by beyond prestressed anchor grouting port to stake one section be coated with sliding agent, by cover have the prestressed anchor two ends of sleeve pipe to be inserted in anchor slab, within the scope of the inner side 100mm of anchor slab permanent position joint face outside slope protection pile;
12) assembling reinforcement mesh sheet outside anchor slab, fixing spilled water hole, sprayed mortar;
13) waist rail is installed, ground tackle between stake is installed, stretch-draw prestressing force anchor pole;
14), after completing waist rail, next step foundation ditch digging can be carried out.
2. pit pile anchor breast wall concrete anchor cable hat beam structure construction method according to claim 1, it is characterized in that, described hat beam minimum dimension is 1.2m × 0.7m, and hat beam concrete strength is not less than C30.
3. pit pile anchor breast wall concrete anchor cable hat beam structure construction method according to claim 1, is characterized in that, described step 5) in, pile crown reinforcing bar stretches into Guan Liang and is no less than 650mm.
4. pit pile anchor breast wall concrete anchor cable according to claim 1 hat beam structure construction method, is characterized in that, described step 6) stream line steel sleeve diameter is 90 ~ 100mm, be plain concrete between two hat beams, pre-buried PVC plastic pipe runs through coupling beam.
CN201310273491.2A 2013-06-28 2013-06-28 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof Active CN103306289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310273491.2A CN103306289B (en) 2013-06-28 2013-06-28 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310273491.2A CN103306289B (en) 2013-06-28 2013-06-28 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN103306289A CN103306289A (en) 2013-09-18
CN103306289B true CN103306289B (en) 2015-04-22

Family

ID=49131975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310273491.2A Active CN103306289B (en) 2013-06-28 2013-06-28 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN103306289B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821059A (en) * 2014-01-28 2014-05-28 中铁二院工程集团有限责任公司 Lateral restraining and reinforcing structure for stabilizing high-fill embankment with soft oil foundation built on bed rock
CN103850259B (en) * 2014-03-27 2016-04-27 宁波冶金勘察设计研究股份有限公司 The horizontal inner support at the capping beam absolute altitude place of foundation pit supporting system and construction method thereof
CN105714830B (en) * 2016-02-03 2017-09-26 华侨大学 It is a kind of to be used for the connecting plate of special-shaped double-row pile
CN105862878B (en) * 2016-05-30 2018-01-09 建研地基基础工程有限责任公司 A kind of support system of deep basal pit
CN106223344B (en) * 2016-07-26 2018-07-13 北京工业大学 A kind of ground line piled anchor frame foundation pit supporting method
CN106320348A (en) * 2016-08-30 2017-01-11 中建三局第建设工程有限责任公司 Opposite-pulling anchor cable supporting structure for adjacent deep foundation pits and construction method of opposite-pulling anchor cable supporting structure
CN108411926B (en) * 2018-03-29 2020-01-03 中冶成都勘察研究总院有限公司 Tensioning and locking method for anchor cable in pile
CN108487303B (en) * 2018-04-02 2020-05-15 山东建筑大学 Combined retaining wall of supporting pile and counterfort retaining wall and construction method
CN108797600A (en) * 2018-05-21 2018-11-13 青岛建集团有限公司 Miniature steel pipe pile prestressed anchor rope combination supporting construction method
CN110670599B (en) * 2019-09-09 2021-08-06 中冶交通建设集团有限公司 Hollow grouting prestressed anchor rod and construction method thereof
CN110924450B (en) * 2019-12-18 2021-06-01 湖北工业大学 Method for protecting existing viaduct friction pile in pit under foundation pit excavation condition
CN112431207A (en) * 2020-10-05 2021-03-02 欧阳春洲 Supporting device of adjacent foundation ditch dam body
CN114164837B (en) * 2021-07-27 2024-07-09 北京市机械施工集团有限公司 Reinforcing apparatus of stock steel waist rail, backing plate
CN113897973A (en) * 2021-11-02 2022-01-07 中建八局第四建设有限公司 Mutual-pulling type foundation pit support structure and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07150565A (en) * 1993-01-27 1995-06-13 Toyo Techno Kk Earth retaining construction method
JPH0796776B2 (en) * 1990-09-03 1995-10-18 鹿島建設株式会社 Yamadome method
CN101560770A (en) * 2008-04-15 2009-10-21 广东省六建集团有限公司 Novel deep building foundation pit supporting system
CN201746840U (en) * 2010-07-29 2011-02-16 林华国 Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling
CN201991009U (en) * 2011-01-12 2011-09-28 陕西建工集团第六建筑工程有限公司 Deep foundation pit shoring system using poured slope-supporting piles and anchor ropes
CN102383417A (en) * 2011-09-28 2012-03-21 马文旭 Combined framework pile
CN102535477A (en) * 2011-12-29 2012-07-04 中铁十六局集团北京轨道交通工程建设有限公司 Safety construction method for cutting off anchor cables of support of excavating foundation pit
CN102828518A (en) * 2012-09-17 2012-12-19 中国建筑第二工程局有限公司 Prestressed anchor cable anchoring structure of manual hole digging support pile and construction method thereof
CN203373753U (en) * 2013-06-28 2014-01-01 中国三冶集团有限公司第一建筑工程公司 Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0796776B2 (en) * 1990-09-03 1995-10-18 鹿島建設株式会社 Yamadome method
JPH07150565A (en) * 1993-01-27 1995-06-13 Toyo Techno Kk Earth retaining construction method
CN101560770A (en) * 2008-04-15 2009-10-21 广东省六建集团有限公司 Novel deep building foundation pit supporting system
CN201746840U (en) * 2010-07-29 2011-02-16 林华国 Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling
CN201991009U (en) * 2011-01-12 2011-09-28 陕西建工集团第六建筑工程有限公司 Deep foundation pit shoring system using poured slope-supporting piles and anchor ropes
CN102383417A (en) * 2011-09-28 2012-03-21 马文旭 Combined framework pile
CN102535477A (en) * 2011-12-29 2012-07-04 中铁十六局集团北京轨道交通工程建设有限公司 Safety construction method for cutting off anchor cables of support of excavating foundation pit
CN102828518A (en) * 2012-09-17 2012-12-19 中国建筑第二工程局有限公司 Prestressed anchor cable anchoring structure of manual hole digging support pile and construction method thereof
CN203373753U (en) * 2013-06-28 2014-01-01 中国三冶集团有限公司第一建筑工程公司 Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
广州邦华环球广场深基坑支护设计与分析;孙亮;《岩土工程学报》;20121109(第S期);第756-760页 *

Also Published As

Publication number Publication date
CN103306289A (en) 2013-09-18

Similar Documents

Publication Publication Date Title
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN108868778B (en) Non-excavation construction method for large underground structure
CN107905799B (en) Reinforced structure of high-speed rail tunnel bottom water passing karst cave and construction method thereof
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN106150506B (en) A kind of entrance open excavation section inverted side-wall construction method
CN101215834A (en) Construction Method of Outrigger Type Diaphragm Wall
CN103321246B (en) Construction Method of Foundation Pit Using Underground Diaphragm Wall
CN211144503U (en) High steep topography bridge tunnel meets section open cut tunnel and connects long structure
CN207017275U (en) Recyclable system of deep foundation pit support can be assembled
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN104264684B (en) A kind of prefabricated abnormity stake and construction method thereof on an empty stomach for deep foundation pit supporting structure
CN203373753U (en) Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches
CN212427155U (en) Tongue-and-groove type prefabricated underground continuous wall structure
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN104196036A (en) Foundation pit supporting structure and method based on old underground outdoor wall structure
CN217204150U (en) Be used for prosthetic stake anchor wall combination reinforced structure of mine maintenance road
CN110616719A (en) Quick construction method for U-shaped groove of upper-span existing culvert
CN215165652U (en) A support structure for the foundation pit of a pipe jacking working well in a pipe gallery
CN218373887U (en) Unloading type combined retaining structure
CN105986830A (en) Underground-excavation building method for roadside strip-shaped underground garage
CN205636749U (en) A excavation supporting system for sandy gravel boulder geological stratification

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 114000 ANSHAN, LIAONING PROVINCE TO: 114039 ANSHAN, LIAONING PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140723

Address after: 114039 Anshan province Liaoning City Mountain Road No. 105 building materials

Applicant after: CHINA THREE METALLURGICAL GROUP CO., LTD.

Address before: 114000 Anshan province Liaoning City Tiedong Gangcheng Street No. 79

Applicant before: The First Construction Engineering Co.,Ltd.,China Third Metallurgical Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant