[go: up one dir, main page]

CN103407554B - The ship type of semisubmersible pipe laying crane ship - Google Patents

The ship type of semisubmersible pipe laying crane ship Download PDF

Info

Publication number
CN103407554B
CN103407554B CN201310363288.4A CN201310363288A CN103407554B CN 103407554 B CN103407554 B CN 103407554B CN 201310363288 A CN201310363288 A CN 201310363288A CN 103407554 B CN103407554 B CN 103407554B
Authority
CN
China
Prior art keywords
ship
main body
pipe laying
main
semisubmersible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310363288.4A
Other languages
Chinese (zh)
Other versions
CN103407554A (en
Inventor
钟文军
杨辉
刘波
陈�峰
张永发
张大鹏
杨亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cnooc Shenzhen Ocean Engineering Technology Service Co ltd
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201310363288.4A priority Critical patent/CN103407554B/en
Publication of CN103407554A publication Critical patent/CN103407554A/en
Application granted granted Critical
Publication of CN103407554B publication Critical patent/CN103407554B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)
  • Earth Drilling (AREA)

Abstract

A ship type for semisubmersible pipe laying crane ship, is provided with: main body, on the main deck of this main body, is furnished with two main hoisting cranes, in the ship in the operating radius of main hoisting crane in region, is provided with a moon pool, in this moon pool, is furnished with a J type pipe laying tower; Ballast tank is provided with about the bottom of main body; The ship meta of main body has installed laying work line, and laying work line bilateral symmetry is furnished with storage area under control, and stem lateral arrangement has life building; All-direction propeller, stem side propeller in several ship stern propelling unit, ship the lower buoyancy aid of main body be equipped with.The present invention is provided with one for installing the moon pool structure of J type pipe laying tower in the main loop wheel machine operating radius of hull, not only effectively improve the operating efficiency of semisubmersible pipe laying crane ship, and, also improve safety performance and the overall economic efficiency of semisubmersible pipe laying crane ship.<!--1-->

Description

The ship type of semisubmersible pipe laying crane ship
Technical field
The present invention relates to pipe laying crane ship, particularly relate to a kind of with moon pool, the ship type of the semisubmersible pipe laying crane ship that is suitable for deepwater work.Belong to ocean engineering field.
Background technology
Offshore oil and gas field is developed, and be unable to do without the handling installation of Large marine equipment and the laying of seabed delivery duct.Pipe laying crane ship as important equipment indispensable in the development process of marine oil gas field, it not only the lifting of the large part such as applicable offshore oil platform upper module and the auxiliary time water of dismounting, jacket and in place, also can be used for installing under water and the operation such as laying, maintenance of sea-bottom oil-gas pipeline.
Along with China's offshore oil and gas field exploitation moves towards deep water from shallow water, large-sized deep water pipe laying crane ship becomes the emphasis of research day by day.
At present, the ship type that deep water pipe laying crane ship adopts has: conventional monomeric ship and semisubmersible two kinds of ship types, pipe laying mode is mainly divided into: S type pipe laying and J type pipe laying two kinds of modes.Because semisubmersible ship type is in rough water quality and accessible load-carrying ability etc., comparatively conventional monomeric gear has obvious advantage, simultaneously, J type pipe laying mode is compared with S type pipe laying mode, with the obvious advantage in dynamic positioning demand and pipeline unrelieved stress etc., therefore, the lifting laying work in the severe marine site of deepwater environment, more and more trends towards adopting semisubmersible J type pipelaying vessel ship type.
Existing deep water semi-submersible J type pipe laying crane ship, is generally furnished with two main hoisting cranes of large-tonnage on the quarter, and the position be arranged on pipe laying crane ship by the pylon of J type pipe laying system is different, has following three kinds of arrangements:
1) pylon is arranged between the main loop wheel machine of pipe laying crane ship stern, send guard system to arrange along pipe laying crane ship captain direction;
The pylon of this kind of mode is arranged in main loop wheel machine operating range, and self loop wheel machine can be utilized to carry out lifting, the dismounting of pylon.But because pylon is between two main loop wheel machines, the yardstick of J type tower is limited to the spacing of hoisting crane, and meanwhile, pylon again limit the degreeof turn of hoisting crane, and both interfere each other.Therefore, when carrying out hoisting operation, pylon need be removed.This just causes the conversion cannot carrying out operation function between pylon and hoisting crane in shorter time gap.In addition, because the pylons of nearly 4000 tons heavy are located between two main loop wheel machines, make the weight of pipe laying crane ship stern more concentrated, be unfavorable for floading condition balance and Structural Strength Design;
2) pylon is arranged in the topside of pipe laying crane ship, and upper guard system is longitudinally arranged, pipeline is along pipe laying crane ship cross direction horizontal feed;
The deck working area degree of utilization of this kind of mode is higher, and J type laying work line does not affect original layout of deck plane, generally, compares the transformation of the ship type be suitable for existing pipe laying crane ship.Its major defect is: because J type laying work line is located at the hull side of pipe laying crane ship, and this just forms very large heeling moment to pipe laying crane ship, therefore, needs to balance by horizontal ballast, thus, unfavorable to pipe laying lifting hull stability; And because rotor inertia is left-right asymmetry, pipe laying crane ship is cross motion poor-performing in wave.In addition, because pipe laying masterpiece is used in the topside of pipe laying crane ship, add extra turn first moment, make when laying work, dynamic positioning and the thrust of moving spent by ship of pipe laying crane ship will increase greatly.And, when from boat navigation, steady course is handled and brings certain difficulty;
3) pylon is arranged in the middle part of stem, and laying work line is longitudinally arranged;
In this kind of mode, the weight being positioned at pipe laying crane ship stem pylon can partial balancing stern hoisting crane weight, is conducive to floading condition balance.But, because pylon is not located in the operating radius of the main hoisting crane of ship stern, therefore, this kind of pipe laying crane ship cannot rely on equipment of itself to carry out dismounting to pylon, and under the operating mode of navigating by water and meet storm, the safety of its towering pylon to stability and structure itself is unfavorable; Meanwhile, the navigation of band pylon, also can produce certain impact to the navigation visual field, thus, need to arrange extra tower cupola; Meanwhile, for the installation of the annexes such as subsea pipeline-end (PLET), certain difficulty is brought; In addition, because operating line is positioned at the ship midship of pipe laying crane ship, therefore, be positioned at the life building of stem, will be separated into two parts in left and right, the contact of the personnel of giving and escape are brought adverse influence by this.
Summary of the invention
Main purpose of the present invention is the above-mentioned shortcoming overcoming prior art existence, and a kind of ship type of semisubmersible pipe laying crane ship is provided, it is provided with one for installing the moon pool structure of J type pipe laying tower in the main loop wheel machine operating radius of hull, not only effectively improve the operating efficiency of semisubmersible pipe laying crane ship, and, also improve safety performance and the overall economic efficiency of semisubmersible pipe laying crane ship.
The object of the invention is to be realized by following technical scheme:
A ship type for semisubmersible pipe laying crane ship, is provided with: main body, it is characterized in that: on the main deck of this main body, be furnished with two main hoisting cranes, in the ship in the operating radius of main hoisting crane in region, be provided with a moon pool, in this moon pool, be furnished with a J type pipe laying tower.
Described main body is made up of lower buoyancy aid, the several first column be arranged on lower buoyancy aid, several tail column, several B-pillar and the upper mounting plate be arranged on first column, tail column, B-pillar, is provided with ballast tank about the bottom of this main body; Be provided with bottom stull between this several first column, tail column and B-pillar, this upper mounting plate is provided with main deck; The ship meta of main body has installed laying work line, and laying work line bilateral symmetry is furnished with storage area under control, and stem lateral arrangement has life building; All-direction propeller, stem side propeller in several ship stern propelling unit, ship the lower buoyancy aid of main body be equipped with.
Pipeline in described storage area under control is through being located at axial transport roller on main body and phloem-xylem transport roller carries out pipeline transportation, pipeline is after being located at and main body checks operation post, maintenance activity station, groove station, end, be transported in main body through horizontal fortune pipe operating line again, and be transported to J type pipe laying tower through upper pipe arm and carry out pipelaying.
The topside of described main body is provided with the little loop wheel machine of pipe.
Beneficial effect of the present invention:
(1) self loop wheel machine can be utilized easily to carry out installing to pylon and remove, thus, achieve in shorter time gap, carry out the conversion of operation function, effectively improve operating efficiency and safety performance;
(2) the impact of the width of pylon not acceptor's loop wheel machine spacing, can suitably do wider, thus, improve the ability that the annexes such as subsea pipeline-end (PLET) are transferred; Set moon pool also can be used for under-water robot (ROV), the transferring of pipeline end manifold (PLEM), and has enriched the function of this ship further;
(3) life building entirety is transversely arranged on bow, and be conducive to personnel and concentrate and escape, meanwhile, living quarters and operating area obtain separates effectively, and the navigation visual field can not be subject to the impact of J type pipe laying tower;
(4) pylon and laying work line are arranged in ship, and hull weight is substantially symmetrical, avoid operating line and are arranged in side, many drawbacks such as the rotor inertia brought is asymmetric;
(5) on captain direction, pylon of the present invention is arranged in the postmedian of hull, effectively alleviates pylon and is arranged in that ship stern causes with problem that is loop wheel machine weight undue concentration.
Visible, the present invention breaches many limitations of traditional pipe laying crane ship, has enriched boats and ships function, effectively improves the operating efficiency of semisubmersible J type pipe laying crane ship, safety performance and overall economic efficiency.
Accompanying drawing explanation
Fig. 1 is side-looking structural representation of the present invention.
Fig. 2 is plan structure schematic diagram of the present invention.
Fig. 3 is bow structure schematic diagram of the present invention.
Major label description in figure:
1. descend buoyancy aid, 2. first column, 3. upper mounting plate, 4. life building, 5. go up pipe arm, 6. angle demodulator, 7.J type pipe laying tower, 8. hoisting crane, 9. tail column, 10. stern propelling unit, 11. all-direction propellers, 12. B-pillars, 13. bow side propelling units, 14. rest arms, 15. storage areas under control, 16. fortune pipe purlin cars, 17. laterally transport pipe roller, 18. moon pools, 19. longitudinally transport pipe roller, 20. little loop wheel machines, 21. maintenance activity stations, 22. inspection operation posts, 23. laterally transport pipe operating line, 24. groove station, ends, 25. central longitudinal are to fortune pipe roller, 26. life boat, 27. stulls.
Detailed description of the invention
As shown in Figure 1, ship type of the present invention is provided with: main body, main body is made up of lower buoyancy aid 1, the several first column 2 be arranged on lower buoyancy aid 1, several tail column 9, several B-pillar 12 and the upper mounting plate 3 be arranged on first column 2, tail column 9, B-pillar 12, is provided with ballast tank about the bottom of above-mentioned main body; Bottom stull 27 is provided with between above-mentioned several first column 2, tail column 9 and B-pillar 12, this stull 27 is except the effect playing anatomical connectivity, also can be used for being arranged on the connection poling of the ballast tank about main body, thus, play convenient left and right and adjust the effect of carrying and optimizing with ballast line; Upper mounting plate 3 is provided with main deck, and the ship meta of main body has installed laying work line.
On the main deck of the upper mounting plate 3 of main body stern, be furnished with two main hoisting cranes 8, for offshore lifting, in the ship in the operating radius of main hoisting crane 8 in region, be provided with a moon pool 18, in moon pool 18, be furnished with J type pipe laying tower 7, a J type pipe laying tower 7 and adjust angle of inclination by angle demodulator 6, storage area under control 15 is arranged symmetrically in the laying work line both sides being arranged in ship, stem lateral arrangement has life building 4, life building 4 periphery life boat 26.
The present invention is mainly used in the lifting of marine large structure and the laying of deep water J type pipeline, is divided into running working condition, laying work operating mode, hoisting operation operating mode and storm from depositing operating mode.Adjust main body by ballast water and be in different drinking water, to adapt to different operating modes.During navigation, lower buoyancy aid 1 surfaces, to obtain preferably resistance performance.Under operation and storm condition, main body is adjusted to partially surfaced condition by ballast water, can obtain preferably seakeeping performance.
The lower buoyancy aid 1 of main body is equipped with multiple propelling unit such as all-direction propeller 11, stem side propeller 13 in several ship stern propelling unit 10, ship with meet from boat and operation time dynamic positioning needs.
When laying work, hoisting crane 8 is placed on the rest arm 14 of upper mounting plate 3 main deck.Main body can self-contained section of tubing, and carries out pipeline supply by carrier, and pipeline supply is realized by the little loop wheel machine 20 of upper pipe being located at topside.Pipeline is deposited in storage area under control 15, this area top arranges fortune pipe purlin car 16 and adjusts for pipeline stockyard, pipeline in storage area under control 15 is through being located at axial transport roller 17 on main body and phloem-xylem transport roller 19 carries out pipeline transportation, pipeline is after being located at and main body checks the operations such as operation post 22, maintenance activity station 21, groove station, end 24, be transported in the middle part of main body through laterally transporting pipe operating line 23 again, and to fortune pipe roller 25, pipeline is sent to upper pipe arm 5 through central longitudinal, and finally through upper pipe arm 5, pipeline being transported to J type pipe laying tower 7 carries out pipelaying.The moon pool 18 at J type pipe laying tower 7 place also can be used for under-water robot (ROV), the transferring of pipeline end manifold (PLEM).
During non-laying work, by the hoisting crane 8 of main body self, dismantled by J type pipe laying tower 7, level is shelved on the laying work line in main body, in order to the height that lowers the center of gravity, reduces boats and ships area exposed to the wind, improves safety of ship performance; Meanwhile, be conducive to when hoisting operation, avoid J type pipe laying tower to the interference of hoisting crane.
Above-mentioned angle demodulator 6, J type pipe laying tower 7, main loop wheel machine 8, sterm propeller 10, all-direction propeller 11, little loop wheel machine 20, maintenance activity station 21, inspection operation post 22, laterally fortune pipe operating line 23, groove station 24, life boat 26 are prior art, and the technology of not specified (NS) is prior art.
The above, it is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, every above embodiment is done according to technical spirit of the present invention any simple modification, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (1)

1. a ship type for semisubmersible pipe laying crane ship, is provided with: main body, it is characterized in that: on the main deck of this main body, be furnished with two main hoisting cranes, in the ship in the operating radius of main hoisting crane in region, be provided with a moon pool, in this moon pool, be furnished with a J type pipe laying tower; Described main body is made up of lower buoyancy aid, the several first column be arranged on lower buoyancy aid, several tail column, several B-pillar and the upper mounting plate be arranged on first column, tail column, B-pillar, is provided with ballast tank about the bottom of this main body; Be provided with bottom stull between this several first column, tail column and B-pillar, this upper mounting plate is provided with main deck; The ship meta of main body has installed laying work line, and laying work line bilateral symmetry is furnished with storage area under control, and stem lateral arrangement has life building; All-direction propeller, stem side propeller in several ship stern propelling unit, ship the lower buoyancy aid of main body be equipped with; Pipeline in described storage area under control is through being located at axial transport roller on main body and phloem-xylem transport roller carries out pipeline transportation, pipeline is after being located at and main body checks operation post, maintenance activity station, groove station, end, be transported in main body through horizontal fortune pipe operating line again, and be transported to J type pipe laying tower through upper pipe arm and carry out pipelaying; The topside of described main body is provided with the little loop wheel machine of pipe.
CN201310363288.4A 2013-08-20 2013-08-20 The ship type of semisubmersible pipe laying crane ship Active CN103407554B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310363288.4A CN103407554B (en) 2013-08-20 2013-08-20 The ship type of semisubmersible pipe laying crane ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310363288.4A CN103407554B (en) 2013-08-20 2013-08-20 The ship type of semisubmersible pipe laying crane ship

Publications (2)

Publication Number Publication Date
CN103407554A CN103407554A (en) 2013-11-27
CN103407554B true CN103407554B (en) 2015-12-23

Family

ID=49600618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310363288.4A Active CN103407554B (en) 2013-08-20 2013-08-20 The ship type of semisubmersible pipe laying crane ship

Country Status (1)

Country Link
CN (1) CN103407554B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105984564A (en) * 2015-02-09 2016-10-05 刘广 Air cushion type offshore self-floating crane ship
US20210179229A1 (en) * 2016-03-03 2021-06-17 Keppel Offshore & Marine Technology Centre Pte Ltd. Super e-column on semi-submersible vessel
CN107416139A (en) * 2017-07-27 2017-12-01 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) A kind of deep water piping work ship
CN107618626A (en) * 2017-08-25 2018-01-23 中国海洋石油总公司 Improved deep water semi-submersible pipe laying crane ship
CN113320654A (en) * 2021-06-07 2021-08-31 上海交通大学 Deep sea self-navigation anti-platform type floating scientific research facility platform with self-sufficient energy

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101036016A (en) * 2004-08-13 2007-09-12 伊特雷科公司 Submarine J-shaped pipeline laying system
CN102027278A (en) * 2008-04-29 2011-04-20 伊特雷科公司 Marine pipelaying system and method
CN102267545A (en) * 2011-04-28 2011-12-07 中国海洋石油总公司 Ship form for semi-submersible type hoisting pipe-laying ship
CN102267546A (en) * 2011-04-28 2011-12-07 中国海洋石油总公司 Tail structure for semi-submersible type lifting pipe laying vessel
CN103118934A (en) * 2010-09-24 2013-05-22 塞彭公司 Transport vessel for supplying pipe to a subsea pipeline-laying vessel, and method and kit for transferring pipe from the transport vessel to a subsea pipeline-laying vessel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0704411D0 (en) * 2007-03-07 2007-04-18 Saipem Spa Undersea pipe-laying

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101036016A (en) * 2004-08-13 2007-09-12 伊特雷科公司 Submarine J-shaped pipeline laying system
CN102027278A (en) * 2008-04-29 2011-04-20 伊特雷科公司 Marine pipelaying system and method
CN103118934A (en) * 2010-09-24 2013-05-22 塞彭公司 Transport vessel for supplying pipe to a subsea pipeline-laying vessel, and method and kit for transferring pipe from the transport vessel to a subsea pipeline-laying vessel
CN102267545A (en) * 2011-04-28 2011-12-07 中国海洋石油总公司 Ship form for semi-submersible type hoisting pipe-laying ship
CN102267546A (en) * 2011-04-28 2011-12-07 中国海洋石油总公司 Tail structure for semi-submersible type lifting pipe laying vessel

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
2×8000t半潜起重铺管船铺管系统研究;程峰;《船舶》;20120229;第23卷(第1期);第73-74页 *
深水半潜式起重船J-Lay系统布置研究;罗超,王琮,毛建辉;《船舶》;20111031;第22卷(第5期);第8页,图5 *
超大型半潜式起重铺管平台结构设计研究;钟文军,王琮,罗超,程维杰,杨青,张海彬,吴雨俊;《中国海洋平台》;20121231;第27卷(第6期);第19页 *

Also Published As

Publication number Publication date
CN103407554A (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN103112553B (en) Self-propelled semi-submersible repair ship and its use
CN103407554B (en) The ship type of semisubmersible pipe laying crane ship
CN102107720B (en) Marine fan integrated setting system
CN204527564U (en) Semi-submerged platform and lower buoyancy aid thereof
AU2014321905B2 (en) Twin-hull offshore structure comprising an interconnecting central deck
CN110712721B (en) An offshore wind farm wind turbine installation operation engineering vessel and operation method thereof
CN203381779U (en) Mobile offshore drilling unit
CN102328733A (en) Semi-submersible lifting living platform
CN102381440B (en) Guide chain device
CN105035260A (en) Method for integrally detaching topside module of offshore abandoned platform
CN107792303B (en) Semi-submersible type ocean hoisting platform and operation method thereof
CN202201145U (en) Semi-submersible type hoisting accommodation platform
CN204979167U (en) Semi -submerged formula accommodation platform
CN103395477A (en) Semi-submersible ships capable of being combined and combined type semi-submersible ship
US9802682B2 (en) Butt joint octagonal frustum type floating production storage and offloading system
CN206141776U (en) Large -scale component transportation of self -navigation formula installs integrative ship
CN204916099U (en) Semi -submerged barge tilting dive stern deadwood
CN109665445B (en) Loading, transporting and conveying process for torch tower crane
CN106275284B (en) Small-water-surface catamaran port-entering and port-exiting load receiving system and method
CN107618626A (en) Improved deep water semi-submersible pipe laying crane ship
CN202863728U (en) Docking round platform floating production storage system
CN203902800U (en) A semi-submersible lifting platform for large floating marine structures
CN114148463B (en) Construction technology of semi-submersible offshore installation platform
CN216918395U (en) Semi-submersible type marine hoisting platform
CN207737469U (en) A kind of small-sized FPSO of dynamic positioning for marginal oil field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20240704

Address after: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Country or region after: China

Patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CNOOC Shenzhen Ocean Engineering Technology Service Co.,Ltd.

Address before: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Country or region before: China

Patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

TR01 Transfer of patent right