[go: up one dir, main page]

CN103864389B - A kind of oilfield oil well blocks up the plugging agent of borehole, sleeve plugging - Google Patents

A kind of oilfield oil well blocks up the plugging agent of borehole, sleeve plugging Download PDF

Info

Publication number
CN103864389B
CN103864389B CN201210526578.1A CN201210526578A CN103864389B CN 103864389 B CN103864389 B CN 103864389B CN 201210526578 A CN201210526578 A CN 201210526578A CN 103864389 B CN103864389 B CN 103864389B
Authority
CN
China
Prior art keywords
weight parts
weight part
plugging
oil well
borehole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210526578.1A
Other languages
Chinese (zh)
Other versions
CN103864389A (en
Inventor
高国强
谢文献
高学生
周喜
吕建海
崔洁
许建华
李力
徐忠
王建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Shengli Oilfield Co Shengli Oil Extraction Plant
Original Assignee
China Petroleum and Chemical Corp
Sinopec Shengli Oilfield Co Shengli Oil Extraction Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Shengli Oilfield Co Shengli Oil Extraction Plant filed Critical China Petroleum and Chemical Corp
Priority to CN201210526578.1A priority Critical patent/CN103864389B/en
Publication of CN103864389A publication Critical patent/CN103864389A/en
Application granted granted Critical
Publication of CN103864389B publication Critical patent/CN103864389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/14Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing calcium sulfate cements
    • C04B28/16Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing calcium sulfate cements containing anhydrite, e.g. Keene's cement
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • C09K8/467Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Inorganic Chemistry (AREA)
  • Ceramic Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Structural Engineering (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention provides the plugging agent that a kind of oilfield oil well blocks up borehole, sleeve plugging, this plugging agent is made up of blocking agent and retardant, the hydraulic cement powder material that described blocking agent is made up of the sulfoaluminate clinker of 40-80 weight part or the anhydrous sodium sulphate of fluoaluminate grog, the anhydrite of 5-20 weight part, the SILICA FUME of 10-40 weight part and 5-10 weight part; The retardant aqueous solution that described retardant is made up of the water of the tartrate of 0.1-5 weight part, the citric acid of 0.1-15 weight part, the boric acid of 5-10 weight part and 80-95 weight part.

Description

A kind of oilfield oil well blocks up the plugging agent of borehole, sleeve plugging
Technical field
The present invention relates to the plugging material that oilfield oil well blocks up borehole, plug operation played by sleeve plugging, oil and water well cement.
Background technology
Oil field, through exploitation for many years, particularly enters ultra-high water-containing after date, there is the contradiction that the aspects such as layers apart system is many, interlayer difference is large penetrated by oil well on the one hand, also there is the many problems of casing failure on the other hand.For this reason, in conjunction with advantages such as cement class blocking agent plugging strength are high, cheap, oil field increases the research application dynamics of cement class blocking agent in oil well plugging borehole and sleeve plugging, and actively developed large quantity research and improvement for produced problem in enforcement, on the basis of common G level oil well cement and ultra-fine oil well cement, by adding various auxiliary agent, have developed borehole plugging agent and the sleeve plugging agent of seriation, achieving good effect in application at the scene.
But oil well cement early strength increases comparatively slow, and the growth of ultimate compression strength daily calculates, and needs Hou Ning can bore plug after 3 ~ 5 days after plugging construction completes according to well temperature, causes shutoff cycle and operation to account for wasting of the ineffective times such as product.
Summary of the invention
Object of the present invention is intended to overcome the deficiencies in the prior art, there is provided a kind of and adopt inorganic materials, nontoxic, significantly shorten the Hou Ning time, improve operation timeliness, greatly shorten the plugging agent that oilfield oil well that well workover duration and operation account for the product time blocks up borehole, sleeve plugging.
Object of the present invention realizes by following technical measures:
Oilfield oil well of the present invention blocks up borehole, the plugging agent of sleeve plugging is made up of blocking agent and retardant, the hydraulic cement powder material that described blocking agent is made up of the sulfoaluminate clinker of 40-80 weight part or the anhydrous sodium sulphate of fluoaluminate grog, the anhydrite of 5-20 weight part, the SILICA FUME of 10-40 weight part and 5-10 weight part; The retardant aqueous solution that described retardant is made up of the water of the tartrate of 0.1-5 weight part, the citric acid of 0.1-15 weight part, the boric acid of 5-10 weight part and 80-95 weight part.
Object of the present invention also realizes by following technical measures:
Described hydraulic cement powder material specific surface area>=360m 2/ Kg; Described retardant solution density is 1.6-1.8g/cm 3; Described blocking agent: retardant=1:0.5-0.7 weight part; Described sulfoaluminate clinker or fluoaluminate grog are 60-70 weight part, anhydrite is 8-12 weight part, SILICA FUME is 10-25 weight part, anhydrous sodium sulphate is 6-8 weight part; Described tartrate is 1-2 weight part, citric acid is 2-3 weight part, boric acid is 6-8 weight part, water is 85-90 weight part; Described retardant solution density is 1.6-1.7g/cm 3.
The present invention adopts the grog based on sulfoaluminate clinker or fluoaluminate grog, adds anhydrite, SILICA FUME and anhydrous sodium sulphate, through being mixed and finely ground the hydraulic cementing materials that condensation is fast, hour gain in strength is fast made.
When Oil Field uses plugging agent of the present invention, according to blocking agent: retardant=1:0.4-0.8 weight, blocking agent water and retardant are made into the slurry of certain density, the presetting period is regulated with retardant, 30min ~ 30h is adjustable presetting period at normal temperatures, at 30 ~ 90 DEG C of temperature, presetting period, 0.5h ~ 2h was adjustable, ensure extemporaneous preparation and site operation safety, inject in oil and water well with pump truck, after construction terminates, " initial set " be i.e. " final set ", fast solidifying after final set, hour intensity is high, the growth of ultimate compression strength calculates by the hour, i.e. so-called " hour cement ", there is early-strong-fast-hard but the feature of " firmly not coagulating soon soon ".
Oilfield oil well of the present invention blocks up borehole, sleeve plugging plugging agent adopts inorganic materials, nontoxic, easy to use.Test-results shows, after final set, 1h ultimate compression strength can reach 20MPa, the ultimate compression strength of 2 hours is 4 times of G level oil well cement, construction terminates just can bore plug in latter 2 hours, and after construction, the Hou Ning time can shorten to 1 ~ 2 hour from present 3 ~ 5 days and can bore plug, significantly shortened the Hou Ning time, improve operation timeliness, shortening well workover duration and operation account for the product time greatly, are major technological breakthroughs, have significant social and economic benefits.
Embodiment
ST21136 well, treating packer is tested cover and is found that sleeve pipe leaks at 67-335m place cover, and successively use the 50 tons of leak stopping of G level oil well cement, because leak source is more shallow, the Hou Ning time is 5 days, just starts to bore plug after 5 days.During follow-up sand control construction, occur again new leak source, under meter is looked for Lou in 69-81m leakage, determines to use oilfield oil well of the present invention to block up borehole, sleeve plugging plugging agent shortens the Hou Ning time.Blocking agent slurry density 1.7-1.75g/cm 3, regulate presetting period 40min with retardant, use oilfield oil well of the present invention to block up borehole, sleeve plugging plugging agent 5 tons altogether, operation pressure rises to 10MPa by 0MPa, construction terminates within latter 2 hours, to start to bore plug, and drilling speed 4 hours/root (G level oil well cement drilling speed 1 hour/root), 76m drills.The success of the test of this well shows: oilfield oil well of the present invention blocks up borehole, the construction of sleeve plugging plugging agent terminates just can bore plug in latter 2 hours, and the Hou Ning time can shorten to 1 ~ 2 hour from original 3 ~ 5 days; From drilling speed, 4 times that oilfield oil well of the present invention blocks up borehole, the sleeve plugging plugging agent ultimate compression strength of 2 hours is G level oil well cement.
Embodiment 1:
The anhydrous sodium sulphate of the sulfoaluminate clinker or fluoaluminate grog, the anhydrite of 5 weight parts, the SILICA FUME of 40 weight parts and 5 weight parts of first getting 80 weight parts makes specific surface area>=360m 2the hydraulic cementing materials of/Kg; It is 1.8g/cm that the water getting the tartrate of 5 weight parts, the citric acid of 0.1 weight part, the boric acid of 10 weight parts and 80 weight parts makes density 3the retardant aqueous solution; When Oil Field uses, then according to hydraulic cementing materials: it is 1.75g/cm that the proportioning of the retardant aqueous solution=1:0.4 weight part makes density 3, water cement ratio is the slurry of 0.5, inject in oil and water well with pump truck.
Embodiment 2:
The anhydrous sodium sulphate of the sulfoaluminate clinker or fluoaluminate grog, the anhydrite of 20 weight parts, the SILICA FUME of 10 weight parts and 10 weight parts of first getting 40 weight parts makes specific surface area>=360m 2the hydraulic cementing materials of/Kg; It is 1.6g/cm that the water getting the tartrate of 0.1 weight part, the citric acid of 15 weight parts, the boric acid of 5 weight parts and 95 weight parts makes density 3the retardant aqueous solution; When Oil Field uses, then according to hydraulic cementing materials: it is 1.6g/cm that the proportioning of the retardant aqueous solution=1:0.8 weight part makes density 3, water cement ratio is the slurry of 0.7, inject in oil and water well with pump truck.
Embodiment 3:
The anhydrous sodium sulphate of the sulfoaluminate clinker or fluoaluminate grog, the anhydrite of 12 weight parts, the SILICA FUME of 25 weight parts and 8 weight parts of first getting 60 weight parts makes specific surface area>=360m 2the hydraulic cementing materials of/Kg; It is 1.7g/cm that the water getting the tartrate of 3 weight parts, the citric acid of 7 weight parts, the boric acid of 7 weight parts and 85 weight parts makes density 3the retardant aqueous solution.When Oil Field uses, then according to hydraulic cementing materials: it is 1.7g/cm that the proportioning of the retardant aqueous solution=1:0.6 weight part makes density 3, water cement ratio is the slurry of 0.6, inject in oil and water well with pump truck.
Embodiment 4:
The anhydrous sodium sulphate of the sulfoaluminate clinker or fluoaluminate grog, the anhydrite of 12 weight parts, the SILICA FUME of 10 weight parts and 8 weight parts of first getting 60 weight parts makes specific surface area>=360m 2the hydraulic cementing materials of/Kg; It is 1.6g/cm that the water getting the tartrate of 2 weight parts, the citric acid of 3 weight parts, the boric acid of 6 weight parts and 90 weight parts makes density 3the retardant aqueous solution.
Embodiment 5:
The anhydrous sodium sulphate of the sulfoaluminate clinker or fluoaluminate grog, the anhydrite of 8 weight parts, the SILICA FUME of 25 weight parts and 6 weight parts of first getting 70 weight parts makes specific surface area>=360m 2the hydraulic cementing materials of/Kg; It is 1.7g/cm that the water getting the tartrate of 1 weight part, the citric acid of 2 weight parts, the boric acid of 8 weight parts and 85 weight parts makes density 3the retardant aqueous solution; Again according to hydraulic cementing materials.

Claims (1)

1. an oilfield oil well blocks up the plugging agent of borehole, sleeve plugging, this plugging agent is made up of hydraulic cement powder material and the retardant aqueous solution, it is characterized in that described hydraulic cement powder material is made up of the sulfoaluminate clinker of 60 weight parts or the anhydrous sodium sulphate of fluoaluminate grog, the anhydrite of 12 weight parts, the SILICA FUME of 25 weight parts and 8 weight parts; The described retardant aqueous solution is made up of the water of the tartrate of 3 weight parts, the citric acid of 7 weight parts, the boric acid of 7 weight parts and 85 weight parts.
CN201210526578.1A 2012-12-10 2012-12-10 A kind of oilfield oil well blocks up the plugging agent of borehole, sleeve plugging Active CN103864389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210526578.1A CN103864389B (en) 2012-12-10 2012-12-10 A kind of oilfield oil well blocks up the plugging agent of borehole, sleeve plugging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210526578.1A CN103864389B (en) 2012-12-10 2012-12-10 A kind of oilfield oil well blocks up the plugging agent of borehole, sleeve plugging

Publications (2)

Publication Number Publication Date
CN103864389A CN103864389A (en) 2014-06-18
CN103864389B true CN103864389B (en) 2016-04-20

Family

ID=50903473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210526578.1A Active CN103864389B (en) 2012-12-10 2012-12-10 A kind of oilfield oil well blocks up the plugging agent of borehole, sleeve plugging

Country Status (1)

Country Link
CN (1) CN103864389B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2016361765A1 (en) * 2015-11-30 2018-05-10 Knauf Gips Kg Additive for gypsum building materials

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1757697A (en) * 2005-11-07 2006-04-12 刘茂平 Seal stoppage agent for oil-well
CN101522853A (en) * 2006-08-07 2009-09-02 普拉德研究及开发股份有限公司 Pumpable geopolymer formulation for oilfield application

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1757697A (en) * 2005-11-07 2006-04-12 刘茂平 Seal stoppage agent for oil-well
CN101522853A (en) * 2006-08-07 2009-09-02 普拉德研究及开发股份有限公司 Pumpable geopolymer formulation for oilfield application

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"国内外油井水泥和外加剂现状及发展趋势";黄柏宗 等;《钻井液与完井液》;19951231;第12卷(第6期);第53-72页 *

Also Published As

Publication number Publication date
CN103864389A (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN100551992C (en) Deep water low temperature cementing cement system
CN112127830B (en) Well cementation method for improving well cementation quality by controlling hydration heat of cement slurry
CN100344723C (en) Comprehensive performace regulator for well cementing cement slurry and its prepn
CN103833294B (en) The single liquid stabilizing cement based slurries of a kind of km deep level roadway rock reinforce
CN103923627A (en) Drilling pressure-bearing plugging agent for oil-gas wells and preparation and application thereof
US9366125B2 (en) Carbonate based slurry fracturing using solid acid for unconventional reservoirs
CN109321220B (en) Plugging agent for adjusting water absorption profile of immobile pipe column of water injection well and water absorption profile adjusting process
CN108751753A (en) High temperature cementing concrete and high temperature cementing slurry
CN100575447C (en) A kind of composition and its preparation and application
CN103849362B (en) The formula of a kind of coal bed gas extraction discharge drilling sealing material and preparation method
CN106167695B (en) Oil well chemical plugging agent
CN107288658A (en) Underground concrete water-proof engineering connects the casting method of stubble seam
US7500520B2 (en) Method of cementing well bores
CN103320107A (en) Tenacity anti-fluid-channeling cement slurry for solid expansion pipe fixed well
CN105238372A (en) High-molecular gel plugging agent and preparation method thereof
CN103864389B (en) A kind of oilfield oil well blocks up the plugging agent of borehole, sleeve plugging
CN105602536B (en) A kind of non-acid-soluble high intensity seal stoppage agent and preparation method thereof
CN105062447A (en) Channeling sealing agent for thermal recovery and preparation method thereof
CN104045271A (en) Plugging agent for oil field or natural gas extraction and preparation method thereof
CN105567188B (en) Auxiliary agent for improving plugging performance of cyanogen coagulation type plugging agent, preparation method thereof and cyanogen coagulation type plugging agent
CN101967964A (en) Method for prewashing multi-density double-setting long-sealing gas channeling prevention well cementing
CN108911568B (en) Grouting material additive and application thereof
CN103952130A (en) Temporary blocking gel for low-pressure oil-gas well and preparation method thereof
CN101462851B (en) Retardation cement mortar
CN112852393B (en) High-temperature-resistant plugging agent for thick oil horizontal well and water plugging method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant