- CN114541570A CN114541570A CN202210213753.5A CN202210213753A CN114541570A CN 114541570 A CN114541570 A CN 114541570A CN 202210213753 A CN202210213753 A CN 202210213753A CN 114541570 A CN114541570 A CN 114541570A
- Authority
- CN
- China
- Prior art keywords
- formwork
- cantilever
- cantilever plate
- layer
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/94—Protection against other undesired influences or dangers against fire
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及一种风琴式外立面结构及施工方法,属于建筑施工技术领域。该方法包括S1、根据建筑规划定位图和施工平面图,确认楼面上的模板安装位置;S2、在模板安装位置,根据施工平面图,支设模板;S3、在模板中浇筑混凝土;S4、在混凝土强度达到100%之后,将上层悬挑板模板、下层悬挑板模板和悬挑梁模板均拆除;S5、在上层悬挑板和下层悬挑板之间砌筑砌块防火墙,砌块防火墙与上层悬挑板和下层悬挑板形成三棱柱结构。通过本发明的改进,解决了模板支设体系难题,降低施工难度,避免了模板浪费,使得施工操作标准化,提升了工作效率;解决现有技术中存在的“传统的施工方法施工难度大、效率低,三角形模板盒拆除难度大,无法满足工程需求”的问题。
The invention relates to an organ-type exterior facade structure and a construction method, belonging to the technical field of building construction. The method includes S1, confirming the installation position of the formwork on the floor according to the architectural planning positioning drawing and the construction plan; S2, supporting the formwork according to the construction plan at the installation position of the formwork; S3, pouring concrete in the formwork; S4, placing the concrete After the strength reaches 100%, the upper cantilever slab formwork, the lower cantilever slab formwork and the cantilever beam formwork are all removed; S5. A block firewall is built between the upper cantilever slab and the lower cantilever slab, and the block firewall and the The upper cantilever plate and the lower cantilever plate form a triangular prism structure. Through the improvement of the invention, the problem of the formwork support system is solved, the construction difficulty is reduced, the formwork waste is avoided, the construction operation is standardized, and the work efficiency is improved; It is difficult to dismantle the triangular formwork box and cannot meet the engineering needs”.
Description
技术领域technical field
本发明涉及一种风琴式外立面结构及施工方法,属于建筑施工技术领域。The invention relates to an organ-type exterior facade structure and a construction method, and belongs to the technical field of building construction.
背景技术Background technique
建筑立面指的是建筑和建筑的外部空间直接接触的界面,以及其展现出来的形象和构成的方式;建筑立面分为建筑外立面和建筑内立面,其中,一般情况下建筑外立面的所指包括除屋顶外建筑所有外围护部分。The building façade refers to the interface between the building and the external space of the building, as well as the image and composition of the building; the building façade is divided into the building exterior facade and the building interior facade. The reference to the façade includes all parts of the building's outer envelope except the roof.
如机场等建筑物都对建筑外立面进行了创作设计,通过建筑设计师的出色设计,出现了风琴式外立面结构(悬挑板为锯齿状,下挂幕墙防火板)。Buildings such as airports have created and designed the facades of the buildings. Through the excellent design of the architects, an organ-style facade structure has appeared (the cantilevered panels are zigzag, and the curtain wall fireproof panels are hung below).
但在风琴式外立面结构的施工过程中,进行模板支设时需加工三角形模板盒,传统的施工方法施工难度大、效率低,三角形模板盒拆除难度大、质量难以保证,无法满足此工程需求。However, in the construction process of the organ-type facade structure, the triangular formwork box needs to be processed when the formwork is supported. The traditional construction method is difficult to construct, low in efficiency, difficult to dismantle the triangular formwork box, and difficult to guarantee the quality, which cannot meet the requirements of this project. need.
发明内容SUMMARY OF THE INVENTION
为了解决上述现有技术中存在的传统的施工方法三角形模板盒拆除难度大,无法满足工程需求的问题,本发明提供一种风琴式外立面结构及施工方法。In order to solve the problem that the triangular formwork box in the conventional construction method is difficult to dismantle and cannot meet the engineering requirements in the above-mentioned prior art, the present invention provides an organ-type façade structure and a construction method.
本发明提供的一种风琴式外立面结构施工方法,采用如下的技术方案:The construction method of an organ-type facade structure provided by the present invention adopts the following technical solutions:
一种制造风琴式外立面结构的施工方法,包括:A construction method for manufacturing an organ-style exterior façade structure, comprising:
S1、根据建筑规划定位图和施工平面图,确认楼面上的模板安装位置;S1. Confirm the installation position of the formwork on the floor according to the architectural planning positioning drawing and construction plan;
S2、在所述的模板安装位置,根据所述施工平面图,支设模板;所述模板包括上层悬挑板模板、下层悬挑板模板和悬挑梁模板,所述上层悬挑板模板和所述下层悬挑板模板形状大小相同、沿水平方向的截面均为三角形;将所述悬挑梁模板的一端水平支设于所述模板安装位置;将所述下层悬挑板模板和所述上层悬挑板模板水平支设在所述悬挑梁模板的另一端,所述下层悬挑板模板的底面与所述悬挑梁模板的底面平齐,所述上层悬挑板的最高点与所述悬挑梁模板的最高点平齐;S2, at the installation position of the template, according to the construction plan, support the template; the template includes an upper-layer cantilever plate template, a lower-layer cantilever plate template and a cantilever beam template, the upper-layer cantilever plate template and all The lower-layer cantilever plate formwork has the same shape and size, and the cross-sections along the horizontal direction are all triangles; one end of the cantilever beam formwork is horizontally supported at the formwork installation position; the lower-layer cantilever plate formwork and the upper-layer cantilever plate formwork The cantilever plate formwork is horizontally supported on the other end of the cantilever beam formwork, the bottom surface of the lower layer cantilever plate formwork is flush with the bottom surface of the cantilever beam formwork, and the highest point of the upper layer cantilever plate is parallel to the bottom surface of the cantilever beam formwork. The highest point of the cantilever beam formwork is flush;
S3、在所述上层悬挑板模板、所述下层悬挑板模板和所述悬挑梁模板中浇筑混凝土;S3, pouring concrete in the upper cantilever plate formwork, the lower cantilever plate formwork and the cantilever beam formwork;
S4、在混凝土强度达到100%之后,将所述上层悬挑板模板、所述下层悬挑板模板和所述悬挑梁模板均拆除,形成上层悬挑板、下层悬挑板和悬挑梁;以及,S4, after the concrete strength reaches 100%, remove the upper cantilever slab formwork, the lower cantilever slab formwork and the cantilever beam formwork to form an upper cantilever slab, a lower cantilever slab and a cantilever beam ;as well as,
S5、在所述上层悬挑板和所述下层悬挑板之间砌筑砌块防火墙,所述砌块防火墙与所述上层悬挑板和所述下层悬挑板组成三棱柱结构。S5. A block fire wall is built between the upper layer cantilever plate and the lower layer cantilever plate, and the block fire wall, the upper layer cantilever plate and the lower layer cantilever plate form a triangular prism structure.
通过采用上述技术方案,对外立面结构进行优化,在上层悬挑板下增设下层悬挑板,形成双层悬挑板;使用标准化的悬挑板模板即可完成制作,无需再制作三角形模板箱,解决了模板支设难题,降低了施工难度;当上层悬挑板和下层悬挑板成形后再砌筑砌块防火墙,避免了模板浪费;上层悬挑板、下层悬挑板和悬挑梁一起浇筑,使得施工工序更加标准化,提升了工作效率,加快了工程进展。By adopting the above technical solutions, the façade structure is optimized, and a lower cantilever plate is added under the upper cantilever plate to form a double-layer cantilever plate; the production can be completed by using a standardized cantilever plate formwork, and there is no need to make a triangular formwork box. , solve the problem of formwork support and reduce the difficulty of construction; when the upper cantilever plate and the lower cantilever plate are formed, the block fire wall is built to avoid the waste of formwork; the upper cantilever plate, the lower cantilever plate and the cantilever beam Pouring together makes the construction process more standardized, improves work efficiency, and speeds up the progress of the project.
优选的,所述步骤S1之前还包括:Preferably, before the step S1, it also includes:
通过Revit软件,建立风琴式外立面结构BIM模型和施工主体结构模型并进行三维模拟实验,检测施工方案是否可行。Through Revit software, the BIM model of the organ-style facade structure and the construction main structure model were established, and three-dimensional simulation experiments were carried out to test whether the construction plan was feasible.
通过采用上述技术方案,能够提前发现施工方案中考虑不周的地方,提前调整优化,避免施工后出现问题。By adopting the above technical solutions, the ill-considered areas in the construction plan can be discovered in advance, adjusted and optimized in advance, and problems after construction can be avoided.
优选的,所述S1包括:Preferably, the S1 includes:
S101、根据所述建筑规划定位图和所述施工平面图,根据楼面轴线测量孔引测建筑物的主轴线的控制线;S101, according to the architectural planning positioning diagram and the construction plan, according to the floor axis measurement hole to guide the control line of the main axis of the building;
S102、以所述控制线为起点,在楼面上确定悬挑梁位置轴线;S102, taking the control line as a starting point, determining the position axis of the cantilever beam on the floor;
S103、根据所述悬挑梁位置轴线,在楼面上确定悬挑梁位置尺寸线和模板控制线,确定模板安装位置。S103 , according to the position axis of the cantilever beam, determine the position dimension line of the cantilever beam and the formwork control line on the floor, and determine the formwork installation position.
通过采用上述技术方案,便于模板的安装和校正。By adopting the above technical solution, the installation and calibration of the template are facilitated.
优选的,所述S2包括:Preferably, the S2 includes:
S201、根据施工需求和建筑物规格,架设脚手架;S201. According to construction requirements and building specifications, erect scaffolding;
S202、在所述的模板安装位置,根据所述施工平面图,支设模板;将所述下层悬挑板模板和所述上层悬挑板模板水平支设在所述悬挑梁模板的另一端,所述下悬挑板模板的底面与所述悬挑梁模板的底面平齐,所述上层悬挑板的最高点与所述悬挑梁模板的最高点平齐;所述下层悬挑板模板底面和所述上层悬挑板模板的底面与所述悬挑梁模板另一端的侧面连接;S202, in the described template installation position, according to the described construction plan, support the template; horizontally support the lower layer cantilever plate template and the upper layer cantilever plate template on the other end of the cantilever beam template, The bottom surface of the lower cantilever plate formwork is flush with the bottom surface of the cantilever beam formwork, and the highest point of the upper layer cantilever plate is flush with the highest point of the cantilever beam formwork; the lower layer cantilever plate formwork The bottom surface and the bottom surface of the upper cantilever plate formwork are connected with the side surface of the other end of the cantilever beam formwork;
所述下层悬挑板模板底面和所述上层悬挑板模板的底面与所述悬挑梁模板另一端的侧面连接;The bottom surface of the lower layer cantilevered plate formwork and the bottom surface of the upper layer cantilevered plate formwork are connected with the side surface of the other end of the cantilever beam formwork;
S203、在所述下层悬挑板模板上放置用于支撑所述上层悬挑板模板的支撑件。S203 , placing a support member for supporting the upper layer cantilever plate formwork on the lower layer cantilever plate formwork.
优选的,所述支撑架包括混凝土块和木方;所述木方放置于所述混凝土块的顶部;Preferably, the support frame includes a concrete block and a wooden block; the wooden block is placed on top of the concrete block;
所述混凝土块与所述下层悬挑板的混凝土强度相同;The concrete strength of the concrete block is the same as that of the lower cantilever slab;
所述混凝土块的厚度与所述下层悬挑板的厚度相同,所述混凝土块和所述木条的厚度之和与所述上层悬挑板模具和所述下层悬挑板模具之间的间距相同。The thickness of the concrete block is the same as the thickness of the lower cantilever plate, the sum of the thickness of the concrete block and the wood strip and the distance between the upper cantilever plate mould and the lower cantilever plate mould same.
通过采用上述技术方案,防止支撑件在下层悬挑板浇筑后无法取出。By adopting the above technical solution, the support can be prevented from being taken out after the lower cantilever slab is poured.
优选的,所述脚手架为扣件式模板脚手架。Preferably, the scaffold is a fastener type formwork scaffold.
优选的,所述上层悬挑板模板、所述下层悬挑板模板和所述悬挑梁模板的材质均为多层夹板。Preferably, the materials of the upper cantilever plate formwork, the lower cantilever plate formwork and the cantilever beam formwork are all multi-layer plywood.
通过采用上述技术方案,能够提高上层悬挑板、下层悬挑板和悬挑梁表面观感,保证工程质量。By adopting the above technical solution, the surface appearance of the upper-layer cantilever plate, the lower-layer cantilever plate and the cantilever beam can be improved, and the engineering quality can be ensured.
本发明还提供了一种采用上述风琴式外立面结构的施工方法制造的风琴式外立面结构,采用如下的技术方案:The present invention also provides an organ-type façade structure manufactured by the above-mentioned construction method of the organ-type façade structure, and adopts the following technical scheme:
一种采用上述风琴式外立面结构施工方法制造的风琴式外立面结构,包括上层悬挑板、下层悬挑板和悬挑梁;An organ-type façade structure manufactured by the above-mentioned organ-type façade structure construction method, comprising an upper-layer cantilever plate, a lower-layer cantilever plate and a cantilever beam;
所述上层悬挑板和所述下层悬挑板形状大小一致、均为三角形;The upper-layer cantilever plate and the lower-layer cantilever plate have the same shape and size, and both are triangles;
所述悬挑梁水平设置于楼面;The cantilever beam is horizontally arranged on the floor;
所述上层悬挑板水平设置于所述悬挑梁远离所述楼面的一端,所述上层悬挑板的上表面与所述悬挑梁的上表面平齐;所述下层悬挑板水平设置于所述悬挑梁远离所述楼面的一端,所述下层悬挑板的底面与所述悬挑梁的底面平齐;The upper cantilever plate is horizontally arranged at one end of the cantilever beam away from the floor, and the upper surface of the upper layer cantilever plate is flush with the upper surface of the cantilever beam; the lower layer cantilever plate is horizontal is arranged at one end of the cantilever beam away from the floor, and the bottom surface of the lower-layer cantilever plate is flush with the bottom surface of the cantilever beam;
所述上层悬挑板和所述下层悬挑板之间竖直设置有砌块防火墙,所述砌块防火墙与所述上层悬挑板和所述下层悬挑板组成三棱柱结构。A block fire wall is vertically arranged between the upper layer cantilever plate and the lower layer cantilever plate, and the block fire wall, the upper layer cantilever plate and the lower layer cantilever plate form a triangular prism structure.
通过采用上述技术方案,形成了双层悬挑板,使得制作上层悬挑板和下层悬挑板时所用的模板支设方案得到了简化。By adopting the above technical solution, a double-layer cantilevered plate is formed, which simplifies the formwork support scheme used in the production of the upper-layer cantilevered plate and the lower-layer cantilevered plate.
优选的,所述上层悬挑板和所述下层悬挑板的数量均为若干个;Preferably, the number of the upper layer cantilever plate and the lower layer cantilever plate is several;
所述上层悬挑板和所述下层悬挑板均沿所述悬挑梁的长度方向均匀分布。Both the upper-layer cantilever plate and the lower-layer cantilever plate are uniformly distributed along the length direction of the cantilever beam.
优选的,所述上层悬挑板、所述下层悬挑板和所述悬挑梁均为混凝土结构;Preferably, the upper cantilever plate, the lower cantilever plate and the cantilever beam are all concrete structures;
所述砌块防火墙的材质为加气混凝土砌块。The material of the block fire wall is aerated concrete blocks.
综上所述,本发明具有如下的有益技术效果:To sum up, the present invention has the following beneficial technical effects:
1、无需制作三角形模板箱,使用标准化的悬挑板模板即可完成制作,简化了模板支设方案,解决了模板拆除难度大的难题,降低了施工难度节省了材料,加快了施工速度;1. There is no need to make a triangular formwork box, and the standard cantilever plate formwork can be used to complete the production, which simplifies the formwork support scheme, solves the difficult problem of formwork dismantling, reduces the construction difficulty, saves materials, and speeds up the construction speed;
2、使得施工工序更加标准化,提升了工作效率,加快了工程进展;2. The construction process is more standardized, the work efficiency is improved, and the project progress is accelerated;
3、能够提前发现施工方案中考虑不周的地方,提前调整优化,避免施工后出现问题;3. Be able to discover in advance the ill-considered places in the construction plan, adjust and optimize in advance, and avoid problems after construction;
4、便于模板的安装和校正;4. It is convenient for the installation and calibration of the template;
5、提高了上层悬挑板、下层悬挑板和悬挑梁表面观感,保证工程质量。附图说明5. Improve the appearance of the upper cantilever plate, the lower cantilever plate and the cantilever beam to ensure the quality of the project. Description of drawings
图1是本申请实施例的流程示意图;1 is a schematic flowchart of an embodiment of the present application;
图2是本申请实施例的结构示意图;2 is a schematic structural diagram of an embodiment of the present application;
图3是图2的侧视示意图。FIG. 3 is a schematic side view of FIG. 2 .
附图标记说明:1、上层悬挑板;2、下层悬挑板;3、砌块防火墙;4、悬挑梁。Description of reference numerals: 1. Upper cantilever slab; 2. Lower cantilever slab; 3. Block fire wall; 4. Cantilever beam.
具体实施方式Detailed ways
以下结合附图1-3对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with accompanying drawings 1-3.
本发明实施例公开一种风琴式外立面结构及施工方法。The embodiment of the invention discloses an organ-type exterior facade structure and a construction method.
如图1所示,一种制造风琴式外立面结构的施工方法,包括:As shown in Figure 1, a construction method for manufacturing an organ-style façade structure includes:
S1、根据施工图纸,确认楼面上的模板安装位置;具体的,步骤S1包括:S1. Confirm the installation position of the formwork on the floor according to the construction drawings; specifically, step S1 includes:
S101、根据施工图纸,根据楼面轴线测量孔引测建筑物的主轴线的控制线;S101. According to the construction drawings, the control line of the main axis of the building is guided according to the floor axis measurement hole;
S102、以控制线为起点,在楼面上确定悬挑梁位置轴线;S102, take the control line as the starting point, determine the position axis of the cantilever beam on the floor;
S103、根据悬挑梁位置轴线,在楼面上确定悬挑梁位置尺寸线和模板控制线,确定模板安装位置;S103, according to the position axis of the cantilever beam, determine the position dimension line of the cantilever beam and the formwork control line on the floor, and determine the formwork installation position;
在步骤S1之前还包括:Before step S1, it also includes:
根据施工图纸,通过Revit软件,建立风琴式外立面结构BIM模型和施工主体结构模型并进行三维模拟实验,检测施工方案是否可行;通过Revit软件的模拟施工功能,检测施工方案是否可行;若可行,则确定施工方案;若不可行,则对施工方案进行提前调整优化,避免施工后出现问题;According to the construction drawings, through the Revit software, establish the BIM model of the organ-style facade structure and the construction main structure model and conduct 3D simulation experiments to check whether the construction plan is feasible; through the simulation construction function of the Revit software, check whether the construction plan is feasible; if feasible , then determine the construction plan; if it is not feasible, adjust and optimize the construction plan in advance to avoid problems after construction;
S2、在模板安装位置,根据施工图纸,支设模板;模板包括上层悬挑板模板、下层悬挑板模板和悬挑梁模板,上层悬挑板模板、下层悬挑板模板形状大小相同、沿水平方向的截面均为三角形;将下层悬挑板模板和上层悬挑板模板水平支设在所述悬挑梁模板的另一端,下层悬挑板模板的底面与悬挑梁模板的底面平齐,上层悬挑板的最高点与悬挑梁模板的最高点平齐;具体的,步骤S2包括:S2. At the installation position of the formwork, according to the construction drawings, the formwork is supported; the formwork includes the upper cantilever plate formwork, the lower layer cantilever plate formwork and the cantilever beam formwork, the upper layer cantilever plate formwork and the lower layer cantilever plate formwork are the same in shape and size, along the The cross-sections in the horizontal direction are all triangles; the lower-layer cantilever plate formwork and the upper-layer cantilever plate formwork are horizontally supported at the other end of the cantilever beam formwork, and the bottom surface of the lower-layer cantilever plate formwork is flush with the bottom surface of the cantilever beam formwork , the highest point of the upper cantilever plate is flush with the highest point of the cantilever beam formwork; specifically, step S2 includes:
S201、根据施工需求和建筑物规格,架设脚手架;S201. According to construction requirements and building specifications, erect scaffolding;
S202、在的模板安装位置,根据施工平面图,支设模板;将下层悬挑板模板和上层悬挑板模板水平支设在悬挑梁模板的另一端下悬挑板模板的底面与悬挑梁模板的底面平齐,上层悬挑板的最高点与悬挑梁模板的最高点平齐;下层悬挑板模板底面和上层悬挑板模板的底面与悬挑梁模板另一端的侧面连接;下层悬挑板模板底面和上层悬挑板模板的底面与悬挑梁模板另一端的侧面连接;S202, at the installation position of the formwork, according to the construction plan, support the formwork; horizontally support the lower-layer cantilever plate formwork and the upper-layer cantilever-plate formwork on the bottom surface of the lower cantilever plate formwork and the cantilever beam at the other end of the cantilever beam formwork The bottom surface of the formwork is flush, and the highest point of the upper cantilever plate is flush with the highest point of the cantilever beam formwork; the bottom surface of the lower layer cantilever plate formwork and the bottom surface of the upper layer cantilever plate formwork are connected with the side of the other end of the cantilever beam formwork; the lower layer The bottom surface of the cantilever plate formwork and the bottom surface of the upper cantilever plate formwork are connected with the side surface of the other end of the cantilever beam formwork;
S203、在下层悬挑板模板上放置用于支撑上层悬挑板模板的支撑件;S203, placing a support for supporting the upper-layer cantilevered plate formwork on the lower-layer cantilevered plate formwork;
其中,脚手架为扣件式模板脚手架,架体纵横间距为1100mm,步距为1500mm,采用可调上下托,自由端为500mm。支撑架立杆下加设槽钢垫板,底部扫地杆距地面200mm,每5跨设置纵横向通长剪刀撑,每三步设横向通长剪刀撑;上层悬挑板模板、下层悬挑板模板和悬挑梁模板的材质均为多层夹板;支撑件包括混凝土块和木方;木方放置于混凝土块;混凝土块与下层悬挑板的混凝土强度相同;混凝土块的厚度与下层悬挑板的厚度相同,混凝土块和木条的厚度之和与上层悬挑板模具和下层悬挑板模具之间的间距相同;Among them, the scaffold is a fastener type formwork scaffold, the vertical and horizontal spacing of the frame body is 1100mm, the step distance is 1500mm, the adjustable upper and lower supports are adopted, and the free end is 500mm. A channel steel backing plate is added under the vertical pole of the support frame, the bottom sweeping pole is 200mm from the ground, vertical and horizontal scissor braces are installed every 5 spans, and horizontal through-length scissors braces are installed every three steps; upper cantilever plate template, lower cantilever plate The material of the formwork and the cantilever beam formwork are multi-layer plywood; the supports include concrete blocks and wooden squares; the wooden squares are placed on the concrete blocks; the concrete strength of the concrete blocks and the lower cantilever slab is the same; the thickness of the concrete block is the same as that of the lower cantilever. The thickness of the slab is the same, and the sum of the thickness of the concrete block and the wooden strip is the same as the distance between the upper cantilever plate mould and the lower cantilever plate mould;
S3、在上层悬挑板模板、下层悬挑板模板和悬挑梁模板中浇筑混凝土;S3. Concrete is poured in the upper cantilever slab formwork, the lower cantilever slab formwork and the cantilever beam formwork;
S4、在混凝土强度达到100%之后,将上层悬挑板模板、下层悬挑板模板和悬挑梁模板均拆除,形成上层悬挑板1、下层悬挑板2和悬挑梁4;其中,在拆除模板前必须填写拆除模板申请,在拆除模板过程中,如发现混凝土出现异常现象,可能影响混凝土结构的安全和质量等问题时,应立即停止拆模;以及,S4. After the concrete strength reaches 100%, the upper cantilever plate formwork, the lower cantilever plate formwork and the cantilever beam formwork are all removed to form the upper
S5、在上层悬挑板1和下层悬挑板之间砌筑砌块防火墙3,砌块防火墙3与上层悬挑板1和下层悬挑板2形成三棱柱结构;其中,采用M5砌筑砂浆砌筑砌块防火墙3。S5. A
如图2-3所示,一种风琴式外立面结构包括上层悬挑板1、下层悬挑板2和悬挑梁4;上层悬挑板1和下层悬挑板2形状大小一致、均为三角形;悬挑梁4水平设置于楼面;上层悬挑板1水平设置于悬挑梁4远离楼面的一端,上层悬挑板1的上表面与悬挑梁4的上表面平齐;下层悬挑板2水平设置于悬挑梁4远离楼面的一端,下层悬挑板2的底面与悬挑梁4的底面平齐;上层悬挑板1和下层悬挑板2沿悬挑梁4的厚度方向的中点对称设置;上层悬挑板1和下层悬挑板2之间竖直设置有砌块防火墙3,砌块防火墙3与上层悬挑板1和下层悬挑板2组成三棱柱结构。As shown in Figure 2-3, an organ-type façade structure includes an
上层悬挑板1和下层悬挑板2的数量均为若干个,沿悬挑梁4的长度方向均匀分布,形成锯齿状结构。The upper
本实施例中,上层悬挑板1、下层悬挑板2和悬挑梁4均为混凝土结构,砌块防火墙3的材质为加气混凝土砌块。In this embodiment, the upper
本说明书中的各个实施例均采用递进的方式描述,各个实施例之间相同相似的部分互相参见即可,每个实施例重点说明的都是与其他实施例的不同之处。Each embodiment in this specification is described in a progressive manner, and the same and similar parts between the various embodiments may be referred to each other, and each embodiment focuses on the differences from other embodiments.
以上为本发明的较佳实施例,并非依此限制本发明的保护范围,故:凡依本发明的结构、形状、原理所做的等效变化,均应涵盖于本发明的保护范围之内。The above are the preferred embodiments of the present invention, and do not limit the protection scope of the present invention accordingly. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention should be covered within the protection scope of the present invention. .
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210213753.5A CN114541570A (en) | 2022-03-04 | 2022-03-04 | A kind of organ-type exterior facade structure and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210213753.5A CN114541570A (en) | 2022-03-04 | 2022-03-04 | A kind of organ-type exterior facade structure and construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN114541570A true CN114541570A (en) | 2022-05-27 |
Family
ID=81661788
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210213753.5A Pending CN114541570A (en) | 2022-03-04 | 2022-03-04 | A kind of organ-type exterior facade structure and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114541570A (en) |
Citations (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101265737A (en) * | 2008-04-25 | 2008-09-17 | 张掖市擎天建材有限责任公司 | Steam pressurized concrete composite heat insulation building blocks and its production process |
| CN103031898A (en) * | 2011-10-10 | 2013-04-10 | 湖南华廷筑邦建材有限公司 | Heat insulating component |
| CN203129415U (en) * | 2013-01-22 | 2013-08-14 | 山东农业大学 | Heat preservation load-bearing type concrete hollow block |
| CN103510651A (en) * | 2013-10-15 | 2014-01-15 | 泉州市三联机械制造有限公司 | Harsh concrete composite self-insulation building block and manufacturing method thereof |
| CN105544973A (en) * | 2016-02-01 | 2016-05-04 | 长兴中海建设工程有限公司 | Decorative concrete overhanging eave formwork |
| CN107816173A (en) * | 2017-11-04 | 2018-03-20 | 北京房修建筑工程有限公司 | Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method |
| US20180274234A1 (en) * | 2013-03-15 | 2018-09-27 | Romeo Ilarian Ciuperca | High performance, reinforced insulated precast concrete and tilt-up concrete structures and methods of making same |
| CN108978996A (en) * | 2018-09-20 | 2018-12-11 | 山东建筑大学 | One kind increased outrigger and its construction method in existing brick mix structure |
| CN109914711A (en) * | 2019-04-29 | 2019-06-21 | 中冶建工集团有限公司 | A kind of assembled architecture top layer eaves gutter building structure and construction method |
| CN209817295U (en) * | 2019-04-29 | 2019-12-20 | 中冶建工集团有限公司 | Structure is found to assembled building top layer eaves gutter |
| CN210164133U (en) * | 2019-03-12 | 2020-03-20 | 山东理工大学 | Embedded composite thermal insulation exterior wall block |
| CN212406134U (en) * | 2020-03-30 | 2021-01-26 | 合肥建工集团有限公司 | Cornice plate pouring support frame for building construction |
| CN112854752A (en) * | 2021-03-15 | 2021-05-28 | 山西三建集团有限公司 | Template support system is pour to outer convex parapet top of down ladder |
| CN112854793A (en) * | 2019-11-28 | 2021-05-28 | 杭州固力建筑工程有限公司 | Construction scheme for additionally arranging hanging columns at end parts of pure cantilever beams |
| CN214531915U (en) * | 2021-03-10 | 2021-10-29 | 云南建投第十建设有限公司 | Tool type template for reforming engineering unsupported system |
| CN214531913U (en) * | 2021-01-07 | 2021-10-29 | 武汉建工集团股份有限公司 | A template structure for dysmorphism structure is chosen board and is pour |
| CN113756554A (en) * | 2021-10-11 | 2021-12-07 | 昆明玺唤科技有限公司 | Construction platform and construction method for cast-in-place reinforced concrete support cantilever scaffold |
-
2022
- 2022-03-04 CN CN202210213753.5A patent/CN114541570A/en active Pending
Patent Citations (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101265737A (en) * | 2008-04-25 | 2008-09-17 | 张掖市擎天建材有限责任公司 | Steam pressurized concrete composite heat insulation building blocks and its production process |
| CN103031898A (en) * | 2011-10-10 | 2013-04-10 | 湖南华廷筑邦建材有限公司 | Heat insulating component |
| CN203129415U (en) * | 2013-01-22 | 2013-08-14 | 山东农业大学 | Heat preservation load-bearing type concrete hollow block |
| US20180274234A1 (en) * | 2013-03-15 | 2018-09-27 | Romeo Ilarian Ciuperca | High performance, reinforced insulated precast concrete and tilt-up concrete structures and methods of making same |
| CN103510651A (en) * | 2013-10-15 | 2014-01-15 | 泉州市三联机械制造有限公司 | Harsh concrete composite self-insulation building block and manufacturing method thereof |
| CN105544973A (en) * | 2016-02-01 | 2016-05-04 | 长兴中海建设工程有限公司 | Decorative concrete overhanging eave formwork |
| CN107816173A (en) * | 2017-11-04 | 2018-03-20 | 北京房修建筑工程有限公司 | Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method |
| CN108978996A (en) * | 2018-09-20 | 2018-12-11 | 山东建筑大学 | One kind increased outrigger and its construction method in existing brick mix structure |
| CN210164133U (en) * | 2019-03-12 | 2020-03-20 | 山东理工大学 | Embedded composite thermal insulation exterior wall block |
| CN109914711A (en) * | 2019-04-29 | 2019-06-21 | 中冶建工集团有限公司 | A kind of assembled architecture top layer eaves gutter building structure and construction method |
| CN209817295U (en) * | 2019-04-29 | 2019-12-20 | 中冶建工集团有限公司 | Structure is found to assembled building top layer eaves gutter |
| CN112854793A (en) * | 2019-11-28 | 2021-05-28 | 杭州固力建筑工程有限公司 | Construction scheme for additionally arranging hanging columns at end parts of pure cantilever beams |
| CN212406134U (en) * | 2020-03-30 | 2021-01-26 | 合肥建工集团有限公司 | Cornice plate pouring support frame for building construction |
| CN214531913U (en) * | 2021-01-07 | 2021-10-29 | 武汉建工集团股份有限公司 | A template structure for dysmorphism structure is chosen board and is pour |
| CN214531915U (en) * | 2021-03-10 | 2021-10-29 | 云南建投第十建设有限公司 | Tool type template for reforming engineering unsupported system |
| CN112854752A (en) * | 2021-03-15 | 2021-05-28 | 山西三建集团有限公司 | Template support system is pour to outer convex parapet top of down ladder |
| CN113756554A (en) * | 2021-10-11 | 2021-12-07 | 昆明玺唤科技有限公司 | Construction platform and construction method for cast-in-place reinforced concrete support cantilever scaffold |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112726878A (en) | Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould | |
| CN206844389U (en) | Building blocks wall structure | |
| CN215888729U (en) | Assembled building interior wall baffle | |
| CN102644382A (en) | Mounting technology of large-module wall | |
| CN112112419A (en) | Construction method of cast-in-situ overhanging floating window plate | |
| CN211974047U (en) | Multi-process integrated assembling-free light wall for building assembly | |
| CN220451424U (en) | Template supporting system for integrally pouring beam plate and beam bottom L-shaped hanging plate | |
| CN110593440B (en) | Construction method of prefabricated wall structure | |
| CN114541570A (en) | A kind of organ-type exterior facade structure and construction method | |
| CN210263490U (en) | Assembled wall that possesses adjustable extending structure | |
| CN108571065A (en) | The assembled steel tendon concrete frame structure of connector is connected to based on steel plate | |
| CN111749395A (en) | A hollow partition board and its vertical connection method | |
| CN111851804A (en) | A prefabricated formwork-free structural body formwork and a cast-in-place formwork-free structural body | |
| CN114790794B (en) | Bracket-free constructional column construction structure and bracket-free rapid constructional column construction method | |
| CN207110035U (en) | Assembled steel tendon concrete frame structure based on steel plate connection joint | |
| CN216640477U (en) | Water inlet flow channel template | |
| CN115822271A (en) | Construction method of oblique wall with large angle | |
| CN115387601A (en) | Reverse ridge hanging formwork support and method for constructing reverse ridge by utilizing same | |
| CN115182580A (en) | Water pipe well floor slab hanging die and post-water pipe well pouring construction method | |
| CN208686067U (en) | Plate sizing arc mould drops in toilet | |
| CN112627397A (en) | Assembly type building inner wall partition board and typesetting method thereof | |
| CN105003074A (en) | Commercial building construction system and construction method thereof | |
| CN214272925U (en) | H-shaped steel beam side concrete formwork structure | |
| CN117703070B (en) | Template for construction of building outer convex node, template unit and construction method | |
| CN223269604U (en) | Form structure at deformation joint |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220527 |