[go: up one dir, main page]

CN114724980A - Ball paving device based on BGA ball planting technology - Google Patents

Ball paving device based on BGA ball planting technology Download PDF

Info

Publication number
CN114724980A
CN114724980A CN202210203371.4A CN202210203371A CN114724980A CN 114724980 A CN114724980 A CN 114724980A CN 202210203371 A CN202210203371 A CN 202210203371A CN 114724980 A CN114724980 A CN 114724980A
Authority
CN
China
Prior art keywords
ball
laying
box
feeding box
bga
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210203371.4A
Other languages
Chinese (zh)
Other versions
CN114724980B (en
Inventor
刘泽洋
谢旭波
付清华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Weisong Industry Automation Co ltd
Original Assignee
Shanghai Weisong Industry Automation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Weisong Industry Automation Co ltd filed Critical Shanghai Weisong Industry Automation Co ltd
Priority to CN202210203371.4A priority Critical patent/CN114724980B/en
Publication of CN114724980A publication Critical patent/CN114724980A/en
Application granted granted Critical
Publication of CN114724980B publication Critical patent/CN114724980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/67005Apparatus not specifically provided for elsewhere
    • H01L21/67011Apparatus for manufacture or treatment
    • H01L21/67144Apparatus for mounting on conductive members, e.g. leadframes or conductors on insulating substrates
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L24/00Arrangements for connecting or disconnecting semiconductor or solid-state bodies; Methods or apparatus related thereto
    • H01L24/74Apparatus for manufacturing arrangements for connecting or disconnecting semiconductor or solid-state bodies
    • H01L24/75Apparatus for connecting with bump connectors or layer connectors
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L2224/00Indexing scheme for arrangements for connecting or disconnecting semiconductor or solid-state bodies and methods related thereto as covered by H01L24/00
    • H01L2224/74Apparatus for manufacturing arrangements for connecting or disconnecting semiconductor or solid-state bodies and for methods related thereto
    • H01L2224/75Apparatus for connecting with bump connectors or layer connectors
    • H01L2224/7598Apparatus for connecting with bump connectors or layer connectors specially adapted for batch processes

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Computer Hardware Design (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Condensed Matter Physics & Semiconductors (AREA)
  • General Physics & Mathematics (AREA)
  • Electric Connection Of Electric Components To Printed Circuits (AREA)

Abstract

The application discloses a ball paving device based on a BGA (ball grid array) ball planting technology, which relates to the technical field of BGA ball planting, and comprises a base and a mounting rack rotationally arranged on the base, wherein the rotating axis of the mounting rack is horizontally arranged, and a rotating assembly for driving the mounting rack to rotate is arranged on the base; the mounting frame is provided with a ball paving table, and a plurality of ball paving holes are regularly distributed on the upper side of the ball paving table; a hollow cavity is formed inside the ball paving table, any ball paving hole is communicated with the hollow cavity, and the hollow cavity is communicated with an external vacuum generating device; a feeding box is arranged on the upper side of the ball paving table in a sliding manner, a material containing cavity is arranged in the feeding box in a penetrating manner along the thickness direction of the ball paving table, and the bottom surface of the material containing cavity is matched with the upper side surface of the ball paving table in a sliding manner; the ball paving table is provided with a sliding assembly for driving the feeding box to slide. This application has the stability that promotes feed box feed operation, promotes the effect of off-the-shelf qualification rate.

Description

一种基于BGA植球技术的铺球装置A ball-laying device based on BGA ball-planting technology

技术领域technical field

本申请涉及BGA植球技术领域,尤其是涉及一种基于BGA植球技术的铺球装置。The present application relates to the technical field of BGA ball placement, and in particular to a ball placement device based on the BGA ball placement technology.

背景技术Background technique

随着硅单芯片集成度的不断提高,使得I/O引脚数大幅增加,进而使集成电路封装要求也随之增加;为满足发展的需要,球栅阵列封装,即BGA封装技术应运而生。BGA封装方式采用焊球作为引脚,不仅提高了封装密度,同时使得封装性能大幅提高。With the continuous improvement of silicon single-chip integration, the number of I/O pins has increased significantly, and the requirements for integrated circuit packaging have also increased; in order to meet the needs of development, ball grid array packaging, that is, BGA packaging technology came into being . The BGA packaging method uses solder balls as pins, which not only improves the packaging density, but also greatly improves the packaging performance.

相关技术中,BGA植球机是IC制造封装工序中的关键设备;其中,铺球方式的选择对最终产品的质量影响重大。目前,传统的铺球设备,通常包括操作台,操作台上具有规则分布铺球孔的铺球区域,操作台内部开设有空腔,任一铺球孔均与空腔连通,且空腔与真空发生装置相连;操作台上侧滑移设有铺球盒,铺球盒具有底部开口的盒腔,操作台上设有驱动铺球盒沿操作台平面移动的驱动机构,驱动机构驱动铺球盒沿操作台上侧面滑移,并使铺球盒盒腔完全扫过铺球区域。In the related art, the BGA ball placement machine is the key equipment in the IC manufacturing and packaging process; among them, the choice of the ball placement method has a significant impact on the quality of the final product. At present, the traditional ball-laying equipment usually includes an operation table. The operation table has a ball-laying area with regularly distributed ball-laying holes. A cavity is opened inside the operation table. Any ball-laying hole is connected to the cavity, and the cavity is connected to the cavity. The vacuum generating device is connected; the upper side of the operating table slides with a ball laying box, the ball laying box has a box cavity with an opening at the bottom, and the operating table is provided with a driving mechanism for driving the ball laying box to move along the plane of the operating table, and the driving mechanism drives the ball laying The box slides along the upper side of the operating table, and the box cavity of the ball laying box completely sweeps the ball laying area.

针对上述中的相关技术,发明人认为,由于锡球具有一定粘性,驱动机构驱动铺球盒移动时,存在铺球盒内锡球堆积在铺球盒盒腔内一处的情况,使得部分铺球孔内无锡球进入,进而使得相应吸球治具无法吸取锡球的情况发生,进而影响BGA基板植球作业的正常进行,影响成品的合格率,存在待改进之处。In view of the above-mentioned related technologies, the inventor believes that, because the solder balls have a certain viscosity, when the driving mechanism drives the ball-laying box to move, there is a situation that the solder balls in the ball-laying box are accumulated in one place in the box cavity of the ball-laying box, so that part of the ball-laying box is stacked. There is no tin ball entering the ball hole, which makes the corresponding ball suction fixture unable to absorb the tin ball, which in turn affects the normal operation of the BGA substrate ball planting operation, and affects the qualified rate of the finished product. There is room for improvement.

发明内容SUMMARY OF THE INVENTION

为了提升BGA基板植球作业的稳定性,提升成品合格率,本申请提供一种基于BGA植球技术的铺球装置。In order to improve the stability of the ball-mounting operation of the BGA substrate and improve the qualified rate of finished products, the present application provides a ball-laying device based on the BGA ball-mounting technology.

本申请提供的一种基于BGA植球技术的铺球装置,采用如下的技术方案:A kind of ball-laying device based on BGA ball-planting technology provided by the application adopts the following technical scheme:

一种基于BGA植球技术的铺球装置,包括底座以及转动设置于底座上的安装架,所述安装架的转动轴线呈水平设置,所述底座上设置有用于驱动安装架转动的转动组件;所述安装架上安装有铺球台,所述铺球台上侧规则排布有多个铺球孔;所述铺球台的内部形成有中空腔室,且任一所述铺球孔均与中空腔室连通,所述中空腔室与外接真空发生装置连通;所述铺球台上侧滑移设置有供料盒,所述供料盒内沿铺球台厚度方向贯穿开设有盛料腔,所述盛料腔的底面与铺球台上侧面滑移配合;所述铺球台上设置有用于驱动供料盒滑移的滑移组件;使用时,所述滑移组件驱动供料盒沿铺球台上表面滑移并扫过全部铺球孔。A ball-laying device based on BGA ball-planting technology, comprising a base and a mounting frame rotatably arranged on the base, the rotation axis of the mounting frame is arranged horizontally, and a rotating component for driving the rotation of the mounting frame is arranged on the base; A ball laying table is installed on the mounting frame, and a plurality of ball laying holes are regularly arranged on the upper side of the ball laying table; a hollow cavity is formed inside the ball laying table, and any of the ball laying holes is connected with the hollow cavity. The hollow chamber is communicated with the external vacuum generating device; the upper side of the ball-laying table is slidably provided with a feeding box, and a material-receiving cavity is opened in the feeding box along the thickness direction of the ball-laying table, and the feeding box is provided. The bottom surface of the material cavity is slidingly matched with the upper side of the ball-laying table; the ball-laying table is provided with a sliding component for driving the sliding of the feeding box; when in use, the sliding component drives the feeding box to slide along the upper surface of the ball-laying table Move and sweep all the ball holes.

通过采用上述技术方案,实际使用时,工作人员首先将数量足以覆盖盛料腔底面的锡球装入供料盒的盛料腔内,并开启外接真空发生装置;然后,滑移组件驱动供料盒相对铺球台上表面滑移;与此同时,转动组件驱动安装架及其上铺球台绕安装架的水平轴线转动;待供料盒的盒底扫过铺球孔时,由于转动组件的驱动作用,供料盒内的锡球在盛料腔内较高一侧向较低一侧滚动;由于外接真空发生装置使中空腔室内形成负压环境,从而将锡球逐个落入相应铺球孔内,并被固定吸附于对应铺球孔中;供料盒沿铺球台表面的逐渐移动,直至任一铺球孔内均落有一颗锡球,以此完成铺球作业;采用此种方式,有效提升吸球治具吸取铺球台上相应位置锡球的准确性,进而有助于保证BGA基板植球作业的正常进行,并提升成品合格率。By adopting the above technical solution, in actual use, the staff first puts enough tin balls to cover the bottom surface of the material holding cavity into the material holding cavity of the feeding box, and turns on the external vacuum generating device; then, the sliding component drives the feeding The box slides relative to the upper surface of the ball laying table; at the same time, the rotating assembly drives the mounting frame and its upper ball laying table to rotate around the horizontal axis of the mounting frame; when the bottom of the feeding box sweeps through the ball laying hole, due to the driving of the rotating assembly As a result, the tin balls in the feeding box roll from the higher side to the lower side in the material holding cavity; due to the external vacuum generating device, a negative pressure environment is formed in the hollow cavity, so that the tin balls fall into the corresponding ball-laying holes one by one. inside, and is fixed and adsorbed in the corresponding ball-laying holes; the feeding box gradually moves along the surface of the ball-laying table until a tin ball falls in any ball-laying hole, so as to complete the ball-laying operation; in this way, Effectively improve the accuracy of the ball suction fixture to absorb the solder balls at the corresponding position on the ball placement table, thereby helping to ensure the normal operation of the BGA substrate ball planting operation, and improve the qualified rate of finished products.

优选的,所述供料盒上沿自身进给方向靠近铺球孔的一端安装有刮板,所述刮板下端面与铺球台上表面滑移配合。Preferably, a scraper is installed on one end of the feeding box close to the ball laying hole along its own feeding direction, and the lower end surface of the scraper is slidingly matched with the upper surface of the ball laying table.

通过采用上述技术方案,由于锡球具有一定的粘性,实际作业过程中,滑移组件驱动供料盒在铺球台上侧面滑移的同时,刮板与铺球台上表面相对滑移,以此刮动铺球台上表面的锡球,使锡球落入对应铺球孔内,从而保证铺球区域的锡球均位于锡球孔内,有效提升吸球治具吸取铺球台上铺球区域内锡球的准确性,提升BGA基板植球作业的准确性,进而提升成品合格率。By adopting the above technical solution, since the solder balls have a certain viscosity, in the actual operation process, when the sliding component drives the feeding box to slide on the side of the ball-laying table, the scraper and the upper surface of the ball-laying table slide relative to each other. Move the tin balls on the upper surface of the ball table, so that the tin balls fall into the corresponding ball laying holes, so as to ensure that the solder balls in the ball laying area are located in the tin ball holes, and effectively improve the suction jig to absorb the tin in the ball laying area on the ball laying table. The accuracy of the ball improves the accuracy of the BGA substrate ball mounting operation, thereby improving the qualified rate of finished products.

优选的,所述供料盒位于盛料腔的上端开口处可拆卸固定罩设有盖板,所述盖板上开设有与盛料腔连通的进料口。Preferably, the detachable fixed cover of the feeding box is located at the upper end opening of the material holding cavity and is provided with a cover plate, and the cover plate is provided with a feeding port communicating with the material holding cavity.

通过采用上述技术方案,利用盖板罩设供料盒的上端开口,有助于减少铺球台转动时,供料盒内锡球从盛料腔上端开口处甩出的情况发生,以此保证铺球作业的正常进行。By adopting the above technical solution, the cover plate is used to cover the upper end opening of the feeding box, which helps to reduce the occurrence of tin balls in the feeding box being thrown out from the upper end opening of the material holding cavity when the ball-laying table rotates, so as to ensure the paving normal operation of the ball.

优选的,所述铺球台位于中空腔室的上侧可拆卸固定连接有铺球板,所述铺球板上表面与铺球台上侧面平齐,所述铺球孔开设于铺球台上;所述铺球台上位于供料盒进给方向背离铺球孔的一端可拆卸设置有余料收集盒,所述余料收集盒的开口朝上设置,且所述供料盒的下表面与余料收集盒的上表面滑移配合。Preferably, the ball-laying table is located on the upper side of the hollow chamber and is detachably and fixedly connected with a ball-laying plate, the surface of the ball-laying plate is flush with the upper side of the ball-laying table, and the ball-laying hole is opened on the ball-laying table; A residual material collection box is detachably provided on the ball-laying table at the end of the feeding box that is away from the ball-spreading hole in the feeding direction. The upper surface of the box is a slip fit.

通过采用上述技术方案,当BGA基板上待焊接的锡球型号更换时,滑移组件驱动供料盒向余料收集盒一侧滑移;待供料盒运动至余料收集盒上方后,盛料腔与余料收集盒上端开口连通,盛料腔内的剩余锡球从盛料腔落入余料收集盒内进行收集;之后,工作人员将装有剩余锡球的余料收集盒从铺球台上取下,并更换上空的余料收集盒;同时,更换铺球台上原有的铺球板,使铺球台上铺球孔的尺寸适配新锡球的铺设要求,随后再进行新型号锡球的铺设作业,有效扩大该铺球装置的适用范围。By adopting the above technical solution, when the type of solder balls to be soldered on the BGA substrate is changed, the sliding component drives the feeding box to slide to the side of the residual material collecting box; after the feeding box moves to the top of the residual material collecting box, the The material cavity is communicated with the opening at the upper end of the residual material collection box, and the remaining solder balls in the material storage cavity fall into the residual material collection box from the material holding cavity for collection; after that, the staff removes the residual material collection box containing the remaining solder balls from the Remove from the ball table and replace the remaining material collection box above; at the same time, replace the original ball laying board on the ball laying table, so that the size of the ball laying hole on the ball laying table can be adapted to the laying requirements of the new tin balls, and then the new type of tin is carried out. The ball laying operation effectively expands the application scope of the ball laying device.

优选的,所述余料收集盒上位于供料盒进给方向的两端均设置有卡接耳,任一所述卡接耳均固定于余料收集盒靠近铺球台的一侧,所述卡接耳的中部位置开设有卡接槽;所述铺球台上对应卡接耳设置有锁扣,所述锁扣的挂环均嵌入卡接槽内,并与卡接槽卡接配合。Preferably, both ends of the residual material collection box in the feeding direction of the feeding box are provided with clipping ears, and any of the clipping ears is fixed on the side of the residual material collection box close to the ball-laying table. The middle position of the clamping lug is provided with a clamping groove; the corresponding clamping lug is provided with a lock on the ball-laying table, and the hanging rings of the lock are embedded in the clamping groove and are engaged with the clamping groove.

通过采用上述技术方案,利用锁扣挂环与卡接槽的卡接配合,实现余料收集盒与铺球台的可拆卸固定连接,连接结构简单,便于工作人员操作。By adopting the above technical solution, the detachable and fixed connection between the residual material collecting box and the ball-laying table is realized by using the snap-fit of the locking ring and the snap-fit slot, and the connection structure is simple and convenient for the staff to operate.

优选的,所述转动组件包括底板与支撑耳,所述底板呈水平设置,所述支撑耳于底板上侧平行间隔设置有两个;所述支撑架上水平固定有转动轴,所述转动轴呈水平设置,所述转动轴的两端分别贯穿对应支撑耳,并与所述支撑耳转动连接;所述转动组件包括安装于底座上的伺服电机,所述伺服电机的输出轴与转动轴同轴传动连接。Preferably, the rotating assembly includes a bottom plate and a supporting lug, the bottom plate is arranged horizontally, and two supporting lugs are arranged on the upper side of the bottom plate in parallel and spaced apart; a rotating shaft is horizontally fixed on the support frame, and the rotating shaft The two ends of the rotating shaft are arranged horizontally, and the two ends of the rotating shaft respectively penetrate the corresponding supporting ears and are rotatably connected with the supporting ears; the rotating assembly includes a servo motor mounted on the base, and the output shaft of the servo motor is the same as the rotating shaft. Shaft drive connection.

通过采用上述技术方案,利用伺服电机驱动安装架转动,驱动结构简单,有助于提升制造该铺球装置时的便捷性,节省企业生产成本。By adopting the above technical scheme, the servo motor is used to drive the mounting frame to rotate, and the driving structure is simple, which helps to improve the convenience of manufacturing the ball laying device and saves the production cost of the enterprise.

优选的,所述安装架上位于转动轴的下侧设置有配重块。Preferably, a counterweight is provided on the mounting frame on the lower side of the rotating shaft.

通过采用上述技术方案,配重块用于平衡安装架两端重量差,从而减少因安装架上端的铺球台质量过大,致使驱动电机堵转的情况发生,有助于延长伺服电机的使用寿命。By adopting the above technical solution, the counterweight is used to balance the weight difference between the two ends of the mounting frame, thereby reducing the situation that the driving motor is blocked due to the excessive mass of the ball-laying table at the upper end of the mounting frame, which helps to prolong the service life of the servo motor. .

优选的,所述滑移组件包括设置于铺球台上的滑轨,所述滑轨的长度方向平行于供料盒的进给方向,所述供料盒上对应滑轨匹配有滑座;所述铺球台上还设置有用于驱动滑座沿滑轨长度方向滑移的驱动件。Preferably, the sliding assembly includes a sliding rail arranged on the ball-laying table, the length direction of the sliding rail is parallel to the feeding direction of the feeding box, and the corresponding sliding rail on the feeding box is matched with a sliding seat; The ball-laying table is also provided with a driving member for driving the sliding seat to slide along the length direction of the sliding rail.

通过采用上述技术方案,实际作业中,驱动件驱动滑座沿滑轨长度方向往复滑移,以此实现供料盒在铺球台表面的滑移运动,滑移组件结构简单,有助于进一步节省企业生产成本。By adopting the above technical solution, in actual operation, the driving element drives the sliding seat to reciprocate and slide along the length direction of the sliding rail, so as to realize the sliding movement of the feeding box on the surface of the ball-laying table, and the sliding component has a simple structure, which is conducive to further saving Enterprise production costs.

综上所述,本申请包括以下至少一种有益技术效果:To sum up, the present application includes at least one of the following beneficial technical effects:

借助转动组件驱动铺球台转动,使得供料盒内的锡球在盛料腔内较高一侧向较低一侧滚动,有效减少因锡球堆积在供料盒盒腔内一处,致使部分铺球孔内无锡球进入的情况发生,从而提升铺球台供球作业的稳定性,进而有效提升吸球治具吸取铺球台上相应位置锡球的准确性,进而提升成品合格率;The ball-laying table is driven by the rotating component to rotate, so that the tin balls in the feeding box roll from the higher side to the lower side in the feeding cavity, which can effectively reduce the accumulation of tin balls in one place in the feeding box cavity, causing some problems. The situation that no tin balls enter in the ball-laying hole, thus improving the stability of the ball-supplying operation of the ball-laying table, thereby effectively improving the accuracy of the ball suction fixture to absorb the solder balls at the corresponding position on the ball-laying table, thereby improving the qualified rate of finished products;

利用可拆卸设置于铺球台上的铺球板、余料收集盒,使该植球装置满足不同尺寸锡球的铺设要求,有助于扩大该植球装置的适用范围,增加其实用性;The ball-laying board and the residual material collection box are detachably arranged on the ball-laying table, so that the ball-planting device can meet the laying requirements of tin balls of different sizes, which is helpful to expand the application range of the ball-planting device and increase its practicability;

通过设置配重块,有效减少电机驱动安装架转动时损坏的情况发生,进而有效延长电机的使用寿命。By setting the counterweight block, it can effectively reduce the occurrence of damage when the motor drives the mounting frame to rotate, thereby effectively prolonging the service life of the motor.

附图说明Description of drawings

图1是本申请实施例主要体现该基于BGA植球技术的铺球装置整体结构的轴测示意图。FIG. 1 is a schematic axonometric view mainly embodying the overall structure of the ball placement device based on the BGA ball placement technology according to an embodiment of the present application.

图2是本申请实施例主要体现中空腔室开设位置的爆炸结构示意图。FIG. 2 is a schematic diagram of an explosion structure mainly embodying the opening position of the hollow chamber according to the embodiment of the present application.

图3是本申请实施例主要体现滑移组件整体结构的轴测示意图。FIG. 3 is a schematic axonometric view mainly embodying the overall structure of the sliding assembly according to the embodiment of the present application.

图4是图2中A部分的放大图,主要用于体现余料收集盒与铺球台之间的连接结构。FIG. 4 is an enlarged view of part A in FIG. 2 , which is mainly used to illustrate the connection structure between the residual material collection box and the ball-laying table.

附图标记:1、底座;11、底板;12、支撑耳;13、托架;2、安装架;21、支撑臂;22、转动轴;3、转动组件;31、伺服电机;4、铺球台;41、铺球板;411、铺球孔;42、中空腔室;43、通气口;5、供料盒;51、盛料腔;52、连接板;53、支撑板;54、盖板;55、进料嘴;6、滑移组件;61、滑轨;62、滑座;7、余料收集盒;8、连接结构;81、卡接耳;811、卡接槽;82、锁扣;9、刮板;10、配重块。Reference numerals: 1, base; 11, bottom plate; 12, support ear; 13, bracket; 2, mounting frame; 21, support arm; 22, rotating shaft; 3, rotating assembly; 31, servo motor; 4, shop Table; 41. Ball-laying plate; 411. Ball-laying hole; 42. Hollow chamber; 43. Ventilation port; 5. Feeding box; plate; 55, feed nozzle; 6, slide assembly; 61, slide rail; 62, slide seat; 7, residual material collection box; 8, connection structure; 81, snap-on ear; 811, snap-on slot; 82, Lock; 9. Scraper; 10. Counterweight.

具体实施方式Detailed ways

以下结合附图1-4,对本申请作进一步详细说明。The present application will be further described in detail below with reference to the accompanying drawings 1-4.

本申请实施例公开一种基于BGA植球技术的铺球装置。The embodiment of the present application discloses a ball placement device based on the BGA ball placement technology.

参照图1和图2,一种基于BGA植球技术的铺球装置,包括水平设置的底座1、转动设置于底座1上的安装架2,安装架2的转动轴22向平行于底座1的长度方向,底座1上设置有用于驱动安装架2转动的转动组件3;安装架2上侧安装有铺球台4;初始状态时,铺球台4呈水平设置,铺球台4上侧按阵列形式开设有多个铺球孔411;铺球台4上开设有中空腔室42,任一铺球孔411均与中空腔室42连通,中空腔室42与外接真空发生装置连通;铺球台4上侧滑移设置有供料盒5,供料盒5中部沿铺球台4厚度方向贯穿开设有盛料腔51,供料盒5的底面与铺球台4上表面滑移配合;铺球台4上设置有用于驱动供料盒5滑移的滑移组件6;使用时,滑移组件6驱动供料盒5沿铺球台4上表面滑移并扫过全部铺球孔411。Referring to FIGS. 1 and 2 , a ball-laying device based on BGA ball-planting technology includes a horizontally arranged base 1 and a mounting frame 2 that is rotatably arranged on the base 1 . In the length direction, the base 1 is provided with a rotating assembly 3 for driving the mounting frame 2 to rotate; the mounting frame 2 is provided with a ball-laying table 4 on the upper side; in the initial state, the ball-laying table 4 is arranged horizontally, and the upper side of the ball-laying table 4 is opened in an array form There are a plurality of ball laying holes 411; the ball laying table 4 is provided with a hollow chamber 42, any ball laying hole 411 is communicated with the hollow chamber 42, and the hollow chamber 42 is communicated with an external vacuum generating device; the ball laying table 4 slides sideways There is a feeding box 5, the middle of the feeding box 5 is provided with a material holding cavity 51 along the thickness direction of the ball laying table 4, and the bottom surface of the feeding box 5 is slidingly matched with the upper surface of the ball laying table 4; The sliding assembly 6 that drives the feeding box 5 to slide; when in use, the sliding assembly 6 drives the feeding box 5 to slide along the upper surface of the ball laying table 4 and sweep all the ball laying holes 411 .

实际作业时,工作人员首先将一定数量的锡球自盛料腔51的上端开口装入供料盒5内,并开启外接真空发生装置;然后,启动滑移组件6,滑移组件6驱动供料盒5相对铺球台4上表面向铺球孔411一侧滑移;与此同时,转动组件3驱动安装架2及其上铺球台4转动,铺球台4带动供料盒5转动,使得供料盒5内锡球自盛料腔51内较高一侧向较低侧滚动;待供料腔扫过铺球区域,且锡球运动至铺球孔411处时,由于外接真空发生装置使中空腔室42内形成负压环境,使得锡球被吸附在对应铺球孔411内,如此循环,直至所有铺料孔内均装入锡球;之后,转动组件3驱动安装架2转动,使铺球台4恢复水平状态;随后,滑移组件6再驱动供料盒5从铺球区域撤离,以此完成铺球作业。During the actual operation, the staff first loads a certain number of tin balls into the feeding box 5 from the upper opening of the material holding cavity 51, and turns on the external vacuum generating device; then, the sliding assembly 6 is activated, and the sliding assembly 6 drives the supply. The material box 5 slides relative to the upper surface of the ball-laying table 4 to the side of the ball-laying hole 411; at the same time, the rotating assembly 3 drives the mounting frame 2 and its upper ball-laying table 4 to rotate, and the ball-laying table 4 drives the feeding box 5 to rotate, so that the supply The solder balls in the material box 5 roll from the higher side to the lower side in the material holding cavity 51; when the supply cavity sweeps over the ball-laying area and the solder balls move to the ball-laying hole 411, the external vacuum generating device makes the solder balls roll. A negative pressure environment is formed in the hollow chamber 42, so that the solder balls are adsorbed in the corresponding ball-laying holes 411, and the cycle is repeated until all the material-laying holes are filled with solder balls; after that, the rotating assembly 3 drives the mounting frame 2 to rotate, so that the The ball-laying table 4 is restored to a horizontal state; then, the sliding assembly 6 drives the feeding box 5 to withdraw from the ball-laying area, thereby completing the ball-laying operation.

具体而言,参照图2,铺球台4呈矩形板状结构,且铺球台4的长度方向平行于底座1的长度方向;中空腔室42开设于铺球台4宽度方向的一端,铺球台4下侧开设有通气口43,外接真空发生装置通过通气口43与中空腔室42连通。铺球台4上位于中空腔室42的开口处密封罩设有铺球板41,铺球板41通过固定螺栓与铺球台4可拆卸固定连接,铺球孔411开设于铺球板41上,且供料盒5下侧面与铺球板41滑移配合。并且,为保证一个铺球孔411内只盛放一颗锡球,任一铺球孔411均呈开口大、底部小结构,任一铺球孔411的大口端尺寸均略大于锡球直径尺寸,任一铺球孔411的小口端尺寸均小于锡球直径尺寸,且任一铺球孔411的深度尺寸均等于锡球直径尺寸。Specifically, referring to FIG. 2 , the ball-laying table 4 has a rectangular plate-like structure, and the length direction of the ball-laying table 4 is parallel to the length direction of the base 1; A vent 43 is provided on the side, and the external vacuum generating device communicates with the hollow chamber 42 through the vent 43 . The ball-laying table 4 is provided with a ball-laying plate 41 on the sealing cover at the opening of the hollow chamber 42, and the ball-laying plate 41 is detachably and fixedly connected with the ball-laying table 4 through fixing bolts. The ball-laying hole 411 is opened on the ball-laying plate 41, and The lower side of the feeding box 5 is slidingly matched with the ball-laying board 41 . In addition, in order to ensure that only one solder ball is contained in a ball-laying hole 411, any ball-laying hole 411 has a structure with a large opening and a small bottom, and the size of the large mouth end of any ball-laying hole 411 is slightly larger than the diameter of the solder ball. , the size of the small mouth of any ball-laying hole 411 is smaller than the diameter of the solder ball, and the depth of any ball-laying hole 411 is equal to the diameter of the solder ball.

参照图3,供料盒5呈矩形板状结构,供料盒5的长度方向平行于铺球台4的长度方向;供料盒5长度方向的两端均设置有连接板52,任一连接板52均呈竖直设置,且任一连接板52背离铺球台4的一端均安装有支撑板53,任一支撑板53背离连接板52的一端均伸入铺球台4下侧。滑移组件6包括设置于铺球台4下侧的滑轨61,滑轨61在铺球台4长度方向的两端均设置有一条,任一滑轨61的长度方向均平行于铺球台4的宽度方向;滑移组件6还包括设置于支撑板53上侧的滑座62,滑座62与滑轨61呈对应设置,任一滑座62均与对应滑轨61相匹配;铺球台4上还设置有用于驱动滑座62沿滑轨61长度方向滑移的驱动件。使用时,驱动件驱动滑座62沿滑轨61长度方向往复滑移,使得滑座62带动供料盒5沿铺球台4宽度方向往复滑移,以此实现对供料盒5的驱动作业。Referring to FIG. 3 , the feeding box 5 has a rectangular plate-like structure, and the length direction of the feeding box 5 is parallel to the length direction of the ball-laying table 4; 52 are arranged vertically, and a support plate 53 is installed at one end of any connecting plate 52 facing away from the table 4 , and one end of any supporting plate 53 facing away from the connecting plate 52 extends into the lower side of the table 4 . The sliding assembly 6 includes a sliding rail 61 arranged on the lower side of the ball-laying table 4 . The sliding rails 61 are provided with one at both ends of the length direction of the ball-laying table 4 , and the length direction of any sliding rail 61 is parallel to the width of the ball-laying table 4 . The sliding assembly 6 also includes a sliding seat 62 arranged on the upper side of the support plate 53, the sliding seat 62 and the sliding rail 61 are arranged correspondingly, and any sliding seat 62 is matched with the corresponding sliding rail 61; A driving member for driving the sliding seat 62 to slide along the length direction of the sliding rail 61 is provided. When in use, the driving element drives the sliding seat 62 to reciprocate sliding along the length direction of the slide rail 61 , so that the sliding seat 62 drives the feeding box 5 to reciprocate sliding along the width direction of the table 4 , so as to realize the driving operation of the feeding box 5 .

并且,参照图2和图4,供料盒5位于盛料腔51背离铺球台4一侧的开口处罩设有盖板54,盖板54通过螺栓与供料盒5可拆卸固定连接,盖板54用于减少铺球台4转动时锡球从盛料腔51上端开口脱出的情况发生;同时,盖板54上安装有与锡球尺寸匹配的进料嘴55。2 and 4 , the opening of the feeding box 5 located on the side of the feeding cavity 51 away from the ball-laying table 4 is covered with a cover plate 54, and the cover plate 54 is detachably and fixedly connected to the feeding box 5 through bolts. The plate 54 is used to reduce the occurrence of solder balls coming out from the upper opening of the material holding cavity 51 when the ball placement table 4 is rotated; meanwhile, the cover plate 54 is provided with a feeding nozzle 55 that matches the size of the solder balls.

铺球台4宽度方向背离中空腔室42的一端设置有余料收集盒7,余料收集盒7与铺球台4设置有连接结构8,余料收集盒7与铺球台4通过连接结构8可拆卸固定连接;余料收集盒7的开口朝上设置,余料收集盒7的下表面与铺球板41抵接,且余料收集盒7的上端面与供料盒5的下表面滑移配合。The end of the ball laying table 4 away from the hollow chamber 42 in the width direction is provided with a residual material collection box 7, and the residual material collection box 7 and the ball laying table 4 are provided with a connecting structure 8, and the residual material collecting box 7 and the ball laying table 4 are detachable and fixed through the connecting structure 8 Connection; the opening of the residual material collection box 7 is set upward, the lower surface of the residual material collection box 7 is in contact with the ball-laying plate 41 , and the upper end surface of the residual material collection box 7 is slidingly matched with the lower surface of the feeding box 5 .

连接结构8包括设置于余料收集盒7长度方向两端的卡接耳81,任一卡接耳81上侧的中部开设有卡接槽811;连接结构8还包括设置于铺球台4上的锁扣82,锁扣82与卡接耳81呈对应设置,锁扣82的挂环嵌入卡接槽811内,并与卡接槽811底面固定抵接。The connection structure 8 includes snap-fit ears 81 arranged at both ends of the residual material collection box 7 in the length direction, and a snap-fit slot 811 is opened in the middle of the upper side of any snap-fit ear 81; Buckle 82 , the lock buckle 82 is arranged corresponding to the engaging ear 81 , and the hanging ring of the locking buckle 82 is embedded in the engaging groove 811 and is in fixed contact with the bottom surface of the engaging groove 811 .

当待焊锡球的型号需要更换时,供料盒5沿铺球台4宽度方向向余料收集盒7一侧滑移,待供料盒5运动至余料收集盒7上方后,盛料腔51与余料收集盒7上端开口连通,盛料腔51内的剩余锡球从盛料腔51落入余料收集盒7内进行收集;然后,工作人员扳动锁扣82扳手,并将锁扣82的挂环从卡接槽811内取出,从而将装有剩余锡球的余料收集盒7从铺球台4上取下;之后,更换上空的余料收集盒7;随后,工作人员更换铺球台4上原有的铺球板41,使铺球板41上的铺球孔411尺寸与待焊锡球尺寸匹配,以此满足不同型号锡球的铺设要求。When the type of the solder balls to be soldered needs to be replaced, the feeding box 5 slides to the side of the residual material collecting box 7 along the width direction of the ball laying table 4. After the feeding box 5 moves to the top of the residual material collecting box 7, the material holding cavity 51 It is communicated with the upper end opening of the residual material collection box 7, and the remaining tin balls in the material holding cavity 51 fall into the residual material collection box 7 from the material holding cavity 51 for collection; The hanging ring of 82 is taken out from the snap groove 811, so that the residual material collection box 7 containing the remaining solder balls is removed from the ball-laying table 4; after that, the empty residual material collection box 7 is replaced; The original ball-laying plate 41 on the table 4 matches the size of the ball-laying hole 411 on the ball-laying plate 41 with the size of the solder balls to be soldered, so as to meet the laying requirements of different types of solder balls.

另外,参照图1,供料盒5背离余料收集盒7的一侧安装有刮板9,刮板9的长度方向平行于铺球台4的长度方向,挂板的下端面与铺球板41、铺球台4及余料收集盒7的上端面滑移配合。由于锡球具有一定粘性,供料盒5带动盛料腔51内锡球运动的同时,刮板9与铺球板41上表面相对滑移,以此推动锡球,从而进一步减少锡球在盛料腔51内推挤的情况发生;刮板9同时将铺球孔411边缘的锡球推入对应铺球孔411内,有助于减少锡球在铺球板41上侧粘黏的情况发生。In addition, referring to FIG. 1 , a scraper 9 is installed on the side of the supply box 5 away from the residual material collection box 7 , the length direction of the scraper 9 is parallel to the length direction of the ball-laying table 4 , and the lower end surface of the hanging plate is connected to the ball-laying board 41 . , The upper end surface of the ball-laying table 4 and the residual material collecting box 7 are slidingly matched. Since the solder balls have a certain viscosity, while the feeding box 5 drives the solder balls in the container 51 to move, the scraper 9 and the upper surface of the ball laying plate 41 slide relative to each other, thereby pushing the solder balls, thereby further reducing the amount of solder balls in the storage chamber 51. The situation of pushing in the material cavity 51 occurs; the scraper 9 pushes the solder balls on the edge of the ball-laying holes 411 into the corresponding ball-laying holes 411 at the same time, which helps to reduce the sticking of the solder balls on the upper side of the ball-laying plate 41. .

参照图1和图2,底座1包括底板11与支撑耳12,底板11呈水平设置,支撑耳12沿底板11长度方向平行间隔设置有两个;安装架2设置于两个支撑耳12之间,安装架2包括沿底板11长度方向平行间隔设置的两个支撑臂21,两个支撑臂21上沿底板11长度方向贯穿设置有转动轴22,任一支撑臂21均与转动轴22固定连接,且转动轴22的两端分别贯穿对应支撑耳12,并与对应支撑耳12转动连接。其中,一个支撑耳12背离支撑臂21的一侧安装有托架13;本申请的此实施例中,转动组件3包括伺服电机31,伺服电机31的壳体固定于托架13上,且伺服电机31的输出轴与转动轴22同轴传动连接。使用时,伺服电机31的输出轴转动,带动转动轴22同步转动,转动轴22又带动安装架2绕转动轴22轴线转动,以此实现对安装架2的驱动。1 and 2 , the base 1 includes a bottom plate 11 and support ears 12 , the bottom plate 11 is arranged horizontally, and two support ears 12 are arranged in parallel and spaced apart along the length direction of the bottom plate 11 ; the mounting frame 2 is arranged between the two support ears 12 , the mounting frame 2 includes two support arms 21 arranged in parallel and spaced along the length direction of the base plate 11 , the two support arms 21 are provided with a rotating shaft 22 along the length direction of the base plate 11 , and any support arm 21 is fixedly connected with the rotating shaft 22 , and the two ends of the rotating shaft 22 respectively penetrate through the corresponding support ears 12 and are rotatably connected with the corresponding support ears 12 . A bracket 13 is installed on the side of one support ear 12 away from the support arm 21; in this embodiment of the present application, the rotating assembly 3 includes a servo motor 31, and the housing of the servo motor 31 is fixed on the bracket 13, and the servo motor 31 is fixed on the bracket 13. The output shaft of the motor 31 is coaxially connected to the rotating shaft 22 for transmission. When in use, the output shaft of the servo motor 31 rotates to drive the rotating shaft 22 to rotate synchronously, and the rotating shaft 22 drives the mounting frame 2 to rotate around the axis of the rotating shaft 22 , so as to drive the mounting frame 2 .

同时,为延长伺服电机31的使用寿命,安装架2上位于转动轴22背离铺球台4的一端安装有配重块10,任一支撑臂21均与配重块10固定连接;配重块10用于平衡安装架2两端的重量差,减少伺服电机31驱动安装架2转动时发生堵转的情况。At the same time, in order to prolong the service life of the servo motor 31, a counterweight 10 is installed on the mounting frame 2 at the end of the rotating shaft 22 away from the table 4, and any support arm 21 is fixedly connected to the counterweight 10; the counterweight 10 It is used to balance the weight difference between the two ends of the mounting frame 2 and reduce the situation of stalling when the servo motor 31 drives the mounting frame 2 to rotate.

本申请实施例一种基于BGA植球技术的铺球装置的实施原理为:实际作业时,工作人员自进料口向盛料腔51内装入一定数量的锡球,并开启外接真空发生装置;然后,驱动件驱动供料盒5沿铺球台4宽度方向向铺球孔411一侧滑移;与此同时,伺服电机31驱动安装架2及铺球台4转动,使得盛料腔51内的锡球自铺球台4上较高一侧向较低一侧滚动;待锡球滚动至相应铺球孔411处时,由于外接真空发生装置使中空腔室42内形成负压环境,从而使锡球被固定吸附于相应铺球孔411内,以此实现锡球在铺球台4上的稳定铺设。The implementation principle of a ball-laying device based on the BGA ball-planting technology in the embodiment of the present application is as follows: during actual operation, the staff loads a certain number of tin balls into the material-receiving cavity 51 from the feeding port, and turns on the external vacuum generating device; Then, the driving element drives the feeding box 5 to slide to the side of the ball laying hole 411 along the width direction of the ball laying table 4; at the same time, the servo motor 31 drives the mounting frame 2 and the ball laying table 4 to rotate, so that the tin in the holding cavity 51 The ball rolls from the higher side to the lower side of the ball-laying table 4; when the solder ball rolls to the corresponding ball-laying hole 411, a negative pressure environment is formed in the hollow chamber 42 due to the external vacuum generating device, so that the solder ball The solder balls are fixed and adsorbed in the corresponding ball laying holes 411 , so as to realize the stable laying of the solder balls on the ball laying table 4 .

当待焊锡球的型号更换时,供料盒5沿铺球台4宽度方向向余料收集盒7一侧滑移,待供料盒5运动至余料收集盒7上方后,盛料腔51内的剩余锡球从盛料腔51落入余料收集盒7内进行收集;然后,工作人员将装有剩余锡球的余料收集盒7从铺球台4上取下,并换上空的余料收集盒7;随后,工作人员更换铺球台4上原有的铺球板41,使铺球板41上的铺球孔411尺寸与待焊锡球尺寸匹配,以此满足不同型号锡球的铺设要求。When the model of the solder balls to be soldered is changed, the feeding box 5 slides to the side of the residual material collecting box 7 along the width direction of the ball-laying table 4 . The remaining tin balls fall into the remaining material collection box 7 from the material holding cavity 51 for collection; then, the staff removes the remaining material collection box 7 containing the remaining tin balls from the ball-laying table 4, and replaces the empty surplus material Collection box 7; then, the staff replaces the original ball-laying board 41 on the ball-laying table 4, so that the size of the ball-laying hole 411 on the ball-laying board 41 matches the size of the solder balls to be soldered, so as to meet the laying requirements of different types of solder balls.

通过转动铺球台4,减少锡球在盛料腔51内一处堆积的情况发生,有效提升供料盒5供料作业的稳定性,进而有效保证响BGA基板植球作业的正常进行,提升成品的合格率。By rotating the ball-laying table 4, the accumulation of solder balls in one place in the material-receiving cavity 51 is reduced, and the stability of the feeding operation of the feeding box 5 is effectively improved, thereby effectively ensuring the normal operation of the BGA substrate ball-planting operation, and improving the finished product. pass rate.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.

Claims (8)

1.一种基于BGA植球技术的铺球装置,其特征在于:包括底座(1)以及转动设置于底座(1)上的安装架(2),所述安装架(2)的转动轴(22)线呈水平设置,所述底座(1)上设置有用于驱动安装架(2)转动的转动组件(3);所述安装架(2)上安装有铺球台(4),所述铺球台(4)上侧规则排布有多个铺球孔(411);所述铺球台(4)的内部形成有中空腔室(42),且任一所述铺球孔(411)均与中空腔室(42)连通,所述中空腔室(42)与外接真空发生装置连通;所述铺球台(4)上侧滑移设置有供料盒(5),所述供料盒(5)内沿铺球台(4)厚度方向贯穿开设有盛料腔(51),所述盛料腔(51)的底面与铺球台(4)上侧面滑移配合;所述铺球台(4)上设置有用于驱动供料盒(5)滑移的滑移组件(6);使用时,所述滑移组件(6)驱动供料盒(5)沿铺球台(4)上表面滑移并扫过全部铺球孔(411)。1. A ball-laying device based on BGA ball-planting technology, characterized in that it comprises a base (1) and a mounting frame (2) that is rotatably arranged on the base (1), and the rotating shaft ( 22) The lines are arranged horizontally, and the base (1) is provided with a rotating assembly (3) for driving the mounting frame (2) to rotate; A plurality of ball-laying holes (411) are regularly arranged on the upper side of the ball table (4); a hollow chamber (42) is formed inside the ball-laying table (4), and any of the ball-laying holes (411) is connected with the ball table (411). The hollow chamber (42) is communicated, and the hollow chamber (42) is communicated with an external vacuum generating device; the upper side of the ball laying table (4) is slidably provided with a feeding box (5), and the feeding box (5) ) along the thickness direction of the ball laying table (4) is provided with a material holding cavity (51), and the bottom surface of the material holding cavity (51) is slidingly matched with the upper side of the ball laying table (4); A sliding component (6) for driving the feeding box (5) to slide is provided; when in use, the sliding component (6) drives the feeding box (5) to slide and sweep along the upper surface of the ball-laying table (4). Pass all the ball holes (411). 2.根据权利要求1所述的一种基于BGA植球技术的铺球装置,其特征在于:所述供料盒(5)上沿自身进给方向靠近铺球孔(411)的一端安装有刮板(9),所述刮板(9)下端面与铺球台(4)上表面滑移配合。2. A ball-laying device based on BGA ball-planting technology according to claim 1, characterized in that: one end of the feeding box (5) close to the ball-laying hole (411) along its own feeding direction is installed with A scraper (9), the lower end surface of the scraper (9) is slidingly matched with the upper surface of the ball-laying table (4). 3.根据权利要求1所述的一种基于BGA植球技术的铺球装置,其特征在于:所述供料盒(5)位于盛料腔(51)的上端开口处可拆卸固定罩设有盖板(54),所述盖板(54)上开设有与盛料腔(51)连通的进料口。3. A ball-laying device based on BGA ball-planting technology according to claim 1, characterized in that: the feeding box (5) is located at the upper end opening of the material-receiving cavity (51), and a detachable fixed cover is provided with a detachable fixed cover. A cover plate (54) is provided on the cover plate (54) with a feed port communicating with the material holding cavity (51). 4.根据权利要求1所述的一种基于BGA植球技术的铺球装置,其特征在于:所述铺球台(4)位于中空腔室(42)的上侧可拆卸固定连接有铺球板(41),所述铺球板(41)上表面与铺球台(4)上侧面平齐,所述铺球孔(411)开设于铺球台(4)上;所述铺球台(4)上位于供料盒(5)进给方向背离铺球孔(411)的一端可拆卸设置有余料收集盒(7),所述余料收集盒(7)的开口朝上设置,且所述供料盒(5)的下表面与余料收集盒(7)的上表面滑移配合。4. A ball-laying device based on BGA ball-planting technology according to claim 1, characterized in that: the ball-laying table (4) is located on the upper side of the hollow chamber (42) and is detachably and fixedly connected with a ball-laying plate (41), the upper surface of the ball-laying board (41) is flush with the upper side of the ball-laying table (4), and the ball-laying hole (411) is opened on the ball-laying table (4); on the ball-laying table (4) A residual material collecting box (7) is detachably provided at one end of the feeding box (5) away from the ball laying hole (411) in the feeding direction, the opening of the residual material collecting box (7) is set upward, and the feeding The lower surface of the box (5) is slidingly matched with the upper surface of the residual material collecting box (7). 5.根据权利要求4所述的一种基于BGA植球技术的铺球装置,其特征在于:所述余料收集盒(7)上位于供料盒(5)进给方向的两端均设置有卡接耳(81),任一所述卡接耳(81)均固定于余料收集盒(7)靠近铺球台(4)的一侧,所述卡接耳(81)的中部位置开设有卡接槽(811);所述铺球台(4)上对应卡接耳(81)设置有锁扣(82),所述锁扣(82)的挂环挂设于卡接槽(811)内,并与卡接槽(811)底面固定抵接。5. A ball-laying device based on BGA ball-planting technology according to claim 4, characterized in that: both ends of the residual material collecting box (7) located in the feeding direction of the feeding box (5) are provided with There are clipping ears (81), any of the clipping ears (81) are fixed on the side of the residual material collection box (7) close to the ball-laying table (4), and the middle position of the clipping ears (81) is opened There is a snap groove (811); a lock (82) is provided on the ball-laying table (4) corresponding to the snap ear (81), and the hanging ring of the lock (82) is hung in the snap groove (811) inside, and is in fixed contact with the bottom surface of the snap groove (811). 6.根据权利要求1所述的一种基于BGA植球技术的铺球装置,其特征在于:底座(1)包括底板(11)与支撑耳(12),所述底板(11)呈水平设置,所述支撑耳(12)于底板(11)上侧平行间隔设置有两个;所述安装架(2)上水平固定有转动轴(22),所述转动轴(22)呈水平设置,所述转动轴(22)的两端分别贯穿对应支撑耳(12),并与所述支撑耳(12)转动连接;所述转动组件(3)包括安装于底座(1)上的伺服电机(31),所述伺服电机(31)的输出轴与转动轴(22)同轴传动连接。6. A ball laying device based on BGA ball planting technology according to claim 1, characterized in that: the base (1) comprises a bottom plate (11) and support ears (12), and the bottom plate (11) is arranged horizontally , the support ears (12) are provided with two parallel intervals on the upper side of the bottom plate (11); a rotating shaft (22) is fixed horizontally on the mounting frame (2), and the rotating shaft (22) is arranged horizontally, Both ends of the rotating shaft (22) respectively penetrate the corresponding support ears (12) and are rotatably connected with the support ears (12); the rotating assembly (3) includes a servo motor ( 31), the output shaft of the servo motor (31) is coaxially connected to the rotating shaft (22). 7.根据权利要求1所述的一种基于BGA植球技术的铺球装置,其特征在于:所述安装架(2)上位于转动轴(22)的下侧设置有配重块(10)。7. A ball-laying device based on BGA ball-planting technology according to claim 1, characterized in that: a counterweight (10) is provided on the mounting frame (2) on the lower side of the rotating shaft (22) . 8.根据权利要求1所述的一种基于BGA植球技术的铺球装置,其特征在于:所述滑移组件(6)包括设置于铺球台(4)上的滑轨(61),所述滑轨(61)的长度方向平行于供料盒(5)的进给方向,所述供料盒(5)上对应滑轨(61)匹配有滑座(62);所述铺球台(4)上还设置有用于驱动滑座(62)沿滑轨(61)长度方向滑移的驱动件。8. A ball-laying device based on BGA ball-planting technology according to claim 1, characterized in that: the sliding assembly (6) comprises a sliding rail (61) arranged on the ball-laying table (4), so The length direction of the sliding rail (61) is parallel to the feeding direction of the feeding box (5), and a sliding seat (62) is matched with the sliding rail (61) on the feeding box (5); 4) A driving member for driving the sliding seat (62) to slide along the length direction of the sliding rail (61) is also provided on it.
CN202210203371.4A 2022-03-02 2022-03-02 A ball laying device based on BGA ball planting technology Active CN114724980B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210203371.4A CN114724980B (en) 2022-03-02 2022-03-02 A ball laying device based on BGA ball planting technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210203371.4A CN114724980B (en) 2022-03-02 2022-03-02 A ball laying device based on BGA ball planting technology

Publications (2)

Publication Number Publication Date
CN114724980A true CN114724980A (en) 2022-07-08
CN114724980B CN114724980B (en) 2022-12-20

Family

ID=82236204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210203371.4A Active CN114724980B (en) 2022-03-02 2022-03-02 A ball laying device based on BGA ball planting technology

Country Status (1)

Country Link
CN (1) CN114724980B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115714090A (en) * 2022-11-22 2023-02-24 上海世禹精密机械有限公司 Vacuum ball laying mechanism
CN115985790A (en) * 2023-01-10 2023-04-18 上海世禹精密设备股份有限公司 Full-sealed tin ball supply device for ball planting machine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030127501A1 (en) * 2002-01-08 2003-07-10 Asm Automation Assembly Ltd Apparatus and method of placing solder balls onto a substrate
CN103311137A (en) * 2012-03-06 2013-09-18 上海微松工业自动化有限公司 Automatic supply equipment for solder ball positioning in high-density chip packaging
JP2015142064A (en) * 2014-01-30 2015-08-03 澁谷工業株式会社 Conductive ball array device
JP2016184609A (en) * 2015-03-25 2016-10-20 澁谷工業株式会社 Mount device for conductive ball
CN112164665A (en) * 2020-09-30 2021-01-01 深圳市立可自动化设备有限公司 Ball distributing device and ball planting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030127501A1 (en) * 2002-01-08 2003-07-10 Asm Automation Assembly Ltd Apparatus and method of placing solder balls onto a substrate
CN103311137A (en) * 2012-03-06 2013-09-18 上海微松工业自动化有限公司 Automatic supply equipment for solder ball positioning in high-density chip packaging
JP2015142064A (en) * 2014-01-30 2015-08-03 澁谷工業株式会社 Conductive ball array device
JP2016184609A (en) * 2015-03-25 2016-10-20 澁谷工業株式会社 Mount device for conductive ball
CN112164665A (en) * 2020-09-30 2021-01-01 深圳市立可自动化设备有限公司 Ball distributing device and ball planting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115714090A (en) * 2022-11-22 2023-02-24 上海世禹精密机械有限公司 Vacuum ball laying mechanism
CN115985790A (en) * 2023-01-10 2023-04-18 上海世禹精密设备股份有限公司 Full-sealed tin ball supply device for ball planting machine

Also Published As

Publication number Publication date
CN114724980B (en) 2022-12-20

Similar Documents

Publication Publication Date Title
CN114724980B (en) A ball laying device based on BGA ball planting technology
CN212263828U (en) Screening device for crystal processing
CN103141191B (en) Air suction plate type seeder
CN111406475A (en) Special-shaped seed precision sowing device and method
CN214493501U (en) Automatic battery assembling device
CN214392728U (en) Tin ball feeding device of BGA automatic ball mounting machine
CN223205519U (en) Chip batch testing device
CN209337083U (en) A kind of article packing case packing production line
CN218432037U (en) Metering type flour packaging device
CN217191348U (en) Purging device
CN210614523U (en) Ceramic disc cleaning device
CN116278130B (en) Initiating explosive device powder forming system
CN208070851U (en) A kind of automatic piling device of automobile air-conditioner radiating piece
CN102091685A (en) Glass powder blower
CN208661623U (en) A kind of silicon wafer powder sprinkling device
CN202669142U (en) Silk screen printing table with conveying device
CN207305129U (en) A kind of close-coupled chip mounter pastes head system
CN117423648B (en) Bulk chip shaking device
CN216250658U (en) A chip component bulk die bonding machine
CN220054299U (en) Boxing machine with static electricity removing device
CN205856603U (en) Full-automatic tube-type PECVD graphite boat process point erecting device
CN113751342B (en) Light-emitting diode screening plastic packaging device
CN219884241U (en) A blister box cartoning machine
CN212373763U (en) Feeding mechanism of packaging and film wrapping machine of PCIE expansion card
CN220826851U (en) Wafer finished product storage device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20220708

Assignee: Shanghai Weisong Software Co.,Ltd.

Assignor: SHANGHAI WEISONG INDUSTRY AUTOMATION Co.,Ltd.

Contract record no.: X2025980012868

Denomination of invention: A ball placement device based on BGA ball mounting technology

Granted publication date: 20221220

License type: Common License

Record date: 20250708