CN114753545A - Water-drop-shaped aluminum hammer sheet suspended ceiling and installation method thereof - Google Patents
Water-drop-shaped aluminum hammer sheet suspended ceiling and installation method thereof Download PDFInfo
- Publication number
- CN114753545A CN114753545A CN202210338523.1A CN202210338523A CN114753545A CN 114753545 A CN114753545 A CN 114753545A CN 202210338523 A CN202210338523 A CN 202210338523A CN 114753545 A CN114753545 A CN 114753545A
- Authority
- CN
- China
- Prior art keywords
- drop
- plate
- shaped
- hanging
- blind plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/34—Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles
- E04B9/36—Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles consisting of parallel slats
- E04B9/366—Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles consisting of parallel slats the principal plane of the slats being vertical
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/006—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Mirrors, Picture Frames, Photograph Stands, And Related Fastening Devices (AREA)
Abstract
Description
技术领域technical field
本发明涉及吊顶技术领域,具体为一种水滴形铝锤片吊顶及其安装方法。The invention relates to the technical field of suspended ceilings, in particular to a water drop-shaped aluminum hammer suspended ceiling and an installation method thereof.
背景技术Background technique
大型公建的公共走廊区域多采用铝锤片吊顶,既美观,又方便;其中水滴形铝锤片吊顶结构简单,由铝材通过挤压成型,产品硬度,直线度效果好,与顶部支架通过插扣式结构连接,因此水滴形铝锤片吊顶被广泛应用。The public corridor areas of large public buildings mostly use aluminum hammer ceilings, which are both beautiful and convenient; the drop-shaped aluminum hammer ceilings have a simple structure and are extruded from aluminum. The product has good hardness and straightness, and passes through the top bracket The plug-in structure is connected, so the drop-shaped aluminum hammer ceiling is widely used.
但是由于水滴形铝锤片吊顶的结构特点,走廊上需要安装的监控球机、空调设备、通信网络设备和照明设备等都必须安装到吊顶以上的走廊顶部,或安装在走廊一侧,这样安装的方式施工、维修更换困难、影响设备的使用,无法满足工程需求,影响吊顶整体的美观性。However, due to the structural characteristics of the drop-shaped aluminum hammer ceiling, the monitoring domes, air conditioning equipment, communication network equipment and lighting equipment that need to be installed in the corridor must be installed on the top of the corridor above the ceiling, or installed on the side of the corridor. It is difficult to construct, maintain and replace in the same way, affect the use of equipment, fail to meet engineering needs, and affect the overall aesthetics of the ceiling.
发明内容SUMMARY OF THE INVENTION
本发明针对现有技术中水滴形铝锤片吊顶安装后其他设备的施工、维修更换困难、影响吊顶整体的美观性的技术问题,提出了一种水滴形铝锤片吊顶及其安装方法。Aiming at the technical problems of difficulty in construction, maintenance and replacement of other equipment after the installation of the drop-shaped aluminum hammer piece ceiling in the prior art, and affecting the overall aesthetics of the ceiling, the present invention proposes a drop-shaped aluminium hammer piece ceiling and an installation method thereof.
为了达到上述目的,本发明采用的技术方案为:一种水滴形铝锤片吊顶,包括并排设置的多组支架和多个水滴形吊片,每组所述支架底部均设有多个连接爪;还包括吊板,所述吊板包括盲板和两个侧板,两个所述侧板固定连接在盲板上表面两侧,所述水滴形吊片与所述侧板顶部均设有连接部,所述连接部与连接爪可拆卸连接。In order to achieve the above purpose, the technical scheme adopted in the present invention is: a water drop-shaped aluminum hammer ceiling, comprising multiple sets of brackets and a plurality of water drop-shaped hanging pieces arranged side by side, and a plurality of connecting claws are arranged at the bottom of each group of the brackets It also includes a hanging plate, the hanging plate includes a blind plate and two side plates, the two side plates are fixedly connected on both sides of the upper surface of the blind plate, and the drop-shaped hanging piece and the top of the side plate are provided with a connecting part, the connecting part is detachably connected with the connecting claw.
优选的,所述盲板底端与水滴形吊片底端平齐。Preferably, the bottom end of the blind plate is flush with the bottom end of the drop-shaped hanging piece.
优选的,两个所述侧板底部均设有弧形板,所述弧形板截面呈四分之一圆形,所述弧形板上部与侧板底端固定连接,且与侧板所在平面相切;所述弧形板下部与盲板固定连接,且与盲板所在平面相切。Preferably, the bottoms of the two side plates are provided with arc-shaped plates, the cross-section of the arc-shaped plates is a quarter circle, and the upper part of the arc-shaped plates is fixedly connected with the bottom end of the side plate, and is connected to the side plate where the side plate is located. The plane is tangent; the lower part of the arc-shaped plate is fixedly connected with the blind plate, and is tangent to the plane where the blind plate is located.
优选的,所述吊板有多个。Preferably, there are multiple hangers.
优选的,所述支架上开有多个固定孔,多个所述固定孔分别一一设置在相邻两个连接爪的中间位置。Preferably, the bracket is provided with a plurality of fixing holes, and the plurality of fixing holes are respectively arranged in the middle position of two adjacent connecting claws one by one.
优选的,还包括加固结构,所述加固结构包括滑轨、滑块、空心杆、螺杆和螺母;所述滑轨固定在盲板上表面,且位于相邻两个连接爪中间的位置上,所述滑轨沿盲板的长度方向设置;所述滑块与滑轨配合,且顶端设有螺纹孔;所述空心杆底端设有螺纹,所述空心杆底端螺纹与滑块顶端螺纹孔配合;所述螺杆下端套接在空心杆内,所述螺杆上端穿过所述支架上的固定孔,与螺母配合。Preferably, a reinforcement structure is also included, and the reinforcement structure includes a sliding rail, a sliding block, a hollow rod, a screw rod and a nut; the sliding rail is fixed on the upper surface of the blind plate and is located in the middle of two adjacent connecting claws, The sliding rail is arranged along the length direction of the blind plate; the sliding block is matched with the sliding rail, and a threaded hole is provided at the top; The lower end of the screw rod is sleeved in the hollow rod, and the upper end of the screw rod passes through the fixing hole on the bracket and is matched with the nut.
本发明还提供了一种水滴形铝锤片吊顶的安装方法,包括以下步骤:The invention also provides a method for installing a drop-shaped aluminum hammer piece ceiling, comprising the following steps:
步骤一 安装支架:在走廊顶端安装支架,并排设置多个;
步骤二 安装吊板:根据图纸设计的吊板位置,将吊板顶部的两个连接部均穿过多组支架下方沿支架横向同一排的连接爪;
步骤三 安装水滴形吊片:将水滴形吊片顶部的连接部穿过多组支架下方沿支架横向同一排的连接爪;依次将多个水滴形吊片穿过未与步骤二中吊板安装的连接爪;Step 3: Install the drop-shaped hanging pieces: Pass the connecting parts on the top of the water-drop-shaped hanging pieces through the connecting claws in the same row along the horizontal direction of the brackets under the multiple sets of supports; the connecting claw;
步骤四 在盲板下表面上安装半球摄像机、音响设备、吸顶灯和移动通信线盒。
优选的,所述步骤二中吊板安装有多个。Preferably, in the second step, a plurality of hanging plates are installed.
优选的,还包括步骤五 安装加固结构:将滑块滑动连接在滑轨上,空心杆通过螺纹固定在滑块上,拔出与空心杆套接的螺杆穿过固定孔,将螺母拧紧在螺杆的上端。Preferably,
与现有技术相比,本发明的优点和积极效果在于:(1)在支架下方设置吊板,包括盲板和两个侧板,盲板底端与水滴形吊片底端平齐,在盲板上安装半球摄像机、音响设备、吸顶灯和移动通信线盒等设备,安装与维修更换时都方便快捷,且不影响设备的正常使用;(2)设置加固结构,盲板上安装的设备较多时,与盲板连接的侧板顶部连接部强度不够,加固结构直接与盲板连接,另一端与支架固定,通过加固结构可加强盲板的承载能力;(3)侧板上部与水滴形吊片上部都设有可与支架的连接爪可拆卸连接的连接部,需要临时增加安装设备时,将水滴形吊片拆下,可轻易替换上带有盲板的吊板,用以安装设备,使用方便。Compared with the prior art, the advantages and positive effects of the present invention are: (1) A hanging plate is arranged under the bracket, including a blind plate and two side plates, and the bottom end of the blind plate is flush with the bottom end of the drop-shaped hanging piece. Dome cameras, audio equipment, ceiling lights and mobile communication box and other equipment are installed on the blind plate, which are convenient and quick to install, maintain and replace, and do not affect the normal use of the equipment; (2) Set up reinforcement structures, and the equipment installed on the blind plate When there are too many, the strength of the top connection part of the side plate connected with the blind plate is not enough, the reinforcement structure is directly connected with the blind plate, and the other end is fixed with the bracket, and the bearing capacity of the blind plate can be strengthened through the reinforcement structure; The upper part of the hanging piece is provided with a connecting part that can be detachably connected with the connecting claw of the bracket. When it is necessary to temporarily increase the installation equipment, the teardrop-shaped hanging piece can be removed, and the hanging plate with a blind plate can be easily replaced to install the equipment. , easy to use.
附图说明Description of drawings
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments.
图1为本吊顶结构示意图;Figure 1 is a schematic diagram of the structure of the suspended ceiling;
图2为本吊顶侧视图;Figure 2 is a side view of the suspended ceiling;
图3为本吊顶在吊板处的放大图;Figure 3 is an enlarged view of the suspended ceiling at the hanging plate;
图4为空心杆与螺杆连接示意图;Figure 4 is a schematic diagram of the connection between the hollow rod and the screw;
图5为本吊顶使用示意图。Figure 5 is a schematic diagram of the use of the suspended ceiling.
1-支架,11-连接爪,12-固定孔;1-bracket, 11-connecting claw, 12-fixing hole;
2-连接部;2-connection part;
3-水滴形吊片;3-drop-shaped hanging piece;
4-吊板,41-盲板,42-侧板,43-弧形板;4-hanging plate, 41-blind plate, 42-side plate, 43-curved plate;
5-加固结构;51-滑轨,52-滑块,53-空心杆,54-螺杆,55-螺母,56-螺纹;5- Reinforcement structure; 51- Slide rail, 52- Slide block, 53- Hollow rod, 54- Screw rod, 55- Nut, 56- Thread;
6-半球摄像机;7-音响设备,8-吸顶灯,9-移动通信线盒。6- Dome camera; 7- Audio equipment, 8- Ceiling light, 9- Mobile communication cable box.
具体实施方式Detailed ways
为了能够更清楚地理解本发明的上述目的、特征和优点,下面结合附图和实施例对本发明做进一步说明。In order to more clearly understand the above objects, features and advantages of the present invention, the present invention will be further described below with reference to the accompanying drawings and embodiments.
在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是,本发明还可以采用不同于在此描述的其他方式来实施,因此,本发明并不限于下面公开说明书的具体实施例的限制。Many specific details are set forth in the following description to facilitate a full understanding of the present invention, however, the present invention may also be implemented in other ways than those described herein, and therefore, the present invention is not limited to the specific embodiments of the following disclosure. limit.
实施例1Example 1
下面结合附图1-5对本发明进一步说明,一种水滴形铝锤片吊顶,如图1和2所示,包括并排设置的多组支架1和多个水滴形吊片3,每组所述支架1底部均设有多个连接爪11;还包括吊板4,所述吊板4包括盲板41和两个侧板42,两个所述侧板42固定连接在盲板41上表面两侧;所述水滴形吊片3与所述侧板42顶部均设有连接部2,所述连接部2与连接爪11可拆卸连接。The present invention will be further described below with reference to the accompanying drawings 1-5. A drop-shaped aluminum hammer ceiling, as shown in Figures 1 and 2, includes multiple sets of
通过设置吊板4,吊板4底部为盲板41,盲板41下可安装半球摄像机6、音响设备7、吸顶灯8和移动通信线盒9等设备,两个侧板42与盲板41固定连接,顶部均设有连接部2,通过连接部2安装在支架1底部的连接爪11上;同时连接部2与连接爪11可拆卸连接,安装与维修更换时都方便快捷,且不影响设备的正常使用;By arranging the
同时需要临时增加安装设备时,将水滴形吊片3拆下,可轻易替换上带有盲板41的吊板4,用以安装设备,使用方便;或,吊板4下的设备拆除了以后,可将吊板4更换为水滴形吊片3。At the same time, when it is necessary to temporarily increase the installation equipment, the teardrop-
如图2所示,所述盲板41底端与水滴形吊片3底端平齐。As shown in FIG. 2 , the bottom end of the
盲板41底端高于水滴形吊片3底端不利于盲板41下设备的安装与使用,半球摄像机6视野变窄,吸顶灯8照明区域减少;盲板41底端低于水滴形吊片3底端,影响吊顶整体的美观性;将盲板41底端与水滴形吊片3底端平齐,既保证了设备的使用,也兼顾了美观性。The bottom end of the
如图3所示,两个所述侧板42底部均设有弧形板43,所述弧形板43截面呈四分之一圆形,所述弧形板43上部与侧板42底端固定连接,且与侧板42所在平面相切;所述弧形板43下部与盲板41固定连接,且与盲板41所在平面相切。As shown in FIG. 3 , an arc-
在盲板41与侧板42连接处设置一段弧形板43作为过渡,即减少了吊板4应力集中的问题,也使得吊板4从侧面看上去与水滴形吊片3外观相差不大,兼顾了美观性。A segment of arc-
如图5所示,所述吊板4有两个。As shown in FIG. 5 , there are two
如图1所示,所述支架1上开有多个固定孔12,多个所述固定孔12分别一一设置在相邻两个连接爪11的中间位置。As shown in FIG. 1 , the
如图3和4所示,还包括加固结构5,所述加固结构5包括滑轨51、滑块52、空心杆53、螺杆54和螺母55;As shown in FIGS. 3 and 4 , a
所述滑轨51固定在盲板41上表面,且位于相邻两个连接爪11中间的位置上,所述滑轨51沿盲板41的长度方向设置;所述滑块52与滑轨51配合,且顶端设有螺纹孔;所述空心杆53底端设有螺纹56,所述空心杆53底端螺纹56与滑块52顶端螺纹孔配合;所述螺杆54下端套接在空心杆53内,所述螺杆54上端穿过所述支架1上的固定孔12,与螺母55配合。The sliding
加固结构5使用时将滑块52与滑轨51配合,再把空心杆53通过螺纹56配合在滑块52的螺纹孔内,接着将滑块52滑动到固定孔12位置处,从空心杆53抽出螺杆54穿过固定孔12,另一端安装上螺母55,旋紧螺母55,直到螺杆54滑动到空心杆53顶端。When the
滑块52可在滑轨51上设置多个,同时也安装多个空心杆53、螺杆54和螺母55。A plurality of sliding
一种水滴形铝锤片吊顶的安装方法,包括以下步骤:An installation method for a drop-shaped aluminum hammer piece ceiling, comprising the following steps:
步骤一 安装支架1:在走廊顶端安装支架1,并排设置多个;
步骤二 安装吊板4:根据图纸设计的吊板4位置,吊板4位置通过走廊内各设备的安装位置确定,将吊板4顶部的两个连接部2均穿过多组支架1下方沿支架1横向同一排的连接爪11;
吊板4安装有两个;There are two hanging
步骤三 安装水滴形吊片3:将水滴形吊片3顶部的连接部2穿过多组支架1下方沿支架1横向同一排的连接爪11;依次将多个水滴形吊片3穿过未与步骤二中吊板4安装的连接爪11;
步骤四 在盲板41下表面上安装半球摄像机6、音响设备7、吸顶灯8和移动通信线盒9;
步骤五 安装加固结构5:将滑块52滑动连接在滑轨51上,空心杆53通过螺纹56固定在滑块52上,拔出与空心杆53套接的螺杆54穿过固定孔12,将螺母55拧紧在螺杆54的上端,直到螺杆54滑动到空心杆53顶端。
以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其他形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例应用于其他领域,但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化,仍属于本发明技术方案的保护范围。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention in other forms. Any person skilled in the art may use the technical content disclosed above to make changes or modifications to equivalent changes. The embodiments are applied in other fields, but any simple modifications and equivalent changes made to the above embodiments according to the technical essence of the present invention without departing from the technical solutions of the present invention still belong to the protection scope of the technical solutions of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210338523.1A CN114753545A (en) | 2022-04-01 | 2022-04-01 | Water-drop-shaped aluminum hammer sheet suspended ceiling and installation method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210338523.1A CN114753545A (en) | 2022-04-01 | 2022-04-01 | Water-drop-shaped aluminum hammer sheet suspended ceiling and installation method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN114753545A true CN114753545A (en) | 2022-07-15 |
Family
ID=82329432
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210338523.1A Pending CN114753545A (en) | 2022-04-01 | 2022-04-01 | Water-drop-shaped aluminum hammer sheet suspended ceiling and installation method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114753545A (en) |
Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130047541A1 (en) * | 2011-08-26 | 2013-02-28 | Hunter Douglas Inc. | Suspension ceiling with parallel vanes for building structures |
| CN205024927U (en) * | 2015-09-09 | 2016-02-10 | 广东华途仕建材实业有限公司 | Multi -functional suspended ceiling |
| CN106149953A (en) * | 2015-04-16 | 2016-11-23 | 北新集团建材股份有限公司 | A kind of sound-absorbing ceiling suspension system |
| CN205976178U (en) * | 2016-08-15 | 2017-02-22 | 杭州臻万建筑装饰工程有限公司 | Ceiling structure |
| CN206607737U (en) * | 2017-02-24 | 2017-11-03 | 上海博丽铝幕墙材料制造有限公司 | A kind of flash batten furred ceiling |
| CN206607732U (en) * | 2017-02-24 | 2017-11-03 | 上海博丽铝幕墙材料制造有限公司 | A kind of U-shaped hang type furred ceiling |
| CN207277661U (en) * | 2017-09-20 | 2018-04-27 | 天津市东泽天润建筑有限公司 | A kind of side leads to ceiling structure |
| CN108118818A (en) * | 2017-12-27 | 2018-06-05 | 骆诚 | It is a kind of to build hold court from behind a screen steel construction and installation method |
| CN208918108U (en) * | 2018-07-24 | 2019-05-31 | 上海六奇装饰工程有限公司 | A kind of use should be in the package assembly and integrated suspended ceiling device of Integral ceiling |
| CN209457232U (en) * | 2018-11-23 | 2019-10-01 | 合肥澳达环境艺术设计工程有限公司 | A U-shaped aluminum square ceiling and downlight combined ceiling |
| CN110469031A (en) * | 2019-09-18 | 2019-11-19 | 杨烨 | A kind of cracking resistance plasterboard |
| CN210288852U (en) * | 2019-05-17 | 2020-04-10 | 上海丰丽集团有限公司 | Hanging piece vertical curtain ceiling structure |
| CN213741834U (en) * | 2020-05-11 | 2021-07-20 | 中铁电气化局集团北京建筑工程有限公司 | Special hanger device capable of sliding and resisting wind uncovering for high-speed rail passenger station house and subway artistic ceiling |
| CN113417402A (en) * | 2021-07-14 | 2021-09-21 | 广州市爱智造科技有限公司 | Ceiling system capable of being installed quickly and installation method thereof |
| CN214739194U (en) * | 2020-10-28 | 2021-11-16 | 上海宝冶建筑装饰有限公司 | Hoisting structure of suspended ceiling swing blade |
-
2022
- 2022-04-01 CN CN202210338523.1A patent/CN114753545A/en active Pending
Patent Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130047541A1 (en) * | 2011-08-26 | 2013-02-28 | Hunter Douglas Inc. | Suspension ceiling with parallel vanes for building structures |
| CN106149953A (en) * | 2015-04-16 | 2016-11-23 | 北新集团建材股份有限公司 | A kind of sound-absorbing ceiling suspension system |
| CN205024927U (en) * | 2015-09-09 | 2016-02-10 | 广东华途仕建材实业有限公司 | Multi -functional suspended ceiling |
| CN205976178U (en) * | 2016-08-15 | 2017-02-22 | 杭州臻万建筑装饰工程有限公司 | Ceiling structure |
| CN206607737U (en) * | 2017-02-24 | 2017-11-03 | 上海博丽铝幕墙材料制造有限公司 | A kind of flash batten furred ceiling |
| CN206607732U (en) * | 2017-02-24 | 2017-11-03 | 上海博丽铝幕墙材料制造有限公司 | A kind of U-shaped hang type furred ceiling |
| CN207277661U (en) * | 2017-09-20 | 2018-04-27 | 天津市东泽天润建筑有限公司 | A kind of side leads to ceiling structure |
| CN108118818A (en) * | 2017-12-27 | 2018-06-05 | 骆诚 | It is a kind of to build hold court from behind a screen steel construction and installation method |
| CN208918108U (en) * | 2018-07-24 | 2019-05-31 | 上海六奇装饰工程有限公司 | A kind of use should be in the package assembly and integrated suspended ceiling device of Integral ceiling |
| CN209457232U (en) * | 2018-11-23 | 2019-10-01 | 合肥澳达环境艺术设计工程有限公司 | A U-shaped aluminum square ceiling and downlight combined ceiling |
| CN210288852U (en) * | 2019-05-17 | 2020-04-10 | 上海丰丽集团有限公司 | Hanging piece vertical curtain ceiling structure |
| CN110469031A (en) * | 2019-09-18 | 2019-11-19 | 杨烨 | A kind of cracking resistance plasterboard |
| CN213741834U (en) * | 2020-05-11 | 2021-07-20 | 中铁电气化局集团北京建筑工程有限公司 | Special hanger device capable of sliding and resisting wind uncovering for high-speed rail passenger station house and subway artistic ceiling |
| CN214739194U (en) * | 2020-10-28 | 2021-11-16 | 上海宝冶建筑装饰有限公司 | Hoisting structure of suspended ceiling swing blade |
| CN113417402A (en) * | 2021-07-14 | 2021-09-21 | 广州市爱智造科技有限公司 | Ceiling system capable of being installed quickly and installation method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207405853U (en) | Kitchen and toilet ceiling structure | |
| CN113356448A (en) | Installation device and installation method of curved surface metal ceiling | |
| CN212129637U (en) | Hanging piece type suspended ceiling | |
| CN211286249U (en) | Indoor suspended ceiling fixing structure | |
| CN200992755Y (en) | Suspension system of point-supported curtain wall and connection device for suspension ribs | |
| CN114753545A (en) | Water-drop-shaped aluminum hammer sheet suspended ceiling and installation method thereof | |
| CN112814257B (en) | Anti-displacement suspended ceiling connection structure and installation method thereof | |
| CN111810867A (en) | Intensive installation structure of lighting facilities and pipelines in rail transit elevated stations | |
| CN217924339U (en) | Buckle suspended ceiling structure | |
| CN207553418U (en) | A kind of assembled Integral ceiling hook makes system | |
| CN215888812U (en) | Installation device of curved surface metal furred ceiling | |
| CN212670973U (en) | Building light steel grid suspended ceiling | |
| CN210002676U (en) | connector for ceiling of house building | |
| CN216973906U (en) | But side ceiling furred ceiling of width regulation | |
| CN219992857U (en) | Assembled furred ceiling structure | |
| CN114277997A (en) | Digital space positioning assembly type construction system for special-shaped suspended ceiling | |
| CN222275916U (en) | Building ceiling structure | |
| CN114383117A (en) | Integrated mounting frame and equipment integration system | |
| CN222649378U (en) | A connection structure of steel frame keel | |
| CN220318927U (en) | Integrated furred ceiling antidetonation construction structures | |
| CN217232372U (en) | Grille ceiling with sound equipment | |
| CN219060553U (en) | Suspended ceiling mounting structure | |
| CN221402882U (en) | Office lighting equipment | |
| CN218990581U (en) | A quick mounting structure for curtain design | |
| CN211622220U (en) | Large plate aluminum keel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220715 |