CN115652922B CN202210600871.1A CN202210600871A CN115652922B CN 115652922 B CN115652922 B CN 115652922B CN 202210600871 A CN202210600871 A CN 202210600871A CN 115652922 B CN115652922 B CN 115652922B
Authority
CN
China
Prior art keywords
anchor
anchor head
internal thread
recyclable
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210600871.1A
Other languages
Chinese (zh)
Other versions
CN115652922A (en
Inventor
杨景伟
李春波
敖及辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN202210600871.1A priority Critical patent/CN115652922B/en
Publication of CN115652922A publication Critical patent/CN115652922A/en
Application granted granted Critical
Publication of CN115652922B publication Critical patent/CN115652922B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a recoverable anchor assembly of a prefabricated concrete bottom anchor head, which comprises an anchor rope, a pulling pin and a bottom anchor head, wherein the bottom anchor head comprises an anchor head body formed by casting concrete and an internal thread anchor which is embedded in the anchor head body and is provided with internal threads, a connecting section is fixedly connected with the bottom end of the anchor rope, the connecting section is matched with the internal thread anchor through threads, the rising angle of the threads is larger than a self-locking angle, the pulling pin is inserted into the connecting section along the length direction and locked with the internal thread anchor in the circumferential direction, and can be pulled out to disengage and release the internal thread anchor.

Description

Recoverable anchor assembly of prefabricated concrete bottom anchor head
Technical Field
The invention relates to construction anchoring equipment, in particular to a recyclable anchoring assembly of a prefabricated concrete bottom anchor head.
Background
Temporary support is a common safety protection measure in building construction, and is realized by anchoring anchor cables. Because the anchor cable is temporarily supported, the anchor cable cannot be recovered after the support function fails in common practice, and is buried underground together with a structure to form underground garbage, so that underground environment pollution is caused, and serious influence is caused on construction of adjacent land blocks, long-distance planning and sustainable development of cities.
In order to solve the above problems, in the prior art, a recoverable anchor rope appears, and a connecting piece and an anchoring piece of an anchoring section of the recoverable anchor rope can be connected and separated in various manners, and the connecting manner is generally in detachable connection, namely in threaded connection or turnbuckle connection, and the anchor rope is separated from the threaded connection or the turnbuckle structure by applying a rotating force to the anchor rope when the anchor rope is recovered, and is pulled out by external force, so that the recovery of the anchor rope is completed.
During practical construction, the bottom end of the anchor cable is connected with the anchoring head through threads, and the anchoring is realized by applying prestressing force in the later period, so that the lead angle of the threads is far smaller than the self-locking angle, otherwise, the threads are separated under the action of circumferential component force, and the anchoring cannot be realized. After the structure of threaded connection is anchored underground, rust may occur in the anchoring environment and the anchor cable cannot be rotated during recycling, and the applied external force transmits torsion moment to the bottom, so that the requirement on the anchor cable is high, and the cost is increased.
Meanwhile, the anchor heads are generally formed by adopting steel structures, two ends of each anchor disc are commonly used, the anchor discs are connected through bolts, an internal thread anchor is pressed in the middle of each anchor disc, the anchor discs and the anchor bodies are poured into a whole after entering the bottom ends of anchor holes, and in the construction process, the anchor heads are not easy to be poured thoroughly when the anchor bodies are poured (particularly in a high-pressure rotary spraying process), so that the bearing capacity of the anchor heads cannot be fully exerted.
Therefore, the existing recyclable anchor cable structure needs to be improved, the anchor head and the anchoring body are integrated completely and tightly, the bearing capacity is guaranteed, the anchor cable recycling operation is simple and convenient, foundation pit support is firm during anchoring, the requirement for transmitting torsion moment to the anchor cable is not high, and finally the purposes of reducing the construction cost and improving the construction efficiency are achieved.
Disclosure of Invention
In view of the above, the invention aims to provide a recoverable anchor assembly of a prefabricated concrete bottom anchor head, the anchor head and an anchor body are integrated completely and tightly, the bearing capacity is ensured, the recovery operation of an anchor cable is simple and convenient, the foundation pit is firmly supported during anchoring, the requirement on the transmission of torsion moment of the anchor cable is not high, and finally the purposes of reducing the construction cost and improving the construction efficiency are achieved.
The invention discloses a recoverable anchor assembly of a prefabricated concrete bottom anchor head, which comprises an anchor rope, a pull pin and a bottom anchor head, wherein the bottom anchor head comprises an anchor head body formed by casting concrete and an internal thread anchor device which is embedded in the anchor head body and is provided with an internal thread, the bottom end of the anchor rope is fixedly connected with a connecting section, the connecting section is matched with the internal thread anchor device through threads, and the rising angle of the threads is larger than a self-locking angle;
the pulling pin is inserted into the connecting section along the length direction and locked in the circumferential direction, and can be pulled out to be separated from the female screw anchor and released.
Further, the anchor head body comprises a steel structure framework and cylindrical concrete poured on the steel structure framework, and the internal thread anchorage is welded on the steel structure framework.
Further, the columnar concrete is provided with a plurality of shear nails in an outward extending mode, and the shear nails are welded on the steel structure framework or formed by integrally extending the steel structure framework outwards.
Further, the cross section of pull out the round pin is the polygon, the internal thread ground tackle is equipped with the internal thread that is used for being connected with the linkage segment, and the bottom of internal thread forms and pulls out round pin complex polygon hole, the linkage segment be equipped with be used for with pull out round pin complex polygon hole.
Further, the connecting section is further provided with an operation hole for placing and taking out the pulling pin, a pulling wire is arranged along with the anchor cable, one end of the pulling wire penetrates through the operation hole to be fixedly connected with the pulling pin, and the other end of the pulling wire is exposed out of the outer anchor head during anchoring.
Further, the anchor cable is sleeved with an isolation tube, and the stay wire is positioned in the isolation tube.
Further, the bottom end of the isolation tube forms a seal with the anchor head body.
Further, the connecting section is of a hollow structure, a steering block is fixedly arranged in the hollow structure, the steering block is provided with a through hole which is opposite to the pulling pin in the length direction, and the pulling wire penetrates through the through hole of the steering block and is connected with the pulling pin.
Further, the shear pin is of a transverse plate-shaped structure.
The recyclable anchor assembly for the precast concrete bottom anchor head has the beneficial effects that the recyclable anchor assembly for the precast concrete bottom anchor head adopts a precast concrete anchor head structure, is firm and thorough in pouring and combination with an anchor body, avoids the occurrence of an overhead condition, thereby ensuring the bearing capacity after anchoring, simultaneously adopts large-lift-angle threaded connection and combines the locking function of the pulling pin in the circumferential direction, the pulling pin is pulled out from the anchor cable during recycling, the recycling operation of the anchor cable is simple and convenient, the construction efficiency is improved, the foundation pit support is firm during anchoring, and the requirement on the transmission of torsion moment by the anchor cable is not high, so that the purposes of reducing the construction cost and improving the construction efficiency are finally achieved.
Drawings
The invention is further described below with reference to the drawings and examples.
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is an enlarged view at A of FIG. 1;
FIG. 3 is a cross-sectional view of the bottom anchor head;
Fig. 4 is a schematic view of a support structure formed by the present invention.
Detailed Description
1-4, The recyclable anchor assembly of the prefabricated concrete bottom anchor head of the embodiment comprises an anchor rope 3, a pulling pin 7 and a bottom anchor head 4, wherein the bottom anchor head 4 comprises an anchor head body formed by concrete pouring and an internal thread anchor 403 which is embedded in the anchor head body and is provided with internal threads, the bottom end of the anchor rope 3 is fixedly connected with a connecting section 301, the connecting section 301 is matched with the internal thread anchor 403 through threads, and the lifting angle of the threads is larger than a self-locking angle;
The pull pin 7 is inserted into the connecting section 301 and the internal thread anchor 403 along the length direction and locked in the circumferential direction, the pull pin 7 can be pulled out and separated from the internal thread anchor 403, when anchoring, the pull pin 7 is inserted into the connecting section 301 and the internal thread anchor 403 to ensure that the connecting section 301 and the internal thread anchor 403 are locked in the circumferential direction, the thread pair bears and cannot be separated when stretching force in the length direction is applied, when the anchor cable 3 needs to be recovered, the pull pin 7 is pulled out of the internal thread anchor 403, the relative freedom degree between the connecting section 301 and the internal thread anchor 403 in the circumferential direction is released, the anchor cable 3 is directly separated from the internal thread anchor under the prestress due to the fact that the thread lift angle is larger than the self-locking angle, and recovery is completed after the external force is pulled out, in the structure, the lift angle can be far larger than the self-locking angle due to the locking function of the pull pin, and the anchor cable can be conveniently pulled out after the release of the lock of the pull pin;
The bottom anchor head of the embodiment is formed by casting concrete, so that the problem of casting failure is avoided when the bottom anchor head enters an anchoring body and is combined with the anchoring body, the binding force is increased, the anchoring quality is ensured, meanwhile, the internal thread anchor is embedded in the concrete to realize a recoverable anchor rope structure, steel materials are less in the whole structure, the cost is saved, and the pollution to the environment is reduced.
In this embodiment, the anchor head body includes a steel structure skeleton 402 and a cylindrical concrete 401 poured on the steel structure skeleton, and the internal thread anchor 403 is welded on the steel structure skeleton, so that the overall tensile strength of the anchor head body is ensured, and the anchor head body is used for supporting the internal thread anchor.
In this embodiment, the cylindrical concrete 401 is provided with a plurality of shear nails 404 extending outwards, and the shear nails 404 are welded to the steel structure skeleton or formed by integrally extending outwards from the steel structure skeleton 402, and generally adopt an integrally formed structure; in the structure, the anchoring body is only required to be combined with shear nails of the outer circle of cylindrical concrete, the problem of overhead does not exist, the shear nails are finally used for being poured in the anchoring body, good combination of the anchor head body and the anchoring body is guaranteed, the anchoring strength is guaranteed, the shear nails are provided with nail caps, the pulling resistance and the shearing resistance of the anchoring structure after pouring molding are improved, as shown in the figure, the steel skeleton comprises annular steel rings and radial rods which are distributed radially, the three internally threaded anchors are evenly distributed in the circumferential direction and are vertical steel pieces at the same time, the annular steel rings are two inner sides and outer sides of the internally threaded anchors respectively and are welded with the two internally threaded anchors, the radial rods extend out of the concrete column in the radial direction and form the shear nails, and the radially inner sides and the outer sides refer to the radial directions of the concrete column.
In this embodiment, the cross section of the pin 7 is polygonal, the internal thread anchor is provided with an internal thread for connecting with a connecting section, the bottom of the internal thread forms a polygonal hole 4031 matched with the pin, the connecting section is provided with a polygonal hole matched with the pin, as shown in the figure, grease is smeared on the pin and a thread pair when the pin and the thread pair are used, so that the pin is pulled out smoothly in the later stage, and the polygonal structure ensures that the pin is reliably transferred, has more stress surfaces and has better bearing capacity.
In this embodiment, the connection section 301 is further provided with an operation hole 3011 for placing and taking out the pull pin, and the pull wire 8 is provided along with the anchor cable 3, where the pull wire 8 is generally a steel wire or a thin steel strand; when the bottom anchor head 4 and the anchor cable 3 are implanted, as shown in the figure, the connecting section 301 is connected with the internal thread anchor 403 in a threaded manner, the operating hole is used for placing the pulling pin into the internal thread anchor and downwards extending into the internal thread anchor to form a circumferential fixed state, the connecting section is of a hollow structure and is used for placing or taking out the pulling pin through the operating hole, a steering block is fixedly arranged in the hollow structure, the steering block 3012 is provided with a through hole which is opposite to the pulling pin in the length direction, and the pulling wire 8 passes through the through hole of the steering block 3012 and is connected with the pulling pin 7, so that the pulling force of the pulling wire 8 directly acts on the pulling pin 7 in the length direction, and the pulling of the pulling pin is convenient;
the anchor cable 3 is sleeved with the isolation tube 9, the isolation tube 9 is generally a PE tube, the pull wire 7 is positioned in the isolation tube 9, the isolation tube 9 is sleeved on the anchor cable 3 after the pulling pin is placed, the bottom end of the isolation tube is connected with the bottom anchor head 4 to form a seal, and the form of sealing and gluing and the like can be adopted to ensure that the anchor cable cannot be polluted or is poured by an anchoring body, so that the later recovery process is smoothly carried out.
In the embodiment, the shear pin is of a transverse plate structure, wherein the transverse plate structure is a plate structure perpendicular to a plane in the length direction, and the shear pin (comprising a pin cap) of the structure can increase the contact area with the anchoring body in the pulling-resistant direction, so that the bearing capacity is increased.
As shown in fig. 4, when the invention is used for anchoring, a cast-in-place pile 1 and a waterproof curtain 2 are cast around a foundation pit, the cast-in-place pile is cast with a crown beam and a waist beam, and the anchoring component of the invention is anchored through the crown beam and the waist beam;
After anchoring, the bottom anchor head 4 is anchored in the anchor body 5, and the bottom end of the anchor body 5 forms an enlarged end 6 to increase the anchoring strength;
Before backfilling earthwork, the pull wire is controlled to pull out the pulling pin from the internal thread anchor, the connecting section is separated from the internal thread anchor by utilizing the prestress of the anchor cable and the thread angle between the connecting section and the internal thread anchor being larger than the self-locking angle, and the anchor cable is pulled out after external force is applied;
As shown in the figure, the stay wire is accompanied with the anchor cable and extends out of a stay wire hole arranged on the external anchor head, and when the pulling pin is required to be pulled out, the anchor cable can be recovered by external force;
Or before backfilling earthwork, after the outer anchor head is disassembled to release the anchor cable, the pull wire is controlled to pull out the pull pin from the internal thread anchor, and the anchor cable is pulled out after external force is applied, so that the aim of the invention can be realized.
Finally, it is noted that the above embodiments are only for illustrating the technical solution of the present invention and not for limiting the same, and although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications and equivalents may be made thereto without departing from the spirit and scope of the technical solution of the present invention, which is intended to be covered by the scope of the claims of the present invention.

Claims (9)

1.一种预制砼底部锚头的可回收锚固组件,其特征在于:包括锚索、拔销和底部锚头,所述底部锚头包括混凝土浇筑成形的锚头本体和预埋在锚头本体内的设有内螺纹的内螺纹锚具,锚索底端固定连接设有连接段,且所述连接段与内螺纹锚具通过螺纹配合,所述螺纹的升角大于自锁角;1. A recyclable anchoring assembly of a precast concrete bottom anchor head, characterized in that it comprises an anchor cable, a pull pin and a bottom anchor head, wherein the bottom anchor head comprises an anchor head body formed by concrete pouring and an internal thread anchor pre-buried in the anchor head body and provided with internal threads, a connecting section is fixedly connected to the bottom end of the anchor cable, and the connecting section is matched with the internal thread anchor by threads, and the lead angle of the threads is greater than the self-locking angle; 所述拔销沿长度方向插入所述连接段以及内螺纹锚具在圆周方向锁定,且拔销可被拔出脱离并释放所述内螺纹锚具。The pull pin is inserted into the connecting section along the length direction and the internal thread anchor is locked in the circumferential direction, and the pull pin can be pulled out to disengage and release the internal thread anchor. 2.根据权利要求1所述的预制砼底部锚头的可回收锚固组件,其特征在于:所述锚头本体包括钢结构骨架和浇筑于钢结构骨架的柱形混凝土,所述内螺纹锚具焊接于钢结构骨架。2. The recyclable anchoring assembly of the precast concrete bottom anchor head according to claim 1 is characterized in that: the anchor head body includes a steel structure frame and columnar concrete cast on the steel structure frame, and the internal thread anchor is welded to the steel structure frame. 3.根据权利要求2所述的预制砼底部锚头的可回收锚固组件,其特征在于:所述柱形混凝土向外延伸设有若干剪力钉,所述剪力钉焊接于钢结构骨架或者由钢结构骨架一体向外延伸形成。3. The recyclable anchoring assembly of the precast concrete bottom anchor head according to claim 2 is characterized in that: the columnar concrete is provided with a plurality of shear nails extending outwardly, and the shear nails are welded to the steel structure frame or are formed by extending outwardly from the steel structure frame as a whole. 4.根据权利要求1所述的预制砼底部锚头的可回收锚固组件,其特征在于:所述拔销的横截面为多边形,所述内螺纹锚具设有用于与连接段连接的内螺纹,内螺纹的底部形成与拔销配合的多边形孔,所述连接段设有用于与拔销配合的多边形孔。4. The recyclable anchoring assembly of the precast concrete bottom anchor head according to claim 1 is characterized in that: the cross-section of the pull pin is polygonal, the internal thread anchor is provided with an internal thread for connecting with the connecting section, the bottom of the internal thread forms a polygonal hole for cooperating with the pull pin, and the connecting section is provided with a polygonal hole for cooperating with the pull pin. 5.根据权利要求4所述的预制砼底部锚头的可回收锚固组件,其特征在于:所述连接段还设有用于放置和取出所述拔销的操作孔,伴随所述锚索设有拉线,所述拉线一端穿过操作孔固定连接于所述拔销,另一端在锚固时外露于外锚头。5. The recyclable anchoring assembly of the precast concrete bottom anchor head according to claim 4 is characterized in that: the connecting section is also provided with an operating hole for placing and removing the pull pin, and a pull wire is provided along with the anchor cable, one end of the pull wire passes through the operating hole and is fixedly connected to the pull pin, and the other end is exposed to the outer anchor head during anchoring. 6.根据权利要求5所述的预制砼底部锚头的可回收锚固组件,其特征在于:所述锚索外套有隔离管,所述拉线位于所述隔离管内。6. The recyclable anchoring assembly of the precast concrete bottom anchor head according to claim 5, characterized in that: the anchor cable is covered with an isolation tube, and the pull wire is located in the isolation tube. 7.根据权利要求6所述的预制砼底部锚头的可回收锚固组件,其特征在于:所述隔离管的底端与锚头本体形成密封。7. The recyclable anchoring assembly of the precast concrete bottom anchor head according to claim 6, characterized in that the bottom end of the isolation tube forms a seal with the anchor head body. 8.根据权利要求4所述的预制砼底部锚头的可回收锚固组件,其特征在于:所述连接段为中空结构,中空结构内部固定设有转向块,转向块设有一在长度方向上正对拔销的过孔,拉线穿过转向块的过孔连接于拔销。8. The recyclable anchoring assembly of the precast concrete bottom anchor head according to claim 4 is characterized in that: the connecting section is a hollow structure, a steering block is fixedly provided inside the hollow structure, the steering block is provided with a through hole facing the pull pin in the length direction, and the pull wire passes through the through hole of the steering block and is connected to the pull pin. 9.根据权利要求3所述的预制砼底部锚头的可回收锚固组件,其特征在于:所述剪力钉为横向的板状结构。9. The recyclable anchoring assembly of the precast concrete bottom anchor head according to claim 3, characterized in that the shear nail is a transverse plate-like structure.
CN202210600871.1A 2022-05-30 2022-05-30 Recyclable anchoring components for precast concrete bottom anchor heads Active CN115652922B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210600871.1A CN115652922B (en) 2022-05-30 2022-05-30 Recyclable anchoring components for precast concrete bottom anchor heads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210600871.1A CN115652922B (en) 2022-05-30 2022-05-30 Recyclable anchoring components for precast concrete bottom anchor heads

Publications (2)

Publication Number Publication Date
CN115652922A CN115652922A (en) 2023-01-31
CN115652922B true CN115652922B (en) 2025-05-27

Family

ID=85023976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210600871.1A Active CN115652922B (en) 2022-05-30 2022-05-30 Recyclable anchoring components for precast concrete bottom anchor heads

Country Status (1)

Country Link
CN (1) CN115652922B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115419076B (en) * 2022-05-30 2024-06-25 中冶建工集团有限公司 High-pressure rotary spraying recyclable anchor cable supporting construction method for deep foundation pit
CN115652940B (en) * 2022-05-30 2025-06-27 中冶建工集团有限公司 Anchoring components for retrievable anchor cables

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN217923554U (en) * 2022-05-30 2022-11-29 中冶建工集团有限公司 Prefabricated concrete bottom anchor head for recoverable anchor cable
CN115652940A (en) * 2022-05-30 2023-01-31 中冶建工集团有限公司 Anchor components for retrievable anchor cables

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3535320A1 (en) * 1985-10-03 1987-04-09 Dyckerhoff & Widmann Ag METHOD AND DEVICE FOR SETTING A ROD, WIRE OR TUBULAR INSTALLATION COMPONENT IN A FLOOR INFORMATION WITH PRESSING WATER
JP2005113585A (en) * 2003-10-09 2005-04-28 Kankyo Kogaku Kk Anchor pin, unit for civil engineering structure and use of anchor pin
CN109339839B (en) * 2018-09-30 2020-07-07 中国科学院武汉岩土力学研究所 Recyclable sand consolidation anchor head prestressed bolt, anchoring jack and application method thereof
CN109972613B (en) * 2019-04-28 2024-02-23 中冶沈勘工程技术有限公司 Recyclable anchoring mechanism and construction method
KR102267289B1 (en) * 2020-09-09 2021-06-18 이태곤 Head-Fixed Retaining Wall and Construction Method Thereof
CN114517562B (en) * 2020-11-20 2024-07-09 林恕如 Reinforcing steel bar anchoring system and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN217923554U (en) * 2022-05-30 2022-11-29 中冶建工集团有限公司 Prefabricated concrete bottom anchor head for recoverable anchor cable
CN115652940A (en) * 2022-05-30 2023-01-31 中冶建工集团有限公司 Anchor components for retrievable anchor cables

Also Published As

Publication number Publication date
CN115652922A (en) 2023-01-31

Similar Documents

Publication Publication Date Title
CN115652922B (en) Recyclable anchoring components for precast concrete bottom anchor heads
EP2580408B1 (en) Tower comprising an adapter piece and method for producing a tower comprising an adapter piece
EP2718520B1 (en) Joint for concrete tower sections
CN102374134B (en) Tower with adapter section
CN106321367B (en) Oblique pull prestress steel and the box-like blower fan pylon of coagulation local soil type
US7731454B1 (en) Method for placing reinforced concrete piling without utilizing a pile driver or an auger
CN107964948B (en) Super-large-diameter assembled hollow pile and splicing method thereof
CN115652940B (en) Anchoring components for retrievable anchor cables
CN111455833B (en) Self-resetting prefabricated assembled bridge pier and construction method thereof
US9458591B1 (en) Method for placing reinforced concrete piling without utilizing a pile driver or an auger
CN217782073U (en) Connecting component suitable for recoverable anchor rope
CN106088088B (en) The construction method of the stress dispersing type stiffening pile of recyclable dowel
CN207582460U (en) A kind of super-large diameter splices hollow pile
CN217923554U (en) Prefabricated concrete bottom anchor head for recoverable anchor cable
CN107327196A (en) A kind of smooth type splices electric pole
JP2009019360A (en) Structure and method for jointing bridge pier and footing
CN217231809U (en) Manual auxiliary device for detaching pre-buried steel pull rod
CN216688997U (en) Pier is assembled in prefabrication of removable part
CN110468830B (en) Quick anchor pile and construction method
KR101056655B1 (en) Detachment joint device of concrete pile
CN205875150U (en) Stake of putting more energy into of stress dispersion type of recoverable dowel
CN211036968U (en) Quick anchor stake
CN222100827U (en) Prestressed hollow pile structure
CN103510624A (en) Anchor bolt anchoring device and construction method of anchor bolt anchoring device
KR100370339B1 (en) Removable ground anchorage and method disassembling tensile memberes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant