CN115680574A - Layered filling sand prevention tool - Google Patents

Layered filling sand prevention tool Download PDF

Info

Publication number
CN115680574A
CN115680574A CN202110860737.0A CN202110860737A CN115680574A CN 115680574 A CN115680574 A CN 115680574A CN 202110860737 A CN202110860737 A CN 202110860737A CN 115680574 A CN115680574 A CN 115680574A
Authority
CN
China
Prior art keywords
central tube
tube
sliding sleeve
filling
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110860737.0A
Other languages
Chinese (zh)
Inventor
闫永维
李志广
李怀文
刘伟
王艳山
李风涛
张子佳
薛清祥
李川
陈冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN202110860737.0A priority Critical patent/CN115680574A/en
Publication of CN115680574A publication Critical patent/CN115680574A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种分层充填防砂工具,上接头、上中心管、内中心管、下中心管、下接头依次通过螺纹固定连接;上中心管外周安装有上弹簧、上阀座、滑套、上阀芯、密封护套;上中心管内安装有滑套;上中心管与滑套由剪钉固定;内中心管外周安装有扩张胶筒组件;内中心管内侧有限位台阶,上中心管内安装的滑套可剪断剪钉移动到内中心管内侧的限位台阶;下中心管外周安装有下弹簧、下阀座、下阀芯;上中心管有径向上充填口,下中心管有径向下充填口,内中心管有过液孔,扩张胶筒组件在压差作用下向上移动剪断销钉进而压缩上压缩胶筒,向下移动压缩下压缩胶筒。可实现两段到多段分段砾石充填,解决因层间差异导致各层充填不均的问题,提高防砂效果。

Figure 202110860737

The invention discloses a sand control tool for layered filling. An upper joint, an upper central pipe, an inner central pipe, a lower central pipe and a lower joint are fixedly connected by threads in sequence; an upper spring, an upper valve seat and a sliding sleeve are installed on the outer periphery of the upper central pipe. , upper spool, sealing sheath; a sliding sleeve is installed in the upper central tube; the upper central tube and the sliding sleeve are fixed by shear nails; the outer circumference of the inner central tube is installed with an expansion rubber tube assembly; The installed sliding sleeve can cut the shear nails and move to the limit step inside the inner central tube; the lower central tube is equipped with a lower spring, a lower valve seat, and a lower valve core; the upper central tube has a radially upper filling port, and the lower central tube has a diameter The filling port is downward, and the inner central pipe has a liquid hole, and the expansion rubber cylinder assembly moves upward under the action of the pressure difference to compress the upper compression rubber cylinder, and then moves downward to compress the lower compression rubber cylinder. It can realize two-stage to multi-stage gravel filling, solve the problem of uneven filling in each layer due to differences between layers, and improve the sand control effect.

Figure 202110860737

Description

一种分层充填防砂工具A layered filling sand control tool

技术领域technical field

本发明属于油井增产措施技术领域,具体涉及一种分层充填防砂工具。The invention belongs to the technical field of oil well stimulation measures, and in particular relates to a layered filling sand control tool.

背景技术Background technique

东部油田疏松砂岩油藏,大部分区块面临不同程度的出砂问题,极大的影响了油田的开发,层间跨度大于50m的长井段多层井的出砂问题是目前生产中面临的一种常见出砂形态,目前国内外对于这类长井段多层井主要采用机械或化学笼统合防的防砂工艺,对于国外的机械多级分段充填防砂来说,防砂效果好,但是存在成本较高、管柱复杂、施工风险大,后期处理困难的问题;用化学笼统合防,虽然施工工艺简便,但对主要出砂层位砾石充填控制难度大,人工井壁完整性差,存在有效期短的问题。目前针对长井段多层井的防砂对策主要采用舍层、合防或选层的防砂工艺,但均存在一定不足,长井段多层出砂井的防砂难点主要体现在:In the unconsolidated sandstone reservoirs of the Eastern Oilfield, most blocks face different degrees of sand production problems, which greatly affects the development of the oilfield. The sand production problem of multi-layer wells with long well intervals with interlayer spans greater than 50m is the current production problem. A common form of sand production. At present, the mechanical or chemical comprehensive sand control technology is mainly used for this kind of multi-layer wells at home and abroad. For foreign mechanical multi-stage and segmented sand control, the sand control effect is good, but there are High cost, complex pipe string, high construction risk, and difficult post-processing problems; chemical cage combined prevention, although the construction process is simple, but it is difficult to control the gravel filling of the main sand production layer, the integrity of the artificial well wall is poor, and there is a validity period short question. At present, the sand control countermeasures for multi-layer wells with long well sections mainly adopt the sand control technology of layer shedding, combined prevention or layer selection, but there are certain deficiencies in all of them. The sand control difficulties of multi-layer sand producing wells with long well sections are mainly reflected in:

(1)井段长,机械防砂管柱长,防砂失效后管柱不易处理,需大修作业;(1) The well section is long, and the mechanical sand control pipe string is long. After the sand control fails, the pipe string is not easy to handle and requires overhaul;

(2)跨度大,层位多,各层物性差异大,层间非均质性严重,导致开展防砂措施时无法对各层均匀填砂,影响防砂井的长效稳产。(2) Large span, many layers, large differences in physical properties of each layer, and serious interlayer heterogeneity, resulting in the inability to uniformly fill sand in each layer when sand control measures are carried out, affecting the long-term and stable production of sand control wells.

针对这类长井段多层井存在的后期管柱不易处理的问题进行了研究,研发了长井段易处理防砂管柱,解决了长井段井机械防砂后期处理需要大修的难题,进一步提高机械防砂的适应性。但对于长井段多层井的充填效果方面没有过多考虑,由于长井段多层井层间跨度大,层位多,各层物性差异大,层间非均质性严重,开展防砂措施时影响各层均匀填砂,从而影响防砂井的长效稳产。Aiming at the problem that the late-stage pipe strings in multi-layer wells with long well sections are not easy to handle, research has been carried out, and the easy-to-handle sand control pipe strings for long well sections have been developed. Adaptability of mechanical sand control. However, the filling effect of multi-layer wells in long well sections has not been considered too much. Since multi-layer wells in long well sections have large interlayer spans, many layers, large differences in physical properties of each layer, and serious interlayer heterogeneity, sand control measures should be carried out. It affects the uniform sand filling of each layer, thus affecting the long-term and stable production of sand control wells.

分层充填工艺已在压裂措施中有了较广泛的应用,但压裂分层充填井段相对较长,施工压力相对较大,且封隔器存在成本高,施工风险大等问题,因此有必要研究适用于防砂的低成本低风险的分层工具解决长井段多层井充填效果不好的问题就显的尤为必要,对于保证长井段多层井的长效稳产具有重要意义。Layered packing technology has been widely used in fracturing measures, but the fracturing layered filling section is relatively long, the construction pressure is relatively high, and the packer has problems such as high cost and high construction risk. It is necessary to study low-cost and low-risk layered tools suitable for sand control to solve the problem of poor filling effect in multi-layer wells with long well sections, which is of great significance for ensuring long-term and stable production of multi-layer wells with long well sections.

发明内容Contents of the invention

本发明所要解决的技术问题是,供一种分层充填防砂工具,具有无卡瓦、防管柱蠕动、防砂卡功能,可实现两段到多段分段砾石充填,解决因层间差异导致各层充填不均的问题,进一步提高长井段防砂井的防砂效果。The technical problem to be solved by the present invention is to provide a sand control tool for layered filling, which has the functions of no slips, anti-pipe string creep, and anti-sand jamming. It can solve the problem of uneven layer filling and further improve the sand control effect of long well section sand control wells.

为了解决上述技术问题,本发明采用的技术方案是:一种分层充填防砂工具,包括上接头、上中心管、上弹簧、上阀座、剪钉、滑套、上阀芯、密封护套、销钉、内中心管、上压缩胶筒、扩张胶筒组件、下压缩胶筒、下中心管、下弹簧、下阀座、下充填口、下阀芯、下接头;In order to solve the above technical problems, the technical solution adopted by the present invention is: a layered filling sand control tool, including an upper joint, an upper center pipe, an upper spring, an upper valve seat, shear nails, a sliding sleeve, an upper valve core, and a sealing sheath , pin, inner central tube, upper compression rubber cylinder, expansion rubber cylinder assembly, lower compression rubber cylinder, lower central tube, lower spring, lower valve seat, lower filling port, lower valve core, lower joint;

上接头、上中心管、内中心管、下中心管、下接头依次通过螺纹固定连接;The upper joint, the upper center pipe, the inner center pipe, the lower center pipe and the lower joint are fixedly connected by threads in sequence;

上中心管外周安装有上弹簧、上阀座、滑套、上阀芯、密封护套;上中心管内安装有滑套;上中心管与滑套由剪钉固定;An upper spring, an upper valve seat, a sliding sleeve, an upper valve core and a sealing sheath are installed on the outer periphery of the upper central tube; a sliding sleeve is installed inside the upper central tube; the upper central tube and the sliding sleeve are fixed by shear nails;

内中心管外周安装有扩张胶筒组件,扩张胶筒组件与上中心管通过销钉固定,扩张胶筒组件上下分别安装上压缩胶筒、下压缩胶筒;内中心管内侧有限位台阶,上中心管内安装的滑套可剪断剪钉移动到内中心管内侧的限位台阶;The expansion rubber tube assembly is installed on the outer periphery of the inner central tube, and the expansion rubber tube assembly and the upper central tube are fixed by pins. The sliding sleeve installed in the tube can cut the shear pin and move to the limit step inside the inner central tube;

下中心管外周安装有下弹簧、下阀座、下阀芯;A lower spring, a lower valve seat and a lower valve core are installed on the outer periphery of the lower central tube;

上中心管有径向上充填口,下中心管有径向下充填口,内中心管有过液孔,扩张胶筒组件在压差作用下向上移动剪断销钉进而压缩上压缩胶筒,扩张胶筒组件可在压差作用下向下移动压缩下压缩胶筒。The upper central tube has a radially upward filling port, the lower central tube has a radially downward filling port, and the inner central tube has a liquid passage hole. The expansion rubber tube assembly moves upwards under the action of the pressure difference and cuts off the pins to compress the upper compression rubber tube and expand the rubber tube. The assembly can move downward under the action of differential pressure to compress the rubber cartridge.

所述销钉为铜销钉。The pins are copper pins.

本发明的有益效果是:实现长井段分段砾石充填防砂,研制了具有无卡瓦、防管柱蠕动、防砂卡功能的分层充填防砂工具,可实现两段到多段分段砾石充填,解决因层间差异导致各层充填不均的问题,进一步提高长井段防砂井的防砂效果。The beneficial effect of the present invention is: to realize the sand control of segmented gravel packing in the long well section, and develop a layered filling sand control tool with the functions of no slips, prevent pipe string creep and prevent sand sticking, which can realize two-stage to multi-stage gravel packing, Solve the problem of uneven filling of each layer due to the difference between layers, and further improve the sand control effect of the long section sand control well.

附图说明Description of drawings

图1是本发明的分层充填防砂工具的结构图;Fig. 1 is the structural diagram of layered filling sand control tool of the present invention;

图2是本发明的分层充填防砂工具第一段局部结构示意图;Fig. 2 is a schematic diagram of the local structure of the first section of the layered filling sand control tool of the present invention;

图3是本发明的分层充填防砂工具第二段局部结构示意图;Fig. 3 is a schematic diagram of the partial structure of the second section of the layered filling sand control tool of the present invention;

图4是本发明的分层充填防砂工具的充填上层结构示意图;Fig. 4 is a schematic diagram of the filling superstructure of the layered filling sand control tool of the present invention;

图5是本发明的扩张胶筒组件的结构示意图;Fig. 5 is a schematic structural view of the expansion rubber cartridge assembly of the present invention;

图中,1-上接头、2-上中心管、3-上弹簧、4-上阀座、5-剪钉、7-滑套、8-上阀芯、9-密封护套、12-销钉、13-内中心管、14-上压缩胶筒、15-扩张胶筒组件、16-下压缩胶筒、17-下中心管、18-下弹簧、19-下阀座、20-下充填口、21-下阀芯、22-下接头。In the figure, 1-upper joint, 2-upper central tube, 3-upper spring, 4-upper valve seat, 5-shear pin, 7-sliding sleeve, 8-upper valve core, 9-sealing sheath, 12-pin , 13-inner central tube, 14-upper compression rubber cylinder, 15-expansion rubber cylinder assembly, 16-lower compression rubber cylinder, 17-lower central tube, 18-lower spring, 19-lower valve seat, 20-lower filling port , 21-lower spool, 22-lower connector.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述;显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例,基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings in the embodiments of the present invention; obviously, the described embodiments are only part of the embodiments of the present invention, not all embodiments, based on The embodiments of the present invention and all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

在本发明的描述中,需要说明的是,术语“上”、“下”、“内”、“外”、“顶/底端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "top/bottom" etc. are based on the orientations shown in the drawings Or positional relationship is only for the convenience of describing the present invention and simplifying the description, but does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and should not be understood as indicating or implying relative importance.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“套设/接”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that, unless otherwise specified and limited, the terms "installed", "set with", "sleeved/connected", "connected", etc. should be understood in a broad sense, such as " Connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, and it can be an internal connection between two components. connectivity. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.

如图1-5所示,本发明的分层充填防砂工具,包括上接头1、上中心管2、上弹簧3、上阀座4、剪钉5、滑套7、上阀芯8、密封护套9、销钉12、内中心管13、上压缩胶筒14、扩张胶筒组件15、下压缩胶筒16、下中心管17、下弹簧18、下阀座19、下充填口20、下阀芯21、下接头22;As shown in Figures 1-5, the layered filling sand control tool of the present invention includes an upper joint 1, an upper center pipe 2, an upper spring 3, an upper valve seat 4, shear nails 5, a sliding sleeve 7, an upper valve core 8, a sealing Sheath 9, pin 12, inner central tube 13, upper compression rubber cylinder 14, expansion rubber cylinder assembly 15, lower compression rubber cylinder 16, lower central tube 17, lower spring 18, lower valve seat 19, lower filling port 20, lower Spool 21, lower joint 22;

上接头1、上中心管2、内中心管13、下中心管17、下接头22依次通过螺纹固定连接;The upper joint 1, the upper central pipe 2, the inner central pipe 13, the lower central pipe 17, and the lower joint 22 are fixedly connected by threads in sequence;

上中心管2外周安装有上弹簧3、上阀座4、滑套7、上阀芯8、密封护套9;上中心管2内安装有滑套7;上中心管2与滑套7由剪钉5固定;Upper central tube 2 is equipped with upper spring 3, upper valve seat 4, sliding sleeve 7, upper valve core 8, sealing sheath 9; upper central tube 2 is equipped with sliding sleeve 7; upper central tube 2 and sliding sleeve 7 are formed The shear pin 5 is fixed;

内中心管13外周安装有扩张胶筒组件15,扩张胶筒组件15与上中心管2通过销钉12固定,扩张胶筒组件15上下分别安装上压缩胶筒14、下压缩胶筒16;内中心管13内侧有限位台阶,上中心管2内安装的滑套7可剪断剪钉5移动到内中心管13内侧的限位台阶;An expansion rubber tube assembly 15 is installed on the outer periphery of the inner central tube 13, and the expansion rubber tube assembly 15 and the upper central tube 2 are fixed by pins 12. The upper compression rubber tube 14 and the lower compression rubber tube 16 are respectively installed on the upper and lower sides of the expansion rubber tube assembly 15; There is a limit step inside the tube 13, and the sliding sleeve 7 installed in the upper central tube 2 can cut the shear pin 5 and move to the limit step inside the inner central tube 13;

下中心管17外周安装有下弹簧18、下阀座19、下阀芯21;A lower spring 18, a lower valve seat 19, and a lower valve core 21 are installed on the outer periphery of the lower central tube 17;

上中心管2有径向上充填口6,下中心管17有径向下充填口20,内中心管13有过液孔11,扩张胶筒组件15在压差作用下向上移动剪断销钉12进而压缩上压缩胶筒14,扩张胶筒组件15可在压差作用下向下移动压缩下压缩胶筒16。The upper central tube 2 has a radially upper filling port 6, the lower central tube 17 has a radially lower filling port 20, the inner central tube 13 has a liquid hole 11, and the expansion rubber tube assembly 15 moves upward under the action of the pressure difference and then compresses the shear pin 12 The upper compression rubber cylinder 14 and the expansion rubber cylinder assembly 15 can move downward to compress the lower compression rubber cylinder 16 under the action of the pressure difference.

优选,所述销钉12为铜销钉。Preferably, the pin 12 is a copper pin.

本发明的分层充填防砂工具具体使用步骤如下:The specific steps of using the layered filling sand control tool of the present invention are as follows:

(1)下井:一种分层充填防砂工具的下接头22与丝堵联接下入预定井深,分层充填防砂工具位于上下层之间。(1) Downhole: The lower joint 22 of a layered filling sand control tool is connected with a plug to run into a predetermined well depth, and the layered filling sand control tool is located between the upper and lower layers.

(2)充填下层:地面用泵车打压携砂液,携砂液下充填口20流出,下弹簧18压缩下阀座19与下阀芯21作用下,分层充填防砂工具内外产生节流压差,在节流压差作用下扩张胶筒组件15径向扩张与套管壁接触密封,由于下层压力大于上层压力,分层充填防砂工具的活塞效应进一步推动扩张胶筒组件15向上移动剪断销钉12进而压缩上压缩胶筒14。上压缩胶筒14与与套管壁接触密封。(2) Fill the lower layer: use a pump truck on the ground to pressurize the sand-carrying liquid, and the sand-carrying liquid flows out from the lower filling port 20, and the lower spring 18 compresses the lower valve seat 19 and the lower valve core 21, and the inside and outside of the sand control tool are filled in layers to generate throttling pressure. Poor, under the action of throttling pressure difference, the expansion rubber tube assembly 15 expands radially and contacts with the casing wall to seal. Since the pressure of the lower layer is greater than the pressure of the upper layer, the piston effect of layered filling sand control tools further pushes the expansion rubber tube assembly 15 upward to move the shear pin 12 and then compress the upper compression rubber cylinder 14. The upper compression rubber cylinder 14 is in contact with the casing wall for sealing.

(3)充填上层:充填完上层后,投球打压推动上中心管2内安装的滑套7剪断剪钉5移动到内中心管13内侧的限位台阶。携砂液经上中心管2与滑套7之间的公差配合间隙、过液孔11进入扩张胶筒组件15与内中心管13之间,膨胀扩张胶筒组件15密封套管,扩张胶筒组件15上部环形空间压力大于扩张胶筒组件15下部环形空间压力,扩张胶筒组件15可在压差作用下向下移动压缩下压缩胶筒16。(3) Filling the upper layer: After filling the upper layer, push the ball to push the sliding sleeve 7 installed in the upper central tube 2 to cut the shear pin 5 and move to the limit step inside the inner central tube 13 . The sand-carrying liquid enters between the expansion rubber tube assembly 15 and the inner central tube 13 through the tolerance fit gap between the upper central tube 2 and the sliding sleeve 7, and the liquid passage hole 11, and the expansion and expansion rubber tube assembly 15 seals the casing, and the expansion rubber tube The pressure in the annular space at the upper part of the assembly 15 is greater than the pressure in the annular space at the lower part of the expansion rubber cylinder assembly 15, and the expansion rubber cylinder assembly 15 can move downwards and compress the lower compression rubber cylinder 16 under the action of the pressure difference.

本发明所采用的技术方案是:一种分层充填防砂工具,包括上接头1、上中心管2、上弹簧3、上阀座4、剪钉5、滑套7、上阀芯8、密封护套9、销钉12、内中心管13、上压缩胶筒14、扩张胶筒组件15、下压缩胶筒16、下中心管17、下弹簧18、下阀座19、下充填口20、下阀芯21、下接头22组成;The technical solution adopted in the present invention is: a layered filling sand control tool, including an upper joint 1, an upper central pipe 2, an upper spring 3, an upper valve seat 4, shear nails 5, a sliding sleeve 7, an upper valve core 8, a sealing Sheath 9, pin 12, inner central tube 13, upper compression rubber cylinder 14, expansion rubber cylinder assembly 15, lower compression rubber cylinder 16, lower central tube 17, lower spring 18, lower valve seat 19, lower filling port 20, lower The spool 21 and the lower joint 22 are composed;

上接头1、上中心管2、内中心管13、下中心管17、下接头22由螺纹固定连接;The upper joint 1, the upper central pipe 2, the inner central pipe 13, the lower central pipe 17, and the lower joint 22 are fixedly connected by threads;

上中心管2外周安装有上弹簧3、上阀座4、滑套7、上阀芯8、密封护套9;上中心管2内安装有滑套7;上中心管2与滑套7由剪钉5固定;Upper central tube 2 is equipped with upper spring 3, upper valve seat 4, sliding sleeve 7, upper valve core 8, sealing sheath 9; upper central tube 2 is equipped with sliding sleeve 7; upper central tube 2 and sliding sleeve 7 are formed The shear pin 5 is fixed;

内中心管13外周安装有扩张胶筒组件15,扩张胶筒组件15与上中心管2通过销钉12固定,扩张胶筒组件15上下分别安装上压缩胶筒14、下压缩胶筒16;An expansion rubber tube assembly 15 is installed on the outer periphery of the inner central tube 13, and the expansion rubber tube assembly 15 and the upper central tube 2 are fixed by pins 12, and the upper compression rubber tube 14 and the lower compression rubber tube 16 are installed on the upper and lower sides of the expansion rubber tube assembly 15;

下中心管17外周安装有下弹簧18、下阀座19、下阀芯21;A lower spring 18, a lower valve seat 19, and a lower valve core 21 are installed on the outer periphery of the lower central tube 17;

所述的上中心管2有径向上充填口6,下中心管17有径向下充填口20,内中心管13有过液孔11,扩张胶筒组件15可在压差作用下向上移动剪断销钉12进而压缩上压缩胶筒14,扩张胶筒组件15可在压差作用下向下移动压缩下压缩胶筒16。The upper central tube 2 has a radially upper filling port 6, the lower central tube 17 has a radially lower filling port 20, the inner central tube 13 has a liquid hole 11, and the expansion rubber tube assembly 15 can be moved upward under the action of pressure difference and cut The pin 12 further compresses the upper compression rubber tube 14 , and the expansion rubber tube assembly 15 can move downwards and compress the lower compression rubber tube 16 under the action of the pressure difference.

所述的内中心管13内侧有限位台阶,上中心管2内安装的滑套7可剪断剪钉5移动到内中心管13内侧的限位台阶。The inside of the inner central tube 13 has a limiting step, and the sliding sleeve 7 installed in the upper central tube 2 can cut the shear pin 5 and move to the limiting step on the inner side of the inner central tube 13 .

充填下层时分层充填防砂工具内外产生节流压差,在节流压差作用下扩张胶筒组件15径向扩张与套管壁接触密封,由于下层压力大于上层压力,分层充填防砂工具的活塞效应进一步推动扩张胶筒组件15向上移动剪断销钉12进而压缩上压缩胶筒14。上压缩胶筒14与套管壁接触密封。When filling the lower layer, there is a throttling pressure difference inside and outside the sand control tool when filling the lower layer. Under the action of the throttling pressure difference, the expansion rubber sleeve assembly 15 radially expands to contact and seal with the casing wall. Since the lower layer pressure is greater than the upper layer pressure, the layered sand control tool The piston effect further pushes the expansion rubber cylinder assembly 15 upward to move the shear pin 12 to compress the upper compression rubber cylinder 14 . The upper compression rubber cylinder 14 is in contact with the casing wall for sealing.

充填完上层后,投球打压推动上中心管2内安装的滑套7剪断剪钉5移动到内中心管13内侧的限位台阶。携砂液经上中心管2与滑套7之间的公差配合间隙、过液孔11进入扩张胶筒组件15与内中心管13之间,膨胀扩张胶筒组件15密封套管,扩张胶筒组件15上部环形空间压力大于扩张胶筒组件15下部环形空间压力,扩张胶筒组件15可在压差作用下向下移动压缩下压缩胶筒16,进而在充填上层时下层不受干扰。After filling the upper layer, throwing a ball presses and pushes the sliding sleeve 7 installed in the upper center tube 2 to cut the shear nails 5 and move to the limit steps on the inside of the inner center tube 13 . The sand-carrying liquid enters between the expansion rubber tube assembly 15 and the inner central tube 13 through the tolerance fit gap between the upper central tube 2 and the sliding sleeve 7, and the liquid passage hole 11, and the expansion and expansion rubber tube assembly 15 seals the casing, and the expansion rubber tube The annular space pressure in the upper part of the assembly 15 is greater than the pressure in the lower annular space of the expansion rubber cartridge assembly 15, and the expansion rubber cartridge assembly 15 can move downwards and compress the lower compression rubber cartridge 16 under the action of the pressure difference, so that the lower layer is not disturbed when the upper layer is filled.

综上所述,本发明的内容并不局限在上述的实施例中,相同领域内的有识之士可以在本发明的技术指导思想之内可以轻易提出其他的实施例,但这种实施例都包括在本发明的范围之内。In summary, the content of the present invention is not limited to the above-mentioned embodiments, people of insight in the same field can easily propose other embodiments within the technical guidance of the present invention, but this embodiment All are included within the scope of the present invention.

Claims (2)

1.一种分层充填防砂工具,其特征在于,包括上接头(1)、上中心管(2)、上弹簧(3)、上阀座(4)、剪钉(5)、滑套(7)、上阀芯(8)、密封护套(9)、销钉(12)、内中心管(13)、上压缩胶筒(14)、扩张胶筒组件(15)、下压缩胶筒(16)、下中心管(17)、下弹簧(18)、下阀座(19)、下充填口(20)、下阀芯(21)、下接头(22);1. A layered filling sand control tool is characterized in that it comprises an upper joint (1), an upper center pipe (2), an upper spring (3), an upper valve seat (4), shear nails (5), a sliding sleeve ( 7), upper spool (8), sealing sheath (9), pin (12), inner central tube (13), upper compression rubber cylinder (14), expansion rubber cylinder assembly (15), lower compression rubber cylinder ( 16), lower central tube (17), lower spring (18), lower valve seat (19), lower filling port (20), lower valve core (21), lower joint (22); 上接头(1)、上中心管(2)、内中心管(13)、下中心管(17)、下接头(22)依次通过螺纹固定连接;The upper joint (1), the upper center pipe (2), the inner center pipe (13), the lower center pipe (17), and the lower joint (22) are fixedly connected by threads in turn; 上中心管(2)外周安装有上弹簧(3)、上阀座(4)、滑套(7)、上阀芯(8)、密封护套(9);上中心管(2)内安装有滑套(7);上中心管(2)与滑套(7)由剪钉(5)固定;Upper central tube (2) is equipped with upper spring (3), upper valve seat (4), sliding sleeve (7), upper valve core (8), sealing sheath (9); There is a sliding sleeve (7); the upper central tube (2) and the sliding sleeve (7) are fixed by shear nails (5); 内中心管(13)外周安装有扩张胶筒组件(15),扩张胶筒组件(15)与上中心管(2)通过销钉(12)固定,扩张胶筒组件(15)上下分别安装上压缩胶筒(14)、下压缩胶筒(16);内中心管(13)内侧有限位台阶,上中心管(2)内安装的滑套(7)可剪断剪钉(5)移动到内中心管(13)内侧的限位台阶;An expansion rubber tube assembly (15) is installed on the outer periphery of the inner center tube (13), the expansion rubber tube assembly (15) and the upper center tube (2) are fixed by pins (12), and the expansion rubber tube assembly (15) is respectively installed on the upper and lower The rubber cylinder (14), the lower compression rubber cylinder (16); the inner side of the inner central tube (13) has a limited step, and the sliding sleeve (7) installed in the upper central tube (2) can cut the shear nails (5) and move to the inner center The limiting step on the inside of the pipe (13); 下中心管(17)外周安装有下弹簧(18)、下阀座(19)、下阀芯(21);A lower spring (18), a lower valve seat (19), and a lower spool (21) are installed on the outer periphery of the lower center pipe (17); 上中心管(2)有径向上充填口(6),下中心管(17)有径向下充填口(20),内中心管(13)有过液孔(11),扩张胶筒组件(15)在压差作用下向上移动剪断销钉(12)进而压缩上压缩胶筒(14),扩张胶筒组件(15)可在压差作用下向下移动压缩下压缩胶筒(16)。The upper central tube (2) has a radially upper filling port (6), the lower central tube (17) has a radially lower filling port (20), the inner central tube (13) has a liquid hole (11), and the expansion rubber cartridge assembly ( 15) Move the shearing pin (12) upwards under the action of differential pressure to compress the upper compression rubber tube (14), and the expansion rubber tube assembly (15) can move downward under the action of differential pressure to compress the lower compression rubber tube (16). 2.根据权利要求1所述分层充填防砂工具,其特征在于,所述销钉(12)为铜销钉。2. The layered filling sand control tool according to claim 1, characterized in that, the pins (12) are copper pins.
CN202110860737.0A 2021-07-28 2021-07-28 Layered filling sand prevention tool Pending CN115680574A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110860737.0A CN115680574A (en) 2021-07-28 2021-07-28 Layered filling sand prevention tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110860737.0A CN115680574A (en) 2021-07-28 2021-07-28 Layered filling sand prevention tool

Publications (1)

Publication Number Publication Date
CN115680574A true CN115680574A (en) 2023-02-03

Family

ID=85058205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110860737.0A Pending CN115680574A (en) 2021-07-28 2021-07-28 Layered filling sand prevention tool

Country Status (1)

Country Link
CN (1) CN115680574A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6364017B1 (en) * 1999-02-23 2002-04-02 Bj Services Company Single trip perforate and gravel pack system
CN101435321A (en) * 2008-12-26 2009-05-20 中国石油化工股份有限公司胜利油田分公司采油工艺研究院 Horizontal well tube exterior subsection gravel filling sand prevention process and pipe column
CN202937223U (en) * 2012-12-11 2013-05-15 中国石油集团渤海钻探工程有限公司 Combined sealing fracturing packer
CN203891848U (en) * 2014-02-27 2014-10-22 孔利生 Integrated extrusion sand control filling device
CN207598221U (en) * 2017-11-10 2018-07-10 中国石油化工股份有限公司 A kind of layering squeezes sand preventing tool
CN207863936U (en) * 2018-01-22 2018-09-14 东营市瑞丰石油技术发展有限责任公司 Multilayer huge discharge squeeze pack tool
CN110735619A (en) * 2018-07-19 2020-01-31 中国石油化工股份有限公司 Independent -layer extrusion filling pipe column in multiple oil layers

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6364017B1 (en) * 1999-02-23 2002-04-02 Bj Services Company Single trip perforate and gravel pack system
CN101435321A (en) * 2008-12-26 2009-05-20 中国石油化工股份有限公司胜利油田分公司采油工艺研究院 Horizontal well tube exterior subsection gravel filling sand prevention process and pipe column
CN202937223U (en) * 2012-12-11 2013-05-15 中国石油集团渤海钻探工程有限公司 Combined sealing fracturing packer
CN203891848U (en) * 2014-02-27 2014-10-22 孔利生 Integrated extrusion sand control filling device
CN207598221U (en) * 2017-11-10 2018-07-10 中国石油化工股份有限公司 A kind of layering squeezes sand preventing tool
CN207863936U (en) * 2018-01-22 2018-09-14 东营市瑞丰石油技术发展有限责任公司 Multilayer huge discharge squeeze pack tool
CN110735619A (en) * 2018-07-19 2020-01-31 中国石油化工股份有限公司 Independent -layer extrusion filling pipe column in multiple oil layers

Similar Documents

Publication Publication Date Title
CN103306634B (en) A kind of Sliding-sleeve-type downhole blow-out preventer and application thereof
CN103184850B (en) Two-way setting hanging packer and preparation method thereof and pit shaft hoop packing method
CN110529073B (en) Soluble full-bore sliding sleeve based on intelligent control
CN110593837A (en) Fracturing construction operation method for soluble full-bore sliding sleeve
CN102587981A (en) Underground salt cavern gas storage and building method thereof
CN109973066A (en) A full bore cementing and fracturing device
CN107060682A (en) A kind of high pressure self-locking packer and its set method
CN101864924A (en) Drilling fixed-point plugging method
CN117967208A (en) Multifunctional integrated pipe column and method for well completion and yield increase of ultra-deep and ultra-thick reservoir
CN202381036U (en) Suspension type squeezing bridge plug
CN113006750B (en) A construction tool and method for improving the recovery rate of horizontal wells in low-permeability oil reservoirs
CN115680574A (en) Layered filling sand prevention tool
CN212428755U (en) Oil pipe water-mixing steam-injection hollow rod oil extraction integrated pipe column
CN204941345U (en) A kind of radial well transfer with packing function
CN105401931B (en) Casing sliding sleeve fracturing production integrated tubular column and fracturing production method thereof
CN209261784U (en) A kind of anti-gas lock oil gas mixed extraction pump and tubing string
CN203783515U (en) Gas-drive production wellhead device
CN107795297A (en) Multistage a chain of Cut Block blocking
CN109899047B (en) Tieback fracturing method and anchoring retrievable tieback fracturing shaft
CN202483539U (en) Thermal recovery steam injection well pipe string compensation packing device
CN116265701A (en) Well cementation sliding sleeve device, composite well completion pipe string and fracturing well completion method
CN114427419A (en) Staged fracturing well completion pipe string for unlimited-grade full-bore oil and gas well
CN219691503U (en) A direct-connected compact fracturing wellhead device
CN206409212U (en) Multistage chain of rings Cut Block blocking device
CN208024336U (en) A kind of full-bore well cementation fracturing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20230203