CN115973337A CN202211641725.XA CN202211641725A CN115973337A CN 115973337 A CN115973337 A CN 115973337A CN 202211641725 A CN202211641725 A CN 202211641725A CN 115973337 A CN115973337 A CN 115973337A
Authority
CN
China
Prior art keywords
binding
crane
deck
lashing
transportation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211641725.XA
Other languages
Chinese (zh)
Inventor
李恭川
徐建中
吴越
李森
俞丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenghua Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenghua Heavy Industries Co Ltd filed Critical Shanghai Zhenghua Heavy Industries Co Ltd
Priority to CN202211641725.XA priority Critical patent/CN115973337A/en
Publication of CN115973337A publication Critical patent/CN115973337A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

本发明公开了一种用于大型门座式起重机整机运输的海运绑扎装置及方法,包括撑杆绑扎组件、旋转绑扎组件和臂架支撑组件;所述撑杆绑扎组件包括撑杆和大车行走止挡;所述旋转绑扎组件包括下转柱‑门架绑扎部件、转盘前部加固部件、转盘后部加固部件和门架张紧拉索绑扎部件;所述臂架支撑组件包括臂架搁置架、柔性绑扎组件和铰点绑扎组件。本发明对用户现场影响较小,整机完整性好并且交机快,免去了大型浮吊的使用费用,降低安装成本。

Figure 202211641725

The invention discloses a marine lashing device and method used for the transportation of a large gantry crane, which comprises a strut lashing assembly, a rotating lashing assembly and a jib support assembly; the strut lashing assembly includes a strut and a cart Walking stopper; the rotating binding assembly includes the lower rotating column-gantry binding part, the front reinforcement part of the turntable, the rear reinforcement part of the turntable and the tensioning cable binding part of the door frame; the boom support assembly includes a boom resting Frames, Flexible Lashing Components and Hinge Point Lashing Components. The present invention has less impact on the user's site, good integrity of the whole machine and fast delivery, avoids the use cost of large floating cranes, and reduces installation costs.

Figure 202211641725

Description

用于大型门座式起重机整机运输的海运绑扎装置及方法Marine lashing device and method for complete machine transportation of large gantry crane

技术领域technical field

本发明涉及岸桥海上运输技术,更具体地说,涉及一种用于大型门座式起重机整机运输的海运绑扎装置及方法。The invention relates to the marine transportation technology of quay cranes, more specifically, to a marine binding device and method for the transportation of large portal cranes.

背景技术Background technique

随着用户对大型门座式起重机完整性的要求提高、大型整机运输船舶的发展以及现场交机周期短,大型门座式起重机逐渐采取整机运输的方式,整机运输成为未来发展的趋势。考虑到门座式起重机轨距小,重心高度高,因此设计一套符合大型门座式起重机海运安全的绑扎装置,保证在海运途中门座式起重机的安全是必要的。With the increasing requirements of users for the integrity of large portal cranes, the development of large-scale complete machine transport ships, and the short delivery period on site, large portal cranes gradually adopt the mode of complete machine transportation, and complete machine transportation has become the trend of future development. . Considering the small gauge of the portal crane and the high height of the center of gravity, it is necessary to design a set of lashing devices that meet the safety of large portal cranes in sea transportation to ensure the safety of the portal crane during sea transportation.

发明内容Contents of the invention

针对现有技术中存在的上述缺陷,本发明的目的是提供一种用于大型门座式起重机整机运输的海运绑扎装置及方法,对用户现场影响较小,整机完整性好并且交机快,免去了大型浮吊的使用费用,降低安装成本。In view of the above-mentioned defects in the prior art, the object of the present invention is to provide a marine binding device and method for the transportation of a large portal crane, which has little impact on the user's site, and the integrity of the whole machine is good and the machine is delivered to the machine. Faster, eliminating the use of large floating cranes and reducing installation costs.

为实现上述目的,本发明采用如下技术方案:To achieve the above object, the present invention adopts the following technical solutions:

一方面,一种用于大型门座式起重机整机运输的海运绑扎装置,包括撑杆绑扎组件、旋转绑扎组件和臂架支撑组件;On the one hand, a marine lashing device used for the transportation of a large portal crane, including a strut lashing assembly, a rotating lashing assembly, and a jib support assembly;

所述撑杆绑扎组件包括撑杆和大车行走止挡;所述撑杆的上端与起重机的门架相连,下端与运输船的甲板相连;所述大车行走止挡设于所述运输船的甲板上,并与所述起重机的车轮轮缘接触;The strut binding assembly includes a strut and a cart travel stop; the upper end of the strut is connected with the gantry of the crane, and the lower end is connected with the deck of the transport ship; the cart travel stop is set on the transport ship on the deck of the crane and is in contact with the wheel rim of the crane;

所述旋转绑扎组件包括下转柱-门架绑扎部件、转盘前部加固部件、转盘后部加固部件和门架张紧拉索绑扎部件;所述下转柱-门架绑扎部件用以连接所述起重机的下转柱和门架;所述转盘前部加固部件、所述转盘后部加固部件用以固定所述起重机的转盘;所述门架张紧拉索绑扎部件的上端与所述起重机的转盘相连,下端与所述甲板相连;The rotating binding assembly includes a lower rotating column-gantry binding part, a front reinforcement part of the turntable, a rear reinforcement part of the turntable, and a door frame tensioning cable binding part; the lower rotating column-gantry binding part is used to connect the The lower rotating column and the door frame of the crane; the front reinforcement part of the turntable and the rear reinforcement part of the turntable are used to fix the turntable of the crane; the upper end of the door frame tensioning cable binding part is connected with the crane The turntable is connected, and the lower end is connected with the deck;

下转柱-门架绑扎部件主要用于固定下转柱与门座间相对位置,以保护回转轴承免受海运摇摆力的损伤;转盘前部加固部件和转盘后部加固部件主要用于固定转盘与门架,免受海运摇摆力引起门架与转盘的相对位移,进而产生超出使用工况的应力导致构件钢板撕裂。The lower rotating column-gantry binding parts are mainly used to fix the relative position between the lower rotating column and the door seat, so as to protect the slewing bearing from the damage of the sea swaying force; the front reinforcement part of the turntable and the rear reinforcement part of the turntable are mainly used to fix the turntable With the gantry, it is protected from the relative displacement of the gantry and the turntable caused by the swaying force of the sea, which in turn produces stress beyond the working conditions and causes the steel plate of the component to tear.

所述臂架支撑组件包括臂架搁置架、柔性绑扎组件和铰点绑扎组件;所述臂架搁置架的下端与所述甲板相连,上端与所述起重机的臂架相连;所述柔性绑扎组件的下端与所述甲板相连,上端与所述臂架搁置架的上端相连;所述铰点绑扎组件的下端与所述甲板相连,上端与所述臂架的铰点相连。The jib support assembly includes a jib resting frame, a flexible binding assembly and a hinge point binding assembly; the lower end of the jib resting frame is connected to the deck, and the upper end is connected to the boom of the crane; the flexible binding assembly The lower end of the lower end is connected with the deck, and the upper end is connected with the upper end of the jib shelf; the lower end of the hinge point binding assembly is connected with the deck, and the upper end is connected with the hinge point of the jib.

较佳的,所述撑杆在所述门架的外侧对称设置12件,其中,沿所述运输船的船宽方向设置8件,沿所述运输船的船长方向设置4件。Preferably, 12 struts are arranged symmetrically on the outer side of the mast, among which 8 are arranged along the width direction of the transport ship, and 4 are arranged along the length of the transport ship.

较佳的,所述撑杆包括螺旋管,以及设于所述螺旋管端部的插板;Preferably, the strut includes a spiral tube, and an inserting plate arranged at the end of the spiral tube;

所述螺旋管一端的所述插板与所述门架的门腿隔板对筋焊接,所述螺旋管另一端的所述插板与所述甲板对筋焊接。The inserting plate at one end of the spiral tube is welded to the ribs of the door leg partition of the door frame, and the inserting plate at the other end of the spiral tube is welded to the deck.

较佳的,所述大车行走止挡对称设置32件;Preferably, there are 32 symmetrically arranged cart travel stoppers;

所述大车行走止挡的圆弧边与所述车轮轮缘接触,底边焊接在所述甲板的临时轨道上。The arc edge of the traveling stop of the cart is in contact with the wheel rim, and the bottom edge is welded on the temporary track of the deck.

较佳的,所述门架张紧拉索绑扎部件设置4组;Preferably, there are 4 groups of the gantry tensioning cable binding parts;

每组所述门架张紧拉索绑扎部件包括钢绞绳、油缸张紧装置、可调螺杆和拉板;所述油缸张紧装置设于所述甲板上,所述油缸张紧装置的输出侧通过所述可调螺杆连接所述钢绞绳,所述钢绞绳与所述拉板相连,所述拉板与所述转盘相连。Each group of the gantry tensioning cable binding parts includes a steel strand, an oil cylinder tensioning device, an adjustable screw and a pull plate; the oil cylinder tensioning device is arranged on the deck, and the output of the oil cylinder tensioning device The side is connected to the steel strand rope through the adjustable screw rod, the steel strand rope is connected to the pull plate, and the pull plate is connected to the turntable.

较佳的,所述臂架搁置架的上端设有耳板、销轴和卡轴板与所述臂架相连;Preferably, the upper end of the arm frame resting frame is provided with an ear plate, a pin shaft and a card shaft plate connected with the arm frame;

所述柔性绑扎组件包括4根φ28的钢丝绳;The flexible binding assembly includes 4 φ28 steel wire ropes;

所述铰点绑扎组件包括设于所述甲板上的支座、设于所述支座上的吊钩以及用以连接所述吊钩和所述铰点的钢丝绳。The hinge point binding assembly includes a support on the deck, a hook on the support, and a wire rope for connecting the hook and the hinge.

另一方面,一种用于大型门座式起重机整机运输的海运绑扎方法,采用所述的用于大型门座式起重机整机运输的海运绑扎装置执行以下步骤:On the other hand, a marine binding method for the transportation of a large portal crane complete machine, the following steps are performed by using the marine binding device for the transportation of a large portal crane complete machine:

S1、根据所述运输船的搭载,预先划出所述起重机的大车行走机构的轨道线、所述臂架搁置架的中心线和所述撑杆的安装线;S1. According to the carrying of the transport ship, pre-draw the track line of the cart traveling mechanism of the crane, the center line of the jib shelf and the installation line of the strut;

S2、根据划出的所述臂架搁置架的中心线安装所述臂架支撑组件;S2. Install the boom support assembly according to the centerline of the drawn boom shelf;

S3、将所述起重机牵引至所述运输船,安装所述大车行走止挡、所述撑杆、所述旋转绑扎组件;S3. Towing the crane to the transport ship, installing the traveling stopper of the cart, the strut, and the rotating lashing assembly;

S4、放倒所述臂架,使其与所述臂架搁置架相连固定;S4, laying down the boom so that it is connected to the boom shelf and fixed;

S5、安装所述门架张紧拉索绑扎部件;S5. Install the tensioning cable binding parts of the gantry;

S6、所述运输船到达目的地后,先拆除所述撑杆,松开所述门架张紧拉索绑扎部件、所述臂架搁置架,使所述臂架脱离;将所述起重机牵引至岸上;S6. After the transport ship arrives at the destination, remove the struts first, loosen the gantry tensioning cable binding parts and the jib resting frame, and disengage the jib; pull the crane to shore;

S7、拆卸下的相关部件带回。S7. Bring back the disassembled related parts.

本发明所提供的一种用于大型门座式起重机整机运输的海运绑扎装置及方法,利用大型运输船同时装载多台大型门座式起重机至用户现场,只需调试大车行走机构即可。对用户现场影响较小,整机完整性好并且交机快。免去了大型浮吊的使用费用,降低安装成本,采用多对焊接撑杆、门架张紧拉索绑扎部件及臂架搁置架,实现了大型门座式起重机的整机运输。The marine lashing device and method for the transportation of large portal cranes provided by the present invention use large transport ships to load multiple large portal cranes to the user site at the same time, and only need to debug the traveling mechanism of the cart . The impact on the user's site is small, the integrity of the whole machine is good, and the delivery is fast. The cost of using large-scale floating cranes is eliminated, and installation costs are reduced. The use of multiple pairs of welded struts, portal frame tensioning cable binding parts, and jib shelf racks realizes the transportation of large portal cranes.

附图说明Description of drawings

图1是本发明海运绑扎装置中撑杆绑扎组件的示意图;Fig. 1 is a schematic diagram of a strut lashing assembly in a marine lashing device of the present invention;

图2是本发明海运绑扎装置中旋转绑扎组件的示意图;Fig. 2 is a schematic diagram of the rotating lashing assembly in the marine lashing device of the present invention;

图3是本发明海运绑扎装置中下转柱-门架绑扎部件的示意图,(a)为主视图,(b)为(a)中A向的示意图;Fig. 3 is a schematic diagram of the lower rotating column-gantry lashing parts in the marine lashing device of the present invention, (a) is the main view, and (b) is a schematic diagram of the A direction in (a);

图4是本发明海运绑扎装置中转盘前部加固部件的示意图;Fig. 4 is a schematic diagram of the reinforcement part at the front of the turntable in the marine lashing device of the present invention;

图5是本发明海运绑扎装置中门架张紧拉索绑扎部件的示意图;Fig. 5 is a schematic diagram of the mast tensioning cable binding parts in the marine binding device of the present invention;

图6是本发明海运绑扎装置中臂架支撑组件的示意图。Fig. 6 is a schematic diagram of the jib support assembly in the marine lashing device of the present invention.

具体实施方式Detailed ways

为了能更好地理解本发明的上述技术方案,下面结合附图和实施例进一步说明本发明的技术方案。In order to better understand the above-mentioned technical solution of the present invention, the technical solution of the present invention will be further described below in conjunction with the drawings and embodiments.

本发明所提供的一种用于大型门座式起重机整机运输的海运绑扎装置,包括撑杆绑扎组件、旋转绑扎组件和臂架支撑组件。The marine lashing device provided by the present invention for the complete transportation of a large portal crane includes a strut lashing assembly, a rotating lashing assembly and a jib support assembly.

结合图1所示,撑杆绑扎组件包括撑杆1和大车行走止挡。As shown in FIG. 1 , the strut binding assembly includes a strut 1 and a traveling stopper of a cart.

撑杆1的上端与起重机的门架2相连,下端与运输船的甲板3相连。The upper end of the strut 1 is connected with the mast 2 of the crane, and the lower end is connected with the deck 3 of the transport ship.

撑杆1在门架2的外侧对称设置12件,其中,沿运输船的船宽方向设置8件,沿运输船的船长方向设置4件。12件撑杆1以克服海运加速度产生的横向摇摆、纵向摇摆及上抛力。There are 12 struts 1 arranged symmetrically on the outside of the portal frame 2, among which 8 are arranged along the ship width direction of the transport ship, and 4 are arranged along the ship length direction of the transport ship. 12 pieces of struts 1 are used to overcome the lateral swing, longitudinal swing and upward throwing force produced by the acceleration of sea transportation.

撑杆1包括螺旋管,以及设于螺旋管端部的插板。螺旋管一端的插板与门架2的门腿隔板对筋焊接,螺旋管另一端的插板与甲板3对筋焊接,保证撑杆1两端的力的传递。The strut 1 includes a helical tube, and an inserting plate arranged at the end of the helical tube. The plate at one end of the spiral tube is welded to the ribs with the door leg partition of the door frame 2, and the plate at the other end of the spiral tube is welded to the ribs with the deck 3 to ensure the power transmission at the two ends of the strut 1.

大车行走止挡对称设置32件,大车行走止挡的圆弧边与车轮轮缘接触,底边焊接在甲板3的临时轨道上。There are 32 symmetrically arranged cart travel stops, the arc edge of the cart travel stop is in contact with the wheel rim, and the bottom edge is welded on the temporary track of deck 3.

运输船上的滚道梁为定制专用工装件,根据运输设备的滚装轨距(或基距)进行铺设,滚到梁两端对准船上主要加强肋。滚道梁铺设完成后,利用卡板将滚道梁与船甲板固定。The raceway beam on the transport ship is a custom-made special tooling. It is laid according to the roll-on gauge (or base distance) of the transport equipment, and the two ends of the beam are rolled to align with the main ribs on the ship. After the raceway beam is laid, the raceway beam and the ship deck are fixed with clamping plates.

结合图2所示,旋转绑扎组件包括下转柱-门架绑扎部件4、转盘前部加固部件5、转盘后部加固部件6和门架张紧拉索绑扎部件7。As shown in FIG. 2 , the rotary binding assembly includes a lower rotating column-gate frame binding part 4 , a front reinforcement part 5 of the turntable, a rear reinforcement part 6 of the turntable and a door frame tensioning cable binding part 7 .

结合图3所示,下转柱-门架绑扎部件4用以连接起重机的下转柱和门架2,主要克服下转柱与门架2之间因船运加速度产生的相对旋转与倾覆,以保护回转轴承免受海运摇摆力的损伤。As shown in Fig. 3, the lower rotating column-gantry binding part 4 is used to connect the lower rotating column and the mast 2 of the crane, mainly to overcome the relative rotation and overturning between the lower rotating column and the mast 2 due to the acceleration of shipping, To protect the slewing bearing from damage caused by sea swaying force.

结合图4所示,转盘前部加固部件5、转盘后部加固部件6用以固定起重机的转盘8与门架,免受海运摇摆力引起门架与转盘的相对位移,进而产生超出使用工况的应力导致构件钢板撕裂,用转盘前部加固部件5的撑杆501与上支撑环联接以减小船运过程中旋转部分对门架的冲击。As shown in Figure 4, the front reinforcement part 5 of the turntable and the rear reinforcement part 6 of the turntable are used to fix the turntable 8 and the gantry of the crane, so as to avoid the relative displacement of the gantry and the turntable caused by the swaying force of the sea, and then produce a load exceeding the operating conditions. The stress caused the steel plate of the component to tear, and the strut 501 of the reinforcement part 5 at the front of the turntable is connected with the upper support ring to reduce the impact of the rotating part on the mast during shipping.

门架张紧拉索绑扎部件7的上端与起重机的转盘8相连,下端与甲板3相连,以克服转盘8由于重心较高,船运过程中横摇、纵摇所引起的翻转力。The upper end of the gantry tensioning cable binding part 7 is connected to the turntable 8 of the crane, and the lower end is connected to the deck 3 to overcome the turning force caused by the roll and pitch of the turntable 8 due to the high center of gravity during shipping.

门架张紧拉索绑扎部件7设置4组。There are 4 groups of gantry tensioning cable binding parts 7.

结合图5所示,每组门架张紧拉索绑扎部件7包括钢绞绳701、油缸张紧装置702、工具索703和拉板704;油缸张紧装置702通过吊耳705设于甲板上,油缸张紧装置702的输出侧依次连接拉板704、工具索703最后连接钢绞绳701。As shown in FIG. 5 , each group of gantry tensioning cable binding parts 7 includes a steel strand 701 , an oil cylinder tensioning device 702 , a tool rope 703 and a pull plate 704 ; , the output side of the cylinder tensioning device 702 is sequentially connected to the pull plate 704, the tool rope 703 and finally connected to the steel strand 701.

结合图6所示,臂架支撑组件包括臂架搁置架9、柔性绑扎组件10和铰点绑扎组件。As shown in FIG. 6 , the boom support assembly includes a boom resting frame 9 , a flexible binding assembly 10 and a hinge point binding assembly.

臂架搁置架9的下端与甲板3焊接相连,上端通过耳板、销轴和卡轴板与与起重机的臂架11相连固定,以克服其在海运过程中因运输船横向摇摆产生的作用力。The lower end of the jib shelf 9 is welded to the deck 3, and the upper end is connected to the jib 11 of the crane through the lug plate, the pin shaft and the clamping plate, so as to overcome the force generated by the lateral swing of the transport ship during the sea transportation. .

柔性绑扎组件10的下端与甲板3相连,上端与臂架搁置架9的上端相连。The lower end of the flexible binding assembly 10 is connected to the deck 3 , and the upper end is connected to the upper end of the boom resting frame 9 .

柔性绑扎组件10包括4根φ28的钢丝绳,以及相配套的10t螺旋扣、绳夹、16t卸扣等,利用4根φ28的钢丝绳来稳定,防止臂架搁置架9的倾覆。The flexible binding assembly 10 includes 4 φ28 steel wire ropes, and matching 10t turnbuckles, rope clips, 16t shackles, etc., and uses 4 φ28 steel wire ropes to stabilize and prevent the overturning of the jib shelf 9.

铰点绑扎组件的下端与甲板相连,上端与臂架11的铰点相连。The lower end of the hinge point binding assembly is connected with the deck, and the upper end is connected with the hinge point of the jib 11 .

铰点绑扎组件包括设于甲板3上的支座12、设于支座上的吊钩以及用以连接吊钩和铰点的钢丝绳13。The hinge point binding assembly includes a support 12 arranged on the deck 3 , a suspension hook provided on the support and a wire rope 13 for connecting the suspension hook and the hinge point.

本发明还提供了一种用于大型门座式起重机整机运输的海运绑扎方法,采用本发明用于大型门座式起重机整机运输的海运绑扎装置执行以下步骤:The present invention also provides a marine binding method for the transportation of the complete large portal crane, and the following steps are performed by using the marine binding device of the present invention for the complete transportation of the large portal crane:

S1、根据起重机的整体结构,下转柱-门架绑扎部件4、转盘前部加固部件5、转盘后部加固部件6可事先安装,发运后拆除;门架张紧拉索绑扎部件7中钢绞线的耳板在结构件制作阶段预先安装,随本体一起冲砂油漆(涂装工艺、油漆与本体结构相同),发运后不拆除,整机卸船完成后钢绞线与张紧油缸等拆除后随船带回;S1. According to the overall structure of the crane, the lower rotating column-gantry binding part 4, the front reinforcement part 5 of the turntable, and the rear reinforcement part 6 of the turntable can be installed in advance and removed after delivery; the gantry tension cable binding part 7 is medium steel The ear plate of the stranded wire is pre-installed in the production stage of the structural parts, sanded and painted together with the main body (the painting process and paint are the same as the main body structure), and will not be dismantled after delivery. After the unloading of the whole machine is completed, the steel stranded wire and the tensioning cylinder Take it back with the ship after dismantling;

S2、根据运输船配载,预先划出起重机的大车行走机构的轨道线、臂架搁置架9的中心线和撑杆1的安装线,确保撑杆1对准甲板3下的强筋,在甲板3上预先焊接好张紧拉索绑扎用的耳板(对筋);S2. According to the loading of the transport ship, draw out the track line of the traveling mechanism of the crane, the center line of the jib shelf 9 and the installation line of the strut 1 in advance to ensure that the strut 1 is aligned with the strong rib under the deck 3, On the deck 3, pre-weld the lug plate (alignment rib) used for binding the tension cable;

S3、根据划出的臂架搁置架9的中心线,安装臂架搁置架9,防倾覆柔性绑扎组件10的钢丝绳组件上口通过16T卸扣与预先船甲板上焊接的吊耳联接,将10T螺旋扣调节到最长,并通过卸扣与事先的耳板联接好,拧紧螺旋扣,使钢丝绳张紧;S3. According to the drawn center line of the jib resting frame 9, install the jib resting frame 9, and connect the upper opening of the steel wire rope assembly of the anti-overturning flexible binding assembly 10 with the lug welded on the pre-deck of the ship through a 16T shackle, and connect the 10T Adjust the turnbuckle to the longest, and connect it with the ear plate in advance through the shackle, tighten the turnbuckle to make the wire rope tension;

S4、起重机用船上自备的4台卷扬机牵引上船,使大车行走的中心线与甲板3上预先划出的中心线基本一致。安装大车行走车挡,采用对称装焊,圆弧边对准车轮轮缘,底边与滚道梁面板焊接。将整体制作完成的撑杆1两端分别与门架2、甲板3焊接(必须保证对船强筋);S4, the crane is pulled onto the ship with 4 self-provided winches on the ship, so that the center line of the cart is basically consistent with the center line drawn in advance on the deck 3. Install the running gear of the large vehicle, adopt symmetrical welding, the arc edge is aligned with the wheel rim, and the bottom edge is welded with the raceway beam panel. Weld the two ends of the strut 1 which has been fabricated as a whole with the door frame 2 and the deck 3 respectively (it must be ensured that it is strong to the ship);

S5、放倒臂架11,使臂架11重量置于臂架搁置架9上,安装销轴及卡轴板,使臂架11固定;S5, put down the arm frame 11, place the weight of the arm frame 11 on the arm frame shelf 9, install the pin shaft and the clamping shaft plate, and fix the arm frame 11;

S6、将钢绞线、拉板、张紧装置、调节螺杆组成组件,行程都挑至最大。用手拉葫芦将钢绞线组件安装至预先焊接的吊耳上,并用专用工具空心油缸将钢绞线受力拉至30T;S6. Steel strands, pull plates, tensioning devices, and adjusting screw rods are assembled into components, and the strokes are all selected to the maximum. Install the steel strand assembly to the pre-welded lifting lug with a hand chain hoist, and use a special tool hollow cylinder to pull the steel strand to 30T;

S7、门起重机船运至用户码头后,先拆除撑杆1,松开门架张紧装置中的张紧油缸,从吊耳上拆除张紧油缸,通电扳起臂架11,使臂架11和臂架搁置架9脱开。利用船上的卷扬机将起重机牵引至岸上,大车入本机轨道,门机入锚定位,做好防风措施,再用80t汽车吊拆除张紧装置中的钢绞线及其余上部机内绑扎;S7. After the gantry crane is shipped to the user's wharf, remove the strut 1 first, loosen the tensioning oil cylinder in the gantry tensioning device, remove the tensioning oil cylinder from the lifting lug, turn on the power to pull up the boom 11, and make the boom 11 Disengage from the arm rest shelf 9. Use the winch on the ship to pull the crane to the shore, put the cart into the track of the machine, put the door crane into the anchor position, take windproof measures, and then use an 80t truck crane to remove the steel strands in the tensioning device and the rest of the upper machine.

S8、将拆下来的销轴装箱、钢绞线组件盘好后放至框子内,所有绑扎撑杆装船并堆放好,并进行相应绑扎,随船带待用。S8. Put the dismantled pin shafts into boxes and the steel strand assemblies into the frame after being coiled, and all the lashing struts are loaded and stacked, and tied up accordingly, and brought with the ship for use.

本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本发明,而并非用作为对本发明的限定,只要在本发明的实质精神范围内,对以上所述实施例的变化、变型都将落在本发明的权利要求书范围内。Those of ordinary skill in the art should recognize that the above embodiments are only used to illustrate the present invention, rather than as a limitation to the present invention, as long as within the scope of the spirit of the present invention, the above-described embodiments Changes and modifications will fall within the scope of the claims of the present invention.

Claims (7)

1.一种用于大型门座式起重机整机运输的海运绑扎装置,其特征在于:包括撑杆绑扎组件、旋转绑扎组件和臂架支撑组件;1. A marine lashing device used for the transportation of a large portal crane, characterized in that it includes a strut lashing assembly, a rotating lashing assembly and a jib support assembly; 所述撑杆绑扎组件包括撑杆和大车行走止挡;所述撑杆的上端与起重机的门架相连,下端与运输船的甲板相连;所述大车行走止挡设于所述运输船的甲板上,并与所述起重机的车轮轮缘接触;The strut binding assembly includes a strut and a cart travel stop; the upper end of the strut is connected with the gantry of the crane, and the lower end is connected with the deck of the transport ship; the cart travel stop is set on the transport ship on the deck of the crane and is in contact with the wheel rim of the crane; 所述旋转绑扎组件包括下转柱-门架绑扎部件、转盘前部加固部件、转盘后部加固部件和门架张紧拉索绑扎部件;所述下转柱-门架绑扎部件用以连接所述起重机的下转柱和门架;所述转盘前部加固部件、所述转盘后部加固部件用以固定所述起重机的转盘;所述门架张紧拉索绑扎部件的上端与所述起重机的转盘相连,下端与所述甲板相连;The rotating binding assembly includes a lower rotating column-gantry binding part, a front reinforcement part of the turntable, a rear reinforcement part of the turntable, and a door frame tensioning cable binding part; the lower rotating column-gantry binding part is used to connect the The lower rotating column and the door frame of the crane; the front reinforcement part of the turntable and the rear reinforcement part of the turntable are used to fix the turntable of the crane; the upper end of the door frame tensioning cable binding part is connected with the crane The turntable is connected, and the lower end is connected with the deck; 所述臂架支撑组件包括臂架搁置架、柔性绑扎组件和铰点绑扎组件;所述臂架搁置架的下端与所述甲板相连,上端与所述起重机的臂架相连;所述柔性绑扎组件的下端与所述甲板相连,上端与所述臂架搁置架的上端相连;所述铰点绑扎组件的下端与所述甲板相连,上端与所述臂架的铰点相连。The jib support assembly includes a jib resting frame, a flexible binding assembly and a hinge point binding assembly; the lower end of the jib resting frame is connected to the deck, and the upper end is connected to the boom of the crane; the flexible binding assembly The lower end of the lower end is connected with the deck, and the upper end is connected with the upper end of the jib shelf; the lower end of the hinge point binding assembly is connected with the deck, and the upper end is connected with the hinge point of the jib. 2.根据权利要求1所述的用于大型门座式起重机整机运输的海运绑扎装置,其特征在于:所述撑杆在所述门架的外侧对称设置12件,其中,沿所述运输船的船宽方向设置8件,沿所述运输船的船长方向设置4件。2. The marine lashing device for the transportation of large portal cranes according to claim 1, wherein 12 pieces of said struts are arranged symmetrically on the outer side of said portal frame, wherein, along the transportation 8 pieces are set in the ship width direction of the ship, and 4 pieces are set along the ship length direction of the transport ship. 3.根据权利要求2所述的用于大型门座式起重机整机运输的海运绑扎装置,其特征在于:所述撑杆包括螺旋管,以及设于所述螺旋管端部的插板;3. The marine lashing device for the transportation of large portal cranes according to claim 2, wherein the struts include spiral tubes and inserting plates arranged at the ends of the spiral tubes; 所述螺旋管一端的所述插板与所述门架的门腿隔板对筋焊接,所述螺旋管另一端的所述插板与所述甲板对筋焊接。The inserting plate at one end of the spiral tube is welded to the ribs of the door leg partition of the door frame, and the inserting plate at the other end of the spiral tube is welded to the deck. 4.根据权利要求1所述的用于大型门座式起重机整机运输的海运绑扎装置,其特征在于:所述大车行走止挡对称设置32件;4. The marine lashing device used for the transportation of large portal cranes according to claim 1, characterized in that: 32 pieces of travel stops of the cart are arranged symmetrically; 所述大车行走止挡的圆弧边与所述车轮轮缘接触,底边焊接在所述甲板的临时轨道上。The arc edge of the traveling stop of the cart is in contact with the wheel rim, and the bottom edge is welded on the temporary track of the deck. 5.根据权利要求1所述的用于大型门座式起重机整机运输的海运绑扎装置,其特征在于:所述门架张紧拉索绑扎部件设置4组;5. The marine binding device for the transportation of large portal cranes according to claim 1, characterized in that: the portal frame tensioning cable binding parts are provided with 4 groups; 每组所述门架张紧拉索绑扎部件包括钢绞绳、油缸张紧装置、可调螺杆和拉板;所述油缸张紧装置设于所述甲板上,所述油缸张紧装置的输出侧通过所述可调螺杆连接所述钢绞绳,所述钢绞绳与所述拉板相连,所述拉板与所述转盘相连。Each group of the gantry tensioning cable binding parts includes a steel strand, an oil cylinder tensioning device, an adjustable screw and a pull plate; the oil cylinder tensioning device is arranged on the deck, and the output of the oil cylinder tensioning device The side is connected to the steel strand rope through the adjustable screw rod, the steel strand rope is connected to the pull plate, and the pull plate is connected to the turntable. 6.根据权利要求1所述的用于大型门座式起重机整机运输的海运绑扎装置,其特征在于:所述臂架搁置架的上端设有耳板、销轴和卡轴板与所述臂架相连;6. The marine lashing device used for the transportation of large portal cranes according to claim 1, characterized in that: the upper end of the boom resting frame is provided with an ear plate, a pin shaft and a clamping shaft plate and the boom connection; 所述柔性绑扎组件包括4根φ28的钢丝绳;The flexible binding assembly includes 4 φ28 steel wire ropes; 所述铰点绑扎组件包括设于所述甲板上的支座、设于所述支座上的吊钩以及用以连接所述吊钩和所述铰点的钢丝绳。The hinge point binding assembly includes a support on the deck, a hook on the support, and a wire rope for connecting the hook and the hinge. 7.一种用于大型门座式起重机整机运输的海运绑扎方法,其特征在于,采用如权利要求1-6之一所述的用于大型门座式起重机整机运输的海运绑扎装置执行以下步骤:7. A marine binding method for the transportation of a large portal crane, characterized in that it is performed by using the marine binding device for the transportation of a large portal crane according to any one of claims 1-6. The following steps: S1、根据所述运输船的搭载,预先划出所述起重机的大车行走机构的轨道线、所述臂架搁置架的中心线和所述撑杆的安装线;S1. According to the carrying of the transport ship, pre-draw the track line of the cart traveling mechanism of the crane, the center line of the jib shelf and the installation line of the strut; S2、根据划出的所述臂架搁置架的中心线安装所述臂架支撑组件;S2. Install the boom support assembly according to the centerline of the drawn boom shelf; S3、将所述起重机牵引至所述运输船,安装所述大车行走止挡、所述撑杆、所述旋转绑扎组件;S3. Towing the crane to the transport ship, installing the traveling stopper of the cart, the strut, and the rotating lashing assembly; S4、放倒所述臂架,使其与所述臂架搁置架相连固定;S4, laying down the boom so that it is connected to the boom shelf and fixed; S5、安装所述门架张紧拉索绑扎部件;S5. Install the tensioning cable binding parts of the gantry; S6、所述运输船到达目的地后,先拆除所述撑杆,松开所述门架张紧拉索绑扎部件、所述臂架搁置架,使所述臂架脱离;将所述起重机牵引至岸上;S6. After the transport ship arrives at the destination, remove the struts first, loosen the gantry tensioning cable binding parts and the jib resting frame, and disengage the jib; pull the crane to shore; S7、拆卸下的相关部件带回。S7. Bring back the disassembled related parts.
CN202211641725.XA 2022-12-20 2022-12-20 Marine lashing device and method for complete machine transportation of large gantry crane Pending CN115973337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211641725.XA CN115973337A (en) 2022-12-20 2022-12-20 Marine lashing device and method for complete machine transportation of large gantry crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211641725.XA CN115973337A (en) 2022-12-20 2022-12-20 Marine lashing device and method for complete machine transportation of large gantry crane

Publications (1)

Publication Number Publication Date
CN115973337A true CN115973337A (en) 2023-04-18

Family

ID=85971600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211641725.XA Pending CN115973337A (en) 2022-12-20 2022-12-20 Marine lashing device and method for complete machine transportation of large gantry crane

Country Status (1)

Country Link
CN (1) CN115973337A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118929476A (en) * 2024-08-27 2024-11-12 上海振华重工(集团)股份有限公司 A disassembly system for shore container crane

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104229096A (en) * 2014-09-30 2014-12-24 泰富国际工程有限公司 Overturn-preventing mechanism of lightering loading and unloading transport ship and transport ship with same
CN204110322U (en) * 2014-07-31 2015-01-21 上海振华重工(集团)股份有限公司 Span winch shipping binding device
CN107813906A (en) * 2017-09-19 2018-03-20 上海振华重工(集团)股份有限公司 Super large gauge gantry crane complete machine shipping device
CN209852531U (en) * 2019-05-13 2019-12-27 上海振华重工(集团)股份有限公司 Binding device for offshore transportation of inner protection barrel of pile stabilizing platform
US11235841B1 (en) * 2021-02-03 2022-02-01 Trendsetter Vulcan Offshore, Inc. Lashing system and method for use in cargo ships
CN218662277U (en) * 2022-12-20 2023-03-21 上海振华重工(集团)股份有限公司 Marine transportation binding device for whole machine transportation of large portal crane

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204110322U (en) * 2014-07-31 2015-01-21 上海振华重工(集团)股份有限公司 Span winch shipping binding device
CN104229096A (en) * 2014-09-30 2014-12-24 泰富国际工程有限公司 Overturn-preventing mechanism of lightering loading and unloading transport ship and transport ship with same
CN107813906A (en) * 2017-09-19 2018-03-20 上海振华重工(集团)股份有限公司 Super large gauge gantry crane complete machine shipping device
CN209852531U (en) * 2019-05-13 2019-12-27 上海振华重工(集团)股份有限公司 Binding device for offshore transportation of inner protection barrel of pile stabilizing platform
US11235841B1 (en) * 2021-02-03 2022-02-01 Trendsetter Vulcan Offshore, Inc. Lashing system and method for use in cargo ships
CN218662277U (en) * 2022-12-20 2023-03-21 上海振华重工(集团)股份有限公司 Marine transportation binding device for whole machine transportation of large portal crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118929476A (en) * 2024-08-27 2024-11-12 上海振华重工(集团)股份有限公司 A disassembly system for shore container crane
CN118929476B (en) * 2024-08-27 2025-09-09 上海振华重工(集团)股份有限公司 Shore container crane dismounting system

Similar Documents

Publication Publication Date Title
CN104925673B (en) A kind of many cranes integration of operation auxiliary hoisting device and method
WO2018171284A1 (en) Wind power steel pipe pile lifting transportation process
CN111792519B (en) Bridge pier hoisting machine for constructing large sea-crossing bridge
CN210912787U (en) Mobile boarding device
CN105621280A (en) Device and method for mounting and dismounting crane boom
CN111039194A (en) Super-large crane final assembly process
CN116062596A (en) A method for hoisting the superstructure of a quay bridge
CN115973337A (en) Marine lashing device and method for complete machine transportation of large gantry crane
US20250059007A1 (en) A self-climbing tower crane
CN110745707B (en) Lifting device for dismantling fabricated support of concrete cast-in-place beam close to railway side
CN218662277U (en) Marine transportation binding device for whole machine transportation of large portal crane
CN102642782A (en) Tower crane capable of being transported, loaded and unloaded
CN217298915U (en) Movable multi-pile mounting frame
CN109534187B (en) Hoisting method suitable for hinged propeller strut on full-rotation floating crane ship
CN111573521A (en) Construction process of cable crane hoisting system
US4027441A (en) Arrangement for erecting and dismounting an elongate object having one end articulated to a foundation
CN119024511A (en) A back-twist frame for ship-shore loading of submarine optical cables on cable-laying vessels and a method of using the same
CN103641000A (en) Crane and super-lifting device thereof
CN116623543A (en) Rubber pipe pulling construction device and construction method
CN212503760U (en) Attached cable crane assembly platform
CN203715125U (en) Crane as well as guying device thereof
CN209853584U (en) Tower drum turnover device
CN112010218A (en) Attached cable crane assembly platform
CN207524867U (en) Double hoisting luffing device
CN215160519U (en) Pile turning device for offshore wind power tower

Legal Events