[go: up one dir, main page]

CN116220807A - Support rod and airtight wall - Google Patents

Support rod and airtight wall Download PDF

Info

Publication number
CN116220807A
CN116220807A CN202310344378.2A CN202310344378A CN116220807A CN 116220807 A CN116220807 A CN 116220807A CN 202310344378 A CN202310344378 A CN 202310344378A CN 116220807 A CN116220807 A CN 116220807A
Authority
CN
China
Prior art keywords
support
rod body
elastic member
rod
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310344378.2A
Other languages
Chinese (zh)
Inventor
宋伟鹏
郭志强
李光琦
张宝健
魏国臣
巩思宇
赵会国
孙来华
敖毅
高广亮
陈力辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Mengdong Energy Co ltd
National Energy Group Guoyuan Power Co Ltd
Original Assignee
Inner Mongolia Mengdong Energy Co ltd
National Energy Group Guoyuan Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Mengdong Energy Co ltd, National Energy Group Guoyuan Power Co Ltd filed Critical Inner Mongolia Mengdong Energy Co ltd
Priority to CN202310344378.2A priority Critical patent/CN116220807A/en
Publication of CN116220807A publication Critical patent/CN116220807A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present disclosure relates to a support pole and a sealing wall, the support pole comprising: a rod body; and the supporting mechanism comprises a first supporting component and a second supporting component, the first supporting component is connected with the first end of the rod body through a first elastic piece, the second supporting component is installed at the second end of the rod body, which is far away from the first elastic piece, and the first elastic piece is used for enabling the first supporting component and the second supporting component to be respectively abutted to the inner wall surface of the roadway so that the rod body is supported in the roadway. Therefore, holes can be prevented from being formed in the inner wall surface of the roadway for the rod body to be inserted, and damage to the roadway can be reduced or even avoided.

Description

支撑杆和密闭墙Support poles and containment walls

技术领域technical field

本公开涉及煤矿安全施工技术领域,具体地,涉及一种支撑杆和密闭墙。The disclosure relates to the technical field of coal mine safety construction, in particular, to a support rod and a closed wall.

背景技术Background technique

煤矿井下临时密闭墙构筑是双巷开采的高效煤矿在井下生产中必不可少的一项技术,在控制通风、阻隔采空区瓦斯和一氧化碳等有害气体的过程中均起到重要的作用。其中,在相关技术中煤矿井下临时密闭墙构筑可以是通过若干的金属杆搭建形成密闭墙的骨架,在将密封布布设在密闭墙骨架上,最终形成煤矿井下临时密闭墙构筑,通过若干的金属杆搭建形成密闭墙的骨架时,为了保证密闭墙骨架的整体稳定性,可以将金属杆的端部部分插入至煤矿巷道壁内,采用这种固定方式可能会对巷道壁造成损坏,存在安全隐患。The construction of temporary airtight walls in coal mines is an indispensable technology in the underground production of high-efficiency coal mines with double lane mining. It plays an important role in the process of controlling ventilation and blocking harmful gases such as gas and carbon monoxide in gobs. Among them, in the related art, the construction of the temporary airtight wall under the coal mine can be constructed by a number of metal rods to form the skeleton of the airtight wall; When the poles are built to form the skeleton of the closed wall, in order to ensure the overall stability of the closed wall skeleton, the end part of the metal rod can be inserted into the coal mine roadway wall. This fixing method may cause damage to the roadway wall and pose a safety hazard .

发明内容Contents of the invention

本公开的目的是提供一种支撑杆和密闭墙,可以避免在巷道的内壁面上开孔以供杆体插入,从而可以减少甚至避免对巷道造成损坏通过若干支撑杆搭建形成的密闭墙骨架可以稳定的支撑在巷道内,且减少对巷道壁的损坏,以至少部分地解决上述技术问题。The purpose of the present disclosure is to provide a support rod and an airtight wall, which can avoid opening holes on the inner wall of the roadway for rod insertion, thereby reducing or even avoiding damage to the roadway. The skeleton of the airtight wall formed by several support rods can be stabilized The support is in the roadway, and the damage to the roadway wall is reduced, so as to at least partly solve the above-mentioned technical problems.

为了实现上述目的,本公开的第一方面提供一种支撑杆,包括:In order to achieve the above object, the first aspect of the present disclosure provides a support rod, comprising:

杆体;和rod body; and

支撑机构,包括第一支撑组件和第二支撑组件,所述第一支撑组件通过第一弹性件连接在所述杆体的第一端,所述第二支撑组件安装在所述杆体的背离所述第一弹性件的第二端,所述第一弹性件用于使得所述第一支撑组件和所述第二支撑组件各自抵接于巷道的内壁面,以使得所述杆体支撑在所述巷道内。The support mechanism includes a first support assembly and a second support assembly, the first support assembly is connected to the first end of the rod body through a first elastic member, and the second support assembly is installed on the rod body away from the The second end of the first elastic member, the first elastic member is used to make the first support assembly and the second support assembly abut against the inner wall surface of the roadway, so that the rod body is supported on the roadway Inside.

可选地,所述杆体构造为空心管体,所述第一支撑组件包括第一支撑板和导向柱,所述导向柱的一端固连于所述第一支撑板,另一端可移动地插接于所述杆体,所述第一弹性件抵接在所述杆体与所述第一支撑板之间,所述第一支撑板用于直接或间接抵接于所述巷道的内壁面。Optionally, the rod body is configured as a hollow pipe, the first support assembly includes a first support plate and a guide column, one end of the guide column is fixedly connected to the first support plate, and the other end is movably inserted into the first support plate. Connected to the rod body, the first elastic member abuts between the rod body and the first support plate, and the first support plate is used to directly or indirectly abut against the inner wall surface of the tunnel.

可选地,所述杆体的朝向所述第一弹性件的一端设有第一止挡件,所述第一弹性件抵接在所述第一止挡件与所述第一支撑板之间。Optionally, one end of the rod body facing the first elastic member is provided with a first stopper, and the first elastic member abuts between the first stopper and the first support plate .

可选地,所述第一弹性件套接在所述导向柱上,所述第一支撑组件还包括套接在所述第一弹性件外侧的第二弹性件,所述第二弹性件的一端固连于所述第一支撑板,所述第二弹性件的另一端用于抵接于所述第一止挡件。Optionally, the first elastic member is sleeved on the guide column, and the first support assembly further includes a second elastic member sleeved on the outside of the first elastic member, and the second elastic member is One end is fixedly connected to the first support plate, and the other end of the second elastic member is used to abut against the first stopper.

可选地,所述第一弹性件与所述第二弹性件均构造为弹簧,所述第二弹性件的弹力大于所述第一弹性件的弹力。Optionally, both the first elastic member and the second elastic member are configured as springs, and the elastic force of the second elastic member is greater than that of the first elastic member.

可选地,所述第一支撑板背离所述导向柱一端的端面上设有第一柔性垫片。Optionally, a first flexible gasket is provided on the end surface of the first support plate away from the end of the guide column.

可选地,所述第二支撑组件包括第二支撑板、螺杆以及螺纹连接在所述螺杆上的螺母,所述螺杆的一端固连于所述第一支撑板,另一端可移动地插接于所述杆体,所述杆体的第二端设有用以抵接所述螺母的第二止挡件,所述第二支撑板用于直接或间接抵接于所述巷道的内壁面。Optionally, the second support assembly includes a second support plate, a screw and a nut threadedly connected to the screw, one end of the screw is fixedly connected to the first support plate, and the other end is movably inserted into the On the rod body, the second end of the rod body is provided with a second stopper for abutting against the nut, and the second support plate is for directly or indirectly abutting against the inner wall of the tunnel.

可选地,所述第二支撑板背离所述螺杆一端的端面上设有第二柔性垫片。Optionally, a second flexible gasket is provided on the end surface of the second support plate away from the end of the screw rod.

本公开的第二方面还提供一种密闭墙,包括:The second aspect of the present disclosure also provides an airtight wall, comprising:

骨架,所述骨架包括沿竖直方向延伸且沿水平方向间隔布置的多根纵向支撑杆以及沿水平方向延伸且沿竖直方向间隔布置的多根横向支撑杆,所述纵向支撑杆和/或所述横向支撑杆采用如上所述的支撑杆;以及A skeleton, the skeleton includes a plurality of longitudinal support rods extending in the vertical direction and arranged at intervals in the horizontal direction, and a plurality of transverse support rods extending in the horizontal direction and arranged at intervals in the vertical direction, the longitudinal support rods and/or The transverse support rod adopts the above-mentioned support rod; and

密封布,所述密封布铺设在所述骨架上。Sealing cloth, the sealing cloth is laid on the skeleton.

可选地,所述纵向支撑杆和所述横向支撑杆的交叉处通过固定件连接。Optionally, intersections of the longitudinal support rods and the lateral support rods are connected by a fixing piece.

通过上述技术方案,通过若干根支撑杆搭接形成密闭墙的骨架,其中,设置在杆体第一端的第一支撑组件与设置在杆体第二端的第二支撑组件可以通过第一弹性件各自抵接于巷道的内壁面,由此可以避免在巷道的内壁面上开孔以供杆体插入,从而可以减少甚至避免对巷道造成损坏并且不会对巷道壁造成损坏。Through the above technical solution, several support rods are overlapped to form the skeleton of the airtight wall, wherein the first support assembly arranged at the first end of the rod body and the second support assembly arranged at the second end of the rod body can respectively resist each other through the first elastic member Connected to the inner wall of the roadway, thereby avoiding opening holes on the inner wall of the roadway for rod insertion, thereby reducing or even avoiding damage to the roadway without causing damage to the roadway wall.

本公开的其他特征和优点将在随后的具体实施方式部分予以详细说明。Other features and advantages of the present disclosure will be described in detail in the detailed description that follows.

附图说明Description of drawings

附图是用来提供对本公开的进一步理解,并且构成说明书的一部分,与下面的具体实施方式一起用于解释本公开,但并不构成对本公开的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present disclosure, and constitute a part of the description, together with the following specific embodiments, are used to explain the present disclosure, but do not constitute a limitation to the present disclosure. In the attached picture:

图1是本公开示例性实施方式中提供的支撑架整体的结构示意图;FIG. 1 is a schematic diagram of the overall structure of a support frame provided in an exemplary embodiment of the present disclosure;

图2是本公开示例性实施方式中提供的杆体的结构示意图;Fig. 2 is a schematic structural view of a rod body provided in an exemplary embodiment of the present disclosure;

图3是本公开示例性实施方式中提供的第二支撑组件的结构示意图;Fig. 3 is a schematic structural diagram of a second support assembly provided in an exemplary embodiment of the present disclosure;

图4是本公开示例性实施方式中提供的第一支撑组件的结构示意图;Fig. 4 is a schematic structural diagram of a first support assembly provided in an exemplary embodiment of the present disclosure;

图5是本公开示例性实施方式中提供的密闭墙骨架的结构示意图。Fig. 5 is a schematic structural view of the airtight wall skeleton provided in the exemplary embodiment of the present disclosure.

附图标记说明Explanation of reference signs

1-杆体;2-支撑机构;201-第一支撑组件;2011-第一支撑板;2012-导向柱;202-第二支撑组件;2021-第二支撑板;2022-螺杆;2023-螺母;3-第一弹性件;4-第一止挡件;5-第二弹性件;6-第一柔性垫片;7-第二止挡件;8-第二柔性垫片;9-骨架;10-巷道。1-rod body; 2-support mechanism; 201-first support component; 2011-first support plate; 2012-guiding column; 202-second support component; 2021-second support plate; 2022-screw; 3-the first elastic member; 4-the first stopper; 5-the second elastic member; 6-the first flexible gasket; 7-the second stopper; 8-the second flexible gasket; 9-skeleton; 10 - Laneway.

具体实施方式Detailed ways

以下结合附图对本公开的具体实施方式进行详细说明。应当理解的是,此处所描述的具体实施方式仅用于说明和解释本公开,并不用于限制本公开。Specific embodiments of the present disclosure will be described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to illustrate and explain the present disclosure, and are not intended to limit the present disclosure.

在本公开中,在未作相反说明的情况下,“内、外”是指相应零部件的本身轮廓而言的,此外,本公开中使用的术语“第一”、“第二”等是为了区别一个要素和另一个要素,不具有顺序性和重要性。下面的描述涉及附图时,除非另有表示,不同附图中的相同数字表示相同或相似的要素。In the present disclosure, unless stated otherwise, "inner and outer" refer to the contours of the corresponding components. In addition, the terms "first", "second" and the like used in the present disclosure are To distinguish one element from another, without order or importance. When the following description refers to the accompanying drawings, the same numerals in different drawings refer to the same or similar elements unless otherwise indicated.

相关技术中,煤矿井下临时密闭墙构筑是双巷开采的高效煤矿在井下生产中必不可少的一项技术,在控制巷道通风、阻隔采空区瓦斯和一氧化碳等有害气体的过程中均起到重要的作用。其中,对于密闭墙的构建可以是通过若干的支撑杆搭建形成密闭墙的骨架,在将密封布布设在密闭墙骨架上,最终形成煤矿井下临时密闭墙,然而,在实际的施工过程中,人员为了提高密闭墙的整体稳定性,可以将支撑杆的两端均埋设至巷道壁内部,以使得密闭墙更牢固,但是,这种支撑杆的固定形式会对巷道壁造成损坏,存在有一定的安全隐患。Among related technologies, the construction of temporary airtight walls in coal mines is an indispensable technology in the underground production of high-efficiency coal mines mined with double lanes. important role. Among them, the construction of the airtight wall can be constructed by a number of support rods to form the skeleton of the airtight wall, and the sealing cloth is laid on the airtight wall skeleton to form a temporary airtight wall in the coal mine. However, in the actual construction process, personnel In order to improve the overall stability of the airtight wall, both ends of the support rods can be buried inside the roadway wall to make the airtight wall stronger. However, the fixing form of the support rods will cause damage to the roadway wall, and there are certain problems. Security risks.

基于此,本公开的第一方面提供一种支撑杆,参考图1所示,该支撑杆包括杆体1和支撑机构2,杆体1包括第一支撑组件201和第二支撑组件202,第一支撑组件201通过第一弹性件3连接在杆体1的第一端,第二支撑组件202安装在杆体1的背离第一弹性件3的第二端,第一弹性件3用于使得第一支撑组件201和第二支撑组件202各自抵接于巷道10的内壁面,以使得杆体1支撑在巷道10内。Based on this, the first aspect of the present disclosure provides a support rod. Referring to FIG. 1 , the support rod includes a rod body 1 and a support mechanism 2. The assembly 201 is connected to the first end of the rod body 1 through the first elastic member 3, and the second support assembly 202 is installed on the second end of the rod body 1 away from the first elastic member 3. The first elastic member 3 is used to make the first support assembly 201 and the second support assembly 202 respectively abut against the inner wall surface of the tunnel 10 so that the rod body 1 is supported in the tunnel 10 .

在本公开中,支撑杆的两端均不会埋设在巷道10内,尽可能地避免支撑杆对巷道10造成人为损坏。具体地,设置在杆体1两端的第一支撑组件201和第二支撑组件202各自抵接于巷道10的内壁面,可以通过第一弹性件3的弹力来实现支撑杆支撑在巷道10中。In the present disclosure, both ends of the support rods are not buried in the roadway 10 , so as to avoid man-made damage to the roadway 10 by the support rods as much as possible. Specifically, the first support assembly 201 and the second support assembly 202 arranged at both ends of the rod body 1 abut against the inner wall of the tunnel 10 , and the support rod can be supported in the tunnel 10 by the elastic force of the first elastic member 3 .

在一些实施方式中,参考图2和图3所示,杆体1构造为空心管体,第一支撑组件201包括第一支撑板2011和导向柱2012,导向柱2012的一端固连于第一支撑板2011,另一端可移动地插接于杆体1,第一弹性件3抵接在杆体1与第一支撑板2011之间,第一支撑板2011用于直接或间接抵接于巷道10的内壁面。In some embodiments, as shown in FIG. 2 and FIG. 3 , the rod body 1 is configured as a hollow tube, the first support assembly 201 includes a first support plate 2011 and a guide post 2012, and one end of the guide post 2012 is fixedly connected to the first support Plate 2011, the other end of which is movably inserted into the rod body 1, the first elastic member 3 abuts between the rod body 1 and the first support plate 2011, and the first support plate 2011 is used to directly or indirectly abut against the inside of the roadway 10 wall.

在本公开中,第一支撑组件201包括第一支撑板2011和导向柱2012,并且杆体1构造为空心管体,导向柱2012的一端固连于第一支撑板2011,另一端可移动地插接于杆体1,第一弹性件3抵接在杆体1与第一支撑板2011之间,当对一根支撑杆进行安装,可以通过调节导向柱2012伸入杆体1内的长度,即,改变第一弹性件3的压缩量,来实现杆体1两端的第一支撑组件201和第二支撑组件202各自抵接于巷道10的内壁面。In the present disclosure, the first support assembly 201 includes a first support plate 2011 and a guide column 2012, and the rod body 1 is configured as a hollow tube, one end of the guide column 2012 is fixedly connected to the first support plate 2011, and the other end is movably inserted into the first support plate 2011. Connected to the rod body 1, the first elastic member 3 abuts between the rod body 1 and the first support plate 2011. When a support rod is installed, the length of the guide column 2012 extending into the rod body 1 can be adjusted, that is, the The amount of compression of the first elastic member 3 is such that the first support assembly 201 and the second support assembly 202 at both ends of the rod body 1 abut against the inner wall surface of the tunnel 10 respectively.

在本公开中,未安装在巷道10内的支撑杆的整体长度要大于巷道10的宽度或高度,即,在安装支撑杆时,需要将导向柱2012朝向第二支撑组件202一端移动,使得第一弹性件3被压缩,此时的支撑杆的整体长度要小于巷道10的宽度或高度,之后将支撑杆横置或竖直放置在巷道10内,随后可以使得导向柱2012在第一弹性件3的弹力作用下朝向背离第二支撑组件202的一端移动,当导向柱2012停止移动,即为完成一根支撑杆的安装,此时的第一弹性件3仍处于压缩状态。In the present disclosure, the overall length of the support rods not installed in the roadway 10 is greater than the width or height of the roadway 10, that is, when installing the support rods, it is necessary to move the guide column 2012 toward one end of the second support assembly 202, so that the first An elastic member 3 is compressed, and the overall length of the support rod at this time is less than the width or height of the roadway 10, and then the support rod is placed horizontally or vertically in the roadway 10, and then the guide column 2012 can be positioned on the first elastic member. 3 moves toward the end away from the second support component 202 under the action of the elastic force of the guide column 2012. When the guide column 2012 stops moving, the installation of a support rod is completed. At this time, the first elastic member 3 is still in a compressed state.

在本公开中,参考图1和图4所示,当支撑杆固定在巷道10内后,第一支撑板2011可以直接抵接巷道10的内壁面,第一支撑板2011的构造可以是圆形垫板,第一支撑板2011的直径大于导向柱2012以及杆体1的直径,可以使得第一支撑板2011接触到的巷道10内壁面的面积更大,为杆体1提供良好地稳定性。In the present disclosure, as shown in FIG. 1 and FIG. 4 , when the support rod is fixed in the tunnel 10, the first support plate 2011 can directly abut against the inner wall of the tunnel 10, and the structure of the first support plate 2011 can be circular. Backing plate, the diameter of the first support plate 2011 is larger than the diameter of the guide column 2012 and the rod body 1, which can make the area of the inner wall of the roadway 10 contacted by the first support plate 2011 larger, and provide good stability for the rod body 1.

在一些实施方式中,参考图1和图4所示,在本公开中,考虑到杆体1的管壁较薄,为了使得第一弹性件3与杆体1之间的接触更稳定,可以在杆体1的朝向第一弹性件3的一端设有第一止挡件4,通过第一止挡件4接触第一弹性件3。In some embodiments, as shown in FIG. 1 and FIG. 4 , in the present disclosure, considering that the tube wall of the rod body 1 is relatively thin, in order to make the contact between the first elastic member 3 and the rod body 1 more stable, a One end of 1 facing the first elastic member 3 is provided with a first stopper 4 , through which the first stopper 4 contacts the first elastic member 3 .

在本公开中,第一止挡件4可以选用法兰盘焊接在杆体1上。In the present disclosure, the first stopper 4 can be welded on the rod body 1 by using a flange.

在一些实施方式中,参考图1和图4所示,第一弹性件3可以套接在导向柱2012上,并且为了使得支撑杆可以更牢固地设置在巷道10内,第一支撑组件201还包括套接在第一弹性件3外侧的第二弹性件5,并且第二弹性件5的一端固连于第一支撑板2011,第二弹性件5的另一端用于抵接于第一止挡件4,在第一弹性件3与第二弹性件5的共同作用下,支撑杆可以更牢固的设置在巷道10内。In some embodiments, as shown in FIG. 1 and FIG. 4 , the first elastic member 3 can be sleeved on the guide column 2012, and in order to make the support rod more firmly set in the tunnel 10, the first support assembly 201 also It includes a second elastic member 5 sleeved on the outside of the first elastic member 3, and one end of the second elastic member 5 is fixedly connected to the first support plate 2011, and the other end of the second elastic member 5 is used to abut against the first stop The stopper 4 , under the joint action of the first elastic member 3 and the second elastic member 5 , the support rod can be more firmly arranged in the roadway 10 .

在一些实施方式中,参考图1和图4所示,在本公开中,第一弹性件3与第二弹性件5均构造为弹簧,且第二弹性件5的弹力大于第一弹性件3的弹力。In some embodiments, as shown in FIG. 1 and FIG. 4 , in the present disclosure, both the first elastic member 3 and the second elastic member 5 are configured as springs, and the elastic force of the second elastic member 5 is greater than that of the first elastic member 3 of elasticity.

在一些实施方式中,参考图1和图4所示,在本公开中,可以在第一支撑板2011背离导向柱2012一端的端面上设有第一柔性垫片6,第一柔性垫片6可以采用橡胶材质的原料制成,增大第一支撑板2011与巷道10内壁面的摩擦力,使得支撑杆在安装后不易发生晃动,同时若巷道壁为强度较低的煤岩体的矿井壁时,杆体1两端的第一支撑组件201和第二支撑组件202朝向背离杆体1的方向挤压巷道壁仍存在损坏巷道壁的风险,因此,第一柔性垫片6还起到保护巷道壁的作用。In some implementations, as shown in FIG. 1 and FIG. 4 , in the present disclosure, a first flexible gasket 6 may be provided on the end surface of the first support plate 2011 away from the end of the guide post 2012 , and the first flexible gasket 6 It can be made of rubber material to increase the friction between the first support plate 2011 and the inner wall of the roadway 10, so that the support rod is not easy to shake after installation. At this time, the first support assembly 201 and the second support assembly 202 at both ends of the rod body 1 press the roadway wall in a direction away from the rod body 1, and there is still a risk of damaging the roadway wall. Therefore, the first flexible gasket 6 also plays a role in protecting the roadway wall. effect.

在一些实施方式中,参考图1至图3所示,第二支撑组件202包括第二支撑板2021、螺杆2022以及螺纹连接在螺杆2022上的螺母2023,螺杆2022的一端固连于第一支撑板2011,另一端可移动地插接于杆体1,杆体1的第二端设有用以抵接螺母2023的第二止挡件7,第二支撑板2021用于直接或间接抵接于巷道10的内壁面。In some embodiments, as shown in FIGS. 1 to 3 , the second support assembly 202 includes a second support plate 2021 , a screw 2022 and a nut 2023 threaded on the screw 2022 , and one end of the screw 2022 is fixedly connected to the first support. The other end of the plate 2011 is movably plugged into the rod body 1, the second end of the rod body 1 is provided with a second stopper 7 for abutting against the nut 2023, and the second support plate 2021 is used for directly or indirectly abutting against the roadway 10 of the inner wall.

在本公开中,第二止挡件7可以选用法兰盘焊接在杆体1上。In the present disclosure, the second stopper 7 can be welded on the rod body 1 by using a flange.

具体地,在第一种实施方式中,当对一根支撑杆进行安装时,可以对支撑杆进行组装,其中,可以是先将螺母2023旋转至贴合第二支撑板2021,之后将螺杆2022插入杆体1的一端内,此时的螺母2023接触第二止挡件7,将导向柱2012插入杆体1的另一端,此时第一弹性件3仅接触第一止挡件4但未发生压缩,并且支撑杆的整体长度小于巷道10的宽度或高度,支撑杆组装完成后,人员将组装完毕的支撑杆移动至预先选定构建密闭墙的位置,人员手握杆体1将其水平或竖直摆放,之后转动螺母2023(螺母2023转动时需确保螺杆2022不会绕自身轴线转动),随着螺母2023的转动,螺母2023与第二支撑板2021之间的距离逐渐变大,杆体1逐渐朝向第一弹性件3一端移动,并使得第一弹性件3和第二弹性件5开始收缩,通过第一弹性件3和第二弹性件5的弹力提供支撑杆可以固定在巷道10内的支撑力。此外,通过调节螺母2023的位置,可以间接调整第一弹性件3和第二弹性件5的压缩量,即可以调整第一弹性件3和第二弹性件5的弹力大小。Specifically, in the first embodiment, when a support rod is installed, the support rod can be assembled, wherein, the nut 2023 can be rotated to fit the second support plate 2021 first, and then the screw rod 2022 Insert one end of the rod body 1, at this time the nut 2023 contacts the second stopper 7, insert the guide column 2012 into the other end of the rod body 1, at this time the first elastic member 3 only contacts the first stopper 4 but does not compress , and the overall length of the support bar is less than the width or height of the roadway 10. After the support bar is assembled, the personnel will move the assembled support bar to a pre-selected position to build a closed wall, and the staff will hold the bar body 1 to horizontally or vertically Place it, then turn the nut 2023 (when the nut 2023 rotates, it is necessary to ensure that the screw rod 2022 will not rotate around its own axis). Move toward one end of the first elastic member 3, and make the first elastic member 3 and the second elastic member 5 start to shrink, and the support bar can be fixed in the tunnel 10 by the elastic force of the first elastic member 3 and the second elastic member 5. force. In addition, by adjusting the position of the nut 2023 , the compression amount of the first elastic member 3 and the second elastic member 5 can be indirectly adjusted, that is, the elastic force of the first elastic member 3 and the second elastic member 5 can be adjusted.

在第二种实施方式中,当对一根支撑杆进行安装时,可以对支撑杆进行组装,其中,可以是先将螺母2023旋转至贴合第二支撑板2021,之后将螺杆2022插入杆体1的一端内,此时的螺母2023接触第二止挡件7,将导向柱2012插入杆体1的另一端,此时第一弹性件3仅接触第一止挡件4但未发生压缩,并且支撑杆的整体长度小于巷道10的宽度或高度,支撑杆组装完成后,人员将组装完毕的支撑杆移动至预先选定构建密闭墙的位置,人员手握杆体1将其水平或竖直摆放;In the second embodiment, when a support rod is installed, the support rod can be assembled, wherein the nut 2023 can be rotated to fit the second support plate 2021 first, and then the screw rod 2022 can be inserted into the rod body 1 At this time, the nut 2023 contacts the second stopper 7, and the guide column 2012 is inserted into the other end of the rod body 1. At this time, the first elastic member 3 only contacts the first stopper 4 but does not compress, and supports The overall length of the rod is less than the width or height of the roadway 10. After the support rod is assembled, the personnel will move the assembled support rod to a pre-selected position for building a closed wall, and the personnel will hold the rod body 1 to place it horizontally or vertically;

摆放完毕后,因第一弹性件3的弹力小于第二弹性件5,并且为了尽可能地减少支撑杆固定在巷道10内时所需的时长,可以是通过人员手动移动杆体1的方式(此时人员可以是手握杆体1的方式移动杆体1),让第一止挡件4挤压第一弹性件3使其压缩(因第一弹性件3的弹力较小,人员无需使用较大的力,即可较为轻松的使得第一弹性件3被第一止挡件4挤压),直至第一止挡件4靠近第二弹性件5背离第一支撑板2011的一端(此时的第二弹性件5未被第一止挡件4挤压),之后需要人员持续对杆体1施加挤压第一弹性件3的力,在人员持续对杆体1施加挤压第一弹性件3的力的过程中转动螺母2023,之后,当螺母2023接触到第二止挡件7时,人员可以去除施加在杆体1上用以挤压第一弹性件3的力,此时,通过第一弹性件3提供的弹力可以初步将支撑杆固定在巷道10内;After placing, because the elastic force of the first elastic member 3 is less than the second elastic member 5, and in order to reduce the time required for the support rod to be fixed in the roadway 10 as much as possible, the mode of manually moving the rod body 1 by personnel can be used ( At this time, the personnel can move the rod body 1 by holding the rod body 1), and let the first stopper 4 squeeze the first elastic member 3 to compress it (because the elastic force of the first elastic member 3 is small, the personnel do not need to use a larger force, that is, the first elastic member 3 can be easily squeezed by the first stopper 4), until the first stopper 4 is close to the end of the second elastic member 5 away from the first support plate 2011 (at this time The second elastic member 5 is not squeezed by the first stopper 4), and then the staff needs to continue to apply the force of squeezing the first elastic member 3 to the rod body 1, and the personnel continue to apply the force of squeezing the first elastic member 3 to the rod body 1 Turn the nut 2023 during the force process, and then when the nut 2023 touches the second stopper 7, the personnel can remove the force applied on the rod body 1 to squeeze the first elastic member 3, at this time, through the first elastic The elastic force provided by part 3 can preliminarily fix the support rod in the roadway 10;

最后,为了确保支撑杆可以更加牢固地固定在巷道10内,还需继续转动螺母2023,随着螺母2023的转动,第一止挡件4开始挤压第二弹性件5并使得第二弹性件5收缩,可以通过人员经验进行判断,当第二弹性件5压缩至一定程度时,停止转动螺母2023。完成对一根支撑杆的固定。Finally, in order to ensure that the support rod can be more firmly fixed in the roadway 10, it is necessary to continue to turn the nut 2023. With the rotation of the nut 2023, the first stopper 4 starts to squeeze the second elastic member 5 and makes the second elastic member 5 contraction can be judged by personnel experience, when the second elastic member 5 is compressed to a certain extent, stop turning the nut 2023. Complete the fixation to a support rod.

在上述的第二种实施方式中,第一弹性件3的作用在于为支撑杆初步安装提供初始的支撑弹力,当支撑杆通过第一弹性件3初步固定在巷道10内时,可以继续转动螺母2023使得第二弹性件5被压缩并为支撑杆提供强有力的支撑。In the above-mentioned second embodiment, the function of the first elastic member 3 is to provide initial supporting elastic force for the initial installation of the support rod. When the support rod is initially fixed in the roadway 10 by the first elastic member 3, the nut can continue to be rotated. 2023 makes the second elastic member 5 be compressed and provides strong support for the support rod.

在本公开中,参考图1和图3所示,当支撑杆固定在巷道10内后,第二支撑板2021可以直接抵接巷道10的内壁面,第二支撑板2021可以构造为圆形垫板,第二支撑板2021的直径大于螺杆2022以及杆体1的直径,可以使得第二支撑板2021接触到的巷道10内壁面的面积更大,为杆体1提供良好的稳定性。In the present disclosure, as shown in FIG. 1 and FIG. 3 , when the support rod is fixed in the tunnel 10, the second support plate 2021 can directly abut against the inner wall of the tunnel 10, and the second support plate 2021 can be configured as a circular pad Plate, the diameter of the second support plate 2021 is larger than the diameter of the screw 2022 and the rod body 1, which can make the area of the inner wall of the roadway 10 contacted by the second support plate 2021 larger, and provide good stability for the rod body 1.

在一些实施方式中,参考图1和图3所示,在本公开中,可以在第二支撑板2021背离螺杆2022一端的端面上设有第二柔性垫片8,第二柔性垫片8可以采用橡胶材质的原料制成,增大第二支撑板2021与巷道10内壁面的摩擦力,使得支撑杆在安装后不易发生晃动,同时若巷道10壁为强度较低的煤岩体的矿井壁时,杆体1两端的第一支撑组件201和第二支撑组件202朝向背离杆体1的方向挤压巷道10壁仍存在损坏巷道10壁的风险,因此,第二柔性垫片8起到保护巷道10壁的作用。In some embodiments, as shown in FIG. 1 and FIG. 3 , in the present disclosure, a second flexible gasket 8 may be provided on the end surface of the second support plate 2021 away from the end of the screw rod 2022, and the second flexible gasket 8 may It is made of rubber material, which increases the friction between the second support plate 2021 and the inner wall of the roadway 10, so that the support rod is not easy to shake after installation. At this time, the first support assembly 201 and the second support assembly 202 at both ends of the rod body 1 press the wall of the roadway 10 in the direction away from the rod body 1, and there is still a risk of damaging the wall of the roadway 10. Therefore, the second flexible gasket 8 plays a role in protecting the roadway 10. The role of the wall.

在上述技术方案的基础上,本公开的第二方面还提供一种密闭墙,该密闭墙包括骨架9和密封布,骨架9包括沿竖直方向延伸且沿水平方向间隔布置的多根纵向支撑杆以及沿水平方向延伸且沿竖直方向间隔布置的多根横向支撑杆,纵向支撑杆和/或横向支撑杆采用上述第一方面或者上述第一方面中任意实施例的支撑杆;密封布铺设在骨架9上。On the basis of the above technical solution, the second aspect of the present disclosure also provides an airtight wall, the airtight wall includes a skeleton 9 and a sealing cloth, the skeleton 9 includes a plurality of longitudinal supports extending vertically and arranged at intervals along the horizontal direction Rods and a plurality of horizontal support rods extending in the horizontal direction and arranged at intervals in the vertical direction, the longitudinal support rods and/or the lateral support rods adopt the above-mentioned first aspect or the support rods in any embodiment of the above-mentioned first aspect; the sealing cloth is laid On skeleton 9.

在本公开中,参考图5所示,通过上述的第一种实施方式或第二种实施方式对若干根支撑杆进行固定后,形成密闭墙的骨架9,可以在该骨架9上铺设密封布,铺设完毕后,可以采用在其表面喷涂砂浆的方式对密闭墙进行最终密封,使得密封布与巷道10壁之间不会存在间隙。In the present disclosure, as shown in FIG. 5 , after fixing several support rods through the above-mentioned first embodiment or second embodiment, a skeleton 9 of an airtight wall is formed, and a sealing cloth can be laid on the skeleton 9 After the laying is completed, the airtight wall can be finally sealed by spraying mortar on its surface, so that there will be no gap between the sealing cloth and the roadway 10 wall.

在一些实施方式中,纵向支撑杆和横向支撑杆的交叉处通过固定件连接,其中,固定件可以是现有器件,例如,环箍、十字固定夹等,或者是采用铁丝拧紧的方式对纵向支撑杆和横向支撑杆的交叉处进行连接固定。In some embodiments, the intersections of the longitudinal support rods and the horizontal support rods are connected by a fixing piece, wherein the fixing piece can be an existing device, such as a hoop, a cross fixing clip, etc., or a wire tightening method is used to tighten the longitudinal The intersection of the support bar and the transverse support bar is connected and fixed.

支撑架构建密闭墙的流程说明:在本公开中,支撑杆采用分体式设计且主要包括三部分,分别为杆体1、第一支撑组件201和第二支撑组件202,当需要在巷道10内搭建密闭墙时,考虑到巷道10内的空间较为狭窄,可以将若干的杆体1、若干的第一支撑组件201和若干的第二支撑组件202分批次地运输至巷道10内,之后可以按照上述的第一种实施方式或第二种实施方式将若干根支撑杆安装需要进行固定并形成骨架9,之后将密封布铺设在骨架9上,铺设完成后,喷涂砂浆对密封布与巷道10壁之间的间隙进行彻底密封。Description of the process of building a closed wall with a support frame: In this disclosure, the support rod adopts a split design and mainly includes three parts, namely the rod body 1, the first support assembly 201 and the second support assembly 202. When it needs to be built in the roadway 10 When sealing the wall, considering that the space in the roadway 10 is relatively narrow, several rod bodies 1, several first support assemblies 201 and several second support assemblies 202 can be transported into the roadway 10 in batches, and then the above-mentioned In the first embodiment or the second embodiment, several support rods need to be installed and fixed to form a skeleton 9, and then the sealing cloth is laid on the skeleton 9. After the laying is completed, spray mortar on the gap between the sealing cloth and the roadway 10 wall. The gap between them is completely sealed.

以上结合附图详细描述了本公开的优选实施方式,但是,本公开并不限于上述实施方式中的具体细节,在本公开的技术构思范围内,可以对本公开的技术方案进行多种简单变型,这些简单变型均属于本公开的保护范围。The preferred embodiments of the present disclosure have been described in detail above in conjunction with the accompanying drawings. However, the present disclosure is not limited to the specific details of the above embodiments. Within the scope of the technical concept of the present disclosure, various simple modifications can be made to the technical solutions of the present disclosure. These simple modifications all belong to the protection scope of the present disclosure.

另外需要说明的是,在上述具体实施方式中所描述的各个具体技术特征,在不矛盾的情况下,可以通过任何合适的方式进行组合,为了避免不必要的重复,本公开对各种可能的组合方式不再另行说明。In addition, it should be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner if there is no contradiction. The combination method will not be described separately.

此外,本公开的各种不同的实施方式之间也可以进行任意组合,只要其不违背本公开的思想,其同样应当视为本公开所公开的内容。In addition, various implementations of the present disclosure can be combined arbitrarily, as long as they do not violate the idea of the present disclosure, they should also be regarded as the content disclosed in the present disclosure.

Claims (10)

1. A support bar, comprising:
a rod body; and
the support mechanism comprises a first support component and a second support component, wherein the first support component is connected with the first end of the rod body through a first elastic piece, the second support component is installed at the second end of the rod body, which is far away from the first elastic piece, and the first elastic piece is used for enabling the first support component and the second support component to be respectively abutted to the inner wall surface of a roadway so that the rod body is supported in the roadway.
2. The support rod according to claim 1, wherein the rod body is configured as a hollow tube body, the first support assembly comprises a first support plate and a guide post, one end of the guide post is fixedly connected to the first support plate, the other end of the guide post is movably inserted into the rod body, the first elastic piece is abutted between the rod body and the first support plate, and the first support plate is used for being directly or indirectly abutted to the inner wall surface of the roadway.
3. The support bar according to claim 2, wherein an end of the rod body facing the first elastic member is provided with a first stopper, and the first elastic member abuts between the first stopper and the first support plate.
4. The support bar of claim 3, wherein the first elastic member is sleeved on the guide post, the first support assembly further comprises a second elastic member sleeved outside the first elastic member, one end of the second elastic member is fixedly connected to the first support plate, and the other end of the second elastic member is used for abutting against the first stop member.
5. The support bar of claim 4, wherein the first resilient member and the second resilient member are each configured as a spring.
6. The support bar of claim 2, wherein the end surface of the first support plate facing away from the end of the guide post is provided with a first flexible spacer.
7. The support rod according to claim 6, wherein the second support assembly comprises a second support plate, a screw rod and a nut screwed on the screw rod, one end of the screw rod is fixedly connected with the first support plate, the other end of the screw rod is movably inserted into the rod body, a second stop piece for abutting against the nut is arranged at the second end of the rod body, and the second support plate is used for directly or indirectly abutting against the inner wall surface of the roadway.
8. The support rod of claim 7, wherein a second flexible spacer is provided on an end face of the second support plate facing away from one end of the screw.
9. A containment wall, comprising:
a skeleton comprising a plurality of longitudinal support rods extending in a vertical direction and arranged at intervals in a horizontal direction and a plurality of transverse support rods extending in a horizontal direction and arranged at intervals in a vertical direction, the longitudinal support rods and/or the transverse support rods adopting the support rods according to any one of claims 1-8; and
and the sealing cloth is paved on the framework.
10. The containment wall of claim 9 wherein the intersections of said longitudinal support bars and said transverse support bars are joined by fasteners.
CN202310344378.2A 2023-03-31 2023-03-31 Support rod and airtight wall Pending CN116220807A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310344378.2A CN116220807A (en) 2023-03-31 2023-03-31 Support rod and airtight wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310344378.2A CN116220807A (en) 2023-03-31 2023-03-31 Support rod and airtight wall

Publications (1)

Publication Number Publication Date
CN116220807A true CN116220807A (en) 2023-06-06

Family

ID=86569651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310344378.2A Pending CN116220807A (en) 2023-03-31 2023-03-31 Support rod and airtight wall

Country Status (1)

Country Link
CN (1) CN116220807A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1310787A (en) * 1961-11-21 1962-11-30 Maschfab Eisengiesserei Beien Improvements to movable supports for mine clearance lanes
CN207848767U (en) * 2017-06-26 2018-09-11 信锦企业股份有限公司 support module
CN208088133U (en) * 2018-02-02 2018-11-13 南通城欣市政工程有限公司 A kind of supporting bridge device
CN212359808U (en) * 2020-04-23 2021-01-15 杨小军 Tunnel construction strutting arrangement for coal mining
CN212583759U (en) * 2020-07-13 2021-02-23 中国水利水电第六工程局有限公司 Reinforcement jacking pillar for tunnel fault broken zone
CN214170197U (en) * 2020-12-08 2021-09-10 山西西山煤电股份有限公司西曲矿 Flexible protective fence outside coal mine tunnel sealing wall
CN215633054U (en) * 2021-09-18 2022-01-25 山西潞安环保能源开发股份有限公司王庄煤矿 U type rack coal mine tunnel supporting construction
CN216240732U (en) * 2021-11-06 2022-04-08 魏新峰 Temporary roadway supporting device for mining engineering

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1310787A (en) * 1961-11-21 1962-11-30 Maschfab Eisengiesserei Beien Improvements to movable supports for mine clearance lanes
CN207848767U (en) * 2017-06-26 2018-09-11 信锦企业股份有限公司 support module
CN208088133U (en) * 2018-02-02 2018-11-13 南通城欣市政工程有限公司 A kind of supporting bridge device
CN212359808U (en) * 2020-04-23 2021-01-15 杨小军 Tunnel construction strutting arrangement for coal mining
CN212583759U (en) * 2020-07-13 2021-02-23 中国水利水电第六工程局有限公司 Reinforcement jacking pillar for tunnel fault broken zone
CN214170197U (en) * 2020-12-08 2021-09-10 山西西山煤电股份有限公司西曲矿 Flexible protective fence outside coal mine tunnel sealing wall
CN215633054U (en) * 2021-09-18 2022-01-25 山西潞安环保能源开发股份有限公司王庄煤矿 U type rack coal mine tunnel supporting construction
CN216240732U (en) * 2021-11-06 2022-04-08 魏新峰 Temporary roadway supporting device for mining engineering

Similar Documents

Publication Publication Date Title
KR101721362B1 (en) Safety chain channel system
CN106150526B (en) A kind of roadway support device
CN116220807A (en) Support rod and airtight wall
CN205330704U (en) Hydraulic support top anchor rope protection device and hydraulic support
CN207298085U (en) Particularly for optical or photographic antidetonation door shaped stent
CN207646924U (en) A kind of assembled architecture energy-consumption shock-absorption device
CN210135365U (en) A protection device for buried oil and gas pipelines in coal mining subsidence areas
CN206472082U (en) photovoltaic panel roof mounting assembly
CN203807940U (en) Bridge expansion device
CN209353479U (en) Prefabricated wall and concrete structure connection structure
CN104500843A (en) Support system for horizontal steel tube
CN104912225B (en) A joint structure of seismic joint and its construction method
CN207598253U (en) A kind of prefabrication and assembly construction push pipe waterproof system
CN218116777U (en) A pre-embedded protective mechanism for civil construction
US20190078324A1 (en) Wet seal system
CN206736706U (en) A kind of concrete cast-in-situ bridge anti-fall girder apparatus
CN112683735B (en) A simulation test device for directional drilling grouting slurry diffusion
CN205397518U (en) Split type cement pump truck elbow
CN216305975U (en) Anchor trays for corners
CN219691086U (en) Adjustable horizontal tunnel portal protection device
CN218813907U (en) A basement expansion joint waterproof fixture
CN114319811A (en) A on-spot antidetonation strutting arrangement of building for civil engineering
CN211735500U (en) A comprehensive pipe gallery structure across ground fissures
CN206607610U (en) A kind of waterstop auxiliary positioning support
CN217629402U (en) Non-deformable's bridge telescoping device for track traffic

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination