CN110360570A - A kind of TDI coke burn before pretreatment system - Google Patents
A kind of TDI coke burn before pretreatment system Download PDFInfo
- Publication number
- CN110360570A CN110360570A CN201910743728.6A CN201910743728A CN110360570A CN 110360570 A CN110360570 A CN 110360570A CN 201910743728 A CN201910743728 A CN 201910743728A CN 110360570 A CN110360570 A CN 110360570A
- Authority
- CN
- China
- Prior art keywords
- tdi
- outlet
- coke
- inlet
- screw conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B03—SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C—MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C1/00—Magnetic separation
- B03C1/02—Magnetic separation acting directly on the substance being separated
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/02—Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/02—Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
- F23G5/033—Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment comminuting or crushing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/44—Details; Accessories
- F23G5/442—Waste feed arrangements
- F23G5/444—Waste feed arrangements for solid waste
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
Abstract
本发明公开了一种TDI焦碳焚烧前的预处理系统,包括卸料部分、研磨部分和气力输送部分。卸料部分包括卸料料斗、一级粉碎机和TDI焦碳料仓。研磨部分包括二级粉碎机、研磨机、旋风分离器、料斗、袋式除尘器和一次风机,该一次风机的吸风口与袋式除尘器的净气出口连接,该一次风机的排风口与立式废液焚烧炉的燃烧器连接;气力输送部分包括两个文丘里喷射器。两个文丘里喷射器的进料口一一对应地与料斗的出口和袋式除尘器的排灰口连接,动力气源由罗茨风机提供;该两个文丘里喷射器的出料口与立式废液焚烧炉的喷嘴连接。本发明的预处理系统,能实现在立式废液焚烧炉内进行TDI焦碳的焚烧,并能使焚烧产生的残渣和烟气达标。
The invention discloses a pretreatment system before TDI coke incineration, which includes a discharge part, a grinding part and a pneumatic conveying part. The unloading part includes unloading hopper, primary pulverizer and TDI coke silo. The grinding part includes a secondary pulverizer, a grinder, a cyclone separator, a hopper, a bag filter and a primary fan. The suction port of the primary fan is connected to the clean air outlet of the bag filter. Burner connection for vertical liquid waste incinerator; pneumatic conveying section includes two Venturi injectors. The inlets of the two Venturi injectors are connected with the outlet of the hopper and the ash outlet of the bag filter one by one, and the power source is provided by the Roots blower; the outlets of the two Venturi injectors are connected with the Nozzle connections for vertical liquid waste incinerators. The pretreatment system of the invention can realize the incineration of TDI coke in the vertical waste liquid incinerator, and can make the residue and flue gas produced by incineration reach the standard.
Description
技术领域technical field
本发明涉及一种危险废料处理设备,具体涉及一种TDI焦碳焚烧前的预处理系统。The invention relates to hazardous waste treatment equipment, in particular to a pretreatment system before TDI coke incineration.
背景技术Background technique
TDI是甲苯二异氰酸酯的简称,是聚氨酯塑料的主要原料之一,广泛应用于软泡、弹性体、合成革浆料、胶粘合剂、涂料、纤维和皮革织物涂饰剂等生产领域,为高附加值产品。然而,在TDI生产过程中会产生一定量的焦碳(焦油渣或焦油末),占到TDI生产能力的2%至8%,主要成分为多聚异氰酸酯。通常TDI焦碳采用焚烧工艺处理,但是,焦油渣在燃烧过程中会产生大量的碳氧化合物、氮氧化合物和烟雾,这些气体会腐蚀焚烧炉及烟道,排入大气中还会对环境造成一定的危害。目前在处理TDI焦碳之前需要先经过研磨机系统的处理后再送至回转窑进行焚烧处理。由于废料市场变化,固体废料增多,现有TDI焦碳的处理工艺挤占了较多的回转窑焦碳的焚烧总量,而对于立式废液焚烧炉,因液体废料减少,经常达不到设计的处理量,为了利用立式废液焚烧炉来焚烧TDI焦碳,就要先对TDI焦碳进行预处理。如果在不经过预处理就直接进入立式废液焚烧炉时,将对立式废液焚烧炉产能及后续烟气排放温度产生较大影响。TDI is the abbreviation of toluene diisocyanate. It is one of the main raw materials of polyurethane plastics. value product. However, a certain amount of coke (tar residue or tar powder) will be produced in the TDI production process, accounting for 2% to 8% of the TDI production capacity, and the main component is polyisocyanate. Usually TDI coke is treated by incineration process, however, tar residue will produce a large amount of carbon oxides, nitrogen oxides and smoke during the combustion process, these gases will corrode the incinerator and flue, and will cause environmental damage when discharged into the atmosphere Certain hazards. At present, before processing TDI coke, it needs to be processed by the grinder system before being sent to the rotary kiln for incineration. Due to the change of the waste market and the increase of solid waste, the existing TDI coke treatment process occupies more of the total amount of coke incineration in the rotary kiln, and for the vertical waste liquid incinerator, due to the reduction of liquid waste, it often fails to meet the design In order to use the vertical waste liquid incinerator to incinerate TDI coke, it is necessary to pretreat TDI coke first. If it directly enters the vertical waste liquid incinerator without pretreatment, it will have a great impact on the production capacity of the vertical waste liquid incinerator and the subsequent flue gas discharge temperature.
发明内容Contents of the invention
本发明的目的在于克服现有技术的缺陷而提供一种TDI焦碳焚烧前的预处理系统,它能实现在立式废液焚烧炉内进行TDI焦碳的焚烧,并能使焚烧产生的残渣和烟气达标。The purpose of the present invention is to overcome the defects of the prior art and provide a pretreatment system before the incineration of TDI coke, which can realize the incineration of TDI coke in the vertical waste liquid incinerator, and can make the residue produced by incineration and smoke compliance.
本发明的目的是这样实现的:一种TDI焦碳焚烧前的预处理系统,包括卸料部分、研磨部分和气力输送部分;The object of the present invention is achieved like this: a kind of pretreatment system before TDI coke incineration, comprises unloading part, grinding part and pneumatic conveying part;
所述卸料部分包括卸料料斗、一级粉碎机和TDI焦碳料仓,其中,The discharge part includes a discharge hopper, a primary pulverizer and a TDI coke silo, wherein,
所述卸料料斗的出口连接一个板式给料机的进料口;The outlet of the discharge hopper is connected to the feed port of an apron feeder;
所述一级粉碎机的进料口连接所述板式给料机的出料口;The feed port of the primary pulverizer is connected to the discharge port of the apron feeder;
所述TDI焦碳料仓的进料口与所述一级粉碎机的出料口连接,该TDI焦碳料仓的出料口连接第一螺旋输送机的进口;The feed port of the TDI coke silo is connected to the discharge port of the primary pulverizer, and the discharge port of the TDI coke silo is connected to the inlet of the first screw conveyor;
所述研磨部分包括二级粉碎机、研磨机、旋风分离器、料斗、袋式除尘器和一次空气风机,其中,The grinding part includes a secondary pulverizer, a grinder, a cyclone separator, a hopper, a bag filter and a primary air blower, wherein,
所述二级粉碎机的进料口与所述第一螺旋输送机的出口连接,该二级粉碎机的出料口与第二螺旋输送机的进口连接;The feed inlet of the secondary pulverizer is connected with the outlet of the first screw conveyor, and the discharge port of the secondary pulverizer is connected with the inlet of the second screw conveyor;
所述研磨机的下部设置一个进料口和一个通风口;所述进料口与所述第二螺旋输送机的出口连接;所述通风口与一个循环风机的排风口连接;该研磨机的上部带有分选器;The bottom of the grinder is provided with a feed port and a vent; the feed port is connected with the outlet of the second screw conveyor; the vent is connected with the exhaust port of a circulating fan; the grinder The upper part has a sorter;
所述旋风分离器的上部径向设有进气口,顶部设有排气口,下端设有出粉口;所述进气口与所述研磨机的分选器的出口连接;所述排气口通过管线与所述循环风机的吸风口连接;The upper part of the cyclone separator is radially provided with an air inlet, the top is provided with an air outlet, and the lower end is provided with a powder outlet; the air inlet is connected with the outlet of the classifier of the grinder; The gas port is connected with the suction port of the circulating fan through a pipeline;
所述料斗的进口与所述旋风分离器的出粉口连接,该料斗的出口与第三螺旋输送机的进口连接;The inlet of the hopper is connected to the powder outlet of the cyclone separator, and the outlet of the hopper is connected to the inlet of the third screw conveyor;
所述袋式除尘器为脉冲袋式除尘器,它的含尘气入口与所述循环风机的排风口连接;The bag filter is a pulse bag filter, and its dusty gas inlet is connected to the air outlet of the circulating fan;
所述一次空气风机的吸风口与所述袋式除尘器的净气出口连接,该一次空气风机的排风口与立式废液焚烧炉的燃烧器连接;The air suction port of the primary air fan is connected with the clean air outlet of the bag filter, and the air exhaust port of the primary air fan is connected with the burner of the vertical waste liquid incinerator;
所述气力输送部分包括两个文丘里喷射器,其中,The pneumatic conveying section includes two venturi injectors, wherein,
两个文丘里喷射器的进料口一一对应地与所述第三螺旋输送机的出口和袋式除尘器的排灰口连接,该两个文丘里喷射器的动力气源由罗茨风机提供;该两个文丘里喷射器的出料口均通过气力输送管道与所述立式废液焚烧炉的喷嘴连接。The feed inlets of the two Venturi ejectors are connected with the outlet of the third screw conveyor and the ash discharge port of the bag filter one by one, and the power gas source of the two Venturi ejectors is provided by a Roots blower. Provided; the outlets of the two Venturi injectors are connected to the nozzles of the vertical waste liquid incinerator through pneumatic conveying pipes.
上述的TDI焦碳焚烧前的预处理系统,其中,在所述板式给料机的末端设置一台第一除铁器。In the above-mentioned pretreatment system before coke incineration of TDI, a first iron remover is arranged at the end of the apron feeder.
上述的TDI焦碳焚烧前的预处理系统,其中,所述卸料部分还包括一个连接在所述一级粉碎机的出料口与TDI焦碳料仓的进料口之间的斗式提升机。The above-mentioned pretreatment system before TDI coke incineration, wherein, the discharge part also includes a bucket elevator connected between the discharge port of the primary pulverizer and the feed port of the TDI coke silo machine.
上述的TDI焦碳焚烧前的预处理系统,其中,所述TDI焦碳料仓内安装有称重装置、除尘器和除尘风机。The above-mentioned pretreatment system before TDI coke incineration, wherein a weighing device, a dust collector and a dust removal fan are installed in the TDI coke silo.
上述的TDI焦碳焚烧前的预处理系统,其中,所述二级粉碎机的出料口通过第二除铁器与所述第二螺旋输送机的进口连接,该第二螺旋输送机的出口通过一个第一旋转阀与所述研磨机的进料口连接。The above-mentioned pretreatment system before TDI coke incineration, wherein, the outlet of the secondary pulverizer is connected to the inlet of the second screw conveyor through the second iron remover, and the outlet of the second screw conveyor is connected through A first rotary valve is connected to the feed port of the grinder.
上述的TDI焦碳焚烧前的预处理系统,其中,所述旋风分离器的出粉口通过一个第二旋转阀与所述料斗的进口连接。The above-mentioned pretreatment system before TDI coke incineration, wherein, the powder outlet of the cyclone separator is connected with the inlet of the hopper through a second rotary valve.
上述的TDI焦碳焚烧前的预处理系统,其中,两个所述文丘里喷射器的进料口一一对应地通过第三旋转阀和第四旋转阀与所述第三螺旋输送机的出口及袋式除尘器的排灰口连接。The above-mentioned pretreatment system before TDI coke incineration, wherein, the feed ports of the two Venturi injectors pass through the third rotary valve and the fourth rotary valve in one-to-one correspondence with the outlet of the third screw conveyor And the ash outlet of the bag filter.
本发明的TDI焦碳的处理系统的技术方案具有以下特点:The technical scheme of the processing system of TDI coke of the present invention has the following characteristics:
1、集卸料、机械输送、多级破碎和粉磨以及气力输送等单元于一体,高效衔接了废料进厂到终端处置之间的环节。1. It integrates unloading, mechanical conveying, multi-stage crushing and grinding, and pneumatic conveying into one unit, and efficiently connects the link between waste entering the factory and terminal disposal.
2、通过将物料颗粒尺寸的均匀化,既方便物料的输送,实现在立式废液焚烧炉内进行TDI焦碳的焚烧,又能使物料燃烧充分,使焚烧产生的残渣和烟气达标,最终使立式废液焚烧炉得到充分利用。2. By homogenizing the particle size of the material, it is not only convenient for material transportation, but also realizes the incineration of TDI coke in the vertical waste liquid incinerator, and can fully burn the material, so that the residue and flue gas produced by incineration can reach the standard. Finally, the vertical waste liquid incinerator can be fully utilized.
附图说明Description of drawings
图1是本发明的TDI焦碳焚烧前的预处理系统的结构示意图。Fig. 1 is a structural schematic diagram of the pretreatment system before TDI coke incineration according to the present invention.
具体实施方式Detailed ways
下面将结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with accompanying drawing.
请参阅图1,本发明的TDI焦碳焚烧前的预处理系统,包括卸料部分、研磨部分和气力输送部分。Please refer to Fig. 1, the pretreatment system before TDI coke incineration of the present invention includes a discharge part, a grinding part and a pneumatic conveying part.
卸料部分包括卸料料斗1、板式给料机2、第一除铁器3、一级粉碎机4、斗式提升机5、TDI焦碳料仓6和第一螺旋输送机7,其中,The discharge part includes a discharge hopper 1, an apron feeder 2, a first iron remover 3, a primary pulverizer 4, a bucket elevator 5, a TDI coke silo 6 and a first screw conveyor 7, wherein,
卸料料斗1设在卸料车间的地坑100的口部,卸料料斗1的下端出口连接板式给料机2的进料口;The discharge hopper 1 is arranged at the mouth of the pit 100 in the discharge workshop, and the outlet at the lower end of the discharge hopper 1 is connected to the feed port of the apron feeder 2;
板式给料机2设在地坑100内并位于卸料料斗1的下方,该板式给料机2的进料口与卸料料斗1的出口连接;The apron feeder 2 is located in the pit 100 and below the discharge hopper 1, and the feed inlet of the apron feeder 2 is connected to the outlet of the discharge hopper 1;
第一除铁器3设置在板式给料机2的末端;The first iron remover 3 is arranged at the end of the apron feeder 2;
一级粉碎机4设在第一除铁器3的下方,该一级粉碎机4的进料口连接第一除铁器3的出料口;The primary pulverizer 4 is arranged below the first iron remover 3, and the feed port of the primary pulverizer 4 is connected to the discharge port of the first iron remover 3;
斗式提升机5的下部位于地坑100内,该斗式提升机5的下端与一级粉碎机4的出料口连接;The lower part of the bucket elevator 5 is located in the pit 100, and the lower end of the bucket elevator 5 is connected to the discharge port of the primary pulverizer 4;
TDI焦碳料仓6设在地坑100的上方,该TDI焦碳料仓6的进料口与斗式提升机5的上端连接;该TDI焦碳料仓6内安装有除尘器61、除尘风机62和称重装置,除尘器61配有反吹自清洁系统;该TDI焦碳料仓6的出料口连接第一螺旋输送机7的进口。The TDI coke silo 6 is located above the pit 100, and the feed port of the TDI coke silo 6 is connected to the upper end of the bucket elevator 5; Fan 62 and weighing device, and dust collector 61 are equipped with a back-blowing self-cleaning system; the outlet of the TDI coke silo 6 is connected to the inlet of the first screw conveyor 7 .
研磨部分包括二级粉碎机8、第二除铁器9、第二螺旋输送机10、研磨机12、循环风机13、旋风分离器14、料斗16、第三螺旋输送机17、袋式除尘器19、一次空气风机21和三个灭火器130,其中,The grinding part includes a secondary pulverizer 8, a second iron remover 9, a second screw conveyor 10, a grinder 12, a circulating fan 13, a cyclone separator 14, a hopper 16, a third screw conveyor 17, and a bag filter 19 , primary air blower 21 and three fire extinguishers 130, wherein,
二级粉碎机8的进料口与第一螺旋输送机7的出口连接;The feed inlet of the secondary pulverizer 8 is connected with the outlet of the first screw conveyor 7;
第二除铁器9设置在二级粉碎机8的出料口;The second iron remover 9 is arranged at the discharge port of the secondary pulverizer 8;
第二螺旋输送机10的进口与第二除铁器9的出口连接,该第二螺旋输送机10的出口连接第一旋转阀11;The inlet of the second screw conveyor 10 is connected to the outlet of the second iron remover 9, and the outlet of the second screw conveyor 10 is connected to the first rotary valve 11;
研磨机12的下部设置一个进料口和一个通风口;研磨机12的进料口与第一旋转阀11的出口连接;研磨机12的通风口与循环风机13的排风口连接;该研磨机12的上部带有分选器120;The bottom of the grinder 12 is provided with a feed port and a vent; the feed port of the grinder 12 is connected with the outlet of the first rotary valve 11; the vent of the grinder 12 is connected with the exhaust port of the circulating fan 13; The upper part of the machine 12 has a sorter 120;
旋风分离器14的上部径向设有进气口141,顶部设有排气口142,下端设有出粉口143;进气口141与研磨机12的分选器120的出口连接;排气口142通过管线与循环风机13的吸风口连接;出粉口143连接一个第二旋转阀15;The top of the cyclone separator 14 is radially provided with an air inlet 141, the top is provided with an air outlet 142, and the lower end is provided with a powder outlet 143; the air inlet 141 is connected with the outlet of the classifier 120 of the grinder 12; The port 142 is connected to the suction port of the circulating fan 13 through a pipeline; the powder outlet 143 is connected to a second rotary valve 15;
料斗16的进口与第二旋转阀15的出口连接,料斗16的出口与第三螺旋输送机17的进口连接;该第三螺旋输送机17的出口连接第三旋转阀18;The inlet of the hopper 16 is connected with the outlet of the second rotary valve 15, and the outlet of the hopper 16 is connected with the inlet of the third screw conveyor 17; the outlet of the third screw conveyor 17 is connected with the third rotary valve 18;
袋式除尘器19为脉冲袋式除尘器,它的含尘气入口191与循环风机13的排风口连接,该袋式除尘器19的排灰口连接第四旋转阀20;The bag filter 19 is a pulse bag filter, and its dusty gas inlet 191 is connected to the exhaust outlet of the circulating fan 13, and the ash outlet of the bag filter 19 is connected to the fourth rotary valve 20;
一次空气风机21为变频风机,该一次空气风机21的吸风口与袋式除尘器19的净气出口192连接,该一次空气风机21的排风口与立式废液焚烧炉的燃烧器的燃烧风机23的吸风口连接;The primary air blower 21 is a variable frequency blower, and the air suction port of the primary air blower 21 is connected with the clean air outlet 192 of the bag filter 19, and the air outlet of the primary air blower 21 is connected with the burner of the vertical waste liquid incinerator. The suction port of fan 23 is connected;
三个灭火器130均连接在研磨机12的通风口上,便于Three fire extinguishers 130 are all connected on the air vent of grinder 12, facilitate
气力输送部分包两个文丘里喷射器22a、22b,其中,The pneumatic conveying part includes two Venturi injectors 22a, 22b, wherein,
两个文丘里喷射器22a、22b的进料口一一对应地与第三旋转阀18的出口和第四旋转阀20的出口连接,该两个文丘里喷射器22a、22b的动力气源由罗茨风机220提供;该两个文丘里喷射器22a、22b的出料口均通过气力输送管道与立式废液焚烧炉的喷嘴连接。The feed ports of the two Venturi injectors 22a, 22b are connected to the outlet of the third rotary valve 18 and the outlet of the fourth rotary valve 20 one by one, and the motive gas source of the two Venturi injectors 22a, 22b is provided by Roots blower 220 is provided; the outlets of the two Venturi injectors 22a, 22b are connected to the nozzles of the vertical waste liquid incinerator through pneumatic conveying pipelines.
本发明的TDI焦碳焚烧前的预处理系统,在工作时,TDI焦碳由自卸卡车1a运送到卸料车间内,投放于地坑100的卸料料斗1中,该卸料料斗1的顶部装有水平格栅,以防操作人员掉入卸料料斗1内。卸料料斗1上装有电动振动机构,以避免物料架桥。TDI焦碳原料由卸料料斗1的出料口出料后经板式给料机2以固定流量输送到一次破碎机4中进行第一次破碎,确保TDI焦炭的粒径小于30mm。由于在板式给料机2的末端设置了第一除铁器3,将可能与TDI焦炭一起出现的大型铁磁性物件(螺杆等)分离。经过一次破碎机破碎后的TDI焦炭将进入斗式提升机5,并通过斗式提升机5进入TDI焦碳料仓6;TDI焦碳料仓6内的称重装置可用来监测仓内TDI焦碳储存量;在斗式提升机5运行时自动启动TDI焦炭料仓6内的除尘器61和除尘风机62。The pretreatment system before TDI coke incineration of the present invention, when working, TDI coke is transported in the unloading workshop by dump truck 1a, puts in the unloading hopper 1 of pit 100, and the discharge hopper 1 The top is equipped with a horizontal grill to prevent operators from falling into the discharge hopper 1. The discharge hopper 1 is equipped with an electric vibration mechanism to avoid material bridging. The TDI coke raw material is discharged from the discharge port of the discharge hopper 1 and then transported to the primary crusher 4 at a fixed flow rate by the apron feeder 2 for the first crushing to ensure that the particle size of the TDI coke is less than 30mm. Since the first iron remover 3 is installed at the end of the apron feeder 2, large ferromagnetic objects (screws, etc.) that may appear together with TDI coke are separated. The TDI coke crushed by a crusher will enter the bucket elevator 5, and enter the TDI coke bin 6 through the bucket elevator 5; the weighing device in the TDI coke bin 6 can be used to monitor the TDI coke in the bin. Carbon storage capacity; when the bucket elevator 5 is running, the dust collector 61 and the dust removal fan 62 in the TDI coke silo 6 are automatically started.
TDI焦碳料仓6下端的出料口通过第一螺旋输送机7送至二级破碎机8中进行第二次粉碎,确保TDI焦碳的粒径小于20mm。第一螺旋输送机7具有变频调速功能,可将进入二级破碎机8的流量调节到所需的流量。二次破碎后的TDI焦碳颗粒经第二除铁器9除去可能在研磨机12内部引发火花的铁质;再由第二螺旋输送机10输送至第一旋转阀11。第二螺旋输送机10以固定的给料速率将TDI焦碳颗粒投入研磨机12中,该第二螺旋输送机10的流量由第一螺旋输送机7的流量决定。研磨机12在旋转运动中将TDI焦碳颗粒被磨成不同粒径的细小粉末,研磨机12自带的分选器120只允许小于期望粒径尺寸的粉末颗粒离开研磨机12。循环风机13产生的空气再将TDI焦炭粉末通过旋风分离器14的进气口141送入旋风分离器14。通过旋风分离器14将较重的TDI焦炭粉末从循环气流中分离出来并落入料斗16中,该料斗16也起缓存作用;较轻的TDI焦炭粉末和空气的混合物由管线回流至循环风机13的吸风口,并由循环风机13送至袋式除尘器19,由袋式除尘器19的灰斗收集。经袋式除尘器19净化后的空气通过一次空气风机21送至立式废液焚烧炉的燃烧风机23的上游,作为立式废液焚烧炉的燃烧器的燃烧空气。从袋式除尘器19中提取的空气量取决于TDI焦炭的含水率等参数,在调试过程中会根据一次空气风机21的频率变化进行调整。The discharge port at the lower end of the TDI coke silo 6 is sent to the secondary crusher 8 through the first screw conveyor 7 for second crushing to ensure that the particle size of the TDI coke is less than 20 mm. The first screw conveyor 7 has a frequency control function, which can adjust the flow into the secondary crusher 8 to the required flow. The secondary crushed TDI coke particles pass through the second iron remover 9 to remove iron that may cause sparks inside the grinder 12 ; and then are transported to the first rotary valve 11 by the second screw conveyor 10 . The second screw conveyor 10 feeds TDI coke particles into the grinder 12 at a fixed feed rate, and the flow rate of the second screw conveyor 10 is determined by the flow rate of the first screw conveyor 7 . The grinder 12 grinds the TDI coke particles into fine powders with different particle sizes during the rotating motion, and the classifier 120 provided with the grinder 12 only allows the powder particles smaller than the desired particle size to leave the grinder 12 . The air generated by the circulating fan 13 sends the TDI coke powder into the cyclone separator 14 through the air inlet 141 of the cyclone separator 14 . The heavier TDI coke powder is separated from the circulating air flow by the cyclone separator 14 and falls into the hopper 16, which also acts as a buffer; the mixture of the lighter TDI coke powder and air is returned to the circulation fan 13 by the pipeline The air suction port is sent to the bag filter 19 by the circulating fan 13, and collected by the ash hopper of the bag filter 19. The air purified by the bag filter 19 is sent to the upstream of the combustion fan 23 of the vertical waste liquid incinerator through the primary air blower 21, as the combustion air of the burner of the vertical waste liquid incinerator. The amount of air extracted from the bag filter 19 depends on parameters such as the moisture content of the TDI coke, and will be adjusted according to the frequency change of the primary air fan 21 during the commissioning process.
旋风分离器14下方的料斗16出口和袋式除尘器19的排灰口193一一对应地通过第三旋转阀18和第四旋转阀20将TDI焦碳粉末送入两个文丘里喷射器22a、22b,并经两个文丘里喷射器22a、22b连接到气力输送管道,确保没有回流。因此料斗16内的TDI焦炭粉末和由袋式除尘器19的灰斗收集的TDI焦炭粉末均通过气力输送管道送至立式废液焚烧炉的喷枪,由喷枪喷入立式废液焚烧炉内燃烧。The outlet of the hopper 16 below the cyclone separator 14 and the ash outlet 193 of the bag filter 19 correspond to each other to send TDI coke powder into the two Venturi injectors through the third rotary valve 18 and the fourth rotary valve 20 22a, 22b, and connected to the pneumatic conveying pipeline via two Venturi injectors 22a, 22b to ensure that there is no backflow. Therefore, the TDI coke powder in the hopper 16 and the TDI coke powder collected by the ash hopper of the bag filter 19 are sent to the spray gun of the vertical waste liquid incinerator through the pneumatic conveying pipeline, and sprayed into the vertical waste liquid incinerator by the spray gun combustion.
在卸料车间外安装控制操作台,可以立即启动或停止TDI焦炭的卸料、输送和破碎。在卸料车间外和地坑100内设置紧急停机系统。The control console is installed outside the unloading workshop, which can immediately start or stop the unloading, conveying and crushing of TDI coke. An emergency shutdown system is set outside the unloading workshop and in the pit 100 .
本发明的TDI焦碳焚烧前的预处理系统具有以下特点:The pretreatment system before the TDI coke incineration of the present invention has the following characteristics:
1、集卸料、机械输送、多级破碎和粉磨以及气力输送等单元于一体,高效衔接了废料进厂到终端处置之间的环节。1. It integrates unloading, mechanical conveying, multi-stage crushing and grinding, and pneumatic conveying into one unit, and efficiently connects the link between waste entering the factory and terminal disposal.
2、通过将物料颗粒尺寸的均匀化,既方便物料的输送,实现在立式废液焚烧炉内进行TDI焦碳的焚烧,又能使物料燃烧充分,使焚烧产生的残渣和烟气达标,最终使立式废液焚烧炉得到充分利用。2. By homogenizing the particle size of the material, it is not only convenient for material transportation, but also realizes the incineration of TDI coke in the vertical waste liquid incinerator, and can fully burn the material, so that the residue and flue gas produced by incineration can reach the standard. Finally, the vertical waste liquid incinerator can be fully utilized.
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变型,因此所有等同的技术方案也应该属于本发明的范畴,应由各权利要求所限定。The above embodiments are only for the purpose of illustrating the present invention, rather than limiting the present invention. Those skilled in the relevant technical fields can also make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent The technical solutions should also belong to the category of the present invention and should be defined by each claim.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910743728.6A CN110360570A (en) | 2019-08-13 | 2019-08-13 | A kind of TDI coke burn before pretreatment system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910743728.6A CN110360570A (en) | 2019-08-13 | 2019-08-13 | A kind of TDI coke burn before pretreatment system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110360570A true CN110360570A (en) | 2019-10-22 |
Family
ID=68224616
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910743728.6A Pending CN110360570A (en) | 2019-08-13 | 2019-08-13 | A kind of TDI coke burn before pretreatment system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110360570A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111186835A (en) * | 2020-01-13 | 2020-05-22 | 北京诺芯环境科技有限公司 | Application of toluene diisocyanate kettle residue, method for preparing graphite by using toluene diisocyanate kettle residue, graphite and application of graphite |
| CN112197279A (en) * | 2020-10-29 | 2021-01-08 | 北京琪玥环保科技股份有限公司 | Coupling system based on plasma melting furnace and rotary kiln incinerator and application |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005155974A (en) * | 2003-11-21 | 2005-06-16 | Hitachi Plant Eng & Constr Co Ltd | Infusion ash melting pretreatment method and system |
| CN104449802A (en) * | 2014-12-31 | 2015-03-25 | 襄阳航生石化环保设备有限公司 | Clean and efficient decoking system |
| CN104689897A (en) * | 2014-04-01 | 2015-06-10 | 上海化学工业区升达废料处理有限公司 | Automatic grinding system and method for cokes |
| JP2016183616A (en) * | 2015-03-26 | 2016-10-20 | 月島機械株式会社 | Fluid bed incineration facility |
| CN206915970U (en) * | 2017-06-16 | 2018-01-23 | 南京塔川化工设备有限公司 | A kind of oily sludge is from heat supply Non-oxygen pyrolytic equipment |
| CN208124299U (en) * | 2018-03-30 | 2018-11-20 | 南京万物新能源科技有限公司 | Domestic garbage gasification incineration system |
| CN210568443U (en) * | 2019-08-13 | 2020-05-19 | 上海化学工业区升达废料处理有限公司 | Pretreatment system before burning of TDI coke |
-
2019
- 2019-08-13 CN CN201910743728.6A patent/CN110360570A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005155974A (en) * | 2003-11-21 | 2005-06-16 | Hitachi Plant Eng & Constr Co Ltd | Infusion ash melting pretreatment method and system |
| CN104689897A (en) * | 2014-04-01 | 2015-06-10 | 上海化学工业区升达废料处理有限公司 | Automatic grinding system and method for cokes |
| CN104449802A (en) * | 2014-12-31 | 2015-03-25 | 襄阳航生石化环保设备有限公司 | Clean and efficient decoking system |
| JP2016183616A (en) * | 2015-03-26 | 2016-10-20 | 月島機械株式会社 | Fluid bed incineration facility |
| CN206915970U (en) * | 2017-06-16 | 2018-01-23 | 南京塔川化工设备有限公司 | A kind of oily sludge is from heat supply Non-oxygen pyrolytic equipment |
| CN208124299U (en) * | 2018-03-30 | 2018-11-20 | 南京万物新能源科技有限公司 | Domestic garbage gasification incineration system |
| CN210568443U (en) * | 2019-08-13 | 2020-05-19 | 上海化学工业区升达废料处理有限公司 | Pretreatment system before burning of TDI coke |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111186835A (en) * | 2020-01-13 | 2020-05-22 | 北京诺芯环境科技有限公司 | Application of toluene diisocyanate kettle residue, method for preparing graphite by using toluene diisocyanate kettle residue, graphite and application of graphite |
| CN112197279A (en) * | 2020-10-29 | 2021-01-08 | 北京琪玥环保科技股份有限公司 | Coupling system based on plasma melting furnace and rotary kiln incinerator and application |
| CN112197279B (en) * | 2020-10-29 | 2024-10-08 | 北京琪玥环保科技股份有限公司 | Coupling system based on plasma melting furnace and rotary kiln incinerator and its application |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110360570A (en) | A kind of TDI coke burn before pretreatment system | |
| JP2013226503A (en) | Crushing system | |
| CN206665703U (en) | A kind of lime negative pressure feed arrangement | |
| CN119934518A (en) | Fly ash treatment device for industrial solid waste incineration and solid waste treatment method | |
| CN210568443U (en) | Pretreatment system before burning of TDI coke | |
| CN211812112U (en) | Material conveying system | |
| JPS59210212A (en) | Combustion apparatus for coal | |
| US3477650A (en) | Apparatus to provide inert atmosphere in material reducing mills | |
| CN118287236A (en) | Positive pressure conveying coal mill stone coal milling recycling system | |
| CN104689897B (en) | Automatic grinding system and method for cokes | |
| JP2014122090A (en) | Transport method of fly ash | |
| Buzduga et al. | Solutions to reduce the environmental pollution by the producers of refractories | |
| EP0763179B1 (en) | System for manufacturing ash products and energy from refuse waste | |
| CN210856031U (en) | An automatic production line for preparing biomass fuel from waste wood | |
| CN115105923A (en) | Roasting furnace flue gas black method adsorption device and method | |
| KR100862774B1 (en) | Pulverized coal manufacturing equipment | |
| CN210058404U (en) | Garbage crushing treatment system | |
| CN219689808U (en) | Purification ash recycling device with ball pressing device | |
| CN209130880U (en) | A kind of environment-friendly type industrial solid wastes incinerator | |
| CN203030526U (en) | Intelligent cleaning blowing machine | |
| CN107213715A (en) | A kind of Long Bag Low Pressure Pulse Filter | |
| CN107469998B (en) | Carbon black grinding system | |
| KR101002404B1 (en) | Coal crushing and classification transfer device | |
| CN105823062A (en) | Desulfurization-deacidification system of clean incineration device for household garbage | |
| CN206778640U (en) | A kind of grinding system for feed additive raw materials of effectively dedusting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191022 |