CN110388830B - Scrap steel preheating device, arc melting equipment and preheating method - Google Patents

Scrap steel preheating device, arc melting equipment and preheating method Download PDF

Info

Publication number
CN110388830B
CN110388830B CN201910705777.0A CN201910705777A CN110388830B CN 110388830 B CN110388830 B CN 110388830B CN 201910705777 A CN201910705777 A CN 201910705777A CN 110388830 B CN110388830 B CN 110388830B
Authority
CN
China
Prior art keywords
scrap steel
shaft
furnace
scrap
flue gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910705777.0A
Other languages
Chinese (zh)
Other versions
CN110388830A (en
Inventor
曹建宁
耿明山
韩庆礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Capital Engineering & Research Inc Ltd
Original Assignee
Capital Engineering & Research Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Capital Engineering & Research Inc Ltd filed Critical Capital Engineering & Research Inc Ltd
Priority to CN201910705777.0A priority Critical patent/CN110388830B/en
Publication of CN110388830A publication Critical patent/CN110388830A/en
Application granted granted Critical
Publication of CN110388830B publication Critical patent/CN110388830B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B14/00Crucible or pot furnaces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B14/00Crucible or pot furnaces
    • F27B14/08Details specially adapted for crucible or pot furnaces
    • F27B14/0806Charging or discharging devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B14/00Crucible or pot furnaces
    • F27B14/08Details specially adapted for crucible or pot furnaces
    • F27B14/20Arrangement of controlling, monitoring, alarm or like devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D13/00Apparatus for preheating charges; Arrangements for preheating charges
    • F27D13/002Preheating scrap
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B14/00Crucible or pot furnaces
    • F27B14/08Details specially adapted for crucible or pot furnaces
    • F27B14/0806Charging or discharging devices
    • F27B2014/0818Discharging
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2001/00Composition, conformation or state of the charge
    • F27M2001/02Charges containing ferrous elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2003/00Type of treatment of the charge
    • F27M2003/13Smelting
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

本发明提供了一种废钢预热装置、电弧熔化设备及预热方法,废钢预热装置包括:竖井,上端为进料口,竖井的下端侧壁设置有出料口;卸料器,设置在竖井内并能够沿竖直方向相对于竖井运动,卸料器具有朝向出料口倾斜的上表面;运料台车,能够振动运料,运料台车的入口端与出料口连接;导向辊,设置于出料口并位于运料台车的入口端上侧,导向辊能够控制出料口的开度。本发明的有益效果是,卸料器能够进行高度方向的调节,通过调节卸料器的高度和导向辊的位置,可以实现不同的卸料速度,运料台车可以水平方向移动,通过调节运料台车的振动频率和幅度,能够控制废钢的落下位置,实现废钢的连续加入。

The invention provides a scrap steel preheating device, arc melting equipment and a preheating method. The scrap steel preheating device includes: a shaft, the upper end is a feed port, and the lower end side wall of the shaft is provided with a discharge port; an unloader is provided on The unloader is in the shaft and can move in the vertical direction relative to the shaft. The unloader has an upper surface inclined toward the discharge port; the material transport trolley can vibrate and transport materials, and the inlet end of the material transport trolley is connected to the discharge port; the guide The roller is arranged at the discharge port and is located above the entrance end of the material transport trolley. The guide roller can control the opening of the discharge port. The beneficial effect of the present invention is that the unloader can be adjusted in the height direction. By adjusting the height of the unloader and the position of the guide roller, different unloading speeds can be achieved. The transport trolley can move in the horizontal direction. By adjusting the transport trolley, The vibration frequency and amplitude of the material trolley can control the falling position of scrap steel and realize the continuous addition of scrap steel.

Description

废钢预热装置、电弧熔化设备及预热方法Scrap steel preheating device, arc melting equipment and preheating method

技术领域Technical field

本发明涉及冶金技术领域,具体涉及一种废钢预热装置、电弧熔化设备及预热方法。The invention relates to the field of metallurgical technology, and specifically to a scrap steel preheating device, arc melting equipment and a preheating method.

背景技术Background technique

电弧炉炼钢中节能、降耗、环保一直是全球电弧炉炼钢技术发展的核心技术之一。Energy saving, consumption reduction and environmental protection in electric arc furnace steelmaking have always been one of the core technologies in the development of global electric arc furnace steelmaking technology.

传统的炼钢电弧炉,废钢分为二至三次从炉顶装入,依靠电极与废钢之间产生的电弧来熔化废钢。因此,传统的电弧炉只能间断的向炉内送电,间隔一段时间即停电,旋开炉盖装料,这样极大地降低了电弧炉的生产率,增加了电弧炉的热损失和能源消耗。同时大量烟尘在装料时排放到厂房内,增加了除尘环保的难度。间断式的电极与废钢产生明弧,增大了对电网的冲击和噪音的危害程度,炼钢产生的高温烟气节能降耗是电弧炉冶炼的重要课题,其中利用烟气余热预热废钢一直被人们广泛关注。电弧炉冶炼过程中会产生大量的高温烟气,这些烟气的温度高达1000℃以上,排烟量高达500~1200m3/(h·t)。利用这些烟气显热预热废钢,将会产生巨大的经济效益。In traditional electric arc furnaces for steelmaking, scrap steel is loaded from the top of the furnace in two to three steps, and the scrap steel is melted by relying on the arc generated between the electrode and the scrap steel. Therefore, the traditional electric arc furnace can only send power to the furnace intermittently, and the power is cut off after a period of time, and the furnace cover is unscrewed to load materials. This greatly reduces the productivity of the electric arc furnace and increases the heat loss and energy consumption of the electric arc furnace. At the same time, a large amount of smoke and dust is discharged into the factory during loading, which increases the difficulty of dust removal and environmental protection. Intermittent electrodes produce open arcs with scrap steel, which increases the impact on the power grid and the harm of noise. Energy saving and consumption reduction of high-temperature flue gas generated by steelmaking is an important issue in electric arc furnace smelting. Among them, the use of flue gas waste heat to preheat scrap steel has always been received widespread attention. During the smelting process of electric arc furnace, a large amount of high-temperature flue gas will be produced. The temperature of these flue gases is as high as over 1000℃, and the exhaust volume is as high as 500~1200m 3 /(h·t). Utilizing the sensible heat of flue gas to preheat scrap steel will produce huge economic benefits.

众所周知,废钢预热是电弧炉钢节能技术的发展方向之一,目前在与电弧炉配套的废钢预热中,代表性方式有水平连续输运方式和竖炉方式,所用设备分别如康斯迪电弧炉(即Consteel电弧炉)和篦式竖炉电弧炉。As we all know, scrap preheating is one of the development directions of energy-saving technology for electric arc furnace steel. Currently, in the scrap preheating supporting electric arc furnaces, the representative methods include horizontal continuous transportation mode and shaft furnace mode. The equipment used is such as Kangsidi Electric arc furnace (Consteel electric arc furnace) and grate shaft electric arc furnace.

其中,利用电弧炉烟气预热废钢技术是一个二十多年来国内外均在研究的一项技术,但因其技术难度大,目前仅有少量方案投入实际使用,典型代表如振动连续加料的Consteel(US5400358-1992)、手指竖炉(DE4025294A1-1992)、竖井侧推加料(US2007/0013112A1)技术。Among them, the technology of using electric arc furnace flue gas to preheat scrap steel is a technology that has been studied at home and abroad for more than 20 years. However, due to its high technical difficulty, only a few solutions have been put into practical use. Typical examples include vibrating continuous feeding. Consteel (US5400358-1992), finger shaft furnace (DE4025294A1-1992), shaft side push feeding (US2007/0013112A1) technology.

水平式废钢预热装置因对厂房高度没有过高的要求,已为部分企业所关注。The horizontal scrap steel preheating device has attracted the attention of some enterprises because it does not have excessive requirements on the height of the factory building.

目前具有代表性的水平式连续加料废钢预热装置主要是国外引进的所谓连续炼钢电弧炉(Consteel)。At present, the representative horizontal continuous feeding scrap steel preheating device is mainly the so-called continuous steelmaking electric arc furnace (Consteel) imported from abroad.

Consteel(US5400358-1992)是一种水平连续给料技术,可实现电弧炉稳弧冶炼,环保且电极消耗降低,可大大降低电弧炉的生产过程费用,但该方法废钢只有上层物料被加热,故废钢预热效果不佳,据国内外报道平均节能效果只有吨钢25kwh;此外,由于要提高原料(废钢)换热效率,输送槽内的废钢在输送带上堆高比较薄,必然加大预热段的长度,设备全长可达90~100m,针对车间的布置是非常不利的;再次,该方案动态密封漏气较严重,对风机等的容量要求较大。Consteel (US5400358-1992) is a horizontal continuous feeding technology that can achieve stable arc smelting in electric arc furnaces. It is environmentally friendly and reduces electrode consumption. It can greatly reduce the production process cost of electric arc furnaces. However, in this method, only the upper layer of scrap steel is heated, so The scrap steel preheating effect is not good. According to domestic and foreign reports, the average energy saving effect is only 25kwh per ton of steel. In addition, due to the need to improve the heat exchange efficiency of the raw material (scrap steel), the scrap steel in the conveyor trough is relatively thin on the conveyor belt, so the preheating time must be increased. The length of the hot section and the total length of the equipment can reach 90 to 100m, which is very unfavorable for the layout of the workshop; thirdly, this solution has serious dynamic seal leakage and requires a large capacity for fans.

康斯迪电弧炉的热烟气在预热装置中逆着废钢运行流动,由于废钢在水平的预热装置中无法充满,有一大部份的气流在废钢层的上部流动,使得底部的废钢预热效果差,为了达到较高的热交换,通常需要60米长的预热隧道。由于废钢中具有含氯的化合物,如PVC等,理论上,这些含氯的化合物在低于800℃不完全燃烧就会产生二噁英,特别在300~500℃范围内不完全燃烧最容易产生二噁英,由于康斯迪炉的预热隧道较长,热烟气和废钢热交换后,温度不断降低,使废钢中的含氯的化合物在300~500℃之间不完全燃烧下极容易产生二噁英,污染环境。The hot flue gas of the Kansidi electric arc furnace flows against the scrap steel in the preheating device. Since the scrap steel cannot be filled in the horizontal preheating device, a large part of the air flow flows in the upper part of the scrap steel layer, causing the scrap steel preheating at the bottom to flow. The thermal effect is poor. In order to achieve higher heat exchange, a 60-meter-long preheating tunnel is usually required. Since scrap steel contains chlorine-containing compounds, such as PVC, theoretically, incomplete combustion of these chlorine-containing compounds below 800°C will produce dioxins, especially incomplete combustion in the range of 300 to 500°C is most likely to produce dioxins. Dioxins, due to the long preheating tunnel of the Kangsidi furnace, the temperature continues to decrease after the heat exchange between the hot flue gas and the scrap steel, making the chlorine-containing compounds in the scrap steel very easy to burn incompletely between 300 and 500°C. Produce dioxins and pollute the environment.

康斯迪电弧炉存在的固有缺点是:1、虽然其发明者英特尔制钢公司认为该公司开发的Consteel工艺可将废钢预热至500℃左右,设备供应商意大利德兴公司也宣传可将废钢预热到400℃~600℃,而Kyoei Steel(即日本共英制钢)公司的生产实践表明,经预热后的废钢温度上下不均(上高下低),距表面600mm~700mm处的废钢温度<100℃,其节能效果仅为25kwh/t钢,传热效率很低。国内在用Consteel电弧炉的生产实践也证明该设备废钢预热温度低,节能效果差。2、其设备长度很长,一般预热通道和装料运输机全长约60米左右,占地面积大,设备的安装和旧厂房的改造非常困难,一次性投资很高。3、漏风量大,烟气中混入大量野风,不仅增加了除尘风机的负担,而且大大不利于烟气余热的回收利用。4、上料电磁吊车作业率非常高,有的达到90%以上,有时会因装料而影响生产。The inherent shortcomings of the Consteel electric arc furnace are: 1. Although its inventor Intel Steel believes that the Consteel process developed by the company can preheat scrap steel to about 500°C, the equipment supplier Dexing Company of Italy also promotes that it can preheat scrap steel. Preheat to 400℃~600℃, and the production practice of Kyoei Steel Company shows that the temperature of the scrap steel after preheating is uneven (higher at the top and lower at the bottom), and the scrap steel at a distance of 600mm to 700mm from the surface When the temperature is <100°C, the energy-saving effect is only 25kwh/t steel, and the heat transfer efficiency is very low. The production practice of Consteel electric arc furnace in use in China also proves that the scrap preheating temperature of this equipment is low and the energy saving effect is poor. 2. The length of the equipment is very long. Generally, the total length of the preheating channel and loading conveyor is about 60 meters. It covers a large area. It is very difficult to install the equipment and renovate the old factory building, and the one-time investment is very high. 3. The air leakage is large, and a large amount of wild wind is mixed into the flue gas, which not only increases the burden on the dust removal fan, but also greatly hinders the recovery and utilization of the waste heat of the flue gas. 4. The operating rate of loading electromagnetic cranes is very high, some reaching more than 90%, and sometimes production will be affected due to loading.

手指竖炉电弧炉是德国FUCHS公司在20世纪90年代初开发和研制的,是一种典型的电弧炉废钢预热装置,所谓“手指”是指在竖炉和电弧炉连通接口之间有单排或多排的可通过机械装置开启和关闭的手指类托架。在电弧炉冶炼过程中,通过向废气流中直接加入废钢而充分利用废气对废钢的预热能力,不仅利用烟气显热,同时可利用烟气中的可燃气体进行二次燃烧的化学能,因此,这类带托料装置的废钢预热技术因烟气能穿透废钢层,预热节能效果好,可达到吨钢60~100kwh,但是,传统竖炉中由于废钢对手指类托架的直接冲击,容易导致被废钢砸坏,增加了设备维护,影响了废钢预热技术的推广使用。同时由于废钢中存在一定量的轻薄料,在可燃气体二次燃烧的情况下有可能造成局部废钢的熔化,造成竖炉内废钢粘结,引发竖炉废钢无法顺畅的进入电弧炉的问题。为此,避免废钢直接砸落到手指类托架,便可明显的减少废钢加料过程的冲击,减少设备的维护。FUCHS公司又推出了新一代FUCHS-COSS电弧炉,即是对竖炉的改进,用独立的推料系统代替原来的竖井,推料系统为无水冷系统,用铸铁板组成,避免了原来因竖井漏水,而影响冶炼周期,但机械结构庞大,运行复杂。The finger shaft electric arc furnace was developed and developed by the German FUCHS company in the early 1990s. It is a typical electric arc furnace scrap steel preheating device. The so-called "finger" refers to a single unit between the shaft furnace and the electric arc furnace connection interface. One or more rows of finger rests that can be opened and closed by mechanical means. In the electric arc furnace smelting process, scrap steel is added directly to the waste gas flow to make full use of the preheating ability of the waste gas. Not only the sensible heat of the flue gas is used, but the chemical energy of the combustible gas in the flue gas can be used for secondary combustion. Therefore, this type of scrap steel preheating technology with a supporting device has good preheating and energy saving effects because the flue gas can penetrate the scrap steel layer, and can reach 60 to 100kwh per ton of steel. However, in traditional shaft furnaces, due to the impact of scrap steel on the finger brackets Direct impact can easily lead to damage by scrap steel, which increases equipment maintenance and affects the promotion and use of scrap steel preheating technology. At the same time, due to the presence of a certain amount of light and thin materials in the scrap steel, the secondary combustion of combustible gas may cause partial melting of the scrap steel, causing the scrap steel in the shaft furnace to stick, causing the problem that the shaft furnace scrap steel cannot enter the electric arc furnace smoothly. For this reason, by preventing scrap steel from falling directly onto the finger bracket, the impact of the scrap steel feeding process can be significantly reduced and the maintenance of the equipment can be reduced. FUCHS Company has launched a new generation of FUCHS-COSS electric arc furnace, which is an improvement on the shaft furnace. It uses an independent pushing system to replace the original shaft. The pushing system is a water-free cooling system and is composed of cast iron plates, which avoids the original shaft problem. Water leakage will affect the smelting cycle, but the mechanical structure is huge and the operation is complex.

竖式废钢预热技术虽然热效率较高,废钢预热温度较高,但它要求厂房的标高很高,设备庞大,一次性投资很高,且不适应旧有电弧炉炼钢车间的改造。在篦式竖炉中,电弧炉的热烟气从竖井的下端进入,从竖井的上端排出。这样,竖井的断面要有足够大,才能让热烟气在废钢间缝隙中流过。在实际生产中,水冷的指篦容易被废钢砸坏漏水,或被废钢卡住,设备的造价高,设备维护量大,所以篦式竖炉在电弧炉炼钢上只一部份的大炉子使用。Although the vertical scrap steel preheating technology has high thermal efficiency and high scrap steel preheating temperature, it requires a high elevation of the factory building, huge equipment, high one-time investment, and is not suitable for the transformation of the old electric arc furnace steelmaking workshop. In a grate-type shaft furnace, the hot flue gas from the electric arc furnace enters from the lower end of the shaft and is discharged from the upper end of the shaft. In this way, the cross-section of the shaft must be large enough to allow the hot flue gas to flow through the gaps between the scrap steel. In actual production, the water-cooled finger grate is easily damaged by scrap steel, leaks, or gets stuck by scrap steel. The cost of equipment is high and the maintenance of the equipment is large. Therefore, grate-type shaft furnaces are only part of the large furnaces in electric arc furnace steelmaking. use.

发明内容Contents of the invention

本发明提供了一种废钢预热装置、电弧熔化设备及预热方法,以解决现有技术中由于废钢原料下落冲击造成手指类机构变形和开裂而导致的设备漏水的问题。The invention provides a scrap steel preheating device, arc melting equipment and a preheating method to solve the problem of equipment leakage in the prior art due to the deformation and cracking of finger-type mechanisms caused by the impact of falling scrap raw materials.

本发明解决其技术问题所采用的技术方案是:一种废钢预热装置,包括:竖井,上端为进料口,竖井的下端侧壁设置有出料口;卸料器,设置在竖井内并能够沿竖直方向相对于竖井运动,卸料器具有朝向出料口倾斜的上表面;运料台车,能够振动运料,运料台车的入口端与出料口连接;导向辊,设置于出料口并位于运料台车的入口端上侧,导向辊能够控制出料口的开度。The technical solution adopted by the present invention to solve the technical problem is: a scrap steel preheating device, which includes: a vertical shaft, the upper end is a feed port, and the lower end side wall of the vertical shaft is provided with a discharge port; an unloader is arranged in the vertical shaft and Able to move in the vertical direction relative to the shaft, the unloader has an upper surface inclined toward the discharge port; the material transport trolley is capable of vibrating the material, and the inlet end of the material transport trolley is connected to the discharge port; the guide roller is provided At the discharge port and located above the entrance end of the material transport trolley, the guide roller can control the opening of the discharge port.

进一步地,导向辊包括伸缩杆、摆动杆和导向辊子,伸缩杆的一端与竖井的壳体铰接,伸缩杆另一端与导向辊子的转动中心铰接,摆动杆的一端与竖井的壳体铰接,摆动杆另一端与导向辊子的转动中心铰接,且伸缩杆的一端与摆动杆的一端错位设置。Further, the guide roller includes a telescopic rod, a swing rod and a guide roller. One end of the telescopic rod is hinged with the shell of the shaft, the other end of the telescopic rod is hinged with the rotation center of the guide roller, and one end of the swing rod is hinged with the shell of the shaft. The other end of the rod is hinged with the rotation center of the guide roller, and one end of the telescopic rod is misaligned with one end of the swing rod.

进一步地,卸料器的上端设置有多个卸料辊,多个卸料辊间隔均布并形成卸料器的上表面。Further, a plurality of discharge rollers are provided at the upper end of the unloader. The plurality of discharge rollers are evenly spaced and form the upper surface of the unloader.

进一步地,卸料器朝向出料口的侧壁上设置有用于预热烟气通过的烟气通孔,烟气通孔用于分别连接卸料器的上表面上方和电弧炉的入口。Further, the side wall of the unloader facing the discharge port is provided with a flue gas through hole for the passage of preheated flue gas, and the flue gas through hole is used to connect the upper surface of the unloader and the inlet of the electric arc furnace respectively.

进一步地,竖井的进料口下侧设置有烟气管道,烟气管道处设置有烟气分析组件和温度测量组件。Further, a flue gas pipe is provided on the lower side of the feed inlet of the shaft, and a flue gas analysis component and a temperature measurement component are provided at the flue gas pipe.

进一步地,废钢预热装置还包括升降机构,升降机构设置在卸料器的下方并能够驱动卸料器沿竖直方向相对于竖井运动。Further, the scrap steel preheating device also includes a lifting mechanism, which is arranged below the unloader and can drive the unloader to move in the vertical direction relative to the shaft.

进一步地,竖井内设置有燃料喷枪和助燃氧枪,燃料喷枪和助燃氧枪均位于进料口下方并位于卸料器上方。Further, a fuel spray gun and a combustion-supporting oxygen gun are provided in the shaft. The fuel spray gun and the combustion-supporting oxygen gun are both located below the feed port and above the unloader.

进一步地,竖井的进料口处设置有用于进料的进料组件。Further, a feeding assembly for feeding material is provided at the feeding inlet of the shaft.

进一步地,进料组件包括:竖炉受料斗,呈漏斗状结构,竖炉受料斗的小径端与进料口连接,竖炉受料斗的大径端沿竖直方向位于竖炉受料斗的小径端的上方;第一密封滑板,设置在竖炉受料斗的大径端并能够控制竖炉受料斗的大径端的开闭;第二密封滑板,设置在竖炉受料斗的小径端并能够控制竖炉受料斗的小径端的开闭,且第一密封滑板和第二密封滑板能够独立运动。Further, the feed assembly includes: a shaft furnace hopper, which is a funnel-shaped structure. The small diameter end of the shaft furnace hopper is connected to the feed port. The large diameter end of the shaft furnace hopper is located vertically along the small diameter of the shaft furnace hopper. Above the end; the first sealing slide plate is arranged at the large diameter end of the shaft furnace receiving hopper and can control the opening and closing of the large diameter end of the shaft furnace receiving hopper; the second sealing sliding plate is arranged at the small diameter end of the shaft furnace receiving hopper and can control the opening and closing of the shaft furnace receiving hopper. The furnace is opened and closed by the small diameter end of the hopper, and the first sealing slide plate and the second sealing slide plate can move independently.

进料组件包括:传送导轨,倾斜设置并连接进料口与地面料堆;料斗,设置在传送导轨上并能够随传送导轨移动,料斗能够向进料口加料。The feeding component includes: a transmission guide rail, which is arranged at an angle and connects the feed port and the ground material pile; a hopper, which is installed on the transmission guide rail and can move with the transmission guide rail, and the hopper can add materials to the feed port.

本发明还提供了一种电弧熔化设备,包括电弧炉和上述的废钢预热装置,电弧炉的入口与运料台车的出口连接。The invention also provides an electric arc melting equipment, which includes an electric arc furnace and the above-mentioned scrap steel preheating device. The inlet of the electric arc furnace is connected to the outlet of the material transport trolley.

本发明进一步还提供了一种预热方法,包括以下步骤:步骤10、将卸料器升至设定最高位置,并通过进料口向竖井中加入废钢形成废钢堆积区;步骤20、开启燃料喷枪和助燃氧枪对废钢堆积区进行加热;步骤30、待废钢堆积区加热到设定温度时,降低卸料器使废钢堆积区与出料口连接,同时开启运料台车向电弧炉中运送废钢;步骤40、随着电弧炉对废钢进行熔炼,电弧炉内会产生大量高温烟气,高温烟气沿卸料器的烟气通孔和卸料器的上端设置有多个辊子间隙对废钢堆积区进行预热;步骤50、通过烟气分析组件和温度测量组件的测量结果调节燃料喷枪和助燃氧枪的开度;步骤60、待电弧炉内钢水达到设定要求后,对电弧炉进行出钢操作;步骤70、依次循环步骤10、步骤30、步骤40、步骤50和步骤60。The invention further provides a preheating method, which includes the following steps: Step 10, raise the unloader to the set highest position, and add scrap steel into the vertical shaft through the feed port to form a scrap steel accumulation area; Step 20, turn on the fuel The spray gun and combustion-supporting oxygen gun heat the scrap accumulation area; step 30, when the scrap accumulation area is heated to the set temperature, lower the unloader to connect the scrap accumulation area with the discharge port, and at the same time open the transport trolley to the electric arc furnace Transport scrap steel; Step 40. As the electric arc furnace melts scrap steel, a large amount of high-temperature flue gas will be generated in the electric arc furnace. Multiple roller gap pairs are provided along the flue gas through hole of the unloader and the upper end of the unloader. Preheat the scrap steel accumulation area; Step 50, adjust the opening of the fuel spray gun and combustion oxygen gun through the measurement results of the flue gas analysis component and the temperature measurement component; Step 60, after the molten steel in the electric arc furnace reaches the set requirements, the electric arc furnace Carry out tapping operation; step 70, cycle step 10, step 30, step 40, step 50 and step 60 in sequence.

进一步地,在步骤30中,通过卸料器和导向辊控制出料口的出钢速度。Further, in step 30, the tapping speed of the discharge port is controlled through the unloader and the guide roller.

本发明的有益效果是,卸料器能够进行高度方向的调节,通过调节卸料器的高度和导向辊的位置,可以实现不同的卸料速度,同时,上述导向辊可以封闭出料口,以达到停止送料的目的;运料台车可以水平方向移动,通过调节运料台车的振动频率和幅度,能够控制废钢的落下位置,实现废钢的连续加入。The beneficial effect of the present invention is that the unloader can be adjusted in the height direction. By adjusting the height of the unloader and the position of the guide roller, different unloading speeds can be achieved. At the same time, the above-mentioned guide roller can close the discharge port, so as to To achieve the purpose of stopping the feeding; the material transport trolley can move horizontally. By adjusting the vibration frequency and amplitude of the material transport trolley, the falling position of the scrap steel can be controlled to realize the continuous addition of scrap steel.

附图说明Description of drawings

构成本申请的一部分的说明书附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The description and drawings that constitute a part of this application are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the attached picture:

图1为本发明实施例的结构示意图;Figure 1 is a schematic structural diagram of an embodiment of the present invention;

图2为废钢持续加入竖井过程示意图;Figure 2 is a schematic diagram of the process of continuously adding scrap steel to the shaft;

图3为卸料器、送料槽送料过程和加料过程示意图;Figure 3 is a schematic diagram of the unloader, feeding chute feeding process and feeding process;

图4为卸料器、送料槽持续加料和废钢熔化过程示意图;Figure 4 is a schematic diagram of the unloader, continuous feeding of feed chute and scrap melting process;

图5为卸料器、送料槽停止加料和钢水冶炼过程示意图;Figure 5 is a schematic diagram of the unloader, feed chute stopping feeding and molten steel smelting process;

图6为竖井装料过程和钢水冶炼过程示意图;Figure 6 is a schematic diagram of the shaft charging process and the molten steel smelting process;

图7为出钢后剩余钢水量和卸料器、送料槽送料过程示意图;Figure 7 is a schematic diagram of the remaining molten steel amount after tapping and the feeding process of the unloader and feeding chute;

图8为采用料斗上料的冶炼过程示意图。Figure 8 is a schematic diagram of the smelting process using hopper loading.

图中附图标记:10、竖井;11、烟气管道;12、烟气分析组件;13、温度测量组件;14、燃料喷枪;15、助燃氧枪;16、壳体框架;20、卸料器;21、升降机构;211、连接件;22、烟气通孔;23、卸料辊;30、运料台车;31、送料槽;40、导向辊;41、伸缩杆;42、摆动杆;43、导向辊子;50、电弧炉;51、炉盖;52、导电横臂;53、集束氧枪;54、电极升降装置;55、旋转升降装置;56、下炉壳倾动机构;61、竖炉受料斗;62、第一密封滑板;63、第二密封滑板;70、料篮;71、传送导轨;72、料斗;73、升降车;74、倾倒机构;75、牵引装置;76、限位挡块;80、基座;81、限位锁定组件;82、密封组件。Reference numbers in the figure: 10. Shaft; 11. Flue gas pipe; 12. Flue gas analysis component; 13. Temperature measurement component; 14. Fuel spray gun; 15. Combustion oxygen gun; 16. Shell frame; 20. Unloading 21. Lifting mechanism; 211. Connectors; 22. Flue gas holes; 23. Unloading roller; 30. Material transport trolley; 31. Feed chute; 40. Guide roller; 41. Telescopic rod; 42. Swing Rod; 43. Guide roller; 50. Electric arc furnace; 51. Furnace cover; 52. Conductive cross arm; 53. Cluster oxygen lance; 54. Electrode lifting device; 55. Rotating lifting device; 56. Lower furnace shell tilting mechanism; 61 , Shaft furnace receiving hopper; 62. First sealing sliding plate; 63. Second sealing sliding plate; 70. Material basket; 71. Transfer guide rail; 72. Hopper; 73. Lifting vehicle; 74. Dumping mechanism; 75. Traction device; 76 , limit stop; 80, base; 81, limit lock component; 82, seal component.

具体实施方式Detailed ways

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。It should be noted that, as long as there is no conflict, the embodiments and features in the embodiments of this application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and embodiments.

如图1至图7所示,本发明实施例提供了一种废钢预热装置,包括竖井10、卸料器20、运料台车30和导向辊40。竖井10的上端为进料口,竖井10的下端侧壁设置有出料口。卸料器20设置在竖井10内并能够沿竖直方向相对于竖井10运动,卸料器20具有朝向出料口倾斜的上表面。运料台车30能够振动运料,运料台车30的入口端与出料口密封连接,运料台车30的出口端与电弧炉50连接。导向辊40设置于出料口并位于运料台车30的入口端上侧,导向辊40能够控制出料口的开度。As shown in FIGS. 1 to 7 , an embodiment of the present invention provides a scrap steel preheating device, including a shaft 10 , an unloader 20 , a transport trolley 30 and a guide roller 40 . The upper end of the shaft 10 is a feed port, and the lower end side wall of the shaft 10 is provided with a discharge port. The unloader 20 is disposed in the shaft 10 and can move in a vertical direction relative to the shaft 10 . The unloader 20 has an upper surface inclined toward the discharge opening. The material transporting trolley 30 can vibrate and transport materials. The inlet end of the material transporting trolley 30 is sealingly connected to the discharge port, and the outlet end of the material transporting trolley 30 is connected to the electric arc furnace 50 . The guide roller 40 is disposed at the discharge port and is located above the entrance end of the material transport trolley 30 . The guide roller 40 can control the opening of the discharge port.

本发明首次提出利用卸料器20和运料台车30进行废钢加入的方式,取消传统设计中利用通水冷却的手指状阀组机构,避免由于废钢原料下落冲击造成手指类机构变形和开裂导致的设备漏水的弊端,同时取消了推钢机构,减小了推钢结构的大型框架和液压机构,利用卸料器20的倾斜上表面实现废钢的下落,结合运料台车30的振动送料,实现废钢的连续加入。The present invention proposes for the first time a method of adding scrap steel using the unloader 20 and the transport trolley 30, eliminating the finger-shaped valve group mechanism that is cooled by water in the traditional design, and avoiding deformation and cracking of the finger-type mechanism due to the impact of the falling scrap raw materials. The disadvantages of equipment leakage are eliminated, and the steel pushing mechanism is eliminated. The large frame and hydraulic mechanism of the steel pushing structure are reduced. The inclined upper surface of the unloader 20 is used to realize the falling of scrap steel. Combined with the vibration feeding of the transport trolley 30, Realize the continuous addition of scrap steel.

需要说明的是,上述竖井10、卸料器20和运料台车30均设置在基座80上,在卸料器20与电弧炉50之间设置有密封组件82。It should be noted that the above-mentioned shaft 10 , unloader 20 and material transport trolley 30 are all arranged on the base 80 , and a sealing assembly 82 is arranged between the unloader 20 and the electric arc furnace 50 .

上述运料台车30底部安装有行走轮,基座80靠近电弧炉50的位置设置有限位锁定组件81,能够对运料台车30进行限位固定,同时能够锁定运料台车30,避免送料槽31送料过程中发生运料台车30移动的情况。The above-mentioned material transport trolley 30 is equipped with running wheels at the bottom, and the base 80 is provided with a limit locking assembly 81 at a position close to the electric arc furnace 50, which can limit and fix the material transport trolley 30 and at the same time lock the material transport trolley 30 to avoid During the feeding process of the feeding chute 31, the material transport trolley 30 moves.

导向辊40包括伸缩杆41、摆动杆42和导向辊子43,伸缩杆41的一端与竖井10的壳体框架16铰接,伸缩杆41另一端与导向辊子43的转动中心铰接,摆动杆42的一端与竖井10的壳体框架16铰接,摆动杆42另一端与导向辊子43的转动中心铰接,且伸缩杆41的一端与摆动杆42的一端错位设置。The guide roller 40 includes a telescopic rod 41, a swing rod 42 and a guide roller 43. One end of the telescopic rod 41 is hinged with the housing frame 16 of the shaft 10. The other end of the telescopic rod 41 is hinged with the rotation center of the guide roller 43. One end of the swing rod 42 It is hinged with the shell frame 16 of the shaft 10 , the other end of the swing rod 42 is hinged with the rotation center of the guide roller 43 , and one end of the telescopic rod 41 is offset from one end of the swing rod 42 .

废钢预热装置还包括升降机构21,升降机构21设置在卸料器20的下方并能够驱动卸料器20沿竖直方向相对于竖井10运动。升降机构21与卸料器20通过连接件211连接。The scrap steel preheating device also includes a lifting mechanism 21. The lifting mechanism 21 is arranged below the unloader 20 and can drive the unloader 20 to move in the vertical direction relative to the shaft 10. The lifting mechanism 21 and the unloader 20 are connected through a connecting piece 211.

卸料器20能够进行高度方向的调节,通过调节卸料器20的高度,通过卸料器20和导向辊40的共同作用,实现不同的卸料速度;同时,上述导向辊子43可以封闭出料口,以达到停止送料的目的。运料台车30可以水平方向移动,可以调节运料台车30的振动频率和幅度,控制不同的废钢落下位置。The unloader 20 can be adjusted in the height direction. By adjusting the height of the unloader 20 and through the joint action of the unloader 20 and the guide roller 40, different discharge speeds can be achieved; at the same time, the above-mentioned guide roller 43 can seal the discharge. mouth to achieve the purpose of stopping feeding. The material transport trolley 30 can move in the horizontal direction, and the vibration frequency and amplitude of the material transport trolley 30 can be adjusted to control different scrap steel falling positions.

优选地,运料台车30在水平方向可以移动,实现送料槽31的动态调节废钢抛落位置;上部的送料槽31采用可伸缩的结构设计,当运料台车30无法满足废钢抛落位置要求时,通过调节送料槽31的长度实现废钢抛落位置的动态调节。运料台车30的送料槽31可以采用机械振动的形式进行废钢的水平输送,也可采用链篦机的形式进行输送。运料台车30采用变频电机,实现送料槽振动幅度和频率的动态调节,满足不同的加料速度要求,加料能力控制在0.4~4.5吨/分钟的加料速度。运料台车30的送料槽31可以采用U形结构,同时沿U形槽内壁加工成田字形凸起,增加送料槽31对废钢的摩擦力,避免废钢的打滑和翻滚。Preferably, the material transport trolley 30 can move in the horizontal direction to realize dynamic adjustment of the scrap steel dropping position of the feeding chute 31; the upper feeding chute 31 adopts a telescopic structural design, when the material transport trolley 30 cannot meet the scrap steel dropping position When required, the scrap throwing position can be dynamically adjusted by adjusting the length of the feeding chute 31. The feeding chute 31 of the material transport trolley 30 can use mechanical vibration to transport scrap steel horizontally, or can also use a grate machine to transport scrap steel. The material transport trolley 30 uses a variable frequency motor to realize dynamic adjustment of the vibration amplitude and frequency of the feeding trough to meet different feeding speed requirements, and the feeding capacity is controlled at a feeding speed of 0.4 to 4.5 tons/minute. The feeding chute 31 of the material transport trolley 30 can adopt a U-shaped structure, and at the same time, a field-shaped protrusion is processed along the inner wall of the U-shaped chute to increase the friction of the feeding chute 31 to the scrap steel and prevent the scrap steel from slipping and rolling.

如图1所示,卸料器20的上端设置有多个卸料辊23,多个卸料辊23间隔均布并形成卸料器20的上表面。利用卸料辊23的旋转可以促进废钢下落至运料台车30的送料槽31,使废钢更加容易运送,以达到取消了推钢机构,减小了推钢结构的大型框架和液压机构的目的。As shown in FIG. 1 , a plurality of discharge rollers 23 are provided at the upper end of the unloader 20 . The plurality of discharge rollers 23 are evenly spaced and form the upper surface of the unloader 20 . The rotation of the discharge roller 23 can promote the scrap steel to fall to the feeding chute 31 of the transport trolley 30, making the scrap steel easier to transport, thereby eliminating the steel pushing mechanism and reducing the large frame and hydraulic mechanism of the steel pushing structure. .

本发明实施例中,卸料器20上表面采用倾斜的布置形式,上表面与水平面夹角在30°~60°。In the embodiment of the present invention, the upper surface of the unloader 20 adopts an inclined arrangement, and the angle between the upper surface and the horizontal plane is between 30° and 60°.

卸料器20朝向出料口的侧壁上设置有用于预热烟气通过的烟气通孔22,烟气通孔22分别连接卸料器20的上表面上方和电弧炉50的入口。竖井10的进料口下侧设置有烟气管道11,烟气管道11处设置有烟气分析组件12和温度测量组件13。竖井10内设置有燃料喷枪14和助燃氧枪15,燃料喷枪14和助燃氧枪15均位于进料口下方并位于卸料器20上方。The side wall of the unloader 20 facing the discharge port is provided with a flue gas through hole 22 for the passage of preheated flue gas. The flue gas through hole 22 is respectively connected to the upper surface of the unloader 20 and the inlet of the electric arc furnace 50 . A flue gas duct 11 is provided on the lower side of the feed opening of the shaft 10 , and a flue gas analysis component 12 and a temperature measurement component 13 are disposed at the flue gas duct 11 . A fuel spray gun 14 and a combustion-supporting oxygen gun 15 are provided in the shaft 10 . The fuel spray gun 14 and the combustion-supporting oxygen gun 15 are both located below the feed port and above the unloader 20 .

优选地,导向辊40采用多孔的设计,内部中空的形式能够使高温烟气通过,烟气可以通过导向辊40、卸料器20上部进入竖井10,实现烟气的顺畅流动。导向辊40同时能够控制送料槽31上废钢的高度,实现废钢在输送槽上均匀水平分布。Preferably, the guide roller 40 adopts a porous design, and the internal hollow form allows high-temperature flue gas to pass through. The flue gas can enter the shaft 10 through the guide roller 40 and the upper part of the unloader 20 to achieve smooth flow of the flue gas. The guide roller 40 can also control the height of scrap steel on the feeding trough 31 to achieve uniform horizontal distribution of scrap steel on the feeding trough.

送料槽31的侧壁的高度大于200mm,在送料过程中避免废钢由于翻滚、振动等由送料槽31侧壁掉落的可能性。The height of the side wall of the feeding chute 31 is greater than 200 mm, which avoids the possibility of scrap steel falling from the side wall of the feeding chute 31 due to rolling, vibration, etc. during the feeding process.

随着电弧炉50内钢水的冶炼,电弧炉50炉膛内部形成大量高温烟气(烟气温度在1300~1600℃),高温烟气沿着卸料器20的烟气通孔22、多个卸料辊23的夹缝和上部空腔进入竖井10,在竖井10内部对废钢进行预热,利用竖井10上安装的烟气分析组件12和温度测量组件13监测和检测烟气温度和烟气主要成分,根据烟气温度和烟气成分,调节燃料喷枪14和助燃氧枪15保证废钢预热温度达到工艺要求的前提下,调节废钢的装入速度,随着废钢持续的加入和冶炼的不断进行,电弧炉50内产生的大量高温烟气持续对废钢预热,同时可以关闭燃料喷枪14和助燃氧枪15。As the molten steel in the electric arc furnace 50 is smelted, a large amount of high-temperature flue gas (flue gas temperature is between 1300 and 1600° C.) is formed inside the furnace of the electric arc furnace 50 . The gap and the upper cavity of the material roller 23 enter the shaft 10, and the scrap steel is preheated inside the shaft 10. The flue gas analysis component 12 and the temperature measurement component 13 installed on the shaft 10 are used to monitor and detect the flue gas temperature and the main components of the flue gas. , according to the flue gas temperature and flue gas composition, adjust the fuel lance 14 and the combustion oxygen lance 15 to ensure that the scrap steel preheating temperature reaches the process requirements, adjust the scrap steel loading speed, with the continuous addition of scrap steel and the continuous progress of smelting, The large amount of high-temperature flue gas generated in the electric arc furnace 50 continues to preheat the scrap steel, and at the same time, the fuel lance 14 and the combustion oxygen lance 15 can be closed.

需要说明的是,针对电弧炉50冶炼的第一炉钢,由于电弧炉50炉缸内没有钢水和烟气,需要开启竖井10上的燃料喷枪14和助燃氧枪15进行废钢加热,同时继续加入废钢。当竖井10下部废钢温度达到600℃时,降低卸料器20,开启运料台车30的振动机构,开启卸料器20顶部的卸料辊23,利用卸料辊23的旋转促进废钢下落至运料台车30的送料槽31,利用运料台车30的振动将废钢输送进入电弧炉;同时导向辊40能够在驱动机构的作用下上下运动,避免废钢原料撞击出料口位置,上述导向辊40根据工艺要求,具有封闭出料口的作用。It should be noted that for the first heat of steel smelted by the electric arc furnace 50, since there is no molten steel and flue gas in the hearth of the electric arc furnace 50, it is necessary to open the fuel lance 14 and the combustion oxygen lance 15 on the shaft 10 to heat the scrap while continuing to add Scrap steel. When the temperature of the scrap steel in the lower part of the shaft 10 reaches 600°C, the unloader 20 is lowered, the vibration mechanism of the transport trolley 30 is turned on, the discharge roller 23 on the top of the unloader 20 is turned on, and the rotation of the discharge roller 23 is used to promote the scrap steel to fall to The feeding chute 31 of the transport trolley 30 uses the vibration of the transport trolley 30 to transport the scrap steel into the electric arc furnace; at the same time, the guide roller 40 can move up and down under the action of the driving mechanism to prevent the scrap steel raw materials from hitting the outlet position. The above-mentioned guide The roller 40 has the function of closing the discharge port according to the process requirements.

本发明实施例中,竖井10的进料口处设置有用于进料的进料组件。其中该进料组件包括竖炉受料斗61、第一密封滑板62和第二密封滑板63。竖炉受料斗61呈漏斗状结构,竖炉受料斗61的小径端与进料口连接,竖炉受料斗61的大径端沿竖直方向位于竖炉受料斗61的小径端的上方。第一密封滑板62设置在竖炉受料斗61的大径端并能够控制竖炉受料斗61的大径端的开闭。第二密封滑板63设置在竖炉受料斗61的小径端并能够控制竖炉受料斗61的小径端的开闭,且第一密封滑板62和第二密封滑板63能够独立运动。In the embodiment of the present invention, a feeding assembly for feeding material is provided at the feeding inlet of the shaft 10 . The feeding assembly includes a shaft furnace hopper 61 , a first sealing slide 62 and a second sealing slide 63 . The shaft furnace receiving hopper 61 has a funnel-shaped structure. The small diameter end of the shaft furnace receiving hopper 61 is connected to the feed port. The large diameter end of the shaft furnace receiving hopper 61 is located above the small diameter end of the shaft furnace receiving hopper 61 in the vertical direction. The first sealing slide plate 62 is provided at the large diameter end of the shaft furnace receiving hopper 61 and can control the opening and closing of the large diameter end of the shaft furnace receiving hopper 61 . The second sealing sliding plate 63 is provided at the small diameter end of the shaft furnace receiving hopper 61 and can control the opening and closing of the small diameter end of the shaft furnace receiving hopper 61, and the first sealing sliding plate 62 and the second sealing sliding plate 63 can move independently.

操作时,通过天车将承载废钢炉料的料篮70运送至竖炉受料斗61上方,打开第一密封滑板62,关闭第二密封滑板63,将废钢原料加入到竖炉受料斗61内,同时将卸料器20升至最高位置,关闭第一密封滑板62,打开第二密封滑板63,废钢原料逐渐下落至竖井10的下段,并形成废钢堆积区,后续下落的废钢逐渐下落在之前下落的废钢上面。During operation, the basket 70 carrying the scrap steel charge is transported to the top of the shaft furnace hopper 61 through the crane, the first sealing slide 62 is opened, the second sealing slide 63 is closed, and the scrap raw materials are added into the shaft furnace hopper 61. The unloader 20 is raised to the highest position, the first sealing slide 62 is closed, and the second sealing slide 63 is opened. The scrap steel raw materials gradually fall to the lower section of the shaft 10 and form a scrap steel accumulation area. The subsequent falling scrap steel gradually falls on the previously fallen scrap. Scrap steel above.

当然,进料组件并不限于上述实施例,如图8所示,进料组件包括传送导轨71、料斗72、升降车73、倾倒机构74、牵引装置75和限位挡块76。Of course, the feeding assembly is not limited to the above embodiment. As shown in FIG. 8 , the feeding assembly includes a conveying guide rail 71 , a hopper 72 , a lifting vehicle 73 , a dumping mechanism 74 , a traction device 75 and a limiting block 76 .

传送导轨71倾斜设置并连接进料口与地面料堆。升降车73设置在传送导轨71上并能够随传送导轨71移动,上述料斗72设置在升降车73上并通过倾倒机构74与升降车73连接。上述牵引装置75设置在传送导轨71的上端并能够驱动传送导轨71移动,限位挡块76能够限制升降车73的移动位移。上述料斗72能够将废钢倾倒进竖井10中,其他结构均与在先实施例中相同,此处不再赘述。The conveying guide rail 71 is arranged obliquely and connects the feed port and the floor material pile. The lifting car 73 is disposed on the conveying guide rail 71 and can move along with the conveying guide rail 71 . The above-mentioned hopper 72 is disposed on the lifting car 73 and is connected to the lifting car 73 through the dumping mechanism 74 . The above-mentioned traction device 75 is disposed at the upper end of the transmission guide rail 71 and can drive the transmission guide rail 71 to move, and the limiting stop 76 can limit the movement displacement of the lifting vehicle 73 . The above-mentioned hopper 72 can dump the scrap steel into the shaft 10, and other structures are the same as in the previous embodiments and will not be described again here.

进一步地,本发明可以采用料篮上料的方式,也可采用倾斜料斗上料的形式,也可采用阶梯型链斗输送机的形式将废钢原料加入到竖井受料料斗内。上料机构也可采用皮带运输机进行连续上料。Further, the present invention can adopt the method of loading the material in the basket, the form of the inclined hopper, or the form of the ladder chain bucket conveyor to add the scrap steel raw materials into the shaft receiving hopper. The feeding mechanism can also use a belt conveyor for continuous feeding.

需要说明的是,卸料辊23、导向辊40、运料台车30的振动工作面选用耐高温的耐磨材质,优选耐热钢和耐热合金,延长设备使用寿命,同时上述耐磨部件采用局部安装的方式,可以实现磨损后的局部更换,降低了设备的运行成本。It should be noted that the vibrating working surfaces of the discharge roller 23, the guide roller 40, and the transport trolley 30 are made of high-temperature-resistant wear-resistant materials, preferably heat-resistant steel and heat-resistant alloys, to extend the service life of the equipment. At the same time, the above-mentioned wear-resistant parts The partial installation method can realize partial replacement after wear and tear, which reduces the operating cost of the equipment.

本发明还提供了一种电弧熔化设备,包括电弧炉50和上述的废钢预热装置,电弧炉50的入口与运料台车30的出口连接。The present invention also provides an electric arc melting equipment, which includes an electric arc furnace 50 and the above-mentioned scrap steel preheating device. The entrance of the electric arc furnace 50 is connected to the exit of the material transport trolley 30 .

其中,本发明实施例中上述电弧炉50包括主要包括炉底、炉壳、炉墙、炉盖51、电极和导电横臂52、电极升降装置54、炉盖支撑框架、承重构件、旋转升降装置55、下炉壳倾动机构56。具体连接结构与现有技术中电弧炉的结构相似,此处不再进行赘述。Among them, in the embodiment of the present invention, the above-mentioned electric arc furnace 50 mainly includes a furnace bottom, a furnace shell, a furnace wall, a furnace lid 51, an electrode and a conductive cross arm 52, an electrode lifting device 54, a furnace lid support frame, a load-bearing member, and a rotating lifting device. 55. Lower furnace shell tilting mechanism 56. The specific connection structure is similar to the structure of the electric arc furnace in the prior art, and will not be described again here.

在工作时,随着电弧炉50内废钢的持续加入,废钢落入钢水熔池内,钢水熔池对废钢进行加热和熔化,同时开启电弧炉50侧壁上的集束氧枪53,对钢水进行吹氧,根据实际需要,可利用侧壁碳枪向炉膛内部喷入碳粉,利用集束氧枪53和碳枪对熔池进行搅拌、增碳、氧化等操作。During operation, as the scrap steel in the electric arc furnace 50 continues to be added, the scrap steel falls into the molten steel pool, and the molten steel molten pool heats and melts the scrap steel. At the same time, the cluster oxygen lance 53 on the side wall of the electric arc furnace 50 is turned on to blow the molten steel. Oxygen, according to actual needs, the side wall carbon gun can be used to inject carbon powder into the furnace, and the cluster oxygen gun 53 and the carbon gun can be used to stir, carburize, oxidize and other operations on the molten pool.

随着电弧炉50内钢水的冶炼,当炉缸内的钢水质量、温度和成分达到目标要求后,驱动旋转升降装置55,将炉盖51上升一定高度,实现炉盖51与炉壁的小间隙分离,驱动与电弧炉下炉壳框架连接的下炉壳倾动机构56,倾动下炉壳,利用炉缸底部的出钢口进行出钢操作,将满足后续工艺要求的钢水浇注入钢水包内,钢包内钢水达到预定质量后,同时炉缸内保留预定的剩余钢水,调整与下炉壳框架连接的下炉壳倾动机构56,将电弧炉调整为冶炼状态;在电弧炉出钢过程中可继续对竖井10进行废钢加入和废钢预热,同时预热到预定温度的废钢持续加入炉缸,电极无需进行升降和断电,实现废钢原料持续加入电弧炉炉缸。As the molten steel in the electric arc furnace 50 is smelted, when the quality, temperature and composition of the molten steel in the furnace furnace reach the target requirements, the rotating lifting device 55 is driven to raise the furnace cover 51 to a certain height to achieve a small gap between the furnace cover 51 and the furnace wall. Separate, drive the lower furnace shell tilting mechanism 56 connected to the lower furnace shell frame of the electric arc furnace, tilt the lower furnace shell, use the tapping port at the bottom of the furnace to perform the steel tapping operation, and pour molten steel that meets the subsequent process requirements into the molten steel ladle. After the molten steel in the ladle reaches a predetermined quality, and a predetermined remaining molten steel is retained in the furnace, the lower furnace shell tilting mechanism 56 connected to the lower furnace shell frame is adjusted to adjust the electric arc furnace to the smelting state; the electric arc furnace can continue to tap during the tapping process. Scrap steel is added to the shaft 10 and scrap steel is preheated. At the same time, scrap steel preheated to a predetermined temperature is continuously added to the furnace hearth. The electrode does not need to be raised, lowered or powered off, so that scrap steel raw materials can be continuously added to the electric arc furnace hearth.

上一个出钢操作完成后,废钢持续加热,电极持续加热,废钢持续加入熔池中,利用保留的液态钢水继续熔化废钢,废钢持续熔化形成更大的熔池,随着钢水的继续增加,达到预定钢水质量、温度和成分后可以进行出钢操作,出钢操作完成后电弧炉进入下一个冶炼周期。竖井10可以实现无间歇持续加料和废钢预热,电弧炉50能够实现无间歇废钢加入炉缸和电极无间歇加热,冶炼合格的钢水实现稳定周期出钢和预定的剩余钢水,满足后续工序的需求。After the last tapping operation is completed, the scrap steel continues to be heated, the electrodes continue to heat, the scrap steel continues to be added to the molten pool, and the retained liquid molten steel is used to continue to melt the scrap steel. The scrap steel continues to melt to form a larger molten pool. As the molten steel continues to increase, it reaches After predetermining the quality, temperature and composition of the molten steel, the tapping operation can be carried out. After the tapping operation is completed, the electric arc furnace enters the next smelting cycle. Shaft 10 can realize non-intermittent continuous feeding and scrap preheating. Electric arc furnace 50 can realize non-intermittent feeding of scrap steel into the furnace and non-intermittent heating of electrodes. The smelting of qualified molten steel can achieve stable periodic tapping and predetermined remaining molten steel to meet the needs of subsequent processes. .

本发明实施例还提供了一种预热方法,包括以下步骤:An embodiment of the present invention also provides a preheating method, which includes the following steps:

步骤10、将卸料器20升至设定最高位置,并通过进料口向竖井10中加入废钢形成废钢堆积区;Step 10: Raise the unloader 20 to the set highest position, and add scrap steel into the shaft 10 through the feed port to form a scrap steel accumulation area;

步骤20、开启燃料喷枪14和助燃氧枪15对废钢堆积区进行加热;Step 20: Turn on the fuel spray gun 14 and the combustion oxygen gun 15 to heat the scrap steel accumulation area;

步骤30、待废钢堆积区加热到设定温度时,降低卸料器20使废钢堆积区与出料口连接,同时开启运料台车30向电弧炉50中运送废钢,其中,通过卸料器20和导向辊40控制出料口的出钢速度;Step 30: When the scrap steel accumulation area is heated to the set temperature, lower the unloader 20 to connect the scrap steel accumulation area with the discharge port, and at the same time open the transport trolley 30 to transport scrap steel to the electric arc furnace 50, wherein, through the unloader 20 and guide roller 40 control the tapping speed of the discharge port;

步骤40、随着电弧炉50对废钢进行熔炼,电弧炉50内会产生大量高温烟气,高温烟气沿卸料器20的烟气通孔22和卸料器20的上端设置有多个辊子间隙对废钢堆积区进行预热;Step 40: As the electric arc furnace 50 melts scrap steel, a large amount of high-temperature flue gas will be generated in the electric arc furnace 50. The high-temperature flue gas is provided with multiple rollers along the flue gas through hole 22 of the unloader 20 and the upper end of the unloader 20. Preheat the scrap steel accumulation area in the gap;

步骤50、通过烟气分析组件12和温度测量组件13的测量结果调节燃料喷枪14和助燃氧枪15的开度;Step 50: Adjust the openings of the fuel spray gun 14 and the combustion oxygen gun 15 through the measurement results of the flue gas analysis component 12 and the temperature measurement component 13;

步骤60、待电弧炉50内钢水达到设定要求后,对电弧炉50进行出钢操作;Step 60: After the molten steel in the electric arc furnace 50 reaches the set requirement, tap the electric arc furnace 50;

步骤70、依次循环步骤10、步骤30、步骤40、步骤50和步骤60。Step 70: Repeat step 10, step 30, step 40, step 50 and step 60 in sequence.

步骤10和步骤20具体如下,参照附图1和附图2所示,The details of steps 10 and 20 are as follows, as shown in Figure 1 and Figure 2,

通过天车将承载废钢炉料的料篮70运送至竖井10上方,打开第一密封滑板62,关闭第二密封滑板63,将废钢原料加入到竖炉受料斗61内,同时将卸料器20升至最高位置,利用导向辊40和卸料器20针对竖井10的出料口进行密封。然后关闭第一密封滑板62,打开第二密封滑板63,废钢原料逐渐下落至竖井下段,并形成废钢堆积区。The basket 70 carrying the scrap steel charge is transported to the top of the shaft 10 through the crane, the first sealing slide 62 is opened, the second sealing slide 63 is closed, the scrap steel raw materials are added into the shaft furnace hopper 61, and at the same time, the unloader 20 liters To the highest position, the guide roller 40 and the discharger 20 are used to seal the outlet of the shaft 10 . Then the first sealing slide 62 is closed, the second sealing slide 63 is opened, and the scrap steel raw materials gradually fall to the lower section of the shaft, and a scrap steel accumulation area is formed.

针对电弧炉50冶炼的第一炉钢,由于电弧炉50炉缸内没有钢水和烟气,开启竖井10上的燃料喷枪14和助燃氧枪15进行废钢加热,同时继续加入废钢;竖炉受料斗61中的废钢持续加入竖井10内。步骤30具体操作参照附图3和附图4所示,当竖井10下部废钢温度达到600℃时,降低卸料器20,开启运料台车30的振动机构,开启卸料器20顶部的卸料辊23,利用卸料辊23的旋转促进废钢下落至运料台车30,利用运料台车30的振动将废钢输送进入电弧炉。For the first heat of steel smelted by the electric arc furnace 50, since there is no molten steel and flue gas in the hearth of the electric arc furnace 50, the fuel lance 14 and the combustion oxygen lance 15 on the shaft 10 are turned on to heat the scrap steel, while continuing to add scrap steel; the shaft furnace receives the hopper Scrap steel in 61 continues to be added to shaft 10. The specific operation of step 30 is shown in Figure 3 and Figure 4. When the temperature of the scrap steel in the lower part of the shaft 10 reaches 600°C, lower the unloader 20, turn on the vibration mechanism of the transport trolley 30, and turn on the unloader on the top of the unloader 20. The material roller 23 uses the rotation of the discharge roller 23 to promote the scrap steel to fall to the material transport trolley 30, and uses the vibration of the material transport trolley 30 to transport the scrap steel into the electric arc furnace.

同时料篮70的废钢原料可以加入到竖炉受料斗61中;导向辊40能够在驱动机构的作用下上下运动,避免废钢原料撞击出口位置;同时根据工艺要求,具有封闭竖炉排料口的作用。参照附图5所示,竖井10内的废钢下降到一定高度时,关闭第二密封滑板63,开启第一密封滑板62,利用天车将装载废钢原料的料篮70吊运至竖炉受料斗61的上部,开启料篮70的底部放料机构,将废钢原料加入竖井10上部的竖炉受料斗61内,废钢完全落入竖炉受料斗61后关闭第一密封滑板62,开启第二密封滑板63,将废钢原料加入竖井10内。At the same time, the scrap steel raw materials in the basket 70 can be added to the shaft furnace hopper 61; the guide roller 40 can move up and down under the action of the driving mechanism to prevent the scrap steel raw materials from hitting the exit position; at the same time, according to the process requirements, there is a closed shaft furnace discharge port effect. Referring to Figure 5, when the scrap steel in the shaft 10 drops to a certain height, the second sealing slide 63 is closed, the first sealing slide 62 is opened, and the basket 70 loaded with scrap steel raw materials is lifted by the overhead crane to the shaft furnace hopper. 61, open the bottom discharging mechanism of the basket 70, and add the scrap steel raw materials into the shaft furnace receiving hopper 61 at the upper part of the shaft 10. After the scrap steel completely falls into the shaft furnace receiving hopper 61, close the first sealing slide 62 and open the second sealing The sliding plate 63 adds scrap steel raw materials into the shaft 10 .

卸料器20能够进行高度方向的调节,通过调节卸料器20的高度并利用导向辊40的共同作用,实现不同的卸料速度。运料台车30可以水平方向移动,可以调节运料台车30的振动频率和幅度,控制不同的废钢落下位置,落入炉缸底部的废钢在炉底堆积,当废钢原料在炉底堆积到预定的数量时,启动电极升降装置54,降低电极高度,通电对废钢进行加热,随着电弧的持续加热,废钢逐渐熔化,在炉缸底部形成液态熔池,在钢水熔池表面形成泡沫渣层,电弧埋没在泡沫渣中进行持续加热。The unloader 20 can be adjusted in the height direction. By adjusting the height of the unloader 20 and utilizing the cooperation of the guide rollers 40, different unloading speeds can be achieved. The transport trolley 30 can move in the horizontal direction, and the vibration frequency and amplitude of the transport trolley 30 can be adjusted to control different scrap falling positions. The scrap steel falling into the bottom of the furnace is accumulated at the bottom of the furnace. When the scrap steel raw materials are accumulated at the bottom of the furnace, When the predetermined amount is reached, the electrode lifting device 54 is started to lower the height of the electrode, and electricity is applied to heat the scrap steel. As the arc continues to be heated, the scrap steel gradually melts, forming a liquid molten pool at the bottom of the furnace and a foamed slag layer on the surface of the molten steel molten pool. , the arc is buried in the foam slag for continuous heating.

随着废钢的持续加入,竖井10内的废钢完全装入电弧炉后,竖井10内无待预热废钢,停止卸料器20的卸料动作。As the scrap steel continues to be added, after the scrap steel in the shaft 10 is completely loaded into the electric arc furnace, there is no scrap steel to be preheated in the shaft 10, and the unloading action of the unloader 20 is stopped.

步骤40和步骤50参照附图6所示,利用升降机构21将卸料器20升至最高位置,同时利用卸料器20和导向辊40进行竖井10底部的密封,关闭第二密封滑板63,开启第一密封滑板62,利用天车将装载废钢原料的料篮70吊运至竖炉受料斗61的上部,开启料篮70的底部放料机构,将废钢原料加入竖井上部的竖炉受料斗61内,废钢完全落入受料漏斗后关闭第一密封滑板62,开启第二密封滑板63,将废钢原料加入竖井10内。Steps 40 and 50 are shown in Figure 6. The lifting mechanism 21 is used to lift the unloader 20 to the highest position. At the same time, the unloader 20 and the guide roller 40 are used to seal the bottom of the shaft 10, and the second sealing slide plate 63 is closed. Open the first sealing slide 62, use the crane to lift the basket 70 loaded with scrap steel raw materials to the upper part of the shaft furnace receiving hopper 61, open the bottom discharge mechanism of the basket 70, and add the scrap steel raw materials to the shaft furnace receiving hopper at the upper part of the shaft. 61, after the scrap steel completely falls into the receiving funnel, the first sealing slide plate 62 is closed, the second sealing slide plate 63 is opened, and the scrap steel raw materials are added into the shaft 10.

预定质量的废钢完全装入电弧炉后,钢水熔池对废钢进行加热和熔化,同时开启电弧炉侧壁上的集束氧枪53,对钢水进行吹氧,根据实际需要,可利用侧壁碳枪向炉膛内部喷入碳粉,利用集束氧枪53和碳枪对熔池进行搅拌、增碳、氧化等操作。After the scrap steel of the predetermined quality is completely loaded into the electric arc furnace, the molten steel pool heats and melts the scrap steel. At the same time, the cluster oxygen lance 53 on the side wall of the electric arc furnace is turned on to blow oxygen into the molten steel. According to actual needs, a side wall carbon gun can be used Inject carbon powder into the furnace, and use the cluster oxygen gun 53 and the carbon gun to stir, carburize, oxidize and other operations on the molten pool.

随着电弧炉内钢水的冶炼,电弧炉50的炉膛内部形成大量高温烟气,高温烟气沿着烟气通孔22、卸料辊23间隙和上部空腔进入竖井10,在竖井内部对废钢进行预热,利用竖井10安装的烟气分析组件12和温度测量组件13监测和检测烟气温度和烟气主要成分,根据烟气温度和烟气成分,调节燃料喷枪14和助燃氧枪15保证废钢预热温度达到工艺要求的前提下,调节废钢的装入速度,随着废钢持续的加入和冶炼的不断进行,电弧炉50的炉膛内产生的大量高温烟气持续对废钢预热,同时可以关闭燃料喷枪14和助燃氧枪15。As the molten steel in the electric arc furnace is smelted, a large amount of high-temperature flue gas is formed inside the furnace of the electric arc furnace 50. The high-temperature flue gas enters the shaft 10 along the flue gas through hole 22, the gap and the upper cavity of the discharge roller 23, and scrap steel is processed inside the shaft. Perform preheating, use the flue gas analysis component 12 and temperature measurement component 13 installed in the shaft 10 to monitor and detect the flue gas temperature and main components of the flue gas, and adjust the fuel nozzle 14 and combustion oxygen gun 15 according to the flue gas temperature and flue gas components to ensure Under the premise that the scrap steel preheating temperature reaches the process requirements, the scrap loading speed is adjusted. As the scrap steel continues to be added and the smelting continues, a large amount of high-temperature flue gas generated in the furnace of the electric arc furnace 50 continues to preheat the scrap steel, and at the same time, the scrap steel can be preheated. Close the fuel spray gun 14 and the combustion oxygen gun 15.

步骤60和步骤70如图7所示,当炉缸内的钢水质量、温度和成分达到目标要求后,驱动炉盖升降装置52,将炉盖51上升一定高度,实现炉盖51与炉壁的小间隙分离,驱动与电弧炉下炉壳框架连接的提升装置56,倾动下炉壳,利用炉缸底部的出钢口进行出钢操作。将满足后续工艺要求的钢水浇注入钢水包内,钢包内钢水达到预定质量后,同时炉缸内保留预定的剩余钢水,调整与下炉壳框架连接的提升装置,将电弧炉调整为冶炼状态。在电弧炉出钢过程中可继续对竖井10进行废钢加入和废钢预热,同时预热到预定温度的废钢持续加入炉缸,电极无需进行升降和断电,实现废钢原料持续加入电弧炉50的炉缸。Steps 60 and 70 are shown in Figure 7. When the quality, temperature and composition of the molten steel in the furnace furnace reach the target requirements, the furnace cover lifting device 52 is driven to raise the furnace cover 51 to a certain height to achieve the alignment between the furnace cover 51 and the furnace wall. After the small gap is separated, the lifting device 56 connected to the lower furnace shell frame of the electric arc furnace is driven, the lower furnace shell is tilted, and the tapping port at the bottom of the furnace hearth is used to perform the tapping operation. The molten steel that meets the subsequent process requirements is poured into the molten steel ladle. After the molten steel in the ladle reaches the predetermined quality, the predetermined remaining molten steel is retained in the furnace. The lifting device connected to the lower furnace shell frame is adjusted to adjust the electric arc furnace to the smelting state. During the tapping process of the electric arc furnace, scrap steel can be continuously added to the shaft 10 and scrap steel is preheated. At the same time, the scrap steel preheated to a predetermined temperature is continuously added to the furnace hearth. The electrode does not need to be lifted or cut off, so that scrap steel raw materials can be continuously added to the electric arc furnace 50. hearth.

上一个出钢操作完成后,废钢持续预热,电极持续加热,废钢持续加入熔池中,利用保留的液态钢水继续熔化废钢,废钢持续熔化形成更大的熔池,随着钢水的继续增加,达到预定钢水质量、温度和成分后可以进行出钢操作,出钢操作完成后电弧炉进入下一个冶炼周期。竖井预热器可以实现无间歇持续加料和废钢预热,电弧炉能够实现无间歇废钢加入炉缸和电极无间歇加热,冶炼合格的钢水实现稳定周期出钢和预定的剩余钢水,满足后续工序的需求。从以上的描述中,可以看出,本发明上述的实施例实现了如下技术效果:After the last tapping operation is completed, the scrap steel continues to be preheated, the electrodes continue to heat, the scrap steel continues to be added to the molten pool, and the retained liquid molten steel is used to continue to melt the scrap steel. The scrap steel continues to melt to form a larger molten pool. As the molten steel continues to increase, After reaching the predetermined quality, temperature and composition of the molten steel, the tapping operation can be carried out. After the tapping operation is completed, the electric arc furnace enters the next smelting cycle. The shaft preheater can realize non-intermittent continuous feeding and scrap preheating. The electric arc furnace can realize non-intermittent adding of scrap steel into the furnace and non-intermittent heating of the electrodes. The smelting of qualified molten steel can achieve stable periodic tapping and predetermined remaining molten steel to meet the requirements of subsequent processes. need. From the above description, it can be seen that the above-mentioned embodiments of the present invention achieve the following technical effects:

本发明能够实现废钢的连续预热,同时能够利用燃料喷枪和助燃氧枪对冶炼的第一炉废钢进行预热,并且可通过烟气分析仪和温度测量仪对烟气温度进行测量,反馈控制助燃氧枪和燃料喷枪的输入量,同时针对烟气中的可燃气体进行燃烧放热,消除烟气中二噁英的有毒物的产生。The invention can realize continuous preheating of scrap steel, and at the same time can use the fuel spray gun and the combustion-supporting oxygen gun to preheat the scrap steel of the first furnace of smelting, and can measure the flue gas temperature through the flue gas analyzer and the temperature measuring instrument, and provide feedback control. The input amount of the combustion-supporting oxygen gun and the fuel spray gun simultaneously burns and releases heat for the combustible gases in the flue gas, eliminating the production of toxic substances such as dioxins in the flue gas.

本发明采用卸料器对下落的废钢进行捕获,实现废钢持续加热,持续自动下落的过程,取消了传统竖炉预热器的手指状阀组或其它形式的控制机构,避免废钢炉料下落过程的冲击引起手指状阀组漏水导致电弧炉停产的弊端。采用卸料器和运料台车进行废钢加入电弧炉的加料方式,卸料器上部安装卸料辊,利用卸料辊的旋转和倾斜表面实现废钢顺畅的下落,采用较小的驱动力和结构实现废钢原料的加料动作。The invention uses an unloader to capture the falling scrap steel, realizes continuous heating of the scrap steel, and continues the automatic falling process. It eliminates the finger-shaped valve group or other forms of control mechanisms of the traditional shaft furnace preheater and avoids the failure of the scrap steel charge during the falling process. Disadvantages of the electric arc furnace shutting down due to leakage from the finger valve group due to impact. An unloader and a transport trolley are used to feed scrap steel into the electric arc furnace. A discharge roller is installed on the upper part of the unloader. The rotation and tilting surface of the discharge roller are used to achieve smooth falling of scrap steel, and a smaller driving force and structure are used. Realize the feeding action of scrap steel raw materials.

卸料器的升降能够减小废钢对卸料辊的冲击,同时能够精确调节废钢的的卸料速度,由于导向辊和运料台车的配合使用,运料台车的送料速度可实时调节,实现废钢恒定速度或变化速度的连续加入,有利于实现加料的平稳性,减小了熔池液面的剧烈波动,利用卸料器的升降和导向辊的配合,同时能够根据需要停止废钢的加入,废钢能够完全密封竖炉排料口,实现废钢的停止加入。The lifting of the unloader can reduce the impact of scrap steel on the unloading roller, and at the same time, it can accurately adjust the unloading speed of scrap steel. Due to the cooperative use of the guide roller and the transport trolley, the feeding speed of the transport trolley can be adjusted in real time. Realizing the continuous addition of scrap steel at a constant speed or changing speed is conducive to the smoothness of the feeding and reducing the violent fluctuations of the molten pool liquid level. By utilizing the lifting and lowering of the unloader and the cooperation of the guide rollers, the addition of scrap steel can be stopped as needed. , the scrap steel can completely seal the discharge port of the shaft furnace and realize the stop of adding scrap steel.

运料台车可以具有称重功能,实现废钢加入量的精确记录和控制。The transport trolley can have a weighing function to accurately record and control the amount of scrap added.

以上所述,仅为本发明的具体实施例,不能以其限定发明实施的范围,所以其等同组件的置换,或依本发明专利保护范围所作的等同变化与修饰,都应仍属于本专利涵盖的范畴。另外,本发明中的技术特征与技术特征之间、技术特征与技术方案之间、技术方案与技术方案之间均可以自由组合使用。The above are only specific embodiments of the present invention and cannot be used to limit the scope of the invention. Therefore, the replacement of equivalent components, or equivalent changes and modifications made according to the patent protection scope of the present invention, should still be covered by this patent. category. In addition, the technical features in the present invention can be freely combined with each other, between technical features and technical solutions, and between technical solutions and technical solutions.

Claims (10)

1. A scrap steel preheating device, characterized by comprising:
the upper end of the vertical shaft (10) is provided with a feed inlet, and the side wall of the lower end of the vertical shaft (10) is provided with a discharge outlet;
-a discharger (20) arranged in the shaft (10) and movable in a vertical direction relative to the shaft (10), the discharger (20) having an upper surface inclined towards the discharge opening;
the material conveying trolley (30) can vibrate and convey materials, and the inlet end of the material conveying trolley (30) is connected with the discharge port;
the guide roller (40) is arranged at the discharge port and is positioned at the upper side of the inlet end of the material conveying trolley (30), and the opening degree of the discharge port can be controlled by the guide roller (40);
the guide roller (40) comprises a telescopic rod (41), a swinging rod (42) and a guide roller (43), one end of the telescopic rod (41) is hinged with the shell frame (16) of the vertical shaft (10), the other end of the telescopic rod (41) is hinged with the rotation center of the guide roller (43), one end of the swinging rod (42) is hinged with the shell frame (16) of the vertical shaft (10), the other end of the swinging rod (42) is hinged with the rotation center of the guide roller (43), and one end of the telescopic rod (41) is arranged in a staggered mode with one end of the swinging rod (42);
the upper end of the discharger (20) is provided with a plurality of discharge rollers (23), and the discharge rollers (23) are uniformly distributed at intervals to form the upper surface of the discharger (20);
the side wall of the discharger (20) facing the discharge hole is provided with a flue gas through hole (22) for preheating flue gas to pass through, and the flue gas through hole (22) is used for respectively connecting the upper part of the upper surface of the discharger (20) and the inlet of the electric arc furnace (50).
2. Scrap steel preheating device according to claim 1, characterized in that the lower side of the feed opening of the shaft (10) is provided with a flue gas duct (11), the flue gas duct (11) being provided with a flue gas analysis assembly (12) and a temperature measurement assembly (13).
3. Scrap steel preheating device according to claim 1, characterized in that it further comprises a lifting mechanism (21), which lifting mechanism (21) is arranged below the discharger (20) and is able to drive the discharger (20) in a vertical direction in relation to the shaft (10).
4. Scrap steel preheating device according to claim 1, characterized in that a fuel lance (14) and a combustion-supporting oxygen lance (15) are arranged in the shaft (10), both the fuel lance (14) and the combustion-supporting oxygen lance (15) being located below the feed opening and above the discharger (20).
5. Scrap steel preheating device according to claim 1, characterized in that the feed opening of the shaft (10) is provided with a feed assembly for feeding.
6. The scrap steel preheating device of claim 5 wherein the feed assembly includes:
a shaft furnace receiving hopper (61) in a funnel-shaped structure, wherein the small diameter end of the shaft furnace receiving hopper (61) is connected with the feeding hole, and the large diameter end of the shaft furnace receiving hopper (61) is positioned above the small diameter end of the shaft furnace receiving hopper (61) along the vertical direction;
a first seal slide plate (62) which is provided at the large diameter end of the shaft furnace receiving hopper (61) and can control the opening and closing of the large diameter end of the shaft furnace receiving hopper (61);
the second sealing slide plate (63) is arranged at the small diameter end of the shaft furnace receiving hopper (61) and can control the opening and closing of the small diameter end of the shaft furnace receiving hopper (61), and the first sealing slide plate (62) and the second sealing slide plate (63) can move independently.
7. The scrap steel preheating device of claim 5 wherein the feed assembly includes:
a conveying guide rail (71) which is obliquely arranged and connects the feed inlet and the ground material pile;
and a hopper (72) which is arranged on the conveying guide rail (71) and can move along with the conveying guide rail (71), wherein the hopper (72) can feed materials to the feeding hole.
8. An arc melting apparatus comprising an arc furnace (50) and a scrap preheating device, characterized in that the scrap preheating device is a scrap preheating device according to any one of claims 1 to 7, the inlet of the arc furnace (50) being connected to the outlet of the transporting trolley (30).
9. A preheating method, characterized in that the scrap steel preheating device according to any one of claims 1 to 7 is employed, comprising the steps of:
step 10, lifting a discharger (20) to a set highest position, and adding scrap steel into a vertical shaft (10) through a feed inlet to form a scrap steel accumulation area;
step 20, starting a fuel spray gun (14) and a combustion-supporting oxygen gun (15) to heat the scrap steel accumulation area;
step 30, when the scrap steel accumulation area is heated to a set temperature, reducing the discharger (20) to enable the scrap steel accumulation area to be connected with a discharge hole, and simultaneously starting a conveying trolley (30) to convey the scrap steel into an electric arc furnace (50);
step 40, along with smelting the scrap steel by the electric arc furnace (50), a large amount of high-temperature flue gas is generated in the electric arc furnace (50), and a plurality of roller gaps are arranged along the flue gas through holes (22) of the discharger (20) and the upper end of the discharger (20) to preheat the scrap steel stacking area;
step 50, adjusting the opening degrees of the fuel spray gun (14) and the combustion-supporting oxygen gun (15) according to the measurement results of the flue gas analysis assembly (12) and the temperature measurement assembly (13);
60, after the molten steel in the electric arc furnace (50) reaches a set requirement, tapping the electric arc furnace (50);
step 70, sequentially looping through the steps 10, 30, 40, 50 and 60.
10. The preheating method according to claim 9, characterized in that in said step 30, the tapping speed of the tap hole is controlled by means of the discharger (20) and guide rollers (40).
CN201910705777.0A 2019-08-01 2019-08-01 Scrap steel preheating device, arc melting equipment and preheating method Active CN110388830B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910705777.0A CN110388830B (en) 2019-08-01 2019-08-01 Scrap steel preheating device, arc melting equipment and preheating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910705777.0A CN110388830B (en) 2019-08-01 2019-08-01 Scrap steel preheating device, arc melting equipment and preheating method

Publications (2)

Publication Number Publication Date
CN110388830A CN110388830A (en) 2019-10-29
CN110388830B true CN110388830B (en) 2024-02-06

Family

ID=68288081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910705777.0A Active CN110388830B (en) 2019-08-01 2019-08-01 Scrap steel preheating device, arc melting equipment and preheating method

Country Status (1)

Country Link
CN (1) CN110388830B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110923394B (en) * 2019-11-28 2023-11-10 中冶京诚工程技术有限公司 Steelmaking apparatus and steelmaking method
CN113203284A (en) * 2021-04-15 2021-08-03 江苏迅隆铝业有限公司 Aluminum alloy continuous melting furnace for regenerating resin sand by using waste heat
CN113957201A (en) * 2021-11-15 2022-01-21 中冶京诚工程技术有限公司 Method for preheating magnetic suspension scrap steel and electric arc furnace steelmaking device capable of preheating magnetic suspension scrap steel
CN116162760B (en) * 2021-11-25 2025-02-28 中冶京诚工程技术有限公司 Continuous shaft scrap steel preheating device and electric furnace steelmaking equipment
CN116929067B (en) * 2023-09-19 2023-11-24 沈阳明腾科技有限公司 Automatic filling device and method for aluminum melting furnace

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1926397A (en) * 2003-11-27 2007-03-07 福斯技术股份公司 Feeding device, especially a charge preheater
CN203100422U (en) * 2013-02-22 2013-07-31 中冶赛迪工程技术股份有限公司 Electric-arc furnace continuously feeding device preheated by smoke
CN108866270A (en) * 2018-07-09 2018-11-23 中冶京诚工程技术有限公司 Steelmaking equipment
CN210802068U (en) * 2019-08-01 2020-06-19 中冶京诚工程技术有限公司 Scrap preheater and arc melting equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100359121B1 (en) * 1999-07-08 2002-11-04 닛폰 고칸 가부시키가이샤 Facility and method for arc-melting cold iron source

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1926397A (en) * 2003-11-27 2007-03-07 福斯技术股份公司 Feeding device, especially a charge preheater
CN203100422U (en) * 2013-02-22 2013-07-31 中冶赛迪工程技术股份有限公司 Electric-arc furnace continuously feeding device preheated by smoke
CN108866270A (en) * 2018-07-09 2018-11-23 中冶京诚工程技术有限公司 Steelmaking equipment
CN210802068U (en) * 2019-08-01 2020-06-19 中冶京诚工程技术有限公司 Scrap preheater and arc melting equipment

Also Published As

Publication number Publication date
CN110388830A (en) 2019-10-29

Similar Documents

Publication Publication Date Title
CN110388830B (en) Scrap steel preheating device, arc melting equipment and preheating method
CN110923394B (en) Steelmaking apparatus and steelmaking method
CN108642237A (en) Steelmaking equipment
CN211367630U (en) Steelmaking equipment
CN108866270A (en) Steelmaking equipment
CN103954133B (en) A kind of middle frequency furnace reinforced device of fluxing continuously
CN105132619B (en) Scrap steel preheating and continuous feeding system constructed based on waste heat recovering channel of electric-arc furnace and application method of system
CN201764828U (en) A short-process scrap steel preheating conveying device
JP2019517653A (en) Sealing feeding device for arc furnace and control method of smoke temperature
CN203080030U (en) Ring type roaster
CN111321272A (en) A steel making device and process for continuously preheating scrap steel
CN111518986B (en) Steelmaking method of scrap steel smelting system by utilizing primary combustion heat energy
CN210802068U (en) Scrap preheater and arc melting equipment
CN102181601A (en) Differential motion airtight feeding electric furnace smelting device and feeding method thereof
CN208472142U (en) Steelmaking equipment
KR20010021430A (en) Methods of heating the ladle
CN113604619A (en) Remote control thermal state wet method jetting lining manufacturing method
CN108624739B (en) Steelmaking equipment and smelting method for making steel from scrap steel
CN208472141U (en) Steelmaking equipment
CN105466212B (en) A kind of vertical heat exchange type alloy baking furnace system
CN220136058U (en) Copper smelting slag water continuous discharge device
CN116463468B (en) Rotary kiln system and method for reducing iron oxide using hydrogen
CN203687627U (en) Continuous fluxing and feeding device for medium-frequency furnace
CN108950132A (en) Electric furnace smelting device and method
CN212894803U (en) Preheating pre-reduction device for smelting reduction process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant