CN110397994A - An air conditioner bracket - Google Patents

An air conditioner bracket Download PDF

Info

Publication number
CN110397994A
CN110397994A CN201810373035.8A CN201810373035A CN110397994A CN 110397994 A CN110397994 A CN 110397994A CN 201810373035 A CN201810373035 A CN 201810373035A CN 110397994 A CN110397994 A CN 110397994A
Authority
CN
China
Prior art keywords
air conditioner
pillar
inserted terminal
plug
mounting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810373035.8A
Other languages
Chinese (zh)
Other versions
CN110397994B (en
Inventor
王晓燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Air Conditioner Gen Corp Ltd
Haier Smart Home Co Ltd
Original Assignee
Qingdao Haier Air Conditioner Gen Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Air Conditioner Gen Corp Ltd filed Critical Qingdao Haier Air Conditioner Gen Corp Ltd
Priority to CN201810373035.8A priority Critical patent/CN110397994B/en
Publication of CN110397994A publication Critical patent/CN110397994A/en
Application granted granted Critical
Publication of CN110397994B publication Critical patent/CN110397994B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/60Arrangement or mounting of the outdoor unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Air-Conditioning Systems (AREA)

Abstract

本发明公开了一种空调支架,属于空调安装技术领域。所述空调支架包括多个支柱单元,任意两个所述支柱单元之间通过主插接端和副插接端连接,所述主插接端设有第一折边,所述副插接端设有第二折边,所述主插接端和所述副插接端插接时,所述第一折边和所述第二折边贴合。本发明的有益效果:空调支架的支柱单元的主插接端的第一折边和副插接端的第二折边面面接触,可以减小应力集中,支柱单元的副插接端不易由于受到外力作用过大而发生变形,空调安装更为稳固。

The invention discloses an air conditioner bracket, which belongs to the technical field of air conditioner installation. The air conditioner support includes a plurality of pillar units, any two of the pillar units are connected through a main plug-in end and a secondary plug-in end, the main plug-in end is provided with a first hem, and the secondary plug-in end There is a second folded edge, and when the main plug-in end and the auxiliary plug-in end are plugged together, the first folded edge and the second folded edge are bonded together. Beneficial effects of the present invention: the first folded edge of the main plug-in end of the air-conditioning bracket is in contact with the second folded edge of the auxiliary plug-in end, which can reduce stress concentration, and the auxiliary plug-in end of the pillar unit is not easy to be subjected to external force If the effect is too large and deformation occurs, the air conditioner installation is more stable.

Description

一种空调支架An air conditioner bracket

技术领域technical field

本发明涉及空调安装技术领域,具体是一种空调支架。The invention relates to the technical field of air conditioner installation, in particular to an air conditioner bracket.

背景技术Background technique

现有的可进行插接安装的支架,支架的插接端的横截面小于被插接端的横截面,插接端插入被插接端,实现多个支架的首尾套插连接。采用此支架进行空调的安装时,可以根据实际情况选择不同数量的支架进行插接安装,达到高度调节的作用,但是,由于空调室外机的质量较大,支架的插接端插入被插接端后,被插接端容易由于受到外力作用过大而发生变形,导致插接端在被插接端发生位移,造成空调安装不稳固。In the existing bracket that can be plugged and installed, the cross section of the plugged end of the bracket is smaller than the cross section of the plugged end, and the plugged end is inserted into the plugged end to realize the end-to-end plug-in connection of multiple brackets. When using this bracket to install the air conditioner, you can choose different numbers of brackets for plug-in installation according to the actual situation, so as to achieve the effect of height adjustment. Finally, the plugged end is easily deformed due to excessive external force, resulting in displacement of the plugged end at the plugged end, resulting in unstable installation of the air conditioner.

发明内容Contents of the invention

本发明实施例提供了一种空调支架,旨在解决现有空调支架容易造成空调安装不稳固的问题。为了对披露的实施例的一些方面有一个基本的理解,下面给出了简单的概括。该概括部分不是泛泛评述,也不是要确定关键/重要组成元素或描绘这些实施例的保护范围。其唯一目的是用简单的形式呈现一些概念,以此作为后面的详细说明的序言。An embodiment of the present invention provides an air conditioner support, which aims to solve the problem that the existing air conditioner support easily causes the installation of the air conditioner to be unstable. In order to provide a basic understanding of some aspects of the disclosed embodiments, a brief summary is presented below. This summary is not an overview, nor is it intended to identify key/critical elements or delineate the scope of these embodiments. Its sole purpose is to present some concepts in a simplified form as a prelude to the more detailed description that is presented later.

根据本发明实施例,提供了一种空调支架,其包括多个支柱单元,任意两个所述支柱单元之间通过主插接端和副插接端连接,通过多个所述支柱单元的首尾套插连接,可以实现所述空调支架的高度调节功能,同时,所述主插接端设有第一折边,所述副插接端设有第二折边,所述主插接端和所述副插接端插接时,所述第一折边和所述第二折边贴合,所述第一折边和所述第二折边面面接触,可以减小应力集中,所述支柱的所述副插接端不易由于受到外力作用过大而发生变形,空调安装更为稳固。According to an embodiment of the present invention, an air conditioner bracket is provided, which includes a plurality of pillar units, any two of the pillar units are connected through a main plug-in end and a secondary plug-in end, and the head and tail of the plurality of pillar units The sleeve connection can realize the height adjustment function of the air-conditioning bracket. At the same time, the main plug-in end is provided with a first folded edge, and the auxiliary plug-in end is provided with a second folded edge. The main plug-in end and the When the auxiliary plug-in end is plugged in, the first folded edge and the second folded edge are bonded together, and the first folded edge and the second folded edge are in surface-to-face contact, which can reduce stress concentration, so The auxiliary plug-in end of the pillar is not easily deformed due to excessive external force, and the air conditioner is installed more stably.

本发明是通过以下几个技术方案实现的:The present invention is achieved through the following several technical solutions:

一种空调支架,所述空调支架包括多个支柱单元,任意两个所述支柱单元之间通过主插接端和副插接端连接,所述主插接端设有第一折边,所述副插接端设有第二折边,所述主插接端和所述副插接端插接时,所述第一折边和所述第二折边贴合。An air-conditioning bracket, the air-conditioning bracket includes a plurality of pillar units, any two of the pillar units are connected through a main plug-in end and a secondary plug-in end, the main plug-in end is provided with a first hem, the The auxiliary plug-in end is provided with a second folded edge, and when the main plug-in end and the auxiliary plug-in end are plugged together, the first folded edge is attached to the second folded edge.

在一些可选技术方案中,所述支柱单元包括多个支柱,相邻两个所述支柱之间通过支柱连板连接,所述支柱的两端分别为所述主插接端和所述副插接端,相邻两个所述支柱单元的所述支柱通过所述主插接端和所述副插接端一一对应插接,所述支柱设置为包括一面开放侧壁的中空的柱体结构。In some optional technical solutions, the pillar unit includes a plurality of pillars, two adjacent pillars are connected by a pillar connecting plate, and the two ends of the pillars are respectively the main plug-in end and the secondary Plug-in ends, the pillars of two adjacent pillar units are plugged in one by one through the main plug-in end and the auxiliary plug-in end, and the pillars are set as hollow columns with an open side wall body structure.

在一些可选技术方案中,所述支柱连板包括支柱连板本体和设于所述支柱连板一侧的侧板,所述侧板的长度小于所述支柱连板本体的长度。In some optional technical solutions, the pillar connecting plate includes a pillar connecting plate body and a side plate provided on one side of the pillar connecting plate, and the length of the side plate is shorter than the length of the pillar connecting plate body.

在一些可选技术方案中,所述主插接端设有第一安装孔,所述副插接端设有第二安装孔,所述主插接端和所述副插接端插接时,所述第一安装孔通过固定件与所述第二安装孔连接。In some optional technical solutions, the main plug-in end is provided with a first installation hole, and the auxiliary plug-in end is provided with a second installation hole, and when the main plug-in end and the auxiliary plug-in end are plugged together , the first mounting hole is connected to the second mounting hole through a fixing piece.

在一些可选技术方案中,所述副插接端设有第三折边,所述第三折边上设有第三安装孔,所述第三安装孔用于通过固定件与所述空调固定。In some optional technical solutions, the auxiliary plug-in end is provided with a third folded edge, and a third installation hole is provided on the third folded edge, and the third installation hole is used for connecting the air conditioner with the fixing piece. fixed.

在一些可选技术方案中,所述空调支架还包括支撑座,所述支撑座设有第一卡接槽,所述第一卡接槽和位于所述空调支架的顶部的所述支柱单元的所述副插接端卡接。In some optional technical solutions, the air-conditioning bracket further includes a support base, and the support base is provided with a first engaging groove, and the first engaging groove and the pillar unit located at the top of the air-conditioning bracket The auxiliary plug-in terminal is clamped.

进一步的,所述支撑座设置为包括一面开放侧壁和一面封闭底面的中空的柱体结构,所述支撑座的所述封闭底面上设有第四安装孔,所述第四安装孔用于通过固定件与所述空调固定。Further, the support seat is set as a hollow cylindrical structure including one open side wall and one closed bottom surface, and a fourth installation hole is provided on the closed bottom surface of the support seat, and the fourth installation hole is used for It is fixed with the air conditioner through a fixing piece.

在一些可选技术方案中,所述空调支架还包括底座,所述底座设有第二卡接槽,所述第二卡接槽和位于所述空调支架的底部的所述支柱单元的所述主插接端卡接。In some optional technical solutions, the air-conditioning bracket further includes a base, and the base is provided with a second engaging groove, and the second engaging groove is connected to the pillar unit at the bottom of the air-conditioning supporting bracket. The main plug-in end snaps in.

本发明实施例提供的技术方案可以包括以下有益效果:The technical solutions provided by the embodiments of the present invention may include the following beneficial effects:

1、空调支架的支柱单元的主插接端和副插接端插接时,主插接端的第一折边和副插接端的第二折边贴合,第一折边和第二折边面面接触,可以减小应力集中,所述支柱单元的所述副插接端不易由于受到外力作用过大而发生变形,空调安装更为稳固。1. When the main plug-in end and the auxiliary plug-in end of the pillar unit of the air-conditioning bracket are plugged in, the first folded edge of the main plug-in end and the second folded edge of the auxiliary plug-in end fit together, and the first folded edge and the second folded edge Surface-to-surface contact can reduce stress concentration, and the auxiliary plug-in end of the pillar unit is not easily deformed due to excessive external force, and the air conditioner is installed more stably.

2、可以根据空调的不同使用环境的高度要求,选择不同数量的支柱单元首尾套插连接,实现所述空调支架的高度调节功能,灵活方便。2. According to the height requirements of different use environments of the air conditioner, different numbers of pillar units can be selected for end-to-end plug-in connection to realize the height adjustment function of the air conditioner bracket, which is flexible and convenient.

应当理解的是,以上的一般描述和后文的细节描述仅是示例性和解释性的,并不能限制本发明。It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention.

附图说明Description of drawings

此处的附图被并入说明书中并构成本说明书的一部分,示出了符合本发明的实施例,并与说明书一起用于解释本发明的原理。The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and together with the description serve to explain the principles of the invention.

图1是根据一示例性实施例示出的一种空调支架的结构图一;Fig. 1 is a first structural diagram of an air conditioner bracket shown according to an exemplary embodiment;

图2是根据一示例性实施例示出的一种空调支架的结构图二;Fig. 2 is a second structural diagram of an air conditioner bracket shown according to an exemplary embodiment;

图3是根据一示例性实施例示出的支柱单元的结构图;Fig. 3 is a structural diagram of a pillar unit shown according to an exemplary embodiment;

图4是根据一实例性实施例示出的支柱的结构图一;Fig. 4 is a first structural diagram of a pillar shown according to an exemplary embodiment;

图5是根据一示例性实施例示出的支柱的结构图二;Fig. 5 is a second structural diagram of a pillar shown according to an exemplary embodiment;

图6是根据一示例性实施例示出的支柱的结构图三;Fig. 6 is a third structural diagram of a pillar according to an exemplary embodiment;

图7是根据一实例性实施例示出的支柱的结构图四;Fig. 7 is a fourth structural diagram of a pillar according to an exemplary embodiment;

图8是根据一示例性实施例示出的支柱的结构图五;Fig. 8 is a fifth structural diagram of a pillar shown according to an exemplary embodiment;

图9是根据一示例性实施例示出的支柱连板的结构图一;Fig. 9 is a first structural diagram of a pillar connecting plate according to an exemplary embodiment;

图10是根据一实例性实施例示出的支柱连板的结构图二;Fig. 10 is a second structural diagram of a pillar connecting plate according to an exemplary embodiment;

图11是根据一示例性实施例示出的支柱连板的结构图三;Fig. 11 is a third structural diagram of a pillar connecting plate according to an exemplary embodiment;

图12是根据一示例性实施例示出的支柱连板的结构图四;Fig. 12 is a fourth structural diagram of a pillar connecting plate according to an exemplary embodiment;

图13是根据一示例性实施例示出的支撑座的结构图一;Fig. 13 is a first structural view of a support seat according to an exemplary embodiment;

图14是根据一示例性实施例示出的支撑座的结构图二;Fig. 14 is a second structural diagram of a support seat according to an exemplary embodiment;

图15是根据一示例性实施例示出的支撑座的结构图三;Fig. 15 is a third structural diagram of a support seat according to an exemplary embodiment;

图16是根据一示例性实施例示出的底座的结构图一;Fig. 16 is a first structural diagram of a base according to an exemplary embodiment;

图17是根据一实例性实施例示出的底座的结构图二;Fig. 17 is a second structural diagram of a base according to an exemplary embodiment;

图18是根据一实例性实施例示出的底座的结构图三。Fig. 18 is a third structural diagram of a base according to an exemplary embodiment.

附图标记说明:Explanation of reference signs:

1-支柱;11-主插接端;111-第一折边;112-第一安装孔;12-副插接端;121-第二折边;122-第二安装孔;123-第三折边;1231-第三安装孔;13-第五安装孔;14-第七安装孔;15-上墙孔;16-限位折边;2-支柱连板;21-支柱连板本体;22-侧板;221-第一侧板;222-第二侧板;23-第六安装孔;3-支撑座;31-第四安装孔;32-第八安装孔;4-底座;5-支柱单元。1-pillar; 11-main insertion end; 111-first flange; 112-first installation hole; 12-secondary insertion end; 121-second flange; 122-second installation hole; 123-third Flange; 1231-third installation hole; 13-fifth installation hole; 14-seventh installation hole; 15-upper wall hole; 16-limit flange; 2-pillar connecting plate; 22-side plate; 221-first side plate; 222-second side plate; 23-sixth mounting hole; 3-support seat; 31-fourth mounting hole; 32-eighth mounting hole; 4-base; 5 - Pillar unit.

具体实施方式Detailed ways

以下描述和附图充分地示出本发明的具体实施方案,以使本领域的技术人员能够实践它们。实施例仅代表可能的变化,除非明确要求,否则单独的部件和功能是可选的,并且操作的顺序可以变化。一些实施方案的部分和特征可以被包括在或替换其他实施方案的部分和特征。本发明的实施方案的范围包括权利要求书的整个范围,以及权利要求书的所有可获得的等同物。在本文中,各实施方案可以被单独地或总地用术语“发明”来表示,这仅仅是为了方便,并且如果事实上公开了超过一个的发明,不是要自动地限制该应用的范围为任何单个发明或发明构思。本文中,诸如第一和第二等之类的关系术语仅仅用于将一个实体或者操作与另一个实体或操作区分开来,而不要求或者暗示这些实体或操作之间存在任何实际的关系或者顺序。The following description and drawings illustrate specific embodiments of the invention sufficiently to enable those skilled in the art to practice them. The embodiments merely represent possible variations, individual components and functions are optional unless explicitly required, and the order of operations may be varied. Portions and features of some embodiments may be included in or substituted for those of other embodiments. The scope of embodiments of the present invention includes the full scope of the claims, and all available equivalents of the claims. Herein, various embodiments may be referred to individually or collectively by the term "invention", which is for convenience only and is not intended to automatically limit the scope of this application if in fact more than one invention is disclosed. A single invention or inventive concept. Herein, relational terms such as first and second etc. are used only to distinguish one entity or operation from another without requiring or implying any actual relationship or relationship between these entities or operations. order.

需要说明,本发明实施例中所有方向性指示(诸如上、下、左、右、前、后……)仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。另外,在本发明中如涉及“第一”、“第二”等的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或隐含地包括至少一个该特征。It should be noted that all directional indications (such as up, down, left, right, front, back...) in the embodiments of the present invention are only used to explain the relationship between the components in a certain posture (as shown in the accompanying drawings). Relative positional relationship, movement conditions, etc., if the specific posture changes, the directional indication will also change accordingly. In addition, in the present invention, descriptions such as "first", "second" and so on are used for description purposes only, and should not be understood as indicating or implying their relative importance or implicitly indicating the quantity of indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include at least one of these features.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体的连接;可以是机械连接,也可以是电连接;可以是直接连接,也可以通过中间媒介间接相连,也可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral It can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, or it can be an internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.

本文中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。Various embodiments herein are described in a progressive manner, each embodiment focuses on the differences from other embodiments, and the same and similar parts of the various embodiments may be referred to each other.

图1-3是根据一示例性实施例示出的一种空调支架的结构图。1-3 are structural views of an air conditioner bracket according to an exemplary embodiment.

该可选实施例提供了一种空调支架,所述空调支架包括多个支柱单元5,任意两个所述支柱单元5之间通过主插接端11和副插接端12连接,所述主插接端11设有第一折边111,所述副插接端12设有第二折边121,所述主插接端11和所述副插接端12插接时,所述第一折边111和所述第二折边121贴合。This optional embodiment provides an air-conditioning bracket, which includes a plurality of pillar units 5, any two of the pillar units 5 are connected through a main plug-in end 11 and a secondary plug-in end 12, the main The plug-in end 11 is provided with a first folded edge 111, and the auxiliary plug-in end 12 is provided with a second folded edge 121. When the main plug-in end 11 and the auxiliary plug-in end 12 are plugged together, the first The folded edge 111 is attached to the second folded edge 121 .

进一步的,所述第一折边111折弯形成,所述第二折边121折弯形成。Further, the first folded edge 111 is formed by bending, and the second folded edge 121 is formed by bending.

需要说明的是,所述主插接端11的所述第一折边111,和所述副插接端12的所述第二折边121采用折弯工艺制成。折弯工艺是指金属板料在折弯机上模或下模的压力下,首先经过弹性变形,然后进入塑性变形,在塑性弯曲的开始阶段,完成一个V型弯曲。采用折弯工艺,工艺简单,工艺成本低。It should be noted that, the first folded edge 111 of the main insertion end 11 and the second folded edge 121 of the auxiliary insertion end 12 are made by bending process. The bending process means that the metal sheet first undergoes elastic deformation under the pressure of the upper or lower die of the bending machine, and then enters plastic deformation. In the initial stage of plastic bending, a V-shaped bending is completed. The bending process is adopted, the process is simple, and the process cost is low.

该可选实施方式中,上、下支柱1的受力通过主插接端11和副插接端12的封闭侧壁面与封闭侧壁面来传递,可以减小应力集中,避免剪切,而且,所述主插接端11和副插接端12插接时,所述主插接端11的第一折边111和所述副插接端12的第二折边121贴合,所述第一折边111和所述第二折边121面面接触,可以减小应力集中,所述支柱单元5的所述副插接端12不易由于受到外力作用过大而发生变形,空调安装更为稳固。进一步的,可以根据空调的不同使用环境的高度要求,选择不同数量的所述支柱单元5首尾套插连接,实现所述空调支架的高度调节功能,灵活方便。In this optional embodiment, the force of the upper and lower pillars 1 is transmitted through the closed side wall surface and the closed side wall surface of the main insertion end 11 and the auxiliary insertion end 12, which can reduce stress concentration and avoid shearing. Moreover, When the main plug-in end 11 and the auxiliary plug-in end 12 are plugged together, the first folded edge 111 of the main plug-in end 11 and the second folded edge 121 of the auxiliary plug-in end 12 are attached, and the first folded edge 111 of the auxiliary plug-in end 12 The face-to-face contact between the first folded edge 111 and the second folded edge 121 can reduce stress concentration, and the secondary insertion end 12 of the pillar unit 5 is not easily deformed due to excessive external force, and the installation of the air conditioner is more convenient. stable. Further, according to the height requirements of different use environments of the air conditioner, different numbers of the pillar units 5 can be selected for end-to-end plug-in connection to realize the height adjustment function of the air conditioner support, which is flexible and convenient.

在一些可选实施例中,所述支柱单元5为中空结构,所述主插接端11的端部向所述支柱单元5的内部折弯形成所述第一折边111,所述副插接端12的中部向所述支柱单元5的内部折弯形成所述第二折边121,所述支柱1的结构更加紧凑。In some optional embodiments, the pillar unit 5 is a hollow structure, and the end of the main insertion end 11 is bent toward the interior of the pillar unit 5 to form the first folded edge 111 , and the auxiliary plug The middle part of the connecting end 12 is bent toward the inside of the pillar unit 5 to form the second hem 121 , and the structure of the pillar 1 is more compact.

在实际应用中,空调可放置于所述空调支架的所述支柱单元5的所述副插接端12上。In practical application, the air conditioner can be placed on the auxiliary plug-in end 12 of the pillar unit 5 of the air conditioner bracket.

图4-8是根据一实例性实施例示出的支柱的结构图。4-8 are structural diagrams of pillars according to an exemplary embodiment.

该可选实施例提供了一种空调支架的支柱1,所述支柱单元5包括多个所述支柱1,相邻两个所述支柱1之间通过支柱连板2连接,所述支柱1的两端分别为所述主插接端11和所述副插接端12,相邻两个所述支柱单元5的所述支柱1通过所述主插接端11和所述副插接端12一一对应插接,所述支柱1设置为包括一面开放侧壁的中空的柱体结构。通过将所述支柱1设置为包括一面开放侧壁的中空的柱体结构,方便通过所述开放侧壁对所述支柱1内部进行操作,同时,中空结构质量更小。This optional embodiment provides a pillar 1 of an air-conditioning bracket, the pillar unit 5 includes a plurality of pillars 1, two adjacent pillars 1 are connected by a pillar connecting plate 2, and the pillars 1 The two ends are the main plug-in end 11 and the auxiliary plug-in end 12 respectively, and the pillars 1 of two adjacent pillar units 5 pass through the main plug-in end 11 and the auxiliary plug-in end 12 For one-to-one insertion, the pillar 1 is configured as a hollow column structure with an open side wall. By arranging the pillar 1 as a hollow column structure with an open side wall, it is convenient to operate the interior of the pillar 1 through the open side wall, and meanwhile, the hollow structure has a smaller mass.

进一步的,所述支柱1的与所述开放侧壁相邻的封闭侧壁,沿所述开放侧壁折弯形成限位折边16,可以起到限位作用。Further, the closed side wall adjacent to the open side wall of the pillar 1 is bent along the open side wall to form a limit flange 16, which can play a position limit role.

在一些可选实施例中,所述支柱单元5的相邻的两个所述支柱1的连接面处于同一平面内,方便所述支柱连板2进行连接。In some optional embodiments, the connection surfaces of two adjacent pillars 1 of the pillar unit 5 are in the same plane, which facilitates the connection of the pillar connecting plates 2 .

在一些可选实施例中,所述主插接端11设有第一安装孔112,所述副插接端12设有第二安装孔122,所述主插接端11和另一所述支柱1的所述副插接端12插接时,和/或,所述副插接端12和另一所述支柱1的所述主插接端11插接时,所述第一安装孔112通过固定件与所述第二安装孔122连接。可选的,所述固定件可为螺钉。In some optional embodiments, the main insertion end 11 is provided with a first installation hole 112, and the auxiliary insertion end 12 is provided with a second installation hole 122, and the main insertion end 11 and the other When the auxiliary plug-in end 12 of the pillar 1 is plugged in, and/or, when the auxiliary plug-in end 12 and the main plug-in end 11 of another pillar 1 are plugged in, the first installation hole 112 is connected with the second installation hole 122 through a fixing piece. Optionally, the fixing member may be a screw.

可选的,所述第一安装孔112的数量为一个或多个。进一步的,多个所述第一安装孔112呈三角状排布,稳固性更好。Optionally, the number of the first installation holes 112 is one or more. Further, the plurality of first mounting holes 112 are arranged in a triangular shape, which has better stability.

可选的,所述第二安装孔122的数量为一个或多个。进一步的,多个所述第二安装孔122呈三角状排布,稳固性更好。Optionally, the number of the second installation holes 122 is one or more. Further, the plurality of second installation holes 122 are arranged in a triangular shape, which has better stability.

该可选方式中,通过所述第一安装孔112和所述第二安装孔122的进一步固定,上、下所述支柱1之间的固定作用更好。In this optional manner, through the further fixing of the first mounting hole 112 and the second mounting hole 122 , the fixing effect between the upper and lower pillars 1 is better.

在一些可选实施例中,所述副插接端12设有第三折边123,具体的,所述副插接端12的端部折弯形成所述第三折边123,所述第三折边123上设有第三安装孔1231,所述第三安装孔1231用于通过固定件与所述空调固定。可选的,所述固定件可为螺钉。通过在所述副插接端12设置第三折边123,可以增大所述副插接端12与所述空调的接触面积,进一步减小应力集中,通过所述第三安装孔1231与所述空调固定,所述空调支架与所述空调之间的固定作用更好,固定更加牢固。In some optional embodiments, the auxiliary insertion end 12 is provided with a third folded edge 123, specifically, the end of the auxiliary insertion end 12 is bent to form the third folded edge 123, the first The third mounting hole 1231 is provided on the three folded edges 123, and the third mounting hole 1231 is used for fixing with the air conditioner through a fixing piece. Optionally, the fixing member may be a screw. By setting the third folded edge 123 on the auxiliary plug end 12, the contact area between the auxiliary plug end 12 and the air conditioner can be increased, and the stress concentration can be further reduced. The air conditioner is fixed, the fixing effect between the air conditioner bracket and the air conditioner is better, and the fixing is more firm.

可选的,所述第三安装孔1231的数量为一个或多个。Optionally, the number of the third installation holes 1231 is one or more.

进一步的,所述副插接端12向外折弯形成第三折边123,可以进一步增大所述副插接端12与所述空调的接触面积,可以分散所述空调的重力,进一步增大所述空调支架的承重性能。Further, the auxiliary plug-in end 12 is bent outward to form a third folded edge 123, which can further increase the contact area between the auxiliary plug-in end 12 and the air conditioner, can disperse the gravity of the air conditioner, and further increase The load-bearing performance of the air conditioning bracket is large.

在一些可选实施例中,所述支柱1还设有上墙孔15,用于与墙体进行连接。In some optional embodiments, the pillar 1 is also provided with an upper wall hole 15 for connecting with the wall.

图9-12是根据一示例性实施例示出的支柱连板的结构图。Figures 9-12 are structural views of a pillar connecting plate according to an exemplary embodiment.

该可选实施例提供了一种空调支架的支柱连板2,所述支柱连板2包括支柱连板本体21和设于所述支柱连板2一侧的侧板22,所述侧板22的长度小于所述支柱连板本体21的长度。所述支柱连板2连接两个所述支柱1时,所述侧板22位于两个所述支柱连板2中间,所述侧板22的两端分别与两个所述支柱1相抵,可以起到限位的作用。This optional embodiment provides a pillar connecting plate 2 of an air-conditioning support. The pillar connecting plate 2 includes a pillar connecting plate body 21 and a side plate 22 arranged on one side of the pillar connecting plate 2. The side plate 22 The length is less than the length of the pillar connecting plate body 21. When the pillar connecting plate 2 is connected to the two pillars 1, the side plate 22 is located in the middle of the two pillar connecting plates 2, and the two ends of the side plate 22 are respectively offset against the two pillars 1, which can play a limiting role.

进一步的,所述侧板22和所述支柱连板本体21的夹角为90°。所述侧板22垂直于所述支柱连板本体21设置,所述侧板22可以起到加强筋的作用,增强所述空调支架的稳固性。Further, the included angle between the side plate 22 and the pillar connecting plate body 21 is 90°. The side plates 22 are arranged perpendicular to the main body 21 of the pillar connecting plate, and the side plates 22 can function as reinforcing ribs to enhance the stability of the air-conditioning bracket.

可选的,所述侧板22包括第一侧板221侧板22和第二侧板22,所述第一侧板221侧板22设于所述支柱连板本体21的一侧,所述第二侧板22设于所述支柱连板本体21的所述第一侧板221侧板22的对侧。增加所述侧板22的数量,所述侧板22可以更好的起到限位和加强稳固性的作用。Optionally, the side plate 22 includes a first side plate 221 side plate 22 and a second side plate 22, the first side plate 221 side plate 22 is arranged on one side of the pillar connecting plate body 21, the The second side plate 22 is disposed on the side opposite to the first side plate 221 of the pillar connecting plate body 21 . By increasing the number of the side plates 22, the side plates 22 can better play a role of limiting and strengthening stability.

在实际应用中,所述支柱1上设有第五安装孔13,所述支柱连板2上设有与所述第五安装孔13相对应的第六安装孔23,所述第五安装孔13与所述第六安装孔23可通过螺钉进行安装。In practical application, a fifth mounting hole 13 is provided on the pillar 1, a sixth mounting hole 23 corresponding to the fifth mounting hole 13 is provided on the pillar connecting plate 2, and the fifth mounting hole 13 and the sixth installation hole 23 can be installed by screws.

在一些可选实施例中,所述支柱1的长度和所述支柱连板2的长度存在以下关系:In some optional embodiments, the length of the strut 1 and the length of the strut connecting plate 2 have the following relationship:

d=1.02n-1*0.618Ld=1.02n -1 *0.618L

其中,L为所述支柱1的长度,d为所述支柱连板2的长度,n为所述空调支架的层数。Wherein, L is the length of the support 1, d is the length of the support plate 2, and n is the number of layers of the air-conditioning support.

具体来看,所述空调支架的层数为所述空调支架的在一个竖直方向上进行插接的所述支柱1的数量。Specifically, the number of layers of the air-conditioning support is the number of the pillars 1 of the air-conditioning support that are plugged in one vertical direction.

所述支柱1的长度和所述支柱连板2的长度满足上述关系,所述空调支架的高度越高,所述支柱连板2相对于所述支柱1的长度越长,所述空调支架越稳定。The length of the pillar 1 and the length of the pillar connecting plate 2 satisfy the above relationship, the higher the height of the air-conditioning bracket, the longer the length of the pillar connecting plate 2 relative to the pillar 1, and the longer the air-conditioning bracket Stablize.

在一些可选实施例中,所述支柱1或所述支柱连板2为钣金件。钣金件具有重量轻、强度高的特点,适用于所述支柱1或所述支柱连板2,承重性能好,此外,钣金件的成本低、大规模量产性能好,适合大规模生产。In some optional embodiments, the pillar 1 or the pillar connecting plate 2 are sheet metal parts. The sheet metal parts have the characteristics of light weight and high strength, are suitable for the pillar 1 or the pillar connecting plate 2, and have good load-bearing performance. In addition, the sheet metal parts are low in cost and good in mass production performance, and are suitable for mass production .

图13-15是根据一示例性实施例示出的支撑座的结构图。13-15 are structural views of a support seat according to an exemplary embodiment.

该可选实施例中,提供了一种空调支架的支撑座3,所述支撑座3设有第一卡接槽,所述第一卡接槽和位于所述空调支架的顶部的所述支柱单元5的所述副插接端12卡接。所述空调通过所述支撑座3与所述空调支架连接,二者的接触面积更大,安装更稳固。In this optional embodiment, a support base 3 of an air conditioner bracket is provided, and the support base 3 is provided with a first engaging groove, and the first engaging groove and the pillar located at the top of the air conditioner bracket The auxiliary plug-in terminal 12 of the unit 5 is clamped. The air conditioner is connected to the air conditioner bracket through the support base 3, the contact area between the two is larger, and the installation is more stable.

可选的,所述第一卡接槽可为所述支撑座3的封闭侧壁和一面封闭底面组成的凹槽。Optionally, the first locking groove may be a groove formed by a closed side wall and a closed bottom surface of the support base 3 .

进一步的,所述支撑座3设置为包括一面开放侧壁和一面封闭底面的中空的柱体结构,所述支撑座3的所述封闭底面上设有第四安装孔31,所述第四安装孔31用于通过固定件与所述空调固定。通过将所述支撑座3设置为包括一面开放侧壁和一面封闭底面的中空的柱体结构,方便通过所述开放侧壁对所述支撑座3内部进行操作,同时,中空结构质量更小。Further, the support seat 3 is set as a hollow cylindrical structure including one open side wall and one closed bottom surface, the closed bottom surface of the support seat 3 is provided with a fourth installation hole 31, the fourth installation The hole 31 is used for fixing with the air conditioner through a fixing piece. By setting the support base 3 as a hollow cylindrical structure including one open side wall and one closed bottom surface, it is convenient to operate the inside of the support base 3 through the open side wall, and at the same time, the mass of the hollow structure is smaller.

在一些可选实施例中,所述支撑座3的所述封闭底面上设有第四安装孔31,所述第四安装孔31用于通过固定件与所述空调固定,可以使所述支撑座3与所述空调支架连接更稳固。可选的,所述固定件可为螺钉。In some optional embodiments, a fourth installation hole 31 is provided on the closed bottom surface of the support base 3, and the fourth installation hole 31 is used for fixing with the air conditioner through a fixing piece, so that the support Seat 3 is more firmly connected with the air-conditioning support. Optionally, the fixing member may be a screw.

可选的,所述第四安装孔31的数量为一个或多个。进一步的,多个所述第四安装孔31呈三角状排布,稳固性更好。Optionally, the number of the fourth installation holes 31 is one or more. Further, the plurality of fourth mounting holes 31 are arranged in a triangular shape, which has better stability.

进一步的,所述支撑座3的所述第四安装孔31设于所述封闭底面的靠近所述开放侧壁的凸出端,方便安装。Further, the fourth installation hole 31 of the support seat 3 is provided at the protruding end of the closed bottom surface close to the open side wall, which is convenient for installation.

在一些可选实施例中,所述支撑座3表面覆有减震层,可以起到缓冲作用。In some optional embodiments, the surface of the support base 3 is covered with a shock-absorbing layer, which can play a buffering role.

在一些可选实施例中,所述支撑座3的封闭底面的材质为摩擦系数较大的防滑材料,可以增大所述空调的静摩擦力。In some optional embodiments, the material of the closed bottom surface of the support base 3 is a non-slip material with a relatively high coefficient of friction, which can increase the static friction of the air conditioner.

在一些可选实施例中,所述支柱1上设有第七安装孔14,所述支撑座3的侧壁上设有与所述第七安装孔14相对应的第八安装孔32,所述第七安装孔14与所述第八安装孔32可通过螺钉进行安装,所述支撑座3与所述空调支架连接更牢固。In some optional embodiments, the pillar 1 is provided with a seventh installation hole 14, and the side wall of the support base 3 is provided with an eighth installation hole 32 corresponding to the seventh installation hole 14, so The seventh installation hole 14 and the eighth installation hole 32 can be installed by screws, and the connection between the support base 3 and the air conditioner bracket is more firm.

图16-18是根据一示例性实施例示出的底座的结构图。16-18 are structural views of a base according to an exemplary embodiment.

该可选实施例提供了一种空调支架的底座4,所述底座4设有第二卡接槽,所述第二卡接槽和位于所述空调支架的底部的所述支柱单元5的所述主插接端11卡接。This optional embodiment provides a base 4 of the air conditioner bracket, the base 4 is provided with a second engaging groove, and the second engaging groove and all the pillar units 5 located at the bottom of the air conditioner bracket The main plug-in terminal 11 is clamped.

具体的,所述底座4设置为包括一面封闭底面的中空的柱体结构。所述底座4的内部设有凸起,所述凸起与所述底座4的封闭侧壁形成的凹槽即为所述第二卡接槽。Specifically, the base 4 is configured as a hollow cylindrical structure with one side closing the bottom surface. The inside of the base 4 is provided with a protrusion, and the groove formed by the protrusion and the closed side wall of the base 4 is the second engaging groove.

该可选实施例中,将所述底座4设置于所述支柱1的副插接端12一侧,底座4的底面与地面接触,可以分散压力,防止应力集中。In this optional embodiment, the base 4 is arranged on the side of the secondary insertion end 12 of the pillar 1, and the bottom surface of the base 4 is in contact with the ground, which can disperse pressure and prevent stress concentration.

在一些可选实施例中,所述底座4的材质为摩擦系数较大的防滑材料,可以增大所述空调支架的静摩擦力。In some optional embodiments, the material of the base 4 is an anti-slip material with a relatively high coefficient of friction, which can increase the static friction of the air conditioner bracket.

应当理解的是,本发明并不局限于上面已经描述并在附图中示出的流程及结构,并且可以在不脱离其范围进行各种修改和改变。本发明的范围仅由所附的权利要求来限制。It should be understood that the present invention is not limited to the processes and structures that have been described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from the scope thereof. The scope of the invention is limited only by the appended claims.

Claims (9)

1. a kind of air conditioner support, which is characterized in that including multiple struts, pass through master between strut described in any two Inserted terminal is connected with secondary inserted terminal, and the main inserted terminal is equipped with the first flanging, and the pair inserted terminal is equipped with the second flanging, the master When inserted terminal and the secondary inserted terminal grafting, first flanging and second flanging fitting.
2. air conditioner support according to claim 1, which is characterized in that the strut includes multiple pillars, and adjacent two It is connected between a pillar by pillar connecting plate, the both ends of the pillar are respectively the main inserted terminal and the secondary grafting The pillar at end, the two neighboring strut corresponds grafting by the main inserted terminal and the secondary inserted terminal, The pillar be set as include one side open side wall hollow column structure.
3. air conditioner support according to claim 2, which is characterized in that the pillar connecting plate includes pillar connecting plate ontology and sets Side plate in pillar connecting plate side, the length of the side plate are less than the length of the pillar connecting plate ontology.
4. air conditioner support according to claim 1, which is characterized in that the main inserted terminal is equipped with the first mounting hole, described When secondary inserted terminal is equipped with the second mounting hole, the main inserted terminal and the secondary inserted terminal grafting, first mounting hole passes through solid Determine part to connect with second mounting hole.
5. air conditioner support according to claim 1, which is characterized in that the pair inserted terminal is equipped with third flanging, and described the Three flangings are equipped with third mounting hole, and the third mounting hole by fixing piece and the air-conditioning for being fixed.
6. air conditioner support according to claim 1, which is characterized in that further include support base, the support base is equipped with first Clamping groove, the secondary inserted terminal card of first clamping groove and the strut positioned at the top of the air conditioner support It connects.
7. air conditioner support according to claim 6, which is characterized in that the support base is set as including one side open side wall With the hollow column structure of a face closure bottom surface, the closing bottom surface of the support base is equipped with the 4th mounting hole, described 4th mounting hole by fixing piece and the air-conditioning for being fixed.
8. air conditioner support according to claim 1, which is characterized in that further include pedestal, the pedestal is equipped with the second clamping Slot, the main inserted terminal clamping of second clamping groove and the strut positioned at the bottom of the air conditioner support.
9. air conditioner support according to claim 1, which is characterized in that the strut is sheet metal component.
CN201810373035.8A 2018-04-24 2018-04-24 Air conditioner bracket Active CN110397994B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810373035.8A CN110397994B (en) 2018-04-24 2018-04-24 Air conditioner bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810373035.8A CN110397994B (en) 2018-04-24 2018-04-24 Air conditioner bracket

Publications (2)

Publication Number Publication Date
CN110397994A true CN110397994A (en) 2019-11-01
CN110397994B CN110397994B (en) 2024-05-03

Family

ID=68320359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810373035.8A Active CN110397994B (en) 2018-04-24 2018-04-24 Air conditioner bracket

Country Status (1)

Country Link
CN (1) CN110397994B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2694122Y (en) * 2004-02-26 2005-04-20 王六灿 Connecting device for prefabricated double layered stainless steel chimney
US6892991B1 (en) * 2003-03-11 2005-05-17 Sung Kuk Soh Height-adjustable support for elevating furniture
CN2843232Y (en) * 2005-09-16 2006-12-06 特乐家具(上海)有限公司 Frame stacking structure
JP2010101510A (en) * 2008-10-21 2010-05-06 Taku Hanbai Kk Installation device of apparatus
CN102400566A (en) * 2010-09-15 2012-04-04 毛国建 Support frame for construction
CN203642385U (en) * 2013-11-08 2014-06-11 广东美的暖通设备有限公司 Upright post for air conditioner outdoor unit and air conditioner outdoor unit
CN204950025U (en) * 2015-07-17 2016-01-13 严明喜 Novel furniture is folding to be accomodate device
CN205939463U (en) * 2016-08-17 2017-02-08 江苏捷诚车载电子信息工程有限公司 Outer quick -witted installation frame of air conditioner
CN107587604A (en) * 2016-07-08 2018-01-16 曹海彦 Spigot-and-socket sheet-pile assembling structure and its installation method
CN107917477A (en) * 2017-12-20 2018-04-17 中国扬子集团滁州扬子空调器有限公司 Air-conditioning system mounting bracket and the air-conditioning system containing the frame
CN208606291U (en) * 2018-04-24 2019-03-15 青岛海尔空调器有限总公司 A kind of air conditioner support

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6892991B1 (en) * 2003-03-11 2005-05-17 Sung Kuk Soh Height-adjustable support for elevating furniture
CN2694122Y (en) * 2004-02-26 2005-04-20 王六灿 Connecting device for prefabricated double layered stainless steel chimney
CN2843232Y (en) * 2005-09-16 2006-12-06 特乐家具(上海)有限公司 Frame stacking structure
JP2010101510A (en) * 2008-10-21 2010-05-06 Taku Hanbai Kk Installation device of apparatus
CN102400566A (en) * 2010-09-15 2012-04-04 毛国建 Support frame for construction
CN203642385U (en) * 2013-11-08 2014-06-11 广东美的暖通设备有限公司 Upright post for air conditioner outdoor unit and air conditioner outdoor unit
CN204950025U (en) * 2015-07-17 2016-01-13 严明喜 Novel furniture is folding to be accomodate device
CN107587604A (en) * 2016-07-08 2018-01-16 曹海彦 Spigot-and-socket sheet-pile assembling structure and its installation method
CN205939463U (en) * 2016-08-17 2017-02-08 江苏捷诚车载电子信息工程有限公司 Outer quick -witted installation frame of air conditioner
CN107917477A (en) * 2017-12-20 2018-04-17 中国扬子集团滁州扬子空调器有限公司 Air-conditioning system mounting bracket and the air-conditioning system containing the frame
CN208606291U (en) * 2018-04-24 2019-03-15 青岛海尔空调器有限总公司 A kind of air conditioner support

Also Published As

Publication number Publication date
CN110397994B (en) 2024-05-03

Similar Documents

Publication Publication Date Title
US11091906B2 (en) Vacuum insulating material providing assembly and vacuum insulating material providing method using same
CN104075097B (en) A kind of erecting device for RRU radio-frequency module
CN110397994A (en) An air conditioner bracket
CN205475743U (en) A corner structure that is used for various steel sheet in toilet to connect
CN110397995B (en) Air conditioner support
CN208205385U (en) A kind of air conditioner suspending board and air-conditioning
CN208606291U (en) A kind of air conditioner support
CN205806173U (en) A kind of changeable type moves about plate nut
CN207072187U (en) A kind of printer stand
CN208606290U (en) A kind of air conditioner support
CN208750842U (en) Bottom shell connecting piece and air conditioner comprising same
CN209538569U (en) A kind of connection structure of external corner and wallboard
CN210399443U (en) an air conditioner panel
CN201605667U (en) A hyperboloid steel support for building structure
CN208750985U (en) Shell structure and vertical air conditioner with same
CN208238222U (en) Supporting structure and air conditioner with same
CN216724003U (en) Picture frame and mirror subassembly
CN209068734U (en) A kind of heat exchanger fixed structure, heat exchanger assembly and air conditioner
CN204605507U (en) The connection structure of condenser and radiator and vehicle
CN214788385U (en) Metal external member for panel
CN105485098A (en) Improved auxiliary frame universal type part bracket
CN208205386U (en) A kind of air conditioner suspending board and air-conditioning
CN210638266U (en) Caster wheel mounting structure and air conditioning equipment
CN217999388U (en) Novel door plant frame structure
CN204127604U (en) A kind of extension plate expanding panel hole distance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20240305

Address after: 266101 Haier Industrial Park, 1 Haier Road, Laoshan District, Shandong, Qingdao

Applicant after: QINGDAO HAIER AIR CONDITIONER GENERAL Corp.,Ltd.

Country or region after: China

Applicant after: Haier Smart Home Co., Ltd.

Address before: 266101 Haier Industrial Park, 1 Haier Road, Laoshan District, Shandong, Qingdao

Applicant before: QINGDAO HAIER AIR CONDITIONER GENERAL Corp.,Ltd.

Country or region before: China

GR01 Patent grant
GR01 Patent grant