CN110512746A - A kind of split type built-in fitting of precast stair and its application method - Google Patents

A kind of split type built-in fitting of precast stair and its application method Download PDF

Info

Publication number
CN110512746A
CN110512746A CN201910766952.7A CN201910766952A CN110512746A CN 110512746 A CN110512746 A CN 110512746A CN 201910766952 A CN201910766952 A CN 201910766952A CN 110512746 A CN110512746 A CN 110512746A
Authority
CN
China
Prior art keywords
precast stair
nut
skew
bar
external thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910766952.7A
Other languages
Chinese (zh)
Inventor
于庆树
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guangfa Building Materials Products Co Ltd
Original Assignee
Shandong Guangfa Building Materials Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Guangfa Building Materials Products Co Ltd filed Critical Shandong Guangfa Building Materials Products Co Ltd
Priority to CN201910766952.7A priority Critical patent/CN110512746A/en
Publication of CN110512746A publication Critical patent/CN110512746A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • E04B1/4164Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head with an adjustment sleeve
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The present invention relates to building fittings technical fields, disclose a kind of split type built-in fitting of precast stair and its application method, including pre-embedded steel slab, the quadrangle on the top of the pre-embedded steel slab is provided through skew-swept airfoil component, the top of the skew-swept airfoil component, which is threadably secured, is connected with straight screw arbor assembly, the pre-embedded steel slab includes hollow steel plate, and the quadrangle on the top of the hollow steel plate offers mounting hole.The present invention is by being in advance embedded in pre-embedded steel slab in precast stair, pass through hollow steel plate and steel bar and cement concrete cohesive force, to enhance the intensity and bearing capacity between built-in fitting and precast stair and between precast stair and precast stair, it ensure that the safety that precast stair uses, by the way that double thread bar is mounted in the internal threaded column of skew-swept airfoil at the construction field (site), it is installed together two precast stairs by fixinig plate, the first nut and the second nut again, it is easy to operate, difficulty of construction is low, and work efficiency is high.

Description

A kind of split type built-in fitting of precast stair and its application method
Technical field
The present invention relates to building fittings technical field, the split type built-in fitting of specifically a kind of precast stair and its user Method.
Background technique
Stair are the important components of multilayer and Bases in High Building Construction, while in hydraulic and hydroelectric engineering construction, also being held Carry on a shoulder pole important role, the characteristics of due to building itself, stair mating for indoor and outdoor generally require bench high, single flight across Degree is big, and pedal bears the requirements such as live load is big, and relative to traditional cast-in-situ stair, precast stair has speed of application fast, former material Many advantages, such as material consumption is low, high-quality, and be widely used, and the connection between precast stair is with regard to needing to use built-in fitting.
Chinese patent discloses a kind of split type built-in fitting of precast stair and its application method (Authorization Notice No. CN109339247A), which is designed by the hole countersunk of pre-embedded bolt hole, can accommodate certain body when being poured concrete Long-pending concrete, increases the contact area of precast stair and cast-in-place node, and the concrete boss of formation reduces precast stair Positional shift, when vertical stud, the first nut, the second nut realize when hole can not centering when, rear-mounted stud remain to by Precast stair and cast-in-place node link together, and improve connection safety coefficient while improving and lifting efficiency, but pre-buried Bonding strength between part and precast stair and between precast stair and precast stair is not high, under the action of larger external force It easily deforms, and when precast stair assembles at the scene, it is inconvenient and time-consuming and laborious.Therefore, those skilled in the art mention A kind of split type built-in fitting of precast stair and its application method are supplied, to solve the problems mentioned in the above background technology.
Summary of the invention
The purpose of the present invention is to provide a kind of split type built-in fitting of precast stair and its application methods, to solve above-mentioned back The problem of being proposed in scape technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of split type built-in fitting of precast stair and its application method, including pre-embedded steel slab, the top of the pre-embedded steel slab Quadrangle be provided through skew-swept airfoil component, the top of the skew-swept airfoil component, which is threadably secured, is connected with straight screw rod group Part, the pre-embedded steel slab include hollow steel plate, and the quadrangle on the top of the hollow steel plate offers mounting hole, and hollow steel plate The middle part on top be fixedly connected with several steel bars by welding, the skew-swept airfoil component includes skew-swept airfoil, described The lower end engagement in the outside of skew-swept airfoil is connected with top nut, and the lower end in the outside of skew-swept airfoil is engaged close to the bottom end of top nut and connected It is connected to lower nut, the straight screw arbor assembly includes double thread bar, and the upper end in the outside of the double thread bar is socketed with fixation Piece, and close to the top of fixinig plate, engagement is connected with the first nut, the double thread bar for the upper end in the outside of double thread bar Outside upper end close to the first nut top engagement be connected with the second nut.
As a further solution of the present invention: the skew-swept airfoil includes curved rod, and the top of the curved rod is fixedly connected There is internal threaded column, and the lower end of curved rod offers external thread groove.
As further scheme of the invention: the straight screw arbor assembly includes straight-bar, and the upper end of the straight-bar offers Second external thread groove, and the lower end of straight-bar offers the first external thread groove, the outside of the straight-bar is opened up close to the top of straight-bar There is outer-hexagonal nut.
As further scheme of the invention: the inside of the external thread groove penetrating mounting holes, the lower nut are located at The bottom end of hollow steel plate, the top nut are located at the bottom end of hollow steel plate, and the external thread groove and hollow steel plate pass through top nut It is fixedly connected with lower nut.
As further scheme of the invention: first external thread groove engages connection by screw thread with internal threaded column, First nut and the second nut engage connection by screw thread with the second external thread groove.
As further scheme of the invention: its implementation, comprising the following steps:
S1, it first checks, clear up template, and to the inner wall brushing release agent of template, then, the mould of bottom end and side being installed Plate, according still further to the requirement assembling reinforcement mesh sheet of setting;
S2, elder generation are clockwise screwed into top nut the upper end in the outside of external thread groove, then external thread groove is applied in mounting hole Inside, wherein the top of hollow steel plate is close in top nut, then, then twists clockwise from the bottom end of hollow steel plate lower nut Enter the lower end in the outside of external thread groove, similarly, four corners of hollow steel plate is made to be respectively mounted a skew-swept airfoil component;
S3, the inside for being embedded into internal threaded column using rubber stopper, then, the pre-embedded steel slab and skew-swept airfoil being installed together Component is put into togerther in the reinforced mesh bound in S1, and wherein pre-embedded steel slab is located at the upper end inside reinforced mesh, skew-swept airfoil The top of component and the lower surface of template are concordant, and reserve several groups counterbore in the lower end of reinforced mesh;
The template on the top and the other side reserved in S4, installation S1, is poured by the hole that template top is reserved into template Cement concrete is built, then, is vibrated to the cement concrete poured;
After the completion of S5, maintenance, form removal forms precast stair, and carries out processing appropriate to the surface of precast stair And repairing;
After S6, precast stair are transported to construction site, the rubber stopper being mounted on the inside of internal threaded column in S3 is extracted, spanner is utilized It is stuck in the outside of outer-hexagonal nut, double thread bar is screwed into the inside of internal threaded column;
S7, the side of the bottom end of the second precast stair is put into the first precast stair top side, wherein first is pre- Counterbore of the straight screw arbor assembly on stair top processed through the second precast stair bottom end then covers fixinig plate on the inside of counterbore On double thread bar, then successively the first nut and the second nut are screwed into clockwise in the second external thread groove, to just complete The assembly of one precast stair and the second precast stair can assemble the precast stair of different number according to actual needs;
After S8, precast stair are completed, using cement mortar to the counterbore of the precast stair of lowermost end and top The internal threaded column of precast stair is blocked, and is recycled cement concrete to pour the side of raised plate, is made raised plate Side is concordant with flooring or floor, to complete the installation of precast stair and building, connection.
Compared with prior art, beneficial effects of the present invention:
By the way that pre-embedded steel slab is embedded in precast stair in advance, bonded by hollow steel plate and steel bar and cement concrete Power is protected to enhance the intensity and bearing capacity between built-in fitting and precast stair and between precast stair and precast stair The safety that precast stair uses has been demonstrate,proved, by the way that double thread bar is mounted in the internal threaded column of skew-swept airfoil at the construction field (site), It is installed together two precast stairs by fixinig plate, the first nut and the second nut again, easy to operate, difficulty of construction is low, Work efficiency is high.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of a kind of split type built-in fitting of precast stair and its application method;
Fig. 2 is the structural schematic diagram of pre-embedded steel slab in a kind of split type built-in fitting of precast stair and its application method;
Fig. 3 is the structural schematic diagram of curved rod component in a kind of split type built-in fitting of precast stair and its application method;
Fig. 4 is the structural schematic diagram of straight screw arbor assembly in a kind of split type built-in fitting of precast stair and its application method;
Fig. 5 is the structural schematic diagram of skew-swept airfoil in a kind of split type built-in fitting of precast stair and its application method;
Fig. 6 is the structural schematic diagram of double thread bar in a kind of split type built-in fitting of precast stair and its application method;
Fig. 7 is the first precast stair and the second precast stair in a kind of split type built-in fitting of precast stair and its application method Decomposition diagram;
Fig. 8 is the first precast stair and the second precast stair in a kind of split type built-in fitting of precast stair and its application method Assembling schematic diagram;
Fig. 9 is the enlarged diagram of A in Fig. 8.
In figure: 1, pre-embedded steel slab;11, hollow steel plate;12, mounting hole;13, steel bar;2, skew-swept airfoil component;21, skew-swept airfoil; 211, curved rod;212, internal threaded column;213, external thread groove;22, top nut;23, lower nut;3, straight screw arbor assembly;31, double end Threaded rod;311, straight-bar;312, outer-hexagonal nut;313, the first external thread groove;314, the second external thread groove;32, fixinig plate; 33, the first nut;34, the second nut;4, the first precast stair;5, the second precast stair;6, counterbore;7, raised plate.
Specific embodiment
Please refer to Fig. 1~9, in the embodiment of the present invention, a kind of split type built-in fitting of precast stair and its application method, including Pre-embedded steel slab 1, the quadrangle on the top of pre-embedded steel slab 1 are provided through skew-swept airfoil component 2, and the top of skew-swept airfoil component 2 passes through It is screwed and is connected with straight screw arbor assembly 3, pre-embedded steel slab 1 includes hollow steel plate 11, and the quadrangle on the top of hollow steel plate 11 is opened Equipped with mounting hole 12, the middle part on the top of hollow steel plate 11 is fixedly connected with several steel bars 13, curved spiral shell by welding Bar assembly 2 includes skew-swept airfoil 21, and the lower end in the outside of skew-swept airfoil 21, which is engaged, is connected with top nut 22, under the outside of skew-swept airfoil 21 It holds and is connected with lower nut 23 close to the engagement of the bottom end of top nut 22, straight screw arbor assembly 3 includes double thread bar 31, double thread bar The upper end in 31 outside is socketed with fixinig plate 32, and the upper end in the outside of double thread bar 31 is engaged close to the top of fixinig plate 32 to be connected It is connected to the first nut 33, engagement is connected with the second nut close to the top of the first nut 33 for the upper end in the outside of double thread bar 31 34。
In Fig. 5: skew-swept airfoil 21 includes curved rod 211, and the top of curved rod 211 is fixedly connected with internal threaded column 212, curved The lower end of connecting rod 211 offers external thread groove 213, so as to install skew-swept airfoil 21 at the construction field (site), prevents precast stair from existing During transhipment, skew-swept airfoil 21 is caused to deform.
In Fig. 6: straight screw arbor assembly 3 includes straight-bar 311, and the upper end of straight-bar 311 offers the second external thread groove 314, directly The lower end of bar 311 offers the first external thread groove 313, and the outside of straight-bar 311 offers outer-hexagonal spiral shell close to the top of straight-bar 311 Cap 312 so that site operation personnel be facilitated to assemble, and improves the intensity of precast stair assembly.
In fig. 3 and in fig. 5: the inside of 213 penetrating mounting holes 12 of external thread groove, lower nut 23 are located at the bottom of hollow steel plate 11 End, top nut 22 are located at the bottom end of hollow steel plate 11, external thread groove 213 and hollow steel plate 11 and pass through top nut 22 and lower nut 23 It is fixedly connected, pre-embedded steel slab 1 and skew-swept airfoil component 2 is fitted together to facilitate.
In fig. 5 and fig.: the first external thread groove 313 engages connection, the first nut 33 by screw thread with internal threaded column 212 Connection is engaged by screw thread with the second external thread groove 314 with the second nut 34, to facilitate skew-swept airfoil component 2 and straight screw rod Component 3 fits together.
In Fig. 1~9: its implementation, comprising the following steps:
S1, it first checks, clear up template, and to the inner wall brushing release agent of template, then, the mould of bottom end and side being installed Plate, according still further to the requirement assembling reinforcement mesh sheet of setting;
S2, elder generation are clockwise screwed into top nut 22 upper end in the outside of external thread groove 213, then external thread groove 213 is run through In the inside of mounting hole 12, wherein the top of hollow steel plate 11 is close in top nut 22, by top nut 22 to external thread groove 213 It is positioned, then, then from the bottom end of hollow steel plate 11 lower nut 23 is screwed into clockwise under the outside of external thread groove 213 End similarly, makes hollow steel plate to make skew-swept airfoil 21 be fixed together with hollow steel plate 11 with lower nut 23 by top nut 22 11 four corners are respectively mounted a skew-swept airfoil component 2;
S3, the inside for being embedded into internal threaded column 212 using rubber stopper make internal threaded column 212 keep sealing, then, peace The pre-embedded steel slab 1 and skew-swept airfoil component 2 being fitted together are put into togerther in the reinforced mesh bound in S1, wherein pre-embedded steel slab 1 Upper end inside reinforced mesh, the top of skew-swept airfoil component 2 and the lower surface of template are concordant, and in the lower end of reinforced mesh Reserved several groups counterbore 6;
The template on the top and the other side reserved in S4, installation S1, is poured by the hole that template top is reserved into template Cement concrete is built, then, is vibrated to the cement concrete poured, until there is laitance in the surface of cement concrete, and No longer there is bubble;
After the completion of S5, maintenance, form removal forms precast stair, and carries out processing appropriate to the surface of precast stair And repairing, guarantee surface zero defect;
After S6, precast stair are transported to construction site, the rubber stopper for being mounted on 212 inside of internal threaded column in S3 is extracted, is utilized Spanner is stuck in the outside of outer-hexagonal nut 312, double thread bar 31 is screwed into the inside of internal threaded column 212, makes double thread bar 31 are fixed together with skew-swept airfoil 21;
S7, the side of the bottom end of the second precast stair 5 is put into the first precast stair 4 top side, wherein first The straight screw arbor assembly 3 on 4 top of precast stair runs through the counterbore 6 of 5 bottom end of the second precast stair, then, 32 sets of fixinig plate heavy On the double thread bar 31 of 6 inside of hole, then the first nut 33 and the second nut 34 are successively screwed into the second external thread groove clockwise On 314, to just complete the assembly of the first precast stair 4 and the second precast stair 5, it can assemble according to actual needs The precast stair of different number;
After S8, precast stair are completed, using cement mortar to the counterbore 6 of the precast stair of lowermost end and top The internal threaded column 212 of precast stair is blocked, and is recycled cement concrete to pour the side of raised plate 7, is made protrusion The side of plate 7 is concordant with flooring or floor, to complete the installation of precast stair and building, connection.
It is above-described, it is merely preferred embodiments of the present invention, but protection scope of the present invention is not limited to This, anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention And its inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of split type built-in fitting of precast stair and its application method, including pre-embedded steel slab (1), the pre-embedded steel slab (1) The quadrangle on top is provided through skew-swept airfoil component (2), and the top of the skew-swept airfoil component (2), which is threadably secured, to be connected with Straight screw arbor assembly (3), which is characterized in that the pre-embedded steel slab (1) includes hollow steel plate (11), the top of the hollow steel plate (11) The quadrangle at end offers mounting hole (12), and the middle part on the top of hollow steel plate (11) is fixedly connected with by welding Several steel bars (13), the skew-swept airfoil component (2) include skew-swept airfoil (21), the lower end engagement in the outside of the skew-swept airfoil (21) It is connected with top nut (22), and close to the bottom end of top nut (22), engagement is connected with lower nut for the lower end in the outside of skew-swept airfoil (21) (23), the straight screw arbor assembly (3) includes double thread bar (31), and the upper end in the outside of the double thread bar (31) is socketed with Fixinig plate (32), and close to the top of fixinig plate (32), engagement is connected with the first nut for the upper end in the outside of double thread bar (31) (33), close to the top of the first nut (33), engagement is connected with the second nut for the upper end in the outside of the double thread bar (31) (34)。
2. a kind of split type built-in fitting of precast stair according to claim 1 and its application method, which is characterized in that described Skew-swept airfoil (21) includes curved rod (211), and the top of the curved rod (211) is fixedly connected with internal threaded column (212), and curved company The lower end of bar (211) offers external thread groove (213).
3. a kind of split type built-in fitting of precast stair according to claim 1 and its application method, which is characterized in that described Straight screw arbor assembly (3) includes straight-bar (311), and the upper end of the straight-bar (311) offers the second external thread groove (314), and straight-bar (311) lower end offers the first external thread groove (313), and the outside of the straight-bar (311) is opened up close to the top of straight-bar (311) There are outer-hexagonal nut (312).
4. a kind of split type built-in fitting of precast stair according to claim 2 and its application method, which is characterized in that described The inside of external thread groove (213) penetrating mounting holes (12), the lower nut (23) are located at the bottom end of hollow steel plate (11), it is described on Nut (22) is located at the bottom end of hollow steel plate (11), and the external thread groove (213) and hollow steel plate (11) pass through top nut (22) It is fixedly connected with lower nut (23).
5. a kind of split type built-in fitting of precast stair according to claim 2 or 3 and its application method, which is characterized in that First external thread groove (313) engages connection, first nut (33) and the second spiral shell by screw thread with internal threaded column (212) Female (34) engage connection by screw thread with the second external thread groove (314).
6. any split type built-in fitting of precast stair and its application method according to claim 1~5, its implementation, The following steps are included:
S1, it first checks, clear up template, and to the inner wall brushing release agent of template, then, the template of bottom end and side being installed, then Assembling reinforcement mesh sheet according to set requirements;
S2, elder generation are clockwise screwed into top nut (22) upper end in the outside of external thread groove (213), then external thread groove (213) is passed through It is through the inside of mounting hole (12), wherein the top of hollow steel plate (11) is close in top nut (22), then, then from hollow steel plate (11) bottom end is clockwise screwed into lower nut (23) lower end in the outside of external thread groove (213), similarly, makes hollow steel plate (11) Four corners be respectively mounted a skew-swept airfoil component (2);
S3, the inside for being embedded into internal threaded column (212) using rubber stopper, then, the pre-embedded steel slab (1) that is installed together and curved Screw arbor assembly (2) is put into togerther in the reinforced mesh bound in S1, and wherein pre-embedded steel slab (1) is located at upper inside reinforced mesh End, the top of skew-swept airfoil component (2) is concordant with the lower surface of template, and reserves several groups counterbore (6) in the lower end of reinforced mesh;
The template on the top and the other side reserved in S4, installation S1, pours water into template by the hole that template top is reserved Cement concrete then vibrates to the cement concrete poured;
After the completion of S5, maintenance, form removal forms precast stair, and carries out processing appropriate to the surface of precast stair and repair It mends;
It after S6, precast stair are transported to construction site, extract and is mounted on rubber stopper on the inside of internal threaded column (212) in S3, using pulling Hand is stuck in the outside of outer-hexagonal nut (312), double thread bar (31) is screwed into the inside of internal threaded column (212);
S7, the side of the bottom end of the second precast stair (5) is put into the first precast stair (4) top side, wherein first The straight screw arbor assembly (3) on precast stair (4) top runs through the counterbore (6) of the second precast stair (5) bottom end, then, fixinig plate (32) it covers on the double thread bar (31) on the inside of counterbore (6), then successively the first nut (33) and the second nut (34) up time Needle is screwed on the second external thread groove (314), so that the assembly of the first precast stair (4) Yu the second precast stair (5) is just completed, it can According to actual needs, the precast stair of different number can be assembled;
After S8, precast stair are completed, using cement mortar to the pre- of the counterbore (6) of the precast stair of lowermost end and top The internal threaded column (212) of stair processed is blocked, and is recycled cement concrete to pour the side of raised plate (7), is made convex The side of starting board (7) is concordant with flooring or floor, to complete the installation of precast stair and building, connection.
CN201910766952.7A 2019-08-20 2019-08-20 A kind of split type built-in fitting of precast stair and its application method Pending CN110512746A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910766952.7A CN110512746A (en) 2019-08-20 2019-08-20 A kind of split type built-in fitting of precast stair and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910766952.7A CN110512746A (en) 2019-08-20 2019-08-20 A kind of split type built-in fitting of precast stair and its application method

Publications (1)

Publication Number Publication Date
CN110512746A true CN110512746A (en) 2019-11-29

Family

ID=68626724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910766952.7A Pending CN110512746A (en) 2019-08-20 2019-08-20 A kind of split type built-in fitting of precast stair and its application method

Country Status (1)

Country Link
CN (1) CN110512746A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2188608Y (en) * 1994-07-08 1995-02-01 北京利科劳务服务公司 Interlocking colour surface stone
BR9600382A (en) * 1995-02-14 1998-03-03 Saint Gobain Isover System for mounting and fixing a coating on a surface to be coated
US20050252123A1 (en) * 2004-05-14 2005-11-17 Karen Colonias Construction connector anchor cage system
CN201753482U (en) * 2010-08-04 2011-03-02 中太建设集团股份有限公司 Embedded part in cast-in-place concrete member
CN106284877A (en) * 2016-08-05 2017-01-04 成都市第四建筑工程公司 Assembled stair and installation method thereof
CN109339247A (en) * 2018-11-12 2019-02-15 中国十七冶集团有限公司 A kind of split type built-in fitting of precast stair and its application method
CN208777595U (en) * 2018-08-17 2019-04-23 浙江中天建筑产业化有限公司 A structurally stable prefabricated staircase
CN209099789U (en) * 2018-10-29 2019-07-12 山西省工业设备安装集团有限公司 A kind of isolated footing pre-embedded anchoring bolts positioning device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2188608Y (en) * 1994-07-08 1995-02-01 北京利科劳务服务公司 Interlocking colour surface stone
BR9600382A (en) * 1995-02-14 1998-03-03 Saint Gobain Isover System for mounting and fixing a coating on a surface to be coated
US20050252123A1 (en) * 2004-05-14 2005-11-17 Karen Colonias Construction connector anchor cage system
CN201753482U (en) * 2010-08-04 2011-03-02 中太建设集团股份有限公司 Embedded part in cast-in-place concrete member
CN106284877A (en) * 2016-08-05 2017-01-04 成都市第四建筑工程公司 Assembled stair and installation method thereof
CN208777595U (en) * 2018-08-17 2019-04-23 浙江中天建筑产业化有限公司 A structurally stable prefabricated staircase
CN209099789U (en) * 2018-10-29 2019-07-12 山西省工业设备安装集团有限公司 A kind of isolated footing pre-embedded anchoring bolts positioning device
CN109339247A (en) * 2018-11-12 2019-02-15 中国十七冶集团有限公司 A kind of split type built-in fitting of precast stair and its application method

Similar Documents

Publication Publication Date Title
CN108049498A (en) The prefabricated post and Prefabricated beam connection structure and method of assembled architecture frame structure
CN105239720A (en) Prefabricated assembled steel-concrete composite beam connected by adopting high-strength bolt
CN108589986A (en) One kind being based on bolted assembled composite wall structure and its construction method
CN101649656A (en) Overlapped shear wall with prefabricated part and cast-in-situ part and manufacturing method thereof
CN206616862U (en) Formwork root bracing means
CN205955067U (en) Prefabricated coincide wallboard of outband moulding
CN217840298U (en) Novel friction energy consumption node of steel core concrete column-precast concrete beam
CN108018972B (en) Full prefabricated floor slab and composite floor slab combined structure, manufacturing and assembling method
CN108240037A (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node
CN106978861A (en) A kind of truss-like combined steel plate wall
CN108374493A (en) Novel low layer assembled wallboard structure energy dissipating steel plate welding node
CN215166455U (en) Low, multi-layer fully prefabricated assembled concrete structure
CN206298957U (en) Bilateral formula precast prestressed concrete frame is from rehabilitation energy dissipation node
CN207003673U (en) A kind of connecting node of beam and wallboard
CN101748893A (en) Method for manufacturing high-rise building balcony boards
CN209227863U (en) Assembled height superimposed sheet dislocation lap joint structure
CN216713926U (en) Precast concrete elevator structure of dry type connecting node of post-cast-free embedded steel box
CN110512746A (en) A kind of split type built-in fitting of precast stair and its application method
CN207934185U (en) A kind of detachably prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint
CN111663682A (en) Assembly type wall body connecting structure based on ribbed box and construction method thereof
CN104060831B (en) A kind of construction method of architecture interlayer combined wall
CN210263391U (en) Assembled steel construction beam column anchor joint that is in milk
CN111236681A (en) Hanging die for adding laminated slab at bottom of concrete slab and construction method thereof
CN209397938U (en) One kind reinforcing tooling for Double-side laminated co-clip heart heat-preservation shear wall wall root

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129