[go: up one dir, main page]

CN111663804A - Steel structure support for building - Google Patents

Steel structure support for building Download PDF

Info

Publication number
CN111663804A
CN111663804A CN202010467357.6A CN202010467357A CN111663804A CN 111663804 A CN111663804 A CN 111663804A CN 202010467357 A CN202010467357 A CN 202010467357A CN 111663804 A CN111663804 A CN 111663804A
Authority
CN
China
Prior art keywords
fixedly connected
block
rod
spring
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010467357.6A
Other languages
Chinese (zh)
Other versions
CN111663804B (en
Inventor
黄逸铴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Chutian Construction Co ltd
Original Assignee
Wenzhou Chutian Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Chutian Construction Co ltd filed Critical Wenzhou Chutian Construction Co ltd
Priority to CN202010467357.6A priority Critical patent/CN111663804B/en
Publication of CN111663804A publication Critical patent/CN111663804A/en
Application granted granted Critical
Publication of CN111663804B publication Critical patent/CN111663804B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/02Shores or struts; Chocks non-telescopic

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

本发明公开了一种建筑用钢结构支架,涉及建筑技术领域,针对现有的支架安全系数较低的问题,现提出如下方案,其包括连接架,所述连接架的上、下两端均固定套接有支撑杆,所述连接架的四周均一体成形有限定套,所述限定套内滑动套接有移动杆,所述移动杆通过螺栓与限定套固定连接,两个所述移动杆的一端设置有转动装置,两个转动装置之间连接有连接杆,本发明结构简单,使用方便,可以吸收减少或者适应移动杆、连接杆以及支撑杆的上的部分应力,减少内应力的产生,进而延长装置的使用,保证工人的安全,减少连锁反应,减少事件发生时所产生的危害性,方便后续的维修,降低维修成本。

Figure 202010467357

The invention discloses a steel structure bracket for construction, which relates to the technical field of construction. Aiming at the problem that the safety factor of the existing bracket is low, the following scheme is proposed, which includes a connecting frame, and the upper and lower ends of the connecting frame are both A supporting rod is fixedly sleeved, and a limiting sleeve is integrally formed around the connecting frame. A moving rod is slidably sleeved in the limiting sleeve. The moving rod is fixedly connected to the limiting sleeve through bolts. The two moving rods One end is provided with a rotating device, and a connecting rod is connected between the two rotating devices. The present invention is simple in structure and convenient to use, and can absorb and reduce or adapt to part of the stress on the moving rod, the connecting rod and the supporting rod, and reduce the generation of internal stress. , thereby prolonging the use of the device, ensuring the safety of workers, reducing chain reactions, reducing the hazard caused by incidents, facilitating subsequent maintenance, and reducing maintenance costs.

Figure 202010467357

Description

一种建筑用钢结构支架A kind of steel structure bracket for building

技术领域technical field

本涉及建筑技术领域,尤其涉及一种建筑用钢结构支架。The present invention relates to the field of construction technology, in particular to a steel structure support for construction.

背景技术Background technique

随着市政发展建设,使得基础设置建造的越来越频繁,在建筑施工时,经常需要进行高空作业,进而需要使用到支架进行支撑,以达到保护和方便施工的目的,保证施工人员能安全有序的施工,同时减少下方行人的危险。With the development and construction of municipal governments, the construction of infrastructure is becoming more and more frequent. During construction, high-altitude operations are often required, and then brackets are required for support to achieve the purpose of protection and convenient construction, and to ensure that the construction personnel can safely and effectively orderly construction, while reducing the danger of pedestrians below.

而现有的建筑支架一般采用两个钢管的套接,然后利用螺栓进行固定拼接,没有一定的缓冲,工地上的情况较为复杂,当一个损坏时,可能牵连到其他多个钢架,形成连锁反应,造成更大的损失。However, the existing building supports generally use the socket connection of two steel pipes, and then use bolts for fixing and splicing. There is no certain buffer, and the situation on the construction site is more complicated. When one is damaged, it may be involved in other steel frames, forming a chain reaction, resulting in greater losses.

内容content

本提出的一种建筑用钢结构支架,解决了支架安全系数较低的问题。The present invention proposes a steel structure support for building, which solves the problem of low safety factor of the support.

为了实现上述目的,本采用了如下技术方案:In order to achieve the above purpose, the following technical solutions are adopted:

一种建筑用钢结构支架,包括连接架,所述连接架的上、下两端均固定套接有支撑杆,所述连接架的四周均一体成形有限定套,所述限定套内滑动套接有移动杆,所述移动杆通过螺栓与限定套固定连接,两个所述移动杆的一端设置有转动装置,两个转动装置之间连接有连接杆,所述连接杆的一侧固定连接有连接装置,所述连接装置的一侧连接有对称设置的加强杆,且加强杆的另一端固定连接有与支撑杆固定连接的固定块。A steel structure support for construction includes a connecting frame, the upper and lower ends of the connecting frame are fixedly sleeved with support rods, and the surrounding of the connecting frame is integrally formed with a limiting sleeve, and a sliding sleeve inside the limiting sleeve A moving rod is connected, the moving rod is fixedly connected with the limiting sleeve by bolts, one end of the two moving rods is provided with a rotating device, a connecting rod is connected between the two rotating devices, and one side of the connecting rod is fixedly connected There is a connecting device, one side of the connecting device is connected with a symmetrically arranged reinforcing rod, and the other end of the reinforcing rod is fixedly connected with a fixing block fixedly connected with the supporting rod.

优选的,所述转动装置包括与移动杆固定连接的限定块,所述限定块的一侧固定连接有第一弹簧,且第一弹簧的另一端固定连接有卡接块,两个所述卡接块之间连接有承接块,所述承接块的一侧一体成形有与移动杆固定连接的延伸块,所述延伸块与连接杆固定连接,所述延伸块的外壁设置有与连接杆固定连接的缓冲装置。Preferably, the rotating device includes a limiting block fixedly connected with the moving rod, a first spring is fixedly connected to one side of the limiting block, and a clamping block is fixedly connected to the other end of the first spring. A receiving block is connected between the connecting blocks, one side of the receiving block is integrally formed with an extension block that is fixedly connected with the moving rod, the extending block is fixedly connected with the connecting rod, and the outer wall of the extending block is provided with a connecting rod fixed connected buffers.

优选的,所述缓冲装置包括与连接杆固定连接的限定圈,所述限定圈的内壁滑动套接有缓冲杆,所述缓冲杆的一侧固定连接有位于限定圈内的第二弹簧,且第二弹簧的另一端与限定圈固定连接。Preferably, the buffer device includes a limiting ring fixedly connected with the connecting rod, the buffer rod is slidably sleeved on the inner wall of the limiting ring, a second spring located in the limiting ring is fixedly connected to one side of the buffer rod, and The other end of the second spring is fixedly connected with the limiting ring.

优选的,所述限定圈内设置有限定腔,所述第二弹簧和缓冲杆位于限定腔内,所述缓冲杆与限定腔的腔壁滑动连接。Preferably, the limiting ring is provided with a limiting cavity, the second spring and the buffer rod are located in the limiting cavity, and the buffer rod is slidably connected with the cavity wall of the limiting cavity.

优选的,所述移动杆内设置有拼接槽,所述延伸块、卡接块、承接块和第一弹簧均位于拼接槽内,所述移动杆的一端设置有缓冲槽,所述缓冲装置位于缓冲槽内。Preferably, the moving rod is provided with a splicing groove, the extension block, the clamping block, the receiving block and the first spring are all located in the splicing groove, one end of the moving rod is provided with a buffer groove, and the buffer device is located in the in the buffer tank.

优选的,所述连接装置包括与连接杆固定连接的安装套,所述安装套内固定连接有第三弹簧,且第三弹簧的另一端固定连接有与安装套滑动套接的安装块,所述安装块的一侧一体成形有间距块,所述加强杆的一端位于间距块内,所述加强杆连接有与间距块固定连接的螺纹套。Preferably, the connecting device includes an installation sleeve fixedly connected with the connecting rod, a third spring is fixedly connected in the installation sleeve, and the other end of the third spring is fixedly connected with an installation block that is slidably sleeved with the installation sleeve, so One side of the mounting block is integrally formed with a spacing block, one end of the reinforcing rod is located in the spacing block, and the reinforcing rod is connected with a threaded sleeve that is fixedly connected with the spacing block.

优选的,所述间距块内设置有间距槽,所述加强杆位于间距槽内,且间距槽的槽壁与加强杆的杆壁滑动连接。Preferably, the spacing block is provided with a spacing groove, the reinforcing rod is located in the spacing groove, and the groove wall of the spacing groove is slidably connected with the rod wall of the reinforcing rod.

优选的,所述加强杆内设置有适应槽,所述螺纹套的中间位于适应槽内,所述适应槽的直径大于螺纹套的直径。Preferably, the reinforcing rod is provided with an adapting groove, the middle of the threaded sleeve is located in the adapting groove, and the diameter of the adapting groove is larger than the diameter of the threaded sleeve.

优选的,所述安装套和安装块的横截面均采用矩形结构,所述安装套横截面的面积比安装块横截面的面积大。Preferably, the cross-sections of the mounting sleeve and the mounting block are rectangular structures, and the cross-sectional area of the mounting sleeve is larger than the cross-sectional area of the mounting block.

优选的,两个所述加强杆之间固定连接有加强筋,所述加强杆上固定连接有多个加强块。Preferably, reinforcing ribs are fixedly connected between the two reinforcing bars, and a plurality of reinforcing blocks are fixedly connected to the reinforcing bars.

本的有益效果:Beneficial effects of:

1:通过转动装置和转动装置配合其他装置之间的连接,可以吸收减少或者适应移动杆、连接杆以及支撑杆的上的部分应力,减少内应力的产生,进而延长装置的使用,保证工人的安全。1: Through the connection between the rotating device and the rotating device in conjunction with other devices, it can absorb and reduce or adapt to the part of the stress on the moving rod, connecting rod and support rod, reduce the generation of internal stress, and then extend the use of the device to ensure the safety of workers. Safety.

2:通过不同装置的相互配合,可以在一定范围内适应支撑杆件的轻微位移,不同装置之间可拆卸的连接,同时配合各个装置的缓冲,可以在部分杆件发生损坏后,可以减少连锁反应,只对受损杆件进行拆除和更换即可,不仅可以减少事件发生时所产生的危害性,也方便后续的维修,降低维修成本。2: Through the mutual cooperation of different devices, it can adapt to the slight displacement of the support rods within a certain range, the detachable connection between different devices, and at the same time cooperate with the buffering of each device, it can reduce the chain after some rods are damaged. In response, only the damaged rods can be removed and replaced, which can not only reduce the harm caused by the incident, but also facilitate subsequent maintenance and reduce maintenance costs.

附图说明Description of drawings

图1为本提出的一种建筑用钢结构支架的主视剖视示意图;Fig. 1 is the front sectional schematic diagram of a kind of architectural steel structure support proposed for this;

图2为本提出的一种建筑用钢结构支架的左视剖视示意图;Fig. 2 is the left side sectional schematic diagram of a kind of architectural steel structure support proposed for this;

图3为本提出的一种建筑用钢结构支架的A处放大示意图;Fig. 3 is the enlarged schematic diagram of place A of a kind of architectural steel structure support proposed for this;

图4为本提出的一种建筑用钢结构支架的A处左视剖视示意图;Fig. 4 is the left side sectional schematic diagram of a kind of architectural steel structure support proposed by this;

图5为本提出的一种建筑用钢结构支架的缓冲装置主视剖视示意图;FIG. 5 is a schematic cross-sectional front view of a buffer device of a steel structure support for buildings proposed for this purpose;

图6为本提出的一种建筑用钢结构支架的B处放大示意图Fig. 6 is the enlarged schematic diagram of the B position of a kind of building steel structure support proposed by the present invention

图中标号:1连接架、2限定套、3支撑杆、4加强杆、5固定块、6移动杆、7连接杆、8加强筋、9缓冲装置、10限定块、11卡接块、12承接块、13拼接槽、14第一弹簧、15延伸块、16缓冲槽、17适应槽、18螺纹套、19间距块、20间距槽、21安装块、22第三弹簧、23安装套、91限定圈、92缓冲杆、93第二弹簧、94限定腔。Labels in the figure: 1 connecting frame, 2 limiting sleeve, 3 supporting rod, 4 reinforcing rod, 5 fixing block, 6 moving rod, 7 connecting rod, 8 reinforcing rib, 9 buffer device, 10 limiting block, 11 snap block, 12 Receiving block, 13 splice groove, 14 first spring, 15 extension block, 16 buffer groove, 17 adapting groove, 18 threaded sleeve, 19 spacing block, 20 spacing groove, 21 mounting block, 22 third spring, 23 mounting sleeve, 91 The limiting ring, 92 the buffer rod, 93 the second spring, 94 defines the cavity.

具体实施方式Detailed ways

下面将结合本实施例中的附图,对本实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本一部分实施例,而不是全部的实施例。The technical solutions in this embodiment will be clearly and completely described below with reference to the accompanying drawings in this embodiment. Obviously, the described embodiments are only a part of the embodiments, not all of the embodiments.

参照图1-6,一种建筑用钢结构支架,包括连接架1,连接架1的上、下两端均固定套接有支撑杆3,连接架1的四周均一体成形有限定套2,限定套2内滑动套接有移动杆6,移动杆6通过螺栓与限定套2固定连接,两个移动杆6的一端设置有转动装置,两个转动装置之间连接有连接杆7,连接杆7的一侧固定连接有连接装置,连接装置的一侧连接有对称设置的加强杆4,且加强杆4的另一端固定连接有与支撑杆3固定连接的固定块5,在进行安装时,利用螺栓将连接架1与支撑杆3进行连接,然后将移动杆6和连接杆7进行连接,最后将移动杆6安装到限定套2内,利用螺栓进行固定,形成基本的框架,此时将加强杆4与连接杆7进行连接,最后利用螺栓将固定块5安装到支撑杆3上,形成防护,安装完成,在使用时,连接装置和转动装置进行一定的扭矩或者内力的抵压吸收,减少移动杆6、连接杆7以及支撑杆3的上的部分应力,保证装置的安全。Referring to Figures 1-6, a steel structure support for construction includes a connecting frame 1, the upper and lower ends of the connecting frame 1 are fixedly sleeved with support rods 3, and the surrounding of the connecting frame 1 is integrally formed with a limiting sleeve 2, A moving rod 6 is slidably connected to the limiting sleeve 2, and the moving rod 6 is fixedly connected to the limiting sleeve 2 through bolts. One end of the two moving rods 6 is provided with a rotating device, and a connecting rod 7 is connected between the two rotating devices. The connecting rod One side of the 7 is fixedly connected with a connecting device, one side of the connecting device is connected with a symmetrically arranged reinforcing rod 4, and the other end of the reinforcing rod 4 is fixedly connected with a fixed block 5 that is fixedly connected with the support rod 3. During installation, Use bolts to connect the connecting frame 1 to the support rod 3, then connect the moving rod 6 to the connecting rod 7, and finally install the moving rod 6 into the limiting sleeve 2, and fix it with bolts to form a basic frame. The reinforcing rod 4 is connected with the connecting rod 7, and finally the fixing block 5 is installed on the supporting rod 3 with bolts to form protection, and the installation is completed. Partial stress on the moving rod 6, the connecting rod 7 and the supporting rod 3 is reduced to ensure the safety of the device.

转动装置包括与移动杆6固定连接的限定块10,限定块10的一侧固定连接有第一弹簧14,且第一弹簧14的另一端固定连接有卡接块11,两个卡接块11之间连接有承接块12,承接块12的一侧一体成形有与移动杆6固定连接的延伸块15,延伸块15与连接杆7固定连接,延伸块15的外壁设置有与连接杆7固定连接的缓冲装置9,在进行安装时,将延伸块15插入到移动杆6中,使得承接块12进入到两个卡接块11之间,进行限定,同时使得缓冲装置9的部分进入到移动杆6中,两者进行相互的挤压,在移动杆6与限定套2连接后,即对连接杆7进行了限定,在装置产生一定的扭矩时,经过第一弹簧14的抵挡,使得连接杆7进行细微的旋转,缓冲应力,同时在两个连接架1相互靠进时,经过缓冲装置9可以进行一定的移动和缓冲,进一步避免挤压应力的产生。The rotating device includes a limiting block 10 fixedly connected with the moving rod 6 , one side of the limiting block 10 is fixedly connected with a first spring 14 , and the other end of the first spring 14 is fixedly connected with a clamping block 11 , and two clamping blocks 11 A receiving block 12 is connected therebetween. One side of the receiving block 12 is integrally formed with an extension block 15 that is fixedly connected to the moving rod 6 , and the extension block 15 is fixedly connected to the connecting rod 7 . When the connected buffer device 9 is installed, the extension block 15 is inserted into the moving rod 6, so that the receiving block 12 enters between the two snap-on blocks 11 to be limited, and at the same time, part of the buffer device 9 is allowed to enter the moving rod. In the rod 6, the two squeeze each other. After the moving rod 6 is connected with the limiting sleeve 2, the connecting rod 7 is limited. When the device generates a certain torque, it is resisted by the first spring 14, so that the connection is made. The rod 7 rotates slightly to buffer stress, and at the same time, when the two connecting frames 1 move toward each other, a certain movement and buffering can be performed through the buffer device 9 to further avoid the generation of extrusion stress.

缓冲装置9包括与连接杆7固定连接的限定圈91,限定圈91的内壁滑动套接有缓冲杆92,缓冲杆92的一侧固定连接有位于限定圈91内的第二弹簧93,且第二弹簧93的另一端与限定圈91固定连接,限定圈91内设置有限定腔94,第二弹簧93和缓冲杆92位于限定腔94内,缓冲杆92与限定腔94的腔壁滑动连接,其中限定圈91中内设置有缓冲液,在进行缓冲时,外界的力作用到缓冲杆92上,挤压缓冲液和第二弹簧93,进行应力的吸收,减少对连接杆7以及移动杆6相向的应力,造成连接杆7的断裂。The buffer device 9 includes a limiting ring 91 fixedly connected with the connecting rod 7, the inner wall of the limiting ring 91 is slidably sleeved with a buffer rod 92, and one side of the buffer rod 92 is fixedly connected with a second spring 93 located in the limiting ring 91, and the first The other ends of the two springs 93 are fixedly connected with the limiting ring 91 . The limiting ring 91 is provided with a limiting cavity 94 , the second spring 93 and the buffer rod 92 are located in the limiting cavity 94 , and the buffer rod 92 is slidably connected with the cavity wall of the limiting cavity 94 . A buffer solution is arranged in the limiting ring 91. During buffering, the external force acts on the buffer rod 92, squeezes the buffer liquid and the second spring 93, absorbs the stress, and reduces the impact on the connecting rod 7 and the moving rod 6. The opposing stress causes the connecting rod 7 to break.

移动杆6内设置有拼接槽13,延伸块15、卡接块11、承接块12和第一弹簧14均位于拼接槽13内,移动杆6的一端设置有缓冲槽16,缓冲装置9位于缓冲槽16内,拼接槽13和缓冲槽16均方便不同装置的进行,并且保证一定的限定作用。The moving rod 6 is provided with a splicing groove 13. The extension block 15, the clamping block 11, the receiving block 12 and the first spring 14 are all located in the splicing groove 13. One end of the moving rod 6 is provided with a buffer groove 16, and the buffer device 9 is located in the buffer. In the groove 16, the splicing groove 13 and the buffer groove 16 are both convenient to carry out different devices, and ensure a certain limited function.

连接装置包括与连接杆7固定连接的安装套23,安装套23内固定连接有第三弹簧22,且第三弹簧22的另一端固定连接有与安装套23滑动套接的安装块21,安装块21的一侧一体成形有间距块19,加强杆4的一端位于间距块19内,加强杆4连接有与间距块19固定连接的螺纹套18,间距块19内设置有间距槽20,加强杆4位于间距槽20内,且间距槽20的槽壁与加强杆4的杆壁滑动连接,加强杆4内设置有适应槽17,螺纹套18的中间位于适应槽17内,适应槽17的直径大于螺纹套18的直径,在进行安装时,首先利用上方的安装块21挤压上方的第三弹簧22,方便下方的安装块21进入到安装套23内,进行连接,两侧的安装块21进入到安装套23内后,对固定块5进行固定,完成加强杆4的安装,然后利用螺纹套18将加强杆4安装到间距块19内,实现不同加强杆4与连接杆7的连接,同时适应槽17可以适应两侧支撑杆3的倾斜,具有一定的适应性,同时在一定范围内进行限定,保证装置相对固定。The connecting device includes an installation sleeve 23 fixedly connected with the connecting rod 7, a third spring 22 is fixedly connected in the installation sleeve 23, and the other end of the third spring 22 is fixedly connected with an installation block 21 slidably sleeved with the installation sleeve 23. One side of the block 21 is integrally formed with a spacing block 19, one end of the reinforcing rod 4 is located in the spacing block 19, the reinforcing rod 4 is connected with a threaded sleeve 18 fixedly connected with the spacing block 19, and a spacing groove 20 is provided in the spacing block 19 to strengthen The rod 4 is located in the spacing groove 20, and the groove wall of the spacing groove 20 is slidably connected with the rod wall of the reinforcing rod 4. The reinforcing rod 4 is provided with an adapting groove 17, and the middle of the threaded sleeve 18 is located in the adapting groove 17. The diameter is larger than the diameter of the threaded sleeve 18. When installing, first use the upper installation block 21 to squeeze the upper third spring 22, so that the lower installation block 21 can enter the installation sleeve 23 for connection. The installation blocks on both sides 21 After entering the installation sleeve 23, fix the fixing block 5 to complete the installation of the reinforcing rod 4, and then use the threaded sleeve 18 to install the reinforcing rod 4 into the spacing block 19 to realize the connection between the different reinforcing rods 4 and the connecting rod 7 At the same time, the adapting groove 17 can adapt to the inclination of the support rods 3 on both sides, has a certain adaptability, and is limited within a certain range to ensure that the device is relatively fixed.

安装套23和安装块21的横截面均采用矩形结构,安装套23横截面的面积比安装块21横截面的面积大,安装套23可以适应安装块21一定方向上指定距离的位置,适应轻微的变形,减少刚性连接所产生的过强的应力。The cross-sections of the mounting sleeve 23 and the mounting block 21 are both rectangular structures. The cross-sectional area of the mounting sleeve 23 is larger than the cross-sectional area of the mounting block 21. deformation, reducing the excessive stress generated by the rigid connection.

两个加强杆4之间固定连接有加强筋8,加强杆4上固定连接有多个加强块,加强筋8进行一定的加固作用,加强块保证转角的强度。A reinforcing rib 8 is fixedly connected between the two reinforcing rods 4 , and a plurality of reinforcing blocks are fixedly connected to the reinforcing rod 4 .

工作原理:在进行安装时,利用螺栓将连接架1与支撑杆3进行连接,然后将延伸块15插入到移动杆6中,使得承接块12进入到两个卡接块11之间,进行限定,同时使得缓冲杆92进入到移动杆6中,配合限定圈91,使得两者进行相互的挤压,在移动杆6与限定套2连接后,即对连接杆7进行了限定,同时限定套2上设置有多个螺纹孔,可以对螺栓进行不同位置的安装,保证移动杆6的固定,适应一定的误差,在装置产生一定的扭矩时,经过第一弹簧14的抵挡,使得连接杆7进行细微的旋转,缓冲应力,同时在两个连接架1相互靠进时,经过第二弹簧93可以进行一定的移动和缓冲,进一步避免挤压应力的产生,此时整个装置形成基本的框架,这时利用上方的安装块21挤压上方的第三弹簧22,方便下方的安装块21进入到安装套23内,进行连接,两侧的安装块21进入到安装套23内后,对固定块5进行固定,完成加强杆4的安装,然后利用螺纹套18将加强杆4安装到间距块19内,实现不同加强杆4与连接杆7的连接,同时适应槽17可以适应两侧支撑杆3的倾斜,具有一定的适应性,同时在一定范围内进行限定,保证装置相对固定,安装完成,多个装置可以减少移动杆6、连接杆7以及支撑杆3的上的部分应力,保证装置的安全使用。Working principle: During installation, the connecting frame 1 and the support rod 3 are connected with bolts, and then the extension block 15 is inserted into the moving rod 6, so that the receiving block 12 enters between the two clamping blocks 11 to define , and at the same time make the buffer rod 92 enter the moving rod 6 and cooperate with the limiting ring 91 to make the two squeeze each other. After the moving rod 6 is connected with the limiting sleeve 2, the connecting rod 7 is limited, and the limiting sleeve 2 is limited. 2 is provided with a plurality of threaded holes, the bolts can be installed at different positions to ensure the fixing of the moving rod 6 and adapt to certain errors. When the device generates a certain torque, the first spring 14 resists, so that the connecting rod 7 Perform slight rotation to buffer stress, and at the same time, when the two connecting frames 1 move toward each other, a certain movement and buffering can be performed through the second spring 93 to further avoid the generation of extrusion stress. At this time, the entire device forms a basic frame, At this time, the upper third spring 22 is squeezed by the upper mounting block 21 to facilitate the lower mounting block 21 to enter the mounting sleeve 23 for connection. 5. Fix, complete the installation of the reinforcement rod 4, and then use the threaded sleeve 18 to install the reinforcement rod 4 into the spacing block 19 to realize the connection between different reinforcement rods 4 and the connecting rod 7, and the adaptation groove 17 can adapt to the support rods 3 on both sides. It has certain adaptability and is limited within a certain range to ensure that the device is relatively fixed. After the installation is completed, multiple devices can reduce part of the stress on the moving rod 6, the connecting rod 7 and the supporting rod 3, and ensure the safety of the device. Safe to use.

在本的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本的限制。In this description, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear" ", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc. The relationship is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of description and to simplify the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature. In this description, "plurality" means two or more, unless otherwise expressly and specifically defined.

以上所述,仅为本较佳的具体实施方式,但本的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本揭露的技术范围内,根据本的技术方案及其构思加以等同替换或改变,都应涵盖在本的保护范围之内。The above is only the preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacements or changes should be covered within the protection scope of this document.

Claims (10)

1. The utility model provides a steel structure support for building, includes link (1), its characterized in that, bracing piece (3) have all been cup jointed fixedly at the upper and lower both ends of link (1), equal integrated into one piece all around of link (1) has limit set (2), sliding sleeve has cup jointed carriage release lever (6) in limit set (2), carriage release lever (6) are through bolt and limit set (2) fixed connection, two the one end of carriage release lever (6) is provided with rotating device, is connected with connecting rod (7) between two rotating device, one side fixedly connected with connecting device of connecting rod (7), one side of connecting device is connected with stiffener (4) that the symmetry set up, and the other end fixedly connected with of stiffener (4) and bracing piece (3) fixed block (5) fixed connection.
2. The steel structural support for buildings as claimed in claim 1, wherein the rotating device comprises a limiting block (10) fixedly connected with the moving rod (6), one side of the limiting block (10) is fixedly connected with a first spring (14), the other end of the first spring (14) is fixedly connected with a clamping block (11), a bearing block (12) is connected between the two clamping blocks (11), one side of the bearing block (12) is integrally formed with an extending block (15) fixedly connected with the moving rod (6), the extending block (15) is fixedly connected with the connecting rod (7), and the outer wall of the extending block (15) is provided with a buffer device (9) fixedly connected with the connecting rod (7).
3. The steel structural support for buildings as claimed in claim 2, wherein the buffer device (9) comprises a limit ring (91) fixedly connected with the connecting rod (7), the inner wall of the limit ring (91) is slidably sleeved with a buffer rod (92), one side of the buffer rod (92) is fixedly connected with a second spring (93) positioned in the limit ring (91), and the other end of the second spring (93) is fixedly connected with the limit ring (91).
4. A structural steel support for construction according to claim 3, wherein a limiting cavity (94) is provided in said limiting ring (91), said second spring (93) and bumper bar (92) are located in said limiting cavity (94), and said bumper bar (92) is slidably connected to the wall of said limiting cavity (94).
5. The steel structure support for buildings as claimed in claim 2, wherein a splicing groove (13) is provided in the moving rod (6), the extension block (15), the clamping block (11), the receiving block (12) and the first spring (14) are all located in the splicing groove (13), a buffer groove (16) is provided at one end of the moving rod (6), and the buffer device (9) is located in the buffer groove (16).
6. The steel structural support for buildings as claimed in claim 1, wherein the connecting device comprises a mounting sleeve (23) fixedly connected with the connecting rod (7), a third spring (22) is fixedly connected in the mounting sleeve (23), and the other end of the third spring (22) is fixedly connected with a mounting block (21) slidably sleeved with the mounting sleeve (23), a spacing block (19) is integrally formed on one side of the mounting block (21), one end of the reinforcing rod (4) is located in the spacing block (19), and the reinforcing rod (4) is connected with a threaded sleeve (18) fixedly connected with the spacing block (19).
7. A steel structural support for buildings according to claim 6, characterized in that the spacing block (19) is provided with a spacing groove (20), the reinforcing rod (4) is located in the spacing groove (20), and the wall of the spacing groove (20) is slidably connected with the wall of the reinforcing rod (4).
8. The structural steel bracket for construction as set forth in claim 6, wherein an adaptive groove (17) is provided in the reinforcing rod (4), the middle of the thread bushing (18) is positioned in the adaptive groove (17), and the diameter of the adaptive groove (17) is larger than that of the thread bushing (18).
9. The structural steel bracket for construction as set forth in claim 6, wherein the cross-section of the mounting sleeve (23) and the mounting block (21) are each of a rectangular structure, and the area of the cross-section of the mounting sleeve (23) is larger than that of the cross-section of the mounting block (21).
10. The structural steel bracket for construction as set forth in claim 1, wherein a reinforcing rib (8) is fixedly connected between two reinforcing rods (4), and a plurality of reinforcing blocks are fixedly connected to the reinforcing rods (4).
CN202010467357.6A 2020-05-28 2020-05-28 Steel construction support for building Active CN111663804B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010467357.6A CN111663804B (en) 2020-05-28 2020-05-28 Steel construction support for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010467357.6A CN111663804B (en) 2020-05-28 2020-05-28 Steel construction support for building

Publications (2)

Publication Number Publication Date
CN111663804A true CN111663804A (en) 2020-09-15
CN111663804B CN111663804B (en) 2025-04-08

Family

ID=72385000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010467357.6A Active CN111663804B (en) 2020-05-28 2020-05-28 Steel construction support for building

Country Status (1)

Country Link
CN (1) CN111663804B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB910183A (en) * 1958-01-28 1962-11-14 Technigraphic Bristol Ltd Coupling elements for constructional purposes
FR2317717A1 (en) * 1975-07-11 1977-02-04 Menabe Edme Multielement frame assembly mechanical joint - has several tubular screwed arms which can be used to terminate tubes of frame
US20060193687A1 (en) * 2005-01-21 2006-08-31 Avik Ghosh Moment resisting frame bearing connector
WO2015132421A1 (en) * 2014-03-03 2015-09-11 Eiroa Investigacion Desarrollo E Innovacion S.L. Assembly element
CN210507796U (en) * 2019-08-21 2020-05-12 郑州德力自动化物流设备制造有限公司 Convenient connecting piece of beam body
CN212613928U (en) * 2020-05-28 2021-02-26 温州楚天建设有限公司 A kind of steel structure bracket for building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB910183A (en) * 1958-01-28 1962-11-14 Technigraphic Bristol Ltd Coupling elements for constructional purposes
FR2317717A1 (en) * 1975-07-11 1977-02-04 Menabe Edme Multielement frame assembly mechanical joint - has several tubular screwed arms which can be used to terminate tubes of frame
US20060193687A1 (en) * 2005-01-21 2006-08-31 Avik Ghosh Moment resisting frame bearing connector
WO2015132421A1 (en) * 2014-03-03 2015-09-11 Eiroa Investigacion Desarrollo E Innovacion S.L. Assembly element
CN210507796U (en) * 2019-08-21 2020-05-12 郑州德力自动化物流设备制造有限公司 Convenient connecting piece of beam body
CN212613928U (en) * 2020-05-28 2021-02-26 温州楚天建设有限公司 A kind of steel structure bracket for building

Also Published As

Publication number Publication date
CN111663804B (en) 2025-04-08

Similar Documents

Publication Publication Date Title
CN206667730U (en) A kind of scalable suspension scaffold of socket joint type disk button
CN210598200U (en) Building engineering construction floor structure
CN211057625U (en) Prefabricated pier stud of assembled installation aligning device
CN219833571U (en) Auxiliary device for cable laying
CN111663804A (en) Steel structure support for building
CN212613928U (en) A kind of steel structure bracket for building
CN205444889U (en) Support arrangement for horizontal prefabricated component
CN204529015U (en) A kind of V-type elevator wall-attached frame
CN110905229A (en) Concrete beam reinforcement structure and construction method thereof
CN205822787U (en) Cast-in-place shear wall formwork reinforcement assembly
CN110127538A (en) A high-altitude overall translation system of a self-climbing tower crane attached to the exterior of a super high-rise building
CN206340939U (en) A kind of electrical engineering cable adapter
CN213626603U (en) Intelligent combined mounting frame for building
CN205314515U (en) Scaffold of building a wall
CN209046218U (en) A kind of reinforcing device for ground wire hardware tool
CN210316535U (en) Construction hydraulic pressure template climbing device
CN207160741U (en) A kind of municipal works fence
CN111663646A (en) Crossbeam and stand connecting device for assembly type structure
CN206438756U (en) A kind of guard bar structure and scaffold for scaffold
CN205314607U (en) Auxiliary bracket
CN111332962B (en) Application method of elastic pin shaft for mounting standard section of tower crane
CN211599728U (en) Pipeline elbow bracket
CN206580473U (en) Exempt from the integration of falling beam inner climbing crane tower support meanss
CN222457993U (en) Self-locking structure for fixing steel pipe pole
CN212453726U (en) Civil engineering construction is with supplementary fixing device convenient to installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Country or region after: China

Address after: Room 301, Building 2, Jinxiu Huating Commercial and Residential Building, No. 5000 Zhongxin Avenue, Liushi Town, Yueqing City, Wenzhou City, Zhejiang Province 325604

Applicant after: Zhejiang Chutian Construction Co.,Ltd.

Address before: No.5000, Central Avenue, Liushi Town, Yueqing City, Wenzhou City, Zhejiang Province

Applicant before: WENZHOU CHUTIAN CONSTRUCTION Co.,Ltd.

Country or region before: China

GR01 Patent grant
GR01 Patent grant