CN111705974A - A railing connection system for stone curtain wall - Google Patents
A railing connection system for stone curtain wall Download PDFInfo
- Publication number
- CN111705974A CN111705974A CN202010494334.4A CN202010494334A CN111705974A CN 111705974 A CN111705974 A CN 111705974A CN 202010494334 A CN202010494334 A CN 202010494334A CN 111705974 A CN111705974 A CN 111705974A
- Authority
- CN
- China
- Prior art keywords
- angle steel
- keel
- connecting bar
- embedded
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4157—Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
- E04F19/04—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
- E04F19/0459—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the fixing method
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明涉及幕墙领域,尤其是一种石材幕墙的栏杆连接系统,包括下部横向龙骨、第一支撑组件、下部竖向龙骨、第二支撑组件、第三支撑组件,第四支撑组件、石材面板、装饰面板、中部竖向龙骨、第五支撑组件、上部龙骨、上部石材挂件和栏杆;所述的下部竖向龙骨竖直固定在墙体A的室内和室外两侧;中部竖向龙骨通过第一预埋件竖向固定,中部竖向龙骨的下部连接有第三支撑组件,中部竖向龙骨的上部连接有第五支撑组件,上部龙骨通过第二预埋件固定在墙体A的顶部;栏杆的顶部固定连接在上部龙骨上。本发明的技术效果是安装效率高,受力合理,使用寿命长,连续性好较为美观。
The invention relates to the field of curtain walls, in particular to a railing connection system for stone curtain walls, comprising a lower horizontal keel, a first support component, a lower vertical keel, a second support component, a third support component, a fourth support component, a stone panel, The decorative panel, the middle vertical keel, the fifth support assembly, the upper keel, the upper stone pendant and the railing; the lower vertical keel is vertically fixed on the indoor and outdoor sides of the wall A; the middle vertical keel passes through the first The embedded parts are fixed vertically, the lower part of the middle vertical keel is connected with a third support component, the upper part of the middle vertical keel is connected with a fifth support component, and the upper keel is fixed on the top of the wall A through the second embedded parts; The top is fixedly connected to the upper keel. The technical effect of the invention is high installation efficiency, reasonable force, long service life, good continuity and more beautiful appearance.
Description
技术领域technical field
本发明涉及幕墙领域,尤其是一种石材幕墙的栏杆连接系统。The invention relates to the field of curtain walls, in particular to a railing connection system for stone curtain walls.
背景技术Background technique
现有的幕墙栏杆,例如公开号为CN204475721U的中国实用新型专利中公开的一种便于安装的高强度室外栏杆,涉及幕墙技术领域,由立柱、栏杆扶手和夹胶玻璃组成,所述栏杆扶手安装在两根立柱中间,在栏杆扶手内部的下方安装设置有芯套,所述芯套为方管状结构,安装时将芯套套装在立柱内,所述夹胶玻璃安装在立柱的内侧并固定安装在栏杆扶手的下方,在立柱的侧边上安装设置有玻璃副框,在每根立柱上安装有两个玻璃副框,所述夹胶玻璃固定在玻璃副框上,在两个玻璃副框的中间还向外垂直安装有压板,所述压板呈“几”字型结构,在压板的外端还安装有与压板配套的压线。Existing curtain wall railings, such as an easy-to-install high-strength outdoor railing disclosed in Chinese Utility Model Patent Publication No. CN204475721U, relate to the technical field of curtain walls, and are composed of uprights, railings, and laminated glass. In the middle of the two uprights, a core sleeve is installed under the inside of the railing. The core sleeve is a square tubular structure. During installation, the core sleeve is sleeved in the upright post, and the laminated glass is installed on the inner side of the upright post and fixedly installed. Below the railing, a glass sub-frame is installed on the side of the column, and two glass sub-frames are installed on each column. The laminated glass is fixed on the glass sub-frame, on the two glass sub-frames A pressure plate is also installed vertically outward in the middle of the pressure plate, and the pressure plate is in a "ji" shape structure, and a pressure line matched with the pressure plate is also installed at the outer end of the pressure plate.
现有的幕墙栏杆存在以下的问题:(1)栏杆安装不可靠;(2)若栏杆损坏,难以进行拆卸更换;(3)整体效果不美观,连续性不佳。The existing curtain wall railings have the following problems: (1) the installation of the railing is unreliable; (2) if the railing is damaged, it is difficult to disassemble and replace; (3) the overall effect is not beautiful and the continuity is poor.
发明内容SUMMARY OF THE INVENTION
为了解决上述幕墙栏杆存在栏杆安装不可靠,损坏维修困难和不够美观的问题,本发明的目的是提供一种便于安装拆卸,易于维修,受力合理,使用寿命长,连续性好较为美观的石材幕墙的栏杆连接系统。In order to solve the problems of unreliable installation of the railings, difficult damage and maintenance, and unbeautiful appearance of the above-mentioned curtain wall railings, the purpose of the present invention is to provide a kind of stone material that is easy to install and disassemble, easy to maintain, reasonable in force, long service life, and good in continuity. Railing connection system for curtain wall.
为本发明的目的,采用以下技术方案予以实施:一种石材幕墙的栏杆连接系统,该系统包括下部横向龙骨、第一支撑组件、下部竖向龙骨、第二支撑组件、第三支撑组件,第四支撑组件、石材面板、装饰面板、中部竖向龙骨、第五支撑组件、上部龙骨、上部石材挂件和栏杆;所述的下部横向龙骨水平安装在墙体A的底部,下部横向龙骨两端均对称安装有第一支撑组件;所述的第一支撑组件包括第一连接角钢和第一连接螺栓;所述的第一连接角钢一个侧面开有竖向的第一调节槽,第一调节槽内安装螺栓,通过螺栓将第一连接角钢安装在下部横向龙骨上;所述的第一连接螺栓安装在第一连接角钢下部,第一连接螺栓的下部形状由一个直槽连接一个燕尾槽构成,第一连接螺栓的下部用于连接石材面板;所述的石材面板有多块,石材面板上设有与第一连接螺栓的下部形状匹配的第一连接槽;所述的下部竖向龙骨竖直固定在墙体A的室内和室外两侧,下部竖向龙骨上连接有第二支撑组件、第三支撑组件和第四支撑组件;所述的第二支撑组件位于下部竖向龙骨的下部,第二支撑组件包括第二连接角钢、第三连接角钢和第二连接螺栓;第二连接角钢包括第一连接条和第二连接条;第三连接角钢包括第三连接条和第四连接条;第一连接条竖向固定连接在下部竖向龙骨上,第二连接条和第三连接条贴合固定,第四连接条与第一连接条平行,且第四连接条与第一连接条不在第二连接条的同一侧,第四连接条上安装第二连接螺栓,第二连接螺栓用于安装装饰面板;所述的装饰面板上设有与第二连接螺栓匹配的第二连接槽;所述的第三支撑组件包括第四连接角钢和第一石材挂件;所述的第四连接角钢包括第五连接条和第六连接条;第一石材挂件包括第一连接部和第一折弯部;所述的第五连接条固定在下部竖向龙骨中部;第六连接条和第一连接部贴合固定,第一折弯部位于第一连接部的一端并向上翘起,第一折弯部用于连接石材面板;所述的第四支撑组件包括第五连接角钢、第六连接角钢、支撑连接件和第三连接螺栓;所述的第五连接角钢包括第七连接条和第八连接条;所述的第六连接角钢包括第九连接条和第十连接条;所述的第七连接条竖直安装在下部竖向龙骨的上部;所述的第八连接条和第九连接条贴合固定;所述的第十连接条与七连接条平行,且第十连接条与七连接条不在第八连接条的同一侧;所述的支撑连接件包括支撑连接槽、第二连接部和第二折弯部;所述的支撑连接槽安装在第十连接条的上端部;所述的第二连接部的一端连接在支撑连接槽上,第二连接部的另一端连接第二折弯部;所述的第二折弯部的一端连接在第十连接条的侧面上;所述的第三连接螺栓安装在第二连接部上,第三连接螺栓用于连接石材面板;所述的中部竖向龙骨通过第一预埋件竖向固定,中部竖向龙骨的下部连接有第三支撑组件,中部竖向龙骨的上部连接有第五支撑组件,第三支撑组件和第五支撑组件分别固定中部的石材面板的上端和下端;所述的上部龙骨通过第二预埋件固定在墙体A的顶部,上部龙骨上连接有多个上部石材挂件;所述的栏杆的顶部固定连接在上部龙骨上。For the purpose of the present invention, the following technical solutions are adopted to implement: a railing connection system of a stone curtain wall, the system includes a lower horizontal keel, a first support assembly, a lower vertical keel, a second support assembly, a third support assembly, and a third support assembly. Four support components, stone panel, decorative panel, middle vertical keel, fifth support component, upper keel, upper stone pendant and railing; the lower horizontal keel is horizontally installed at the bottom of wall A, and both ends of the lower horizontal keel are A first support assembly is symmetrically installed; the first support assembly includes a first connecting angle steel and a first connecting bolt; one side of the first connecting angle steel is provided with a vertical first adjusting groove, and the first adjusting groove is in the first adjusting groove. Mounting bolts, the first connecting angle steel is installed on the lower horizontal keel by bolts; the first connecting bolt is installed at the lower part of the first connecting angle steel, and the lower part of the first connecting bolt is formed by a straight groove connecting a dovetail groove, The lower part of a connecting bolt is used to connect the stone panel; the stone panel is multi-piece, and the stone panel is provided with a first connecting groove that matches the shape of the lower part of the first connecting bolt; the lower vertical keel is vertically fixed On the indoor and outdoor sides of the wall body A, the lower vertical keel is connected with a second support assembly, a third support assembly and a fourth support assembly; the second support assembly is located at the lower part of the lower vertical keel, and the second support assembly is The supporting component includes a second connecting angle steel, a third connecting angle steel and a second connecting bolt; the second connecting angle steel includes a first connecting bar and a second connecting bar; the third connecting angle steel includes a third connecting bar and a fourth connecting bar; The connecting strip is vertically fixed and connected to the lower vertical keel, the second connecting strip and the third connecting strip are attached and fixed, the fourth connecting strip is parallel to the first connecting strip, and the fourth connecting strip and the first connecting strip are not in the second connecting strip. On the same side of the connecting bar, a second connecting bolt is installed on the fourth connecting bar, and the second connecting bolt is used to install the decorative panel; the decorative panel is provided with a second connecting groove matching the second connecting bolt; the The third support component includes a fourth connection angle steel and a first stone pendant; the fourth connection angle includes a fifth connection bar and a sixth connection bar; the first stone pendant includes a first connection part and a first bending part; The fifth connecting strip is fixed in the middle of the lower vertical keel; the sixth connecting strip and the first connecting part are fitted and fixed, the first bending part is located at one end of the first connecting part and tilted upward, and the first bending part is for connecting stone panels; the fourth support component includes a fifth connecting angle steel, a sixth connecting angle steel, a support connector and a third connecting bolt; the fifth connecting angle steel includes a seventh connecting bar and an eighth connecting bar; The sixth connecting angle steel includes a ninth connecting bar and a tenth connecting bar; the seventh connecting bar is vertically installed on the upper part of the lower vertical keel; the eighth connecting bar and the ninth connecting bar are fitted together Fixed; the tenth connecting bar is parallel to the seventh connecting bar, and the tenth connecting bar and the seventh connecting bar are not on the same side of the eighth connecting bar; the supporting connecting piece includes a supporting connecting groove, a second connecting part and a Two bending parts; the support connection groove is installed on the upper end of the tenth connection bar; one end of the second connection part is connected to the support connection groove, The other end of the second connecting part is connected to the second bending part; one end of the second bending part is connected to the side surface of the tenth connecting bar; the third connecting bolt is installed on the second connecting part, the first Three connecting bolts are used to connect the stone panels; the middle vertical keel is vertically fixed by the first embedded part, the lower part of the middle vertical keel is connected with a third support component, and the upper part of the middle vertical keel is connected with a fifth support component, the third support component and the fifth support component respectively fix the upper end and the lower end of the stone panel in the middle; the upper keel is fixed on the top of the wall body A through the second embedded part, and a plurality of upper stone materials are connected to the upper keel Pendant; the top of the railing is fixedly connected to the upper keel.
作为优选,所述的第一预埋件有两个,第一预埋件包括第一预埋螺栓和第一预埋角钢;所述的第一预埋螺栓横向安装在墙体A上;所述的第一预埋角钢的一端固定在第一预埋螺栓上,第一预埋角钢的另一端连接中部竖向龙骨,第一预埋角钢和中部竖向龙骨之间采用焊接的方式进行固定。Preferably, there are two first embedded parts, and the first embedded parts include first embedded bolts and first embedded angle steel; the first embedded bolts are laterally installed on the wall body A; One end of the first embedded angle steel is fixed on the first embedded bolt, the other end of the first embedded angle steel is connected to the middle vertical keel, and the first embedded angle steel and the middle vertical keel are fixed by welding. .
作为优选,所述的第二预埋件包括第二预埋螺栓和第二预埋角钢;所述的第二预埋螺栓竖向安装在墙体A的顶部;所述的第二预埋角钢的一端固定在第二预埋螺栓上,第二预埋角钢的另一端连接上部龙骨,第二预埋角钢和上部龙骨之间采用焊接的方式进行固定。Preferably, the second embedded part includes a second embedded bolt and a second embedded angle steel; the second embedded bolt is vertically installed on the top of the wall body A; the second embedded angle steel One end of the second embedded angle steel is fixed on the second embedded bolt, the other end of the second embedded angle steel is connected to the upper keel, and the second embedded angle steel and the upper keel are fixed by welding.
作为优选,所述的第五支撑组件包括第七连接角钢、第八连接角钢和长螺栓;所述的第七连接角钢包括第十一连接条和第十二连接条;所述的第八连接角钢包括第十三连接条和第十四连接条;所述的第十一连接条焊接在中部竖向龙骨的顶部;所述的第十二连接条竖直设置且位于第十一连接条的左端;所述的第十三连接条通过螺栓固定连接在第十一连接条的上端面;所述的第十四连接条竖向安装在第十三连接条的左端上方;所述的长螺栓安装在第十四连接条上,长螺栓上固定连接石材面板和装饰面板,装饰面板位于石材面板的外侧。Preferably, the fifth support component includes a seventh connecting angle steel, an eighth connecting angle steel and a long bolt; the seventh connecting angle steel includes an eleventh connecting bar and a twelfth connecting bar; the eighth connecting bar The angle steel includes the thirteenth connecting bar and the fourteenth connecting bar; the eleventh connecting bar is welded on the top of the vertical keel in the middle; the left end; the thirteenth connecting bar is fixedly connected to the upper end face of the eleventh connecting bar by means of bolts; the fourteenth connecting bar is vertically installed above the left end of the thirteenth connecting bar; the long bolts It is installed on the fourteenth connecting strip, and the long bolts are fixed to connect the stone panel and the decorative panel, and the decorative panel is located on the outer side of the stone panel.
作为优选,所述的第一连接螺栓、第二连接螺栓和第三连接螺栓形状相同。Preferably, the first connecting bolt, the second connecting bolt and the third connecting bolt have the same shape.
作为优选,所述的石材面板和装饰面板连接处以及相邻的两块石材面板连接处均涂有耐候密封胶和防水涂层。Preferably, the connection between the stone panel and the decorative panel and the connection between the two adjacent stone panels are coated with weather-resistant sealant and waterproof coating.
作为优选,所述的栏杆的底部与上部龙骨之间通过螺栓固定连接。Preferably, the bottom of the railing and the upper keel are fixedly connected by bolts.
综上所述,本发明的技术效果是通过对各支撑组件对石材面板进行固定保证了安装的可靠性。第一调节槽的存在,使得底部的石材面板在进行安装时能进行小幅的调整,便于安装。第二连接螺栓的形状能有效的提高装饰面板安装的可靠性。第一折弯部的设计有利于提高石材面板的安装效率,同时又能兼顾安装的稳定性。支撑连接件使得第四支撑组件的受力更加均匀,有利于提高使用寿命。栏杆的连接方式简单可靠,便于安装,且安装连续性好,同时容易拆卸,总体成本低。To sum up, the technical effect of the present invention is that the reliability of the installation is ensured by fixing the stone panels to the respective supporting components. The existence of the first adjustment groove enables the stone panel at the bottom to be slightly adjusted during installation, which is convenient for installation. The shape of the second connecting bolt can effectively improve the installation reliability of the decorative panel. The design of the first bending portion is conducive to improving the installation efficiency of the stone panel, and at the same time, the stability of the installation can be taken into account. The support connector makes the force of the fourth support component more uniform, which is beneficial to improve the service life. The connection method of the railing is simple and reliable, easy to install, and the installation continuity is good, and at the same time, it is easy to disassemble, and the overall cost is low.
附图说明Description of drawings
图1为本发明的纵剖结构示意图。FIG. 1 is a schematic diagram of a longitudinal section of the present invention.
图2为第二支撑组件的结构示意图。FIG. 2 is a schematic structural diagram of the second support assembly.
图3为第三支撑组件的结构示意图。FIG. 3 is a schematic structural diagram of a third support assembly.
图4为第四支撑组件的结构示意图。FIG. 4 is a schematic structural diagram of a fourth support assembly.
图5为第五支撑组件的结构示意图。FIG. 5 is a schematic structural diagram of a fifth support assembly.
具体实施方式Detailed ways
如图1所示,一种石材幕墙的栏杆连接系统,该系统包括下部横向龙骨1、第一支撑组件2、下部竖向龙骨3、第二支撑组件4、第三支撑组件5,第四支撑组件6、石材面板7、装饰面板8、中部竖向龙骨9、第五支撑组件10、上部龙骨11、上部石材挂件12和栏杆13。下部横向龙骨1水平安装在墙体A的底部,下部横向龙骨1两端均对称安装有第一支撑组件2。第一支撑组件2包括第一连接角钢21和第一连接螺栓22。第一连接角钢21的一个侧面开有竖向的第一调节槽23,第一调节槽23内安装螺栓,通过螺栓将第一连接角钢21安装在下部横向龙骨1上。由于第一调节槽23的存在,使得底部的石材面板7在进行安装时能进行小幅的调整,便于安装。第一连接螺栓22安装在第一连接角钢21下部,第一连接螺栓22的下部形状由一个直槽连接一个燕尾槽构成,第一连接螺栓22的下部用于连接石材面板7。石材面板7有多块,石材面板7上设有与第一连接螺栓22的下部形状匹配的第一连接槽71。下部竖向龙骨3竖直固定在墙体A的室内和室外两侧,下部竖向龙骨3上连接有第二支撑组件4、第三支撑组件5和第四支撑组件6。通过对各支撑组件对石材面板7进行固定保证了安装的可靠性。As shown in Figure 1, a railing connection system for stone curtain wall, the system includes a lower
如图2所示,第二支撑组件4位于下部竖向龙骨3的下部,第二支撑组件4包括第二连接角钢41、第三连接角钢42和第二连接螺栓43。第二连接角钢41包括第一连接条411和第二连接条412。第三连接角钢42包括第三连接条421和第四连接条422。第一连接条411竖向固定连接在下部竖向龙骨3上,第二连接条412和第三连接条421贴合固定,第四连接条422与第一连接条411平行,且第四连接条422与第一连接条411不在第二连接条412的同一侧,第四连接条422上安装第二连接螺栓43,第二连接螺栓43用于安装装饰面板8。装饰面板8上设有与第二连接螺栓43匹配的第二连接槽81。第二连接螺栓43的形状能有效的提高装饰面板8安装的可靠性。As shown in FIG. 2 , the
如图3所示,第三支撑组件5包括第四连接角钢51和第一石材挂件52。第四连接角钢51包括第五连接条511和第六连接条512。第一石材挂件52包括第一连接部521和第一折弯部522。第五连接条511固定在下部竖向龙骨3中部。第六连接条512和第一连接部521贴合固定,第一折弯部522位于第一连接部521的一端并向上翘起,第一折弯部522用于连接石材面板7。第一折弯部522的设计有利于提高石材面板7的安装效率,同时又能兼顾安装的稳定性。As shown in FIG. 3 , the
如图4所示,第四支撑组件6包括第五连接角钢61、第六连接角钢62、支撑连接件63和第三连接螺栓64。第五连接角钢61包括第七连接条611和第八连接条612。第六连接角钢62包括第九连接条621和第十连接条622。第七连接条611竖直安装在下部竖向龙骨3的上部。第八连接条612和第九连接条621贴合固定。第十连接条622与七连接条611平行,且第十连接条622与七连接条611不在第八连接条612的同一侧。支撑连接件63包括支撑连接槽631、第二连接部632和第二折弯部633。支撑连接槽631安装在第十连接条622的上端部。第二连接部632的一端连接在支撑连接槽631上,第二连接部632的另一端连接第二折弯部633。第二折弯部633的一端连接在第十连接条622的侧面上。第三连接螺栓64安装在第二连接部632上,第三连接螺栓64用于连接石材面板7。支撑连接件63使得第四支撑组件6的受力更加均匀,有利于提高使用寿命。As shown in FIG. 4 , the
中部竖向龙骨9通过第一预埋件91竖向固定,第一预埋件91有两个,第一预埋件91包括第一预埋螺栓911和第一预埋角钢912。第一预埋螺栓911横向安装在墙体A上。第一预埋角钢912的一端固定在第一预埋螺栓911上,第一预埋角钢912的另一端连接中部竖向龙骨9,第一预埋角钢912和中部竖向龙骨9之间采用焊接的方式进行固定。中部竖向龙骨9的下部连接有第三支撑组件5,中部竖向龙骨9的上部连接有第五支撑组件10,第三支撑组件5和第五支撑组件10分别固定中部的石材面板7的上端和下端。The middle
如图5所示,第五支撑组件10包括第七连接角钢101、第八连接角钢102和长螺栓103。第七连接角钢101包括第十一连接条1011和第十二连接条1012。第八连接角钢102包括第十三连接条1021和第十四连接条1022。第十一连接条1011焊接在中部竖向龙骨9的顶部。第十二连接条1012竖直设置且位于第十一连接条1011的左端。第十三连接条1021通过螺栓固定连接在第十一连接条1011的上端面。第十四连接条1022竖向安装在第十三连接条1021的左端上方。长螺栓103安装在第十四连接条1022上,长螺栓103上固定连接石材面板7和装饰面板8,装饰面板8位于石材面板7的外侧。As shown in FIG. 5 , the
上部龙骨11通过第二预埋件111固定在墙体A的顶部,第二预埋件111包括第二预埋螺栓1111和第二预埋角钢1112。第二预埋螺栓1111竖向安装在墙体A的顶部。第二预埋角钢1112的一端固定在第二预埋螺栓1111上,第二预埋角钢1112的另一端连接上部龙骨11,第二预埋角钢1112和上部龙骨11之间采用焊接的方式进行固定。上部龙骨11上连接有多个上部石材挂件12。栏杆13的顶部固定连接在上部龙骨11上。栏杆13的底部与上部龙骨11之间通过螺栓固定连接。The
第一连接螺栓22、第二连接螺栓43和第三连接螺栓64形状相同。石材面板7和装饰面板8连接处以及相邻的两块石材面板7连接处均涂有耐候密封胶和防水涂层。The first connecting
本发明通过对各支撑组件对石材面板7进行固定保证了安装的可靠性。第一调节槽23的存在,使得底部的石材面板7在进行安装时能进行小幅的调整,便于安装。第二连接螺栓43的形状能有效的提高装饰面板8安装的可靠性。第一折弯部522的设计有利于提高石材面板7的安装效率,同时又能兼顾安装的稳定性。支撑连接件63使得第四支撑组件6的受力更加均匀,有利于提高使用寿命。栏杆13的连接方式简单可靠,便于安装,且安装连续性好,同时容易拆卸,总体成本低。The present invention ensures the reliability of installation by fixing the
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010494334.4A CN111705974B (en) | 2020-06-03 | 2020-06-03 | Railing connecting system of stone curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010494334.4A CN111705974B (en) | 2020-06-03 | 2020-06-03 | Railing connecting system of stone curtain wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111705974A true CN111705974A (en) | 2020-09-25 |
| CN111705974B CN111705974B (en) | 2021-09-10 |
Family
ID=72537583
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010494334.4A Expired - Fee Related CN111705974B (en) | 2020-06-03 | 2020-06-03 | Railing connecting system of stone curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111705974B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112211335A (en) * | 2020-11-09 | 2021-01-12 | 卓匈新材料科技(上海)有限公司 | A kind of matching structure of GRC hanging plate |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103321382A (en) * | 2013-07-19 | 2013-09-25 | 李秀风 | Connecting piece and construction method for mounting building decorative stone panel |
| CN106677387A (en) * | 2015-11-08 | 2017-05-17 | 重庆圣石牛建材有限公司 | Stone curtain wall provided with I-shaped seams |
| CN106812233A (en) * | 2017-03-12 | 2017-06-09 | 中国十七冶集团有限公司 | A kind of construction method of building abnormity wall decorative curtain wall |
| US9797131B1 (en) * | 2016-09-14 | 2017-10-24 | Stc Architectural Products, Llc | Mullion seal |
| CN207959633U (en) * | 2018-03-13 | 2018-10-12 | 浙江爱居装饰股份有限公司 | A kind of stone curtain wall |
| CN111139956A (en) * | 2020-01-17 | 2020-05-12 | 温州锐翔装饰工程有限公司 | Building curtain wall |
-
2020
- 2020-06-03 CN CN202010494334.4A patent/CN111705974B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103321382A (en) * | 2013-07-19 | 2013-09-25 | 李秀风 | Connecting piece and construction method for mounting building decorative stone panel |
| CN106677387A (en) * | 2015-11-08 | 2017-05-17 | 重庆圣石牛建材有限公司 | Stone curtain wall provided with I-shaped seams |
| US9797131B1 (en) * | 2016-09-14 | 2017-10-24 | Stc Architectural Products, Llc | Mullion seal |
| CN106812233A (en) * | 2017-03-12 | 2017-06-09 | 中国十七冶集团有限公司 | A kind of construction method of building abnormity wall decorative curtain wall |
| CN207959633U (en) * | 2018-03-13 | 2018-10-12 | 浙江爱居装饰股份有限公司 | A kind of stone curtain wall |
| CN111139956A (en) * | 2020-01-17 | 2020-05-12 | 温州锐翔装饰工程有限公司 | Building curtain wall |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112211335A (en) * | 2020-11-09 | 2021-01-12 | 卓匈新材料科技(上海)有限公司 | A kind of matching structure of GRC hanging plate |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111705974B (en) | 2021-09-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2016101414A1 (en) | Fence device capable of being quickly assembled and disassembled | |
| CN111287363B (en) | Open stone curtain hangs system futilely | |
| CN204174809U (en) | Super-high glass rib support suspension type hollow full glass curtain wall Glass Rib is refuted and is connect connecting structure | |
| CN108049554A (en) | Double-deck drop level furred ceiling and installation method | |
| CN119754464B (en) | Installation structure and construction method of stone curtain wall | |
| CN111705974A (en) | A railing connection system for stone curtain wall | |
| CN202658773U (en) | Bamboo-board curtain wall system | |
| CN214195149U (en) | Embedded unit curtain wall window easy to install and adjust | |
| CN211548254U (en) | Corner curtain wall upright post-free connecting structure | |
| CN111287356B (en) | Glass curtain wall's sunken wall body system of decorating | |
| CN111677158B (en) | An entrance column stone connection system for stone curtain wall | |
| CN211007217U (en) | Ceramic plate curtain wall dry-hanging system | |
| CN111287364B (en) | Component is hung futilely to open stone material curtain | |
| CN213268686U (en) | Indoor single-upright-rod double-sided dry hanging structure | |
| CN210867045U (en) | Support frame for cable bridge | |
| CN109518852B (en) | Lattice aluminum plate curtain wall connection structure | |
| CN2533360Y (en) | Grate type electric cable bridge support | |
| CN202466898U (en) | Holohyaline self-balance glass curtain wall | |
| CN219528082U (en) | Open stone curtain wall construction system | |
| CN220058643U (en) | Wood grain board wall surface system | |
| CN222541954U (en) | A tool-type operating platform for facade construction | |
| CN111270799A (en) | Hidden frame glass curtain wall | |
| CN222701298U (en) | Energy-saving heat-preserving closing-up structure for bottom of curtain wall | |
| CN216405866U (en) | Open type crossbeam-free quartz stone porcelain plate curtain wall system | |
| CN211523852U (en) | Wall culture stone mosaic structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20210820 Address after: Room 1301, unit 1, building 1, Dongfeng Jiayuan, Feiyun street, Ruian City, Wenzhou City, Zhejiang Province Applicant after: Wang Congxiang Address before: Room 1301, unit 1, building 1, Dongfeng Jiayuan, Feiyun street, Ruian City, Wenzhou City, Zhejiang Province Applicant before: Wenzhou Ruixiang Decoration Engineering Co.,Ltd. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240218 Address after: Room 111, Unit 0, Building 2, Qinglv Kuancheng No.1, east of Kaixuan Road and north of Fucheng Road, Kuancheng District, Changchun City, Jilin Province, 130051 Patentee after: Jilin Province Jufeng Building Decoration Engineering Co.,Ltd. Country or region after: China Address before: Room 1301, unit 1, building 1, Dongfeng Jiayuan, Feiyun street, Ruian City, Wenzhou City, Zhejiang Province Patentee before: Wang Congxiang Country or region before: China |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210910 |